Premium Essay

Definition of Em Completion

In:

Submitted By diezee
Words 1210
Pages 5
Office of Environmental Management Corporate Projects Initiative January 2003

Definition of EM Completion and DOE Site Closure
This fact sheet defines critical points in the cleanup process, specifies where the Office of Environmental Management (EM) programmatic responsibility ends, and clarifies the responsibilities of other Program Secretarial Offices managing a site after EM’s mission is complete. Accordingly, these definitions serve as the framework for developing or revising strategic plans, site baselines, and implementation plans.

Environmental Management (Cleanup) includes those activities necessary to evaluate and mitigate a release or threat of release of a hazardous substance that may pose a risk to human health or the environment. Cleanup activities may include source term remediation, facility disposition, ground water response measures, surface water response measures, and legacy waste management (e.g., transuranic and orphan waste disposition). The term cleanup is used interchangeably with the terms remedial action, removal action, response action, and corrective action. Response Action Completion occurs when a specific response attains its response action objective(s)/cleanup criteria such that no land use restrictions remain (e.g., contaminant concentrations reduced to acceptable, healthbased levels in ground water). EM Completion occurs when: 1) all required short-term response activities at a specific site are complete (e.g., soil excavation, cap construction, building decommissioning); 2) all required long-term response measures (e.g., ground water treatment systems) are constructed and determined to be operational and functional; 3) all necessary documentation is in place (e.g., engineering certifications/and verifications, post-closure or operating

permits, final site condition/configuration records); and 4) the site is

Similar Documents

Premium Essay

Benziger

...att Atkinson, ranch manager at Benziger Family Winery (BFW), was overseeing the development of the winery’s environmental management system (EMS). Matt was working with Chris Benziger, partner and national sales manager, to ensure that development of the EMS was consistent with BFW’s operational and strategic direction. It was February 2003 and Matt and Chris had already invested countless hours in the EMS, which was being developed with assistance from the California Environmental Protection Agency (Cal/EPA). Through its EMS winery pilot project, Cal/EPA hoped to design an EMS template that eventually could be made available to other wineries. Furthermore, Cal/EPA was attempting to develop a template that was consistent with ISO 14001, an internationally recognized standard for environmental management systems. Cal/EPA had selected BFW in June 2000 as one of two pilot wineries because of the winery’s proactive commitment to environmental policies and the significant environmental advances it had already made. Matt believed that considerable progress had been made on the company’s EMS. With Cal/EPA’s assistance, BFW had developed a formal environmental policy, identified and prioritized its environmental impacts, and established objectives and targets. However, there were still many steps to be carried out in establishing a full-fledged EMS. Further development would require time-consuming efforts in writing standardized operating procedures and in establishing document control...

Words: 7788 - Pages: 32

Premium Essay

Benziger Winery

...Substances Control had been the primary participants developing the system, the rest of the organization would have to become involved and staff training would be required. In light of the financial investments and time that would be required from management and employees, Matt and Chris had to decide whether to aggressively pursue ISO 14001 certification. The alternative was to continue to develop an EMS as time and resources permitted, leaving open the possibility of eventually pursuing ISO 14001 certification. M att Atkinson, ranch manager at Benziger Family Winery (BFW), was overseeing the development of the winery’s environmental management system (EMS). Matt was working with Chris Benziger, partner and national sales manager, to ensure that development of the EMS was consistent with BFW’s operational and strategic direction. It was February 2003 and Matt and Chris had already invested countless hours in the EMS, which was being developed with assistance from the California Environmental Protection Agency (Cal/EPA). Through its EMS winery pilot project, Cal/EPA hoped to design an EMS template that eventually could be made available to other wineries. Furthermore, Cal/EPA was attempting to develop a template that was consistent with ISO 14001, an internationally recognized standard for environmental management systems. Cal/EPA had selected BFW in June 2000 as one of two pilot wineries because of the winery’s proactive commitment to environmental policies and the significant...

