Versova -Andheri – Ghatkopar MRTS Mumbai Metropolitan Region Development Authority

Sheet 1 of 9 Revision R1

MASS RAPID TRANSIT SYSTEM (MRTS) VERSOVA- ANDHERI- GHATKOPAR CORRIDOR MUMBAI –INDIA

EXECUTIVE SUMMARY MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY BANDRA KURLA COMPLEX, BANDRA( E), MUMBAI 400 051
Fax: 2659 1246 EPBX: 2659 001-08
Email:- mmrda@giasbom01.vsnl.net.in Web : http://www.mmrdamumbai.org

C:\Documents and Settings\Administrator\My Documents\Web tenders\EXECUTIVE SUMMARY.doc

EXECU

Versova -Andheri – Ghatkopar MRTS Mumbai Metropolitan Region Development Authority

Sheet 2 of 9 Revision R1

1.0

Background
Greater Mumbai, the capital of Maharashtra, the financial capital of India is the heart of commercial and trade activities of the country. The Island City of Mumbai is experiencing rapid growth in economic activity and suburbs are growing faster than the Island City in terms of population distribution and activity location. The city with its present population of over 12 million generates about 14 million trips in a day, with about 88 percent of the total trips catered by the suburban railway and the public transport bus service provided by BEST. The ever growing vehicular and passenger demands coupled with constraints on capacity augmentation of the existing network have resulted in chaotic conditions during peak hours of the day.

Greater Mumbai has always had the distinction and advantage of a high modal share (88%) in favour of a public mass transport system. The role of existing Suburban Rail Services is extremely important in the life of people of Greater Mumbai. The system carries about 6 million passengers every day. The existing suburban rail network serves the South – North traffic very efficiently. For East-West traffic, however, there is an urgent need for efficient, fast and environment friendly public transit system. To augment the capacity of the rail and road transport systems, several improvement works are now under implementation under the World Bank aided MUTP II. The emphasis is mainly on the railway corridor and improving east – west road connectivity. To supplement these efforts, GOM through MMRDA has embarked upon the ambitious MUIP with emphasis on road improvements & flyovers etc and works are under implementation. In the above context, the Government of Maharashtra has also been exploring the viability and suitability of various efficient, economical and environmental friendly mass transit systems such as Light Rail Transit (LRT), Rapid Rail Transit (RRT), electric trolley buses, etc. for the city travel needs. MMRDA was a nodal agency for detailed
C:\Documents and Settings\Administrator\My Documents\Web tenders\EXECUTIVE SUMMARY.doc

EXECU

Versova -Andheri – Ghatkopar MRTS Mumbai Metropolitan Region Development Authority

Sheet 3 of 9 Revision R1

feasibility study under the SMART Project (Selection of a MAss Rapid Transit System) for Mumbai. The study was carried out under the Indo-German Technical Co-operation by entrusting the consultancy work to TEWET in association with DE-Consult & TCS, during 1997-2000. The study recommended a mass transit corridor from Andheri to Ghatkopar as potentially bankable and economically viable, after examining a number of alternative corridors and alignments In the year 2003, MMRDA appointed M/s CES to review the recommended MRTS alignment by SMART Report and update the same. DMRC were appointed in 2003 to prepare the master plan for Mumbai metro , Andheri –Ghatkopar section has been extended to Versova as a part of the master plan

2.0

Alignment
The salient features of the recommended alignment for Versova - Andheri- Ghatkopar MRTS CES Report are as follows:

• • • •

Alignment Length – 11.443 km Branch line to Sahar Airport -1.265 km Car Depot - DN Nagar / Versova and / or Ghatkopar MRT Station Locations – Versova, D.N. Nagar, Azad Nagar, Andheri, WEH, Chakala, Airport Road, Marol Naka, Sakinaka, Subhash Nagar, Asalpha Road, Ghatkopar and Sahar Airport.

