Free Essay

Bore Pile Design

In:

Submitted By 13298830
Words 637
Pages 3
Further information:
Cementation Skanska skanska.co.uk/cementation cementation@skanska.co.uk

Bored Pile Retaining Walls

Application
Basement construction, road/ rail cuttings, underpasseses, cut-and-cover tunnels and portals, cofferdams, underground tanks , slope stabilisation. Systems available include secant and contiguous pile walls. King post walls can also be offered. The choice of system depends on a variety of factors including soil type, groundwater, retained height, deflections, propping arrangement, design life, etc.
Advantages
• Maximum underground space; with minimum bulk excavation
• Adaptable to complex wall layouts
• Control of ground movements and groundwater • Wide range of wall thicknesses and capability
• Can be installed in restricted working space.
• Can be designed to carry long term vertical loads
• Cost and time saving plus health and safety benefits when combined with patented Cementation precast guide/capping beam. Large and small diameter bored cast-in-place piles are often used to construct efficient and economic temporary or permanent retaining walls. These walls are suitable for deep basements, underpasses, tunnel portals and other underground structures particularly where working space is limited and adjacent structures require support. They minimise bulk excavation and help to control ground movements and groundwater ingress.
Three distinct bored pile wall systems are in current use:
• Contiguous pile wall
• Secant pile wall – hard/soft or hard/firm
• Secant pile wall – hard/hard
The choice of system depends on a number of factors. These include soil type, ground water profile, retained heights, available construction time, propping arrangement, cost and design life.
Piles can be constructed using cased rotary or continuous flight auger (CFA) methods. Where working space is limited, minipiling techniques

24/09/09 Rev 7

may be appropriate. Pile diameters up to 1200mm are commonly used. Larger diameters can be installed with rotary piling equipment. Maximum pile depths of 29m are possible with CFA Greater depths generally require rotary piling.
Bored pile walls can be combined with our patented precast guide wall/capping beam system to secure health and safety, cost, and programme benefits. Contiguous Pile Wall

Contiguous piles are suitable where the groundwater table is below excavation level. It is normally the most economic and rapid option. The wall consists of discrete piles typically installed at centres 150mm greater than their diameter, leaving gaps where soil is exposed during excavation.

Permanent works applications therefore generally require an additional reinforced concrete lining to secure exposed soil, and resist long term groundwater pressures.

Secant Pile Wall – Hard/Soft or
Hard/Firm

Where short term water retention is required this system offers the most cost-effective and rapid solution. The wall consists of interlocking bored piles. Primary piles are constructed first using a 'soft' cement-bentonite mix (commonly 1N/ mm2) or 'firm' concrete (commonly 10N/mm2).
Secondary piles, formed in structural reinforced concrete, are then installed between the primary piles with a typical interlock of 150mm. These walls may need a reinforced concrete lining for permanent works applications, depending on the particular requirements of the project.

Secant Wall – Hard/Hard

Hard/hard wall construction is very similar to a hard/firm wall but in this case the primary piles are constructed in higher strength concrete and may be reinforced. Heavy duty rotary piling rigs, using tools fitted with specially designed cutting heads, are necessary to cut the secondary piles.
Since structural concrete is used throughout there may be no need to provide a lining wall. The end product provides a fully concreted face and can be an effective alternative to diaphragm wall construction. 24/09/09 Rev 7

Design
Cementation Skanska provide a full design and construction service engineered by a highly experienced in-house design department. We can also operate on a build-only basis to the Client’s specification. Our expertise enables us to offer early contractor involvement, helping our clients to develop and assess a range of practical and economic solutions.

Similar Documents

Free Essay

Carrying Out a Site Investigation

...and the other at the south (Hampton) Both landscapes may differ however this should not affect the way each site investigation is carried out. Currently Hampton has been under redevelopment for the past 15 years, as it was previously used as a quarry to store unused rocks and bricks for the brick industry, where as the site in Eye Village is a standard brown field site that is just run down and disused. Task 1: A site investigation describes the process of carrying out investigations on land to determine whether there is contamination present and to collect sufficient, suitable data for the purpose of risk assessment. Moreover it is a study of a sites state of affairs to determine their probable influence of the external and internal design and structure If a site investigation was not taken place, for landscape, drainage or vegetation such as tree preservation order (TPO) reasons, the build may not physically be able to commence, Also a huge risk of health and safety issues can take place if this investigation was ignored. The investigation is normally carried out in several stages. These stages range from a desk study and simple visual inspection to a full intrusive investigation using trial pits and boreholes etc and the sampling and analysis of materials. The first is a desk top survey this is completed by collating as much information about the site as possible whether it is the structure,...

