Free Essay

Floor Plan Site Survey

In:

Submitted By Toke614
Words 1551
Pages 7
Associate Level Material
Appendix E

Floor Plan Site Survey Data Sheet

Use the tables to gather the data necessary to analyze each of the five floor plans in the Floor Plan Site Survey exercise. The information gathered in this assignment will assist you in your final project.

Conference Center

Explain the major features of this floor plan. For example, are there large open spaces, large walls, cubes, or offices? | A few of the main characteristics which this floor plan provides are a lift, a big meeting room, and many concrete walls. The southern portion of the floor plan also has a worker rest room with vending machines. At the west portion there are lavatories which are segregated with concrete wall. | Identify areas of this floor plan that may present issues when designing your network. Why will these areas present issues? For each area identified, what can you do to overcome the issue? | Some areas that may present issues when designing a network would be the large conference room and the break room. The large conference room is surrounded by concrete walls and the AP is at one corner of the floor plan surrounded by more concrete walls. The break room is also surrounded by walls and vending machines. This causes the signals to weaken because of the several walls and metal obstacles that are interfering. One way to fix the issue is to rearrange the AP to another place where there is less interference or in this case less walls. | According to your site survey, is the data center an ideal location for the wireless access point? Would you place the access point somewhere else in the building? If so, where and why? Do you think it will be necessary to