Versova Ch.0+045

Versova Car Depot

. Azad Nagar . Ch.2+280
D.N. Nagar Ch.1+360 Andheri Ch.0+045 WEH Ch.1+195 Airport Road Ch. 3+175 Chakala Ch. 2+438

Saki Naka Ch. 4+796

WESTERN RAILWAY
Sahar Airport Ch. 1+233

Marol Naka Ch.4+081 Subhash Nagar Ch. 6+207

Asalpha Road Ch. 6+897

MRTS Alignment Spur Line//Cardepot Line Car Depot Location MRTS Station Sub Stations

Ghatkopar Ch. 8+038

C:\Documents and Settings\Administrator\My Documents\Web tenders\EXECUTIVE SUMMARY.doc

EXECU

Versova -Andheri – Ghatkopar MRTS Mumbai Metropolitan Region Development Authority

Sheet 4 of 9 Revision R1

1. The alignment is fully elevated . It also cross the (Western Express Highway) WEH on elevated structures 2. All the station will have mid level concourse with adequate provisions of escalators. Lifts and other amenities for physically challenged persons. 3. Ghatkopar MRT Station will be located over central railway track for better integration with the existing sub-urban station. 4. All stations will have good interchange facilities with other modes of transport 5. The trains will have 4 coach composition fully vestibuled and air-conditioned 6. The system will have electric traction at 750 V DC (OHE) and modern 3 phase AC Technology which may be eventually replaced by 25 KV AC traction supply. 7. Three aspect of automatic colour light Signalling will be provided to regulate tram movement on the corridor. Section will be centrally controlled 8. Modern communication facilities are planned to be provided both at stations and on train. 9. Stations will be provided with automatic fare collection system and will be access controlled. 10. Adequate measures will be taken to protect the environment all along the corridor and provisions of sound barrier 11. safety and security of the commuters will be given the outmost consideration in system implementation 12. Each train will have two drivers with 4 coach composition. Salient features of the proposed Versova Andheri Ghatkopar MRTS is presented in the Table 1.0 below. Table 1.0 Salient feature for Versova Andheri Ghatkopar corridor Sl. No. 1. Item Route Length Figure for A-V-G Main Line – 11.443 km Airport line – 1.265 km Car-depot line – 0.45 km Total length 13.158 km 100 % 4.0% 100 m 5.5 m 13 90 D.N Nagar 22 m. 3.2 m.
EXECU

2. 3. 4. 5. 6. 7. 8. 9. 10.

Elevated alignment Maximum gradient Maximum curvature Minimum Clearance No. of stations Platform Length Car Depot Length Width of coach Ground

C:\Documents and Settings\Administrator\My Documents\Web tenders\EXECUTIVE SUMMARY.doc

Versova -Andheri – Ghatkopar MRTS Mumbai Metropolitan Region Development Authority

Sheet 5 of 9 Revision R1

3.0

Ridership Forecast
To appreciate the study area travel and traffic characteristics, extensive data related to Greater Mumbai has been collected from a number of sources viz. MMRDA, MCGM, Regional Transport Office, Census of India, Indian Railways, etc. and compiled. The data and information generated have been used in developing transport demand model to forecast future travel demand by using TRIPS software. In the present study, the MRT ridership has been assessed considering the impact of road improvements proposed under Mumbai Urban Infrastructure Project (MUIP) and proposed changes in the alignment & MRT Station locations and envisaged headway. The ridership figures are given in the table 2.0 below Table 2.0 Total Passenger Boardings on Versova -Andheri – Ghatkopar MRT Corridor Year 2008 2011 2021 2031 Hourly Ridership 38004 41067 53176 70603 Daily Ridership 475046 513338 664703 882533 PHPD 17356 18580 23321 30491

• • • •

PHPD – Maximum oneway peak hour flows The 3 slab distance based fare structure is proposed to adopted as under 8 km – Rs. 10/The above fare structure compares favorably with other modes of transport on the corridor.