Words: 3464 - Pages: 14

Free Essay

Global Warming

...INTRODUCTION DESIGN AND CONSTRUCTION OF DEEP FOUNDATIONS Have been used since prehistoric times Wooden poles/piles to support the home near the lake in Switzerland 12,000 years ago Pile-supported huts in lagoons around the shores of lake in R. Ayothiraman R A thi Department of Civil Engineering Indian Institute of Technology Delhi New Delhi – 110 016. E-mail: araman@civil.iitd.ac.in Venezuela V l In early years, primarily used to bye-pass the water depth and soft soil layer even for lightly-loaded buildings Commonest Function: To transfer the load that cannot be adequately supported at shallow depths to a depth where adequate support becomes available. FUNCTIONS OF PILES • • • • • • • To carry the superstructure loads (both vertical and lateral) into/ through a soil stratum. To resist large uplift force and/or overturning moments To compact loose, cohesionless deposits -- a combination of pile volume displacement and driving vibrations (piles is withdrawn later) To control settlements when spread footing/mat is on a marginal soil/highly compressible soil To stiffen the soil beneath the machine foundations – to control both amplitudes and natural frequency of the system Provides additional safety factor beneath bridge abutments/piers, if scour is a potential problem Piles in offshore – load transfer thro’ water into underlying soil – partially embedded pile -- to vertical (buckling) and lateral load) Use of piles Effect of relation between foundation width and pile length on...

Words: 4712 - Pages: 19

Free Essay

Soil Dynamics

...Course Teacher: Dr. Md. Mokhlesur Rahman Professor Department of Civil Engineering DUET Soil Dynamics: Soil Dynamics is the branch of soil mechanics which deals with the engineering properties and behavior of soil under dynamic stress, including the analysis of the stability of earth supported and earth retaining structures. The study of Soil dynamics include the machine foundations, impact loadings, dynamic soil properties, slope stability, bearing capacity, settlement, vibratory compaction, pile driving analysis and field testing, ground anchor systems, seismic design parameters, liquefaction, sheet pile walls and laboratory testing. Nature/sources of types of dynamic loading: * Dynamic loads on foundation and soil structure may act due to * Earthquake * Bomb blast * Operation of reciprocating and rotary machines and hammers * Construction operation such as pile driving * Quarrying * Fast moving traffic including landing aircraft * Wind * Loading due to wave action of water * Etc * The nature of each of these loads is quite different from the nature of the loads in the other cases. * Earthquakes constitute the single most important source of dynamic loads on structures and foundation. * Every earth quake is associated with a certain amount of energy released at its source and can be assigned a magnitude (m) which is just a number. * Table gives an idea of the energy associated with a particular...

Words: 15647 - Pages: 63

Free Essay

Soil Investigation

...Soil investigation is often neglected or rejected by most clients on the basis of cost, despite the fact that the cost of carrying out a soil investigation is very little compared to the cost of the project Soil investigation is done for various purposes. In engineering, soil investigation is very necessary. It is essential to investigate the soil of the selected plot on which a structure will be constructed. Based on soil investigation a soil report is prepared for the purpose of designing the building foundation. When an engineer designs building foundation he/she must carefully read the report and design the foundation based on the data provided in the report. Soil investigation is required for the following purposes - To know the allowable bearing capacity of foundation for proposed building. To know the depth and type of foundation for the proposed building. To know the allowable passive resistance for the foundation of proposed building. To know the type, grading and nature of soil. To know the ground water level. Typical steps of soil investigation Soil investigation involves following steps –  Details planning for the sequence of operations.  Collecting the samples of soil from the plot.  Determining the soil characteristics by conducting field tests.  Study the condition of ground water level.  Collecting ground water sample for chemical analysis.  Soil exploration.  Testing all collected samples in the laboratory.  Preparation of drawings...