Words: 8320 - Pages: 34

Free Essay

Emt Education Standards

...Pittsburgh, PA Contract Number DTNH22-90-C-05189 -------------------------------------United States Department of Transportation National Highway Traffic Safety Administration EMT-Basic: National Standard Curriculum i EMT-Basic: National Standard Curriculum Instructor's Course Guide ------------------------------------- CURRICULUM DEVELOPMENT GROUP James Bothwell, EMT-P National Flight Paramedics Association William Brown, RN, NREMT-P National Registry of Emergency Medical Technicians Ricky Davidson International Association of Fire Chiefs Karla Holmes, RN National Council of State EMS Training Coordinators Richard Judd, Ph.D., EMSI National Association of Emergency Medical Technicians Kathryn Lewis, RN, Ph.D. Phoenix College, Education Design Expert Paul Maniscalco National Association of Emergency Medical Technicians Susan McHenry National Association of State EMS Directors William Metcalf, EMT-P American College of Emergency Physicians Mary Beth Michos International Association of Fire Chiefs Joe Taylor, RN, Ph.D. Emergency Nurses Association Katherine West, RN, MS Infection Control Expert Roger...

Words: 36133 - Pages: 145

Premium Essay

Pert Mustang

...Second Trimester Session 2012/2013 GSM 5113 Operations Management Case Study: Car Restoration at BASS Prepared By: Risidaxshinni Kumarusamy GM05090 Mogna Priya Pindaya GM05082 Saraniya Gunasegaran GM05092 Prepared For: Assc. Prof. DrAzmawaniAbdRahman Date of Submission: 7th March 2013 Introduction Background of BASS Bennett Auto Sales and Service (BASS) sells and services several American and Japanese cars, and owns two auto parts stores, a large body shop, a car painting business and an auto salvage yard. The owner of BASS, David Bennett, built the business into a successful empire upon inheriting it from her father. Her motto is to “Sell em today, repair em tomorrow”, implying that repeat customers and high customer loyalty is their secret to success. Currently, Bennett is interested in expanding the business via restoration of vintage automobiles. In order to assess the practicability of this idea, she wants to restore her 1965 Shelby Mustang GT 350 to mint condition. The Mustang will serve as an advertisement for the new restoration business she plans to start and will be taken to auto shows and exhibits to attract business. The Mustang restoration project involves 22 activities (from A-V) and needs to be completed within 45 days so that the car can be displayed in an auto show at Detroit. Roberts wants the new business to appeal to both types of people, as follows: * For the first group, she envisions serving as parts broker for...

Words: 2928 - Pages: 12

Premium Essay

Essay

...What is Earnings Management? Earning Management is the use of the accounting techniques that helps managers make financial statements look better than they actually are. In the Earnings Wizardry, author talks about Earnings Management and the pressure that issuers and non-issuers face when they have to meet investors’ expectations. According to this article, one out of five U.S. CFO’s manipulate their company earnings legally by managing earnings to misrepresent economic performance of the company. Vincent Ryan in The Search for Suspect Accounting, gets a closer look at Earnings Management and talks not just definitions, which he said are a “cover-ups” during slowdowns in financial performance,” but also explains how managers can manipulate financial data and move items from balance sheet to the income statement by itemizing expenses and boosting income. AICPA states that Earnings Management is not a term, but it can occur when managers have opportunity to make accounting decisions and when they actually exploit those opportunities. All articles agree in one, Earnings Management is at manager’s discretion and financial data can be manipulated by the managers to mislead investors. Why practicing Earnings Management? Managers manipulate earnings because of internal and external pressure. There are number of reasons why managers do manipulate financial data and the biggest reason is to meet investor’s expectations. It is expected that managers will make their budgeted/estimated...

Words: 916 - Pages: 4

Free Essay

Job Analysis

...Functional Job Analysis Paramedic Characteristics The Paramedic must be a confident leader who can accept the challenge and high degree of responsibility entailed in the position. The Paramedic must have excellent judgement and be able to prioritize decisions and act quickly in the best interest of the patient, must be self disciplined, able to develop patient rapport, interview hostile patients, maintain safe distance, and recognize and utilize communication unique to diverse multicultural groups and ages within those groups. Must be able to function independently at optimum level in a non-structured environment that is constantly changing. Even though the Paramedic is generally part of a two- person team generally working with a lower skill and knowledge level Basic EMT, it is the Paramedic who is held responsible for safe and therapeutic administration of drugs including narcotics. Therefore, the Paramedic must not only be knowledge about medications but must be able to apply this knowledge in a practical sense. Knowledge and practical application of medications include thoroughly knowing and understanding the general properties of all types of drugs including analgesics, anesthetics, anti-anxiety drugs, sedatives and hypnotics, anti-convulsants, central nervous stimulants, psychotherapeutics which include antidepressants, and other anti-psychotics, anticholerginics, cholergenics, muscle relaxants, anti-dysrythmics, anti-hypertensives, anticoagulants...