4.0

System Technology
MRTS System Traffic study has estimated the maximum peak hour peak direction section load on the Versova -Andheri – Ghatkopar Corridor to be 17356 in 2008 and 30491 in the year 2031 respectively. A number of systems in operation all over the World including India have been studied and finally for this corridor, bottom supported flanged steel wheels on steel rail with standard gauge (1435 mm) MRT System is proposed due to its proven engineering superiority in suspension features, guidance, propulsion, switching and suitability compared to other systems.

C:\Documents and Settings\Administrator\My Documents\Web tenders\EXECUTIVE SUMMARY.doc

EXECU

Versova -Andheri – Ghatkopar MRTS Mumbai Metropolitan Region Development Authority

Sheet 6 of 9 Revision R1

Salient Features of System Technology Item Description Traction 750 V DC OHE Signaling Way side signals/ 3 aspect automatic colour lights signal Train control With Driver Ticketing system Auto Fare Collection Train Composition Four Coaches No. of Classes Single Class Environment Air Conditioned Max. Speed 80 kmph Average Speed 33 kmph Acceleration 1.1 m/sec2 Deceleration 1.2 m/sec2 Max. Rake requirement (2021) 14 nos. Frequency (2008) 5 min. (2031) 3 min Carrying Capacity/rake 1500 Pax. Total Journey Time 17 min Approx 5.0 Station Area Planning

The stations are an essential component of the entire MRT System since stations are the place where the users directly interact with the system. Salient Features The salient features provided for in the design of stations can be summed up as follows: • • • • • All stations are elevated. All stations are of side platform configuration except airport road which has an island platform configuration. Since all the stations have platforms at an average height of 12 to 13 m, concourse has been provided at an intermediate level which has ticketing and other facilities. All stations have been provided with escalators for accessing concourse and platform levels. Lifts have been provided for the physically challenged

6.0

Integration and Extendibility
Integration with the other modes of transport has been given due consideration as this will generate the traffic. Location of the stations plays very important role in this respect. Andheri and Ghatkopar stations have been integrated with suburban railway system to facilitate smooth Intermodal transfer of commuters. Integration with bus stops, taxi and rickshaw stands is taken into consideration.

C:\Documents and Settings\Administrator\My Documents\Web tenders\EXECUTIVE SUMMARY.doc

EXECU

Versova -Andheri – Ghatkopar MRTS Mumbai Metropolitan Region Development Authority

Sheet 7 of 9 Revision R1

7.0

Capital Cost and O&M Cost
The estimated cost of project as shown below in Table 3.0 is based on the proposed alignment and the economical system design as now proposed. Table 3.0 Estimated Capital Cost (Rs. in Millions) Item Civil Works OHE Traction Power Supply Signalling Telecom Ticketing E&M Equipment Depot Equipment Rolling Stock Environment Measure Sub-Total Preparation of DPR @ 2% Detailed Engineering Management @ 5% Financial charges @ 3% Sub-Total Land for the project Pre-construction planning expenses @ 1% Grand Total & Project Cost (at prices 2003) 4080 148 438 171 191 532 100 515 2060 29 8264 165 413 248 9090 530 83 9703

8.0

Economic Analysis The estimated cost of the Project is Rs 9703 million including other charges. The capacity augmentation cost and reinvestment cost is estimated at Rs 190 million and Rs 1988 million respectively. Similarly annual O&M cost is estimated at Rs 422.8 million and Rs 470.4 million in the year 2011 and 2021 respectively. These costs have been converted into economic costs by applying conversion factor of 0.90 so as to represent exclusion of taxes and duties which are considered transfer payments and costs relating to depreciation. The economic analysis of the base case is 18.27% with an NPV of Rs. 3035 M. at 12% rate of discount.

9.0

Environmental Screening
EXECU

C:\Documents and Settings\Administrator\My Documents\Web tenders\EXECUTIVE SUMMARY.doc

Versova -Andheri – Ghatkopar MRTS Mumbai Metropolitan Region Development Authority

Sheet 8 of 9 Revision R1

Preliminary screening of environment and social impacts of the proposed MRTS between Andheri and Ghatkopar was carried out including Environmental Legislations, ambient air quality, noise level, water bodies, ecology, heritage and aesthetic issues, sensitive receptors along the alignment etc. The detailed EIA Study will be carried out in due course. All necessary measures will be adopted to protect the environment along the corridor Rail based MRT system with electric traction is eco friendly by design.