Words: 1233 - Pages: 5

Free Essay

Tunnels

...The Channel Tunnel (French: le tunnel sous la Manche), widely recognized as one of the world’s greatest civil engineering projects, is a 50.5km underwater rail tunnel connecting Folkestone, Kent in the UK with Coquelles, Pas-de-Calais in France under the English Channel. Even though it began construction in 1988 and was opened in 1994, the idea to have a cross-channel tunnel was first mooted more than 200 years ago but did not materialize due to political, national security and cost considerations. However, with the tremendous increase in traffic growth, better and alternative means of communication, convenience and speed was necessary and hence the need for an alternative transport route was clearly evident. The need for such tunnel was further compounded with Britain joining the European Community and the cross-channel traffic doubling in the last 20 years (leading to the project), reflecting improved trading between the Britain and rest of Europe. The Channel Tunnel would also be able to provide an alternative competitive link between the transportation systems of the UK and France, providing both speed and reliability to freight deliveries. With the strong endorsement from the governments of both sovereigns, the decision to build the Channel Tunnel was thus made. In April 1985, the British and French governments issued a formal invitation to potential tenderers for the fixed Channel link and eventually the contract was awarded to the consortium Channel Tunnel Group Limited-...

Words: 5274 - Pages: 22

Premium Essay

Pancake Theory

...Introduction/Synopsis 1. The Story Behind Pancake Theory (the collapse of WTC; what happened and involved) 2. What is the Pancake Theory (how and why did it happened?) 3. Conspiracies (other causalities?) 4. Conclusion 5. References http://911research.wtc7.net/wtc/analysis/design.html http://www.popularmechanics.com/technology/military/news/debunking-911-myths-world-trade-center#damage http://architecture.about.com/od/disastersandcollapses/a/twintowerfall.htm http://www.tms.org/pubs/journals/jom/0112/eagar/eagar-0112.html http://911review.com/articles/griffin/nyc1.html 1. The Story behind Pancake Theory (The Collapse of WTC) On September 11, 2001, the twin towers of the World Trade Center (WTC) collapsed due to a terrorists’ attack affiliated with al-Qaeda. It hijacked four commercial passenger jet airliners and flying one into the North Tower and another into the South Tower. The major events include the following: * The airplane impact with damage to the columns. * The ensuing fire with loss of steel strength and distortion. * The collapse, which generally occurred inward without significant tipping. Some features that lead to the analysis of the collapse. * The towers fell faster than they could have if they were crushing themselves. * The volume of dust was too great to have been the product of a gravity-driven collapse. * The South Tower's top shattered before falling, and so its breakup was not a result of gravity-driven crushing...

Words: 1445 - Pages: 6

Premium Essay

Dac Test Document

...BRE Building Elements Foundations, basements and external works Performance, diagnosis, maintenance, repair and the avoidance of defects H W Harrison, ISO, Dip Arch, RIBA P M Trotman BRE Garston Watford WD25 9XX Prices for all available BRE publications can be obtained from: CRC Ltd 151 Rosebery Avenue London, EC1R 4GB Tel: 020 7505 6622 Fax: 020 7505 6606 email: crc@construct.emap.co.uk BR 440 ISBN 1 86081 540 5 © Copyright BRE 2002 First published 2002 BRE is committed to providing impartial and authoritative information on all aspects of the built environment for clients, designers, contractors, engineers, manufacturers, occupants, etc. We make every effort to ensure the accuracy and quality of information and guidance when it is first published. However, we can take no responsibility for the subsequent use of this information, nor for any errors or omissions it may contain. Published by Construction Research Communications Ltd by permission of Building Research Establishment Ltd Requests to copy any part of this publication should be made to: CRC Ltd Building Research Establishment Bucknalls Lane Watford, WD25 9XX BRE material is also published quarterly on CD Each CD contains BRE material published in the current year, including reports, specialist reports, and the Professional Development publications: Digests, Good Building Guides, Good Repair Guides and Information Papers. The CD collection gives you the opportunity to build a comprehensive library...