Words: 8598 - Pages: 35

Premium Essay

Coordination

...INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT International Journal of Project Management 25 (2007) 150–157 www.elsevier.com/locate/ijproman Coordination mechanisms for construction supply chain management in the Internet environment Xiaolong Xue a,c,* , Yaowu Wang a,c , Qiping Shen b,c , Xiaoguo Yu a,d a c Department of Construction and Real Estate, School of Management, Harbin Institute of Technology, P.O. Box 1243, No. 13, Fayuan Street, Harbin 150001, China b Department of Building and Real Estate, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong, China National Center for Technology, Policy and Management, Science Park, Harbin Institute of Technology, No. 2, Yikuang Street, Harbin 150001, China d Harbin Institute of Technology, Shenzhen Graduate School, HIT Campus of Shenzhen University Town, XiLi, Shenzhen 518055, China Abstract The construction industry in general is characterized with high fragmentation, low productivity, cost and time overruns, and conflicts compared with other manufacturing industries. Supply chain management as an innovative management mode provides a new solution for resolving these problems from systems perspective. Coordination is the core issue to improve construction performance in construction supply chain (CSC). In this paper, the concepts of CSC and CSC management are defined. Furthermore, the inter-organization problems that effect CSC coordination are identified. Considering...

Words: 4614 - Pages: 19

Premium Essay

Srs Template

...Index : Technical Specification Sections Finalised by SRS Commiittee for Restructured APDRP under 11th Plan Page-1 Section – G1 :: General Technical requirements Sl. No. Title Page No. / Section No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Introduction Intent of specification Scope of work Other Services and Items Specific Exclusions Utility’s Current IT Infrastructure Arrangement by the Contractor Software tools Warranty, operational guarantee and system reliability with ‘on-site’ support Annual Maintenance Contract Price Loading for Evaluation of Bids Payment terms Project synopsis Bid Schedule Basic reference drawings Spares Time schedule Implementation schedule Quality assurance plan Qualifying requirements 2 of G1 2 of G1 4 of G1 19 of G1 23 of G1 23of G1 23of G1 24 of G1 24 of G1 26 of G1 26 of G1 27 of G1 27 of G1 27 of G1 27 of G1 27 of G1 28 of G1 28 of G1 28 of G1 29 of G1 Page-2 Section – G2 :: Technical specification requirements for Application Packages Sl. No. Title Page No. / Section No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Part-A – Essentially Required by most Utilities for setting up an IT backbone for collection of baseline data, Energy Accounting / Auditing and establishment of Customer care centers Introduction System Functionality Module : Meter Data Acquisition Module : Energy Audit Module : New Connection Module : Disconnection & Dismantling Module : GIS based customer Indexing and asset mapping Module...

Words: 90558 - Pages: 363

Premium Essay

Project Management

...University of Western Cape School of Business and Finance MAN620/ADM720 Project Management Lecture Session 1 : 26th January 2010       An introduction into project management with some history of project management and some contextual information. How project management has permeated almost all aspects of working life. The evolution of the project management context. Why and under what circumstances project management is used. What characterizes projects and differentiates them from other forms of management. Examples of projects – large medium and small. Chapter 1 - An Introduction to Project Management The Project Management Book of Knowledge (PMBoK) defines Projecy Management as “the application of knowledge, skills, tools and techniques to project activities to meet project requirements”. In the course outline we make the following statements with regard to what this course promises you engineering students. In the engineering environment, Project Management can be practiced either a stand-alone professional discipline or as an integral part of the delivery mechanism for engineering services. Either way, all engineers need a thorough understanding of Project Management theory, principles, practices, tools and techniques. This course has been structured to stimulate the interest of student engineers in the discipline of Project Management and to equip them with sufficient knowledge of the discipline to meaningfully participate in project work at an early stage. Many...