10.0

Way Forward
Project Preparation and Risk Minimisation The project is proposed to be implemented on BOOT basis through Public Private Partnership. MMRDA have already reached following very important decisions in preparation for a BOOT/PPP implementation programme and have adopted a tender strategy which will minimize the risks, for the investors and make it attractive for potential BOOT operators.

• • • • • • • • • • •

The GoM’s necessary approvals have been obtained. MMRDA has setup Project Implementation Unit (PIU) for carrying out pre-requisite tasks prior to implementation of MRTS. Strategic legal planning by adopting Tramway Act to keep Government of Maharashtra’s Control over the project. Proper integration with existing and future rail, road and other modes of transport Inviting global tenders on BOOT/PPP basis to get access to modern technology, management skills and competitive finance Providing land free of cost for the Car Depot, ROW, stations and traction substations free of cost Relaxing normal Concession Period of 25 and extended to 35 years (including a maximum of 5 year Construction Period) Accepting responsibility for necessary Clearances and liaison with local agencies Adopting an open door policy to accept international modern technology and management philosophy. MMRDA would participate in SPV by providing equity. Government of India has also been approached for financial participation in the project and extend all concession for this important infrastructure project. The global bid are expected to be invited shortly. The construction period for the project is maximum of 5 years. Completion of this project will be an important landmark for Mumbai ‘s transport system.

11.0

Likely time schedule for Implementation
Invitation of Bids (Issued) Aug 2004
EXECU

C:\Documents and Settings\Administrator\My Documents\Web tenders\EXECUTIVE SUMMARY.doc

Versova -Andheri – Ghatkopar MRTS Mumbai Metropolitan Region Development Authority

Sheet 9 of 9 Revision R1

Sale of Documents Selection of Owners Consultant Pre-Bid conference Selection of preferred bidder Financial Closure Construction Period Commencement of Operations

(6th – 30th) Sept 2004 Sept 2004 25th Oct 2004 April / May 2005 Dec 2005 2005-2008 2008

C:\Documents and Settings\Administrator\My Documents\Web tenders\EXECUTIVE SUMMARY.doc

EXECU

Similar Documents

Free Essay

Paper for Success

...Executive Summary: Organizational Focus & Goals Derron Venerable University of Phoenix HRM/326 MARIBEL HINES September 15, 2014 Introduction The purpose of an Executive Summary is articulate a full report with the least amount of words possible depending on the size and nature of the issue. In most cases executive summaries serve as a report for executives who do not have the time to read the full report; therefore, the summary will give the executive the information that he or she needs to understand the objective, the issue(s), and the plan(s) in place to solve the issue(s). The following summary is focusing on an on-going overtime issue that one of the company’s branches is having. Focus and Goals The current focus at this particular location is to complete the daily task in the fastest most efficient safest way possible. The goals are to minimize or combine the current routes, run the routes from the closet point to the furthest and create a benchmark for each driver to attempt to meet in a safe but efficient manner. The research states that if the routes are done in a sequence form from the closet point to...

Words: 706 - Pages: 3

Free Essay

Mta 620

...An executive summary, sometimes known as a management summary, is a short document or section of a document, produced for purposes, that summarizes a longer report or proposal or a group of r business elated reports in such a way that readers can rapidly become acquainted with a large body of material without having to read it all. It usually contains a brief statement of the problem or proposal covered in the major document(s), background information, concise analysis and main conclusions. It is intended as an aid to decision-making by managers[1][2] and has been described as possibly the most important part of a business plan.[3] They must be short and to the point. An executive summary differs from an abstract in that an abstract will usually be shorter and is intended to provide a neutral overview or orientation rather than being a condensed version of the full document. Abstracts are extensively used in academic research where the concept of the executive summary would be meaningless. "An abstract is a brief summarizing statement... read by parties who are trying to decide whether or not to read the main document", while "an executive summary, unlike an abstract, is a document in miniature that may be read in place of the longer document".[4] An executive summary differs from an abstract in that an abstract will usually be shorter and is intended to provide a neutral overview or orientation rather than being a condensed version of the full document. Abstracts are...