Words: 167696 - Pages: 671

Free Essay

Mode Bill 2012

...ARCHITECTURAL SERVICES DEPARTMENT MODEL BILLS OF QUANTITIES FOR BUILDING WORKS The Government of The Hong Kong Special Administrative Region Architectural Services Department Quantity Surveying Branch Queensway Government Offices 66 Queensway Hong Kong 2012 EDITION CONTENTS Demolitions and Alterations Piling and Caissons Diaphragm Walling Excavation Underpinning Concrete Works Brickwork and Blockwork Drainage (including Underground Pipe Ducts) Waterproofing Stone Works Roof Tiling Wood Works Ironmongery Steel and Metal Works Plastering and Paving Plumbing and Water Supply Systems Glazing Painting Landscaping External Works Electrical Installation Air Conditioning Installation Fire Service Installation Low Voltage Cubicle Switchboards Installation Diesel Generating Sets Installation Uninterruptible Power Supply System Broadcast Reception Installation Compressed Air System Steam Boiler System Liquefied Petroleum Gas Installation Fuel Supply System Swimming Pool Water Treatment Installation MODBQ.1/1 MODBQ.2/1 MODBQ.3/1 MODBQ.4/1 MODBQ.5/1 MODBQ.6/1 MODBQ.7/1 MODBQ.8/1 MODBQ.9/1 MODBQ.10/1 MODBQ.11/1 MODBQ.12/1 MODBQ.13/1 MODBQ.14/1 MODBQ.15/1 MODBQ.16/1 MODBQ.17/1 MODBQ.18/1 MODBQ.19/1 MODBQ.20/1 MODBQ.21/1 MODBQ.22/1 MODBQ.23/1 MODBQ.24/1 MODBQ.25/1 MODBQ.26/1 MODBQ.27/1 MODBQ.28/1 MODBQ.29/1 MODBQ.30/1 MODBQ.31/1 MODBQ.32/1 6 22 3 8 4 18 7 12 10 7 3 23 8 22 30 19 5 10 7 19 27 55 30 9 5 4 10 6 10 9 7 14 Bill Nr. MODBQ.1 DEMOLITIONS AND ALTERATIONS DEMOLITIONS...

Words: 71251 - Pages: 286

Free Essay

Plumbing

...Plumbing Handbook A guide to working with Water Corporation As endorsed by Introduction This handbook has been produced by the Water Corporation to assist plumbers and builders to work with the Corporation and our regulators to deliver the best possible outcomes for our customers, by protecting public health, as well as public and privately owned assets. We recognise the need for government bodies, utilities and industry to work together to identify relevant areas of responsibility within the plumbing industry and the services delivered to the community. In addition to their customer obligations, plumbers also have statutory obligations in protecting water and sewerage infrastructure. Laws and Regulations relevant to Water Corporation’s operations and assets that set out these obligations are listed within this publication, to guide plumbers and builders to other documents they need to understand, when delivering plumbing services. Information provided within this handbook was accurate at the time of print. Content updates will be made to the online version as required, available at www.watercorporation.com.au go to Builders and Developers,Buildingand click on our Plumbing Handbook To be notified of updates to the handbook email building.services@watercorporation.com.au with Plumbing Handbook Updates in the subject line. ISBN 1 74043 565 6 January 2014 1 Plumbing Handbook Contents Definitions 4 Working with the Water Corporation ...

Words: 10574 - Pages: 43

Free Essay

Construction

...Q.1 Past site investigation reports are often very useful and can often save time and money in site investigations. The Geotechnical Information Unit of the Geotechnical Engineering Office(GEO) contains numerous records of boreholes from throughout the Territory, as will as useful records of landslides, rainfall and piezometric data, and laboratory test results on soil and rock samples. Relevant data can be readily accessed by geographical location of the site. Past construction records for both the site and for adjacent properties are useful for site investigation. Several government departments posses valuable information for the planning and execution of the site investigation. They are the Civil Engineering Department, Building Ordinance Office, Highways Department, Water Supplies Department, Drainage Services Department, and Architectural Services Department. Non-government agencies such as Mass Trainsit Railway Corporation and other utility companies can also provide valuable information on past construction records. Services records are also an essential part of the desk study, necessary to locate hidden services such as electricity cables, sewers and telephone wires. This in formation is usually provided free of charge by the relevant service provider. A suggested list of sources is: Water Supplies Department, Drainage Services Department, Mass Trainsit Railway Corporation, The Hong Kong Electric Company, Hong Kong & China Gas Company, all telecom company etc… Aerial photographs...

Words: 5262 - Pages: 22

Premium Essay

Sanitation

...mproving Sanitation in Coastal Communities with Special Reference to Puerto Princesa, Palawan Province, Philippines Table of Contents Acknowledgments (see below) Abstract (see below) Resumé (see below) Chapter 1 Introduction 1.1 Thesis Rationale 1.2 Goals and Objectives of the Thesis 1.3 Research Methodology 1.4 Scope and Limitations of the Study 1.5 Organization of the Thesis Chapter 2 General Scenario of Sanitation Problems in Coastal and Waterfront Communities--A Literature Review 2.1 Reasons for Settling on Coastal, Waterfront and Low-lying Areas 2.2 Sanitation Problems 2.3 Health and Environmental Conditions Chapter 3 Low-Cost Sanitation Systems used in Coastal and Waterfront Communities--A Literature Review 3.1 Available Low-Cost Sanitation Technologies 3.2 Sanitation Systems Used in Coastal and Waterfront Communities Chapter 4 The Case Study 4.1 Community Background 4.2 * Chapter 5 Results of Field Survey-- Analysis of Existing Sanitation in the Coastal Communities of Puerto Princesa 5.1 Basis of Analysis 5.2 Existing Environmental Sanitation 5.3 Health Condition and Observed Hygienic Practices related to Sanitation and Water Supply Chapter 6 Essential Factors for the Provision of Sanitation Systems in Coastal Communities 6.1 Considerations in the Provision of Sanitation Systems 6.2 Sanitation Systems Options Chapter 7 Conclusions and Recommendations 7.1 Summary of Existing sanitation Problems 7.2 Key Considerations in the Provision of...

Words: 26826 - Pages: 108

Free Essay

Book Writing Template

...Book Writing Template Dan Poynter Write "by-the-Numbers" Just Fill-in the Blanks Para Publishing, Santa Barbara Book Writing Template Remove the staples from this Template and insert the pages into a 3-ring binder. Separate the chapters, front matter and back matter with dividers. For details, see pages 77-78 in Writing Nonfiction: Turning Thoughts into Books. Build your book by filling in this template. You do not have to begin writing at the beginning. Start by filling in any information you have at this time. Once you have filled several pages, transfer the information to your computer. Then print out the pages, 3-hole punch them and replace the old pages in the binder. This guide may be used for fiction but it is specifically designed for nonfiction books. Also see Writing Your Book. Thinking/planning, writing and deciding on publishing: Get an agent, find a publisher or publish yourself. http://parapub.com/getpage.cfm?file=resource/writing.html The New Book Model, Text. http://parapub.com/getpage.cfm?file=newbook.html The New Book Model, Audio. http://www.jackstreet.com/jackstreet/RR.Newbookmodel.cfm (Wait for the sound to load) Does this system work? Thousands of published authors say YES! See the Success Stories at http://parapub.com/successstories.cfm? © Copyright 2005, Dan Poynter Para Publishing, Dan Poynter, PO Box 8206, Santa Barbara, CA 93118-8206, USA. Tel: (805) 968-7277, Fax: (805) 968-1379, http://ParaPublishing.com (Front Cover) For a list...

Words: 3836 - Pages: 16

Free Essay

This Paper Is Awesome

...Appendix B Construction, Mitigation and Reclamation Plans 1) Keystone Pipeline Project Construction Mitigation and Reclamation Plan 2) Standard Mitigative Measures for Construction, Operation and Maintenance of Western Facilities 3) Western Area Power Administration Construction Standards - Standard 13 Final EIS Keystone Pipeline Project KEYSTONE PIPELINE PROJECT CONSTRUCTION MITIGATION AND RECLAMATION PLAN Prepared By April 4, 2006 Rev. 3 CONSTRUCTION MITIGATION AND RECLAMATION PLAN 1.0 2.0 INTRODUCTION GENERAL CONDITIONS 2.1 Training 2.2 Advance Notice of Access to Property Prior to Construction 2.3 Other Notifications 2.4 Damages to Private Property 2.5 Appearance of Worksite 2.6 Access 2.7 Above-Ground Facilities 2.8 Minimum Depth of Cover 2.9 Threatened and Endangered Species 2.10 Non-Hazardous Waste Disposal 2.11 Hazardous Wastes 2.12 Noise Control 2.13 Weed Control 2.14 Dust Control 2.15 Off Road Vehicle Control 2.16 Fire Prevention and Control 2.17 Road and Railroad Crossings 2.18 Adverse Weather SPILL PREVENTION AND CONTAINMENT 3.1 Spill Prevention 3.2 Contingency Plans 3.3 Equipment 3.4 Emergency Notification 3.5 Spill Containment and Countermeasures UPLANDS (AGRICULTURAL, FOREST, PASTURE, RANGE AND GRASS LANDS) 4.1 Interference with Irrigation Systems 4.2 Clearing 4.3 Topsoil Removal and Storage 4.4 Grading 4.5 Temporary Erosion and Sediment Control 4.5.1 General 4.5.2 Sediment Barriers 4.5.3 Trench Plugs 4.5.4 Temporary Slope Breakers (Water...

Words: 25117 - Pages: 101

Free Essay

Advantages of Twiiter

...New South Wales Government Procurement System for Construction Space Procurement Practice Guide Building project elements July 2008 Procurement Practice Guide Procurement method selection Important notices Current version The current version of this Procurement Practice Guide is maintained on the Internet at: http://www.nswprocurement.com.au/Procurement-System-for-Construction/Reference-material/Procurementpractice-guides.aspx Amendments Refer to the Procurement Practice Guide Amendments Log which is available on the Internet at: http://nswprocurement.com.au/psc/ppg/amendments.aspx Copyright This work is copyright. Apart from any use as permitted under the Copyright Act 1968 (Cwlth), no part may be reproduced by any process without written permission. © NSW Government 2008 Requests and enquiries concerning reproduction and rights should be addressed to: NSW Procurement Client Support Centre: Telephone: 1800 NSW BUY (1800 679 289) Email: nswp_support@commerce.nsw.gov.au Using hyperlinks in this document This Procurement Practice Guide contains embedded hyperlinks and Uniform Resource Locators (URL). To follow a hyperlink or URL:   Right mouse click; and Select “Open in web browser” in the drop-down box. July 2008 ©NSW Government Page ii Building project elements Guidance notes  This guide is provided to assist with the preparation of GC21 tender schedules titled „schedule of information for “Schedule 3 – Progress Claims Worksheet”  This guide...

Words: 5739 - Pages: 23

Free Essay

A Day in Seguela

...A day in Seguela The blue helmet peacekeeper was not in his usual fatigue and bullet proof jacket today. He was taking his time off, enjoying the sunshine and long drive to Seguela a small town in the north of Cote d’Ivoire under control of the rebels. He started his journey late in the morning from Daloa. It’s a government held town almost in the centre of the war ravaged country. Busy as it could be. He hated rushing people, crowds and smog. As he slipped in to the leather slipper and came out of his room very early in the morning in his blue faded denim and sky blue half shirt, inhaled deeply the fresh and unpolluted air from last night’s heavy rain. The prospect of serene and tranquil Seguela curved a thin smile on his lips. By the hour the heat, the smog and the crowd will make it worse to stay in the bustling town. He felt the urge to flee as far as he could. Not until late in the morning he did so. Their convoy of three vehicles stopped at the market place in Vabua, an hour drive from Daloa to the north. Shahed was following his friend from the Engineers who was on the way to inspect the newly established camp location in Seguela. He has all the time till the evening to devour the countryside, breathe the fresh air and wonder at lush green. He even did not mind to opportunity shopping in this market place. Vabua market place is like a beehive made of thousand shanties, arrayed in ranks and files like the soldiers stand in the parade. Nearly dark narrow...

Words: 3555 - Pages: 15