Words: 5880 - Pages: 24

Premium Essay

Mgcr 211 Notes

...September 9, 2013 Accounting is the information system which records, summarizes, and reports the underlying economic conditions of an entity. Financial accounting is used to report this information to external parties [managerial accounting is to use this information internally]. Financial statements are management’s report to owners. 3 profit-seeking entities: Sole proprietorship simple to establish, owner controlled Unlimited liability (no legal separation). All profits and losses belong to owner, report income on tax returns. Business ends if owner dies, can sell it. Easy and inexpensive to operate. No reporting requirements. Partnership simple to establish, shared control, broader skills and resources Two or more owner-managers. Want a formal agreement covering $ contributions, workload, withdrawals, decision-making. Each partner’s net income reported on his or her personal tax form. No tax advantage. General Partners: have unlimited liability (person A and B legally connected). Limited Partners: limited involvement, limited liability (LLP at the end of the name). Ends if the partners die or dissolve it, can try to sell your portion. Corporation Easier to transfer ownership, easier to attract investors, no personal liability, tax advantages possible. Separate legal entity from owners. Owners called shareholders. Limited liability. Can only lose investment, not personal assets. Taxed separately from owners:...

Words: 3631 - Pages: 15

Premium Essay

Ent Coversheet This Form Should Be Completed, and Attached as the Cover of Each Piece of Assignment Submitted. Please Note Without the Cover Sheet Your Assignment Cannot Be Marked. Student Name: Atrinath Bhattacharya

...marked. STUDENT NAME: ATRINATH BHATTACHARYA PROGRAMME START DATE: 16/06/2013 PROGRAMME TITLE: 3HRC COURSE LOCATION: DUBAI PERSONAL TUTOR: MARK FIELDER ASSIGNMENT TITLE: 3HRC ( 1st Submission ) SUBMISSION: (delete) 1ST 2ND Extension DATE OF SUBMISSION: 24/07/2013 Before submitting your work to www.bradfield.co.uk please read the following statements and tick the appropriate box to show that you have understood and completed what is required. 1. I have read my work through and have checked it for spelling and grammatical errors using, where appropriate the spell and grammar checker on the computer. 2. I have written my name at the top of each page of my work and have numbered each page. 3. I have read the definition of plagiarism. I realise that plagiarism is cheating and can confirm that the assignment I am submitting is my own work. Y Y Y l ‘Plagiarism is the act of presenting the ideas or discoveries of another as one’s own. To copy sentences, phrases or even striking expressions without acknowledgement in a manner which may deceive the reader as to the source is plagiarism; to paraphrase in a manner which may deceive the reader is likewise plagiarism. Where such copying or close paraphrase has occurred the mere mention of the source in a bibliography will not be deemed sufficient acknowledgement; in each instance it must be referred specifically to its source. FOR OFFICE USE ONLY Date Received: Date sent for Assessment: V1...

Words: 4683 - Pages: 19

Free Essay

So Rules 2013

...ANATOMY AND PHYSIOLOGY- 2013 Draft v4 7-3-12 1. DESCRIPTION: Understand the anatomy and physiology of the nervous, excretory and digestive system. A TEAM OF UP TO: 2 APPROXIMATE TIME: 50 Minutes 2. EVENT PARAMETERS: Each team may bring only one 8.5" x II" two-sided page of notes that contain information in any form from any source and up to 2 non-programmable, non-graphing calculators. 3. THE COMPETITION: Students should know the basic anatomy and physiology of the nervous, excretory and digestive systems and how aging and specific diseases affect them. Process skills expected may include data collection, making observations, inferences, predictions, calculations, analyses and conclusions. The test may include various formats (e. g., timed stations, written test, PowerPoint slides, anatomical specimens, etc.) for the following topics: a. DIGESTIVE SYSTEM - All levels should know: 1. Functions ofthe digestive system 11. Basic anatomy of the component parts of the alimentary canal and accessory organs of digestion iii. Anatomy of the four layers ofthe wall of the alimentary canal IV. Comparison of the lining of the esophagus, stomach, small intestine and large intestine v. Compare and contrast mechanical and chemical digestion vi. Physiology of chemical digestion of proteins, fats and carbohydrates vii. The effects of exercise on the digestive system viii. The diseases on each level from the cell to the whole person as listed: stomach & duodenal ulcers, cancers of the digestive...