Words: 315 - Pages: 2

Free Essay

Management

...Executive Summary The purpose of an executive summary is to summarize a report. Executive summaries are written for executives who most likely do not have time to read the complete document. Therefore, the executive summary must cover the major points and be detailed enough to mirror the content yet concise enough for an executive to understand the substance without reading the entire report. An executive summary differs from an abstract. Readers use an abstract to decide whether to read the complete document. They read an executive summary to obtain information without having to read the report in full. The executive summary should be written as a document that can stand on its own and is usually written on one or two pages, depending on the length of the report. It restates the purpose of the report and describes any results, conclusions, or recommendations made in the report so that the reader understands the reasons for the conclusion or recommendations. Acronyms, symbols, and abbreviations must be written out. Tables and figures in the report should not be referred to by number in the executive summary. The audience for an executive summary is receptive to the message, so the writer should assume that the audience wants to know and understand the message. It is written in a formal tone using an impersonal style and eliminating first person pronouns (I, we, our, etc.). Use the following guidelines when writing an executive summary: • • • • • State clearly the purpose of the...

Words: 1022 - Pages: 5

Premium Essay

D Department of Choice Chocolate

...Good and poor examples of executive summaries This is a GOOD example from an Accounting & Finance assignment. Footnote Executive Summary This report provides an analysis and evaluation of the current and prospective profitability, liquidity and financial stability of Outdoor Equipment Ltd. Methods of analysis include trend, horizontal and vertical analyses as well as ratios such as Debt, Current and Quick ratios. Other calculations include rates of return on Shareholders Equity and Total Assets and earnings per share to name a few. All calculations can be found in the appendices. Results of data analysed show that all ratios are below industry averages. In particular, comparative performance is poor in the areas of profit margins, liquidity, credit control, and inventory management. The report finds the prospects of the company in its current position are not positive. The major areas of weakness require further investigation and remedial action by management.Recommendations discussed include:  improving the average collection period for accounts receivable·   improving/increasing inventory turnover·   reducing prepayments and perhaps increasing inventory levels The report also investigates the fact that the analysis conducted has limitations. Some of the limitations include: forecasting figures are not provided nature and type of company is not known nor the current economic conditions data limitations as not enough information is provided or enough detail...

Words: 824 - Pages: 4

Free Essay

Exec Summary Electronic Discharge

...[Type the abstract of the document here. The abstract is typically a short summary of the contents of the document. Type the abstract of the document here. The abstract is typically a short summary of the contents of the document.] [Type the abstract of the document here. The abstract is typically a short summary of the contents of the document. Type the abstract of the document here. The abstract is typically a short summary of the contents of the document.] Electronic Discharge Summary EXECUTIVE SUMMARY Electronic Discharge Summary EXECUTIVE SUMMARY S. CHANDE, C. CHAHAL, N. GANDHI, A. HUSSEIN, K. MANOHARON. N. NURU S. CHANDE, C. CHAHAL, N. GANDHI, A. HUSSEIN, K. MANOHARON. N. NURU THE PROPOSAL There were 15 million discharge summaries produced for admissions into hospital last year. A staggering 80% of these were found to be inaccurate or incomplete and another 70% of these were reported as being severely delayed on a regular basis. This compromise to clinical care and patient safety is simply unacceptable.  Our empirical market research has found that the majority of junior doctors, the principal users of discharge forms, were unhappy with the current systems in place. It has also been reported that on average junior doctors spend more time carrying out admin duties than in formal training and teaching sessions. There are electronic discharge systems present however, these have been described as insufficient as they lack comprehensive coding and in some circumstances...

Words: 1303 - Pages: 6

Premium Essay

Metro Group Case Executive Summary

...------------------------------------------------- EXECUTIVE SUMMARY TO: MS. LINDA AUTORE NAME: MR. MICHAEL WU SUBJECT: PROPOSAL TO IMPLEMENT CRM SYSTEM AND CONTINUAL INVESTMENT TO ERP ------------------------------------------------- DATE: 2/18/14 ------------------------------------------------- INTRODUCTION Moore Medical primarily serves practitioners including physicians, podiatrists, emergency medical technicians, government facilities and the like by providing medical supplies. Moore’s mission is to be first choice in a one-stop shop that meets customer needs by offering a wide product range and fulfilling orders quickly, accurately, and reliably. The problem at Moore Medical is determining whether the company should invest in a CRM system, adding bolt-on modules to the current ERP system, both, or neither. This executive summary details the current issue as well as proposing a solution to the problem. BACKGROUND OF THE PROBLEM Currently, Moore has an ERP system that cannot accurately forecast demand due to it reacting to market conditions rather than predicting what demand will be. Additionally the ERP system is not efficient at creating a bid/quote for customers along with the related customer information. This caused customer service levels to decrease due to customer service representatives taking longer to handle orders. Moreover, new accounts could not be reviewed against old accounts, which led to the problem of duplicating customer information...

Words: 480 - Pages: 2

Premium Essay

Metro

...ANNUAL REPORT / 2014 to ascend / to rise in rank OUR VISION Building on the synergies of our rich retail experience, strong foothold in the People’s Republic of China (“the PRC”), and our strategic partnerships, Metro aims to be a leading property development and investment group in the region. Contents Key Facts 02 Corporate Data 33 Metro Holdings at a Glance 04 Partnerships 34 Chairman’s Message 06 Financial Highlights 36 Board of Directors 13 Financial Summary 38 Key Management 16 Corporate Structure 17 Corporate Social Responsibility and Sustainability Report 40 Portfolio Review 18 Corporate Governance 42 We embarked on a new chapter of our strategy by broadening our property portfolio to build sustainable streams of profitability which now includes residential and mixed-use developments, beyond our core commercial development interests. In continuing to strengthen and enhance our diversified portfolio, we remain focused on pursuing a prudent and balanced expansion approach to capitalise on our core competitive advantages for long-term growth. Key Facts NET PROFIT OF S$106.9 MILLION FOR FY2014 The Group achieved a 64.6% increase in net profit to S$106.9 million in FY2014 on the back of higher revenue from the property division, fair value adjustments and one-off items such as gains arising from the disposal of a warehouse in Singapore and negative goodwill...

Words: 51677 - Pages: 207

Premium Essay

Petty

...Week 3 Homework Assignment for Chapters 9, 10 and 11 Chapter 9 Hardage v. CBS 1. What were the legal issues in this case? What did the court decide? In the summer of 1998, Hardage began working as an advertising account executive for KSTW-TV, a television station owned by Viacom Television Stations, Inc. and managed by CBS Broadcasting Inc. He was promoted to Local Sales Manager in February of 2000, and in this position, he worked with another Local Sales Manager, Nadene Stauffer, to manage and supervise the account executives. Patty Dean, the General Sales Manager, who was in turn supervised by defendant Sparks, the station’s General Manager, supervised both Hardage and Stauffer.   Until about a month before Hardage resigned in August of 2001, he worked in the Seattle sales office whereas Sparks worked in the management office in Tacoma. Hardage contends he was sexually harassed by Sparks on several occasions and subjected to retaliation after he rejected her advances.   He alleges that during Sparks' visits to the Seattle office, she repeatedly flirted with him and made inappropriate comments-such as “[y]ou need somebody that's older and more stable that can take care of you.”   Leo Elbert, another employee at KSTW, stated that Sparks would “camp out” in Hardage's office, kick back in his chair with her feet on his desk, and smile and giggle in a flirtatious manner.   Hardage asserts that he never flirted...

Words: 4191 - Pages: 17

Free Essay

Managerial Stat

...is an apartment that you own. In real-world terms, condos often take the form of an apartment or similar shared complex, but theoretically, a condo could physically look like anything.1 The difference between a condominium and an apartment is purely legal. What defines a condominium is the ownership. Technically, a condominium is a collection of individual home units along with the land upon the land which they sit.2 Condominium units are generally popular in areas with high property values, and vacation hotspots and urban settings are both locations where you can expect to find them on the market. This is mainly because buying a singlefamily home can be quite expensive in cities where additional building space may be scarce especially in Metro Manila. As such, condos can open home ownership to whole new groups of people. There are many good of reasons that a condo could be a better alternative to an apartment or single home, and money is surely one of them. According to The Real Estate Journal, the prices of condominiums tend to appreciate at a 1 2 Ezinarticles.com wikipedia slower rate than single-family dwellings, making them a more cost-effective choice in markets where prices are on the rise. And, compared to renting an apartment, since you actually own your condo, you can take advantage of tax deductions, such as the interest on your mortgage. Real estate companies are now offering good deals, such as low interest rates, affordable payment schemes and easy...

Words: 2088 - Pages: 9

Premium Essay

Concept of Project Management

...Concept of Project & Project Management Under guidance of: Dr. Alok Rai Associate Professor Presented by: Ashutosh Mishra MBA-Marketing FMSBHU Flow of Presentation •What is a project? •Features of Project •Project Management •Project management vs. general management •Project Life Cycle •Phases of Project life cycle •Bangalore Metro Rail Project •Conclusion •References 2 What is Project? The word project comes from the Latin word projectum which means "something that comes before anything else happens". Source: www.wikipedia.org A project is “a unique endeavour to produce a set of deliverables within clearly specified time, cost and quality constraints”. -Jason Westland, CEO MPMM “Trying to manage a project without project management is like trying to play a football game without a game plan.” - K .Tate 3 Features of Project Unique in Nature Defined Timescale Limited Resources Element of Risk Approved Budget Beneficial change Source: Project Management Guidebook 4 Typology of Projects Strategic 2-5 years. High degree of change to customers. Highly complex. Systems 1-2 years. Medium degree of change to customers. Medium complex. Operational Up to 1 year. Low degree of change to customers. Less complex. 5 What is Project Management? In project management a project consists of a temporary endeavour undertaken to create a unique product, service or result. It...

Words: 899 - Pages: 4

Free Essay

Oracle Apps

...|Un-Married | |Nationality |Indian | |Email |Harjinder.singh102@gmail.com | |Phone |+91-7207460775 | |Current Designation |System Engineer | |Current Location |Hyderabad | |Current Employer |Tata Consultancy Services | Executive Summary: My ambition is to work for the leading consulting firms within the IT industry as I believe I am skilled and have much to offer potential employers and their clients. Currently, I am a System Engineer with Tata Consultancy Services Limited. Primary Skills: 2years & 9 Months of experience as Technical Consultant in Oracle E-Business Suite Applications. Resume Details: • 2 years and 9 month of analysis, design, development and support experience in Oracle apps. • Has exposure in working with Onsite – Offshore models. • Experience in all phases of the system development /implementation life cycle. • Experience in Oracle Apps...

Words: 1310 - Pages: 6

Premium Essay

Business Plan

...Executive Summary Take Five Sports Bar and Grill has established a successful presence in the food and beverage service industry. The flagship location in suburban Anytown (Medlock Bridge) will gross in excess of $2 million in sales in its first year of operation. First year operations will produce a net profit of $445,000. This will be generated from an investment of $625,000 in initial capital. Since 10 months of operations have already been completed the confidence level for final first year numbers is extremely high. The first 10 months of start-up costs, sales revenues, and operating expenses are actual. Expansion plans are already underway. Owner funding and internally generated cash flow will enable additional stores to open. Sales projections for the next four years are based upon current planned store openings. Site surveys have been completed and prime locations have been targeted for store expansion. The sales figures and projections presented here are based upon an additional four store locations at the most premium sites available in the Anytown Metro market area as well as a prime resort location in Destin, Florida. Management has recognized the rapid growth potential made possible by the quick success and fast return-on-investment from the first location. Payback of total invested capital on the first location will be realized in less than 18 months of operation. Cash flow becomes positive from operations immediately and profits are substantial in the first...

Words: 1381 - Pages: 6

Premium Essay

Nationa Bookstore Research Paper

...COUNTRY REPORT Retailing in the Philippines May 2013 EXECUTIVE SUMMARY Retailing market sees more vibrant performance in 2012 With a better economic backdrop compared to 2011, the year 2012 sees more robust growth in the retail market, both in grocery and non-grocery channels. The industry has benefited from the increase in government spending on infrastructure, dynamic local tourism, strong BPO growth, and influx of OFW remittances. The Philippine economy remains to be largely driven by consumer consumption which has accelerated growth both for store-based and non-store channels. Chained players expand in provincial areas During the year, chained retailers continue to realise the increasing potential of fast growing cities outside of Metro Manila. With BPO moving beyond the National Capital Region and tourism flourishing in the southern provinces of Visayas and Mindanao, the establishment of more shopping centres in provincial cities in turn encourages the expansion of chained players in these areas. Aiming to tap emerging lucrative markets, companies like Philippine Seven Corp, SM Retail Inc and Robinsons Retail Group, among others, are keen on establishing a presence outside Metro Manila. Grocery retailers surpasses non-grocery retailers sales growth With players like Puregold Price Club and SM Retail Inc focused on growing their networks of stores, grocery retailers surpass growth of non-grocery channels in 2012. The growth of hypermarkets and supermarkets which...

Words: 437 - Pages: 2

Premium Essay

Jimmy John's Marketing Plam

...Plan Metro Detroit Market January 1, 2017-December 31, 2017 Jimmy John’s Marketing Plan Metro Detroit Market January 1, 2017-December 31, 2017 Designed for Metro Detroit Franchisees | | | | | Executive Summary | Write this last so that you can summarize the most important points from your business plan. Provide a concise but positive description of your company, including objectives and accomplishments. For example, if your company is established, consider describing what it set out to do, how it has accomplished goals to date, and what lies ahead. If new, summarize what you intend to do, how and when you intend to do it, and how you think you can overcome major obstacles (such as competition).You can also choose to use the following four subheadings to organize and help present the information for your executive summary.Note: to delete any tip, such as this one, just click the tip text and then press the spacebar. | Introduction Major Aspects of Marketing Plan Budget Statement Table of Contents I. Executive Summary 1 Introduction Major Aspects of Marketing Plan Budget Statement II. Introduction 2 History Performance Purpose III. Situational Analysis 3 Market Analysis Market Segmentation Competition Pricing IV. Marketing Planning 4 Marketing Objectives Target Markets Product Promotion Distribution Price V. Implementation and Control of the Marketing Plan 5 VI. Summary ...

Words: 4563 - Pages: 19

Free Essay

Growing City

...------------------------------------------------- Table of Contents Executive Summary…........................................................................................................ 3 Introduction..............…....................................................................................................... 4 Analysis.............................................................................................................................. 4 Alternative Solutions…...................................................................................................... 6 Recommendations and Implementation Plan .................................................................... 8 Contingency …………………………………………………………………………….. 10 Executive Summary Growing City is in the midst of expanding their organic recycling business in Canada. The major issues they face is related to the complexity of their external environment. In relation to the industry size, low barriers to entry, and political regulation. In recent years there has been social and political trends are pulled towards environmental campaigns Growing City is one of many companies that will see the potential profit in this industry. Growing City needs to choose a strategy that allows them to differentiate their services from existing and potential competitors, but most importantly they must be the first to capture the market share. They also must increase efficiency in the operations of the business...

Words: 2609 - Pages: 11