Premium Essay

Cmit Final Project

In:

Submitted By mizhele
Words 626
Pages 3
CMIT376 FINAL PROJECT (250 points)

You are the network administrator for City Power & Light. CP&L has five different locations named Central, Northwest, Northeast, Southwest, and Southeast. The Central location has 500 client computers and two network servers. The Northwest and Northeast locations have approximately 75 client computers and one server computer each. The Southwest and Southeast locations have 100 client computers and one network server each. The diagram below illustrates the company’s network infrastructure. Each server is on a separate IPv4 subnet, using non-MS routers to provide access to other internal locations.

Subnetting Table (using a subnet mask of 255.255.255.0)

10.18.1.0 – Central Location – 250 users and server S1
10.18.2.0 – Central Location – 250 users and server S2
10.18.3.0 – Northwest Location – 75 users and server S3
10.18.4.0 – Northeast Location – 75 users and server S4
10.18.5.0 – Southwest Location – 100 users and server S5
10.18.6.0 – Southeast Location – 100 users and server S6

[pic]

All servers are Domain Controllers in the City Power & Light domain (called CPANDL.AD). The servers run Microsoft Windows Server 2008, Enterprise Edition. All client computers run Windows XP, Vista SP1, or Windows 7. City Power & Light also has a website maintained by their ISP called CPANDL.COM (http://www.cpandl.com).

Andy Ruth, director of CP&L, asked you to design a networking infrastructure for the company.

The requirements are: 1) All clients should obtain IP addresses automatically. Servers are configured with static IP addresses.

2) All workstation and server computers need name resolution capabilities to every server in the network. S2 can also be referred to by its alias TMRPT.

3) The Central location will have the only connection to the Internet (via their ISP). He wants all internal users to

Similar Documents

Premium Essay

Cmit 350 Final Project

...WAN Implementation with SOHO Skills Configuration Prepared for: University of Maryland University College Prepared by: Nathan Poole Table of Contents I. Springfield Site Device and STP Configurations II. Worchester Site Subnetting Configurations III. Boston Site Routing Protocol, Route Summarization and Topology Improvements IV. Sacramento Site VLAN, Routing on a Stick (ROS) and DHCP Implementation V. Los Angeles Site Management Technologies VI. xACME WAN - WAN Implementation and Secure Communications VII. Bibliography WAN Implementation with SOHO Skills Configuration I. Springfield Site Device and STP Configurations Problem Statement: The device hostnames on each switch are generic and default. They do not match the network topology device hostnames as delivered with the network architecture. Each switch and router must have the correct hostname configured per device. Switch>en Switch#config t Enter configuration commands, one per line. End with CNTL/Z. Switch(config)#Hostname SpringfieldSwitch1 SpringfieldSwitch1(config)# Switch>en Switch#config t Enter configuration commands, one per line. End with CNTL/Z. Switch(config)#Hostname SpringfieldSwitch2 SpringfieldSwitch2(config)# Switch>en Switch#config t Enter configuration commands, one per line. End with CNTL/Z. Switch(config)#Hostname SpringfieldSwitch3 SpringfieldSwitch3(config)# Switch>en Switch#config t Enter configuration commands, one per line. End with CNTL/Z...

Words: 1180 - Pages: 5

Free Essay

Learning from the Titanic

...Post-Mortem Hailmar Suranthe de Silva Overview • Snapshot • Understand what went wrong • Blame-game and performance evaluation • Factors during voyage • Learning from History • How it relates to the IT field Snapshot of circumstance... • Business case • • • • Safety and Luxury through new technology Unparalled Customer Experience 6 year construction and 2 year breakeven. 75% of revenue from first class – reflects in space allocation: 60% for 905 first-class and 7% for 1134 third-class Lavish attention and money substituted processes Marketing drive: ‘unsinkable ship’ Traditional safety (life-boats) given low priority Project Manager (Captain Smith) didn’t trust new methodologies (ice bucket test) • Implied non-functional requirements due to perception/assumptions • • • • • Over-confidence • Old School • Political Influence • • Project Sponsor (Bruce Ismay) High Expectations set – arrive a day early Snapshot of what happened... • Business and Economic pressures • • • • • • • Under-prepared (lack of equipment) and untrained crew – 83 of 900 were mariners Under-quality material substituted Untested processes/methods Traditional safety methods (life-boats) given low priority Safety: only mitigation by technology and no contingency/worst-case (life-boats) Testing: was maiden voyage Prove Titanic is the best ship even when grounded (Fatal) • Over-confidence • Decisions based on aesthetics and luxury compromised individual safety features • • • • • •...

Words: 903 - Pages: 4

Free Essay

Drroberr

...ENTRY STRATEGY INTO VIETNAMESE ENVIRONMENTAL MARKET A CASE STUDY OF ALTECH ENVIRONMENT PTE LTD by Dang Tran Bao Hanh A research study submitted in partial fulfillment of the requirements for the degree of Master in Business Administration Examination Committee Dr. Do Ba Khang (Chairman) Dr. Fredric W. Swierczek Dr. Lalit M Johri Nationality Vietnamese Previous degree Graduate Diploma in Business Administration SAV Program Scholarship Donor Government of Switzerland/ Swiss Agency for Development and Cooperation (SAV program) Asian Institute of Technology School of Management Bangkok, Thailand April, 2000 Acknowledgment It is a rare pleasure for me to express my profound gratitude and thanks to Dr. Do Ba Khang, advisor to this research, for his valuable guidance, explicit direction, and encouragement throughout this research. I also want to give my sincere thanks to Dr. Fred and Dr. Johri for serving as members of the examination committee together with their constructive and useful advice. My acknowledgements are due to Swiss - AIT - Vietnam Management Development Program and Swiss Government who gave me a great chance to participate in MBA study by providing financial support. My special thanks also go to the management of Altech Pte Ltd Company, especially Mr. Goh Boh Chung, for providing me helpful information and giving...

Words: 22837 - Pages: 92

Free Essay

Cmit 321 Final Exam

...CMIT 321 Final Exam Click Link Below To Buy: http://hwaid.com/shop/cmit-321-final-exam/ Written 2016 Attempt Score: 121 / 125 - 96.8 % Final Exam Question 1 1 / 1 point __________ is the exploitation of an organization's telephone, dial, and private branch exchange (PBX) system to infiltrate the internal network in order to abuse computing resources. a. War driving b. Line dialing c. PBX driving d. War dialing View Feedback Question 2 1 / 1 point __________ cryptography is the most common method on the Internet for authenticating a message sender or encrypting a message. a. Symmetric b. Hash-based c. Private-key d. Public-key View Feedback Question 3 1 / 1 point __________ is a lightweight Knoppix version cut to 50 MB for a business-card-sized CD. a. Gnoppix b. GeeXboX c. Morphix d. Damn Small Linux View Feedback Question 4 1 / 1 point The __________ utility tests the integrity of an ODBC data source. a. odbcping b. ASPRunner c. FlexTracer d. DbEncrypt View Feedback Question 5 1 / 1 point In the TCP/IP stack, the __________ layer is where applications and protocols, such as HTTP and Telnet, operate. a. Internet b. network c. transport d. application View Feedback Question 6 1 / 1 point Attackers can use a simple test to find out if an application is vulnerable to an OLE DB error. They can fill in the username and password...

Words: 4865 - Pages: 20

Premium Essay

Business Ingelligence Overview

...| Business Intelligence | Today, Tools and Tomorrow | | Team 5 | 10/12/2010 | Final PaperBusiness XXXX | Introduction Business Intelligence Today Business Intelligence has different meanings and uses to different people. If you were to look Business Intelligence up on Wikipedia it will tell you Business Intelligence, “refers to the computer based techniques used in spotting, digging-out, and analyzing business data…” and that it “often aims to support better business decisions”. Many people only think of the data needed to understand the competition and others think of BI as the information that is confidential to their business. Today Business Intelligence is all of this and so much more. Business intelligence used successfully can be a powerful tool utilized for competitive advantage. To ensure success, companies must understand the importance of accuracy in the data they have gathered together. If the data they have pulled together is not accurate then the information that will be used to make business decisions could potentially cause poor or misdirected decisions having huge negative impacts on their organizations. During a time when the economy has taken such a down turn this can make or break an organization. One industry where business intelligence is being utilized heavily is insurance. The insurance industry in the past few years has taken a huge hit on their credibility. To ensure competitive advantage they must utilize their BI to ensure...

Words: 4345 - Pages: 18

Premium Essay

Cmit 495 Implementation Plan

...World-Wide Trading Company: Project Implementation Plan Group 3 Kristine Bird (AD Forest Domain OU, Groups and GPO Implementation) Ryan Bonisch (Contact list and LAN Implementation Tasks) Anthony Campo (Configuration of Routers, Switches, and VLANs) Gerald Casanada (Voice VLAN, Wireless, DHCP and DNS) Jennifer Coleman (AD Implementation and Tasks lists for AD Policies) Billie Jo Derouin (Security Implementation) Raymond Mack (Security Technology and Timeline) University of Maryland University College CMIT 495 Professor Sam Musa February 28, 2016 Table of Contents Introduction 2 Purpose 3 Implementation Requirements 3 Project Contact List 3 Tool List 3 Equipment Installation Plan 5 Project TimeLine 6 Lan Implementation task 7 Security Implementation task 11 Configuration Routers 41 Switches 46 VLAN Configurations 49 Voice VLAN and Wireless 51 DHCP and DNS 54 Active Directory Implementation Task 56 Active Directory Policies 58 AD Forest Domain OU formation/AD Group Formation/AD GPO Implementation 68 Security Technologies 88 Introduction The implementation of the WWTC is crucial to keep the business functioning and growing. To ensure that new office installation goes smooth group 3 will create a functional implementation plan from the design we proposed to WWTC over the last 7 weeks. Purpose The purpose of this plan is to provide a step by step guide on the network designed proposed...

Words: 13687 - Pages: 55