Words: 20546 - Pages: 83

Premium Essay

Solid Waste Management for Small Hotels

...SOLID WASTE MANAGEMENT FOR SMALL HOTELS JESSICA MOULD OKANAGAN COLLEGE Introduction Tourism is “one of the world’s fastest-growing industries”; as of 2012, “global tourism accounts for 1.2 trillion dollars (USD) in exports annually, 9% of worldwide GDP and is responsible for one out of every 12 jobs” [ (Canadian Tourism Commission, 2013) ]. Ninety percent of hotels worldwide are small hotels, e.g. hotels with less than 50 rooms (Radwan et al., 2010, p. 179). This essay addresses the problems associated with solid waste produced by the hotel industry including the difficulties faced by small hotels in managing their solid waste and ultimately describes benefits and solutions for sustainable waste management by small hotels. Waste minimizatioin is priority area 1 on Agenda 21 for the Travel and Tourism Industry [ (Stipanuk, 2006, p. 89) ]. The objective of priority area 1 is “to minimize resource inputs, maximize product quality, and minimize waste outputs” [ (Stipanuk, 2006, p. 89) ]. Waste is defined as “unused material produced as a result of inefficient production and/or consumption practices” that “puts economic and environmental costs on society through its collection, treatment and disposal” (Radwan et al., 2012, p. 535). “Waste can be regarded as a human concept as there appears to be no such thing as waste in nature” where “waste products created by a natural process or organism quickly become the raw products used by other processes and organisms”(Full Cycle...

Words: 3022 - Pages: 13

Premium Essay

Timbuk

...tions and supply competitive dim chain strategy. ensions of opera Identify order tions and supply winners and or chain strategy. der qualifiers. See how strategy is implemented through operatio Introduce the co ns and supply ch ncepts of risk as ain activities. sessment and mi Show how prod tigation. uctivity is me asured and ho supply chain pr w it relates to ocesses. operations and Chapter Outlin e 25 Mi ssi on St at em en ts wi th As pir at ion s be yo nd Ma 26 A Su sta ina kin g a Pr of it ble Op er at ion s an d Su pp ly Ch ain St rat eg y 28 W ha t Is Op er at ion s an d Su pp ly Ch ain Competitive Dim St rat eg y? ensions The Notion of Trade-Offs Order Winners and Order Qualifi ers: The Marketing–O perations Link Operations and Sustainability defi ned Triple bottom line defined supply chain str ategy defined Operations eff ectiveness defi ned Straddling defi ned Order winner defi ned Order qualifier defined e Ris k As so cia system maps defi ned te d wi th Op er at ion s an d Framework Su pp ly Ch ain St rat eg ies 37 Pr od uc tiv ity Supply chain risk Me as ur em en defined t Risk Managem ent 33 St rat eg ies Ar e Im ple me nt ed Us ing Op IK EA ’s St rat eg er at ion s an d y Su pp ly Ch ain Ac tiv iti es — 35 As se ssi ng th Activity- 39 Su mm ary 43 Ca se : Th e Ta o of Tim bu k2 Productivity defi ned WALKTHROUGH xvii Opening Vignettes Each chapter opens with a short vignette to set the stage and help pique students’ interest in the...

Words: 3267 - Pages: 14

Free Essay

Flow Shop Scheduling Problem

...A Comparison of Solution Procedures for the Flow Shop Scheduling Problem with Late Work Criterion Jacek Błażewicz *) Erwin Pesch 1) Małgorzata Sterna 2) Frank Werner 3) *) Institute of Computing Science, Poznań University of Technology Piotrowo 3A, 60-965 Poznań, Poland phone: +48 (61) 8790 790 fax: +48 (61) 8771 525 blazewic@sol.put.poznan.pl Institute of Information Systems, FB 5 - Faculty of Economics, University of Siegen Hölderlinstrasse 3, 57068 Siegen, Germany pesch@fb5.uni-siegen.de Institute of Computing Science, Poznań University of Technology Piotrowo 3A, 60-965 Poznań, Poland Malgorzata.Sterna@cs.put.poznan.pl Faculty of Mathematics, Otto-von-Guericke-University PSF 4120, 39016 Magdeburg, Germany Frank.Werner@mathematik.uni-magdeburg.de 1) 2) 3) 1 A Comparison of Solution Procedures for the Flow Shop Scheduling Problem with Late Work Criterion Abstract In this paper, we analyze different solution procedures for the two-machine flow shop scheduling problem with a common due date and the weighted late work criterion, i.e. for problem F2 | dj = d | Yw, which is known to be binary NP-hard. In computational experiments, we compare the practical efficiency of a dynamic programming approach, an enumerative method and a heuristic list scheduling procedure. Test results show that each solution method has its advantages and none of them can be rejected from the consideration a priori. Keywords: flow shop, late work, dynamic programming, enumerative...

Words: 9053 - Pages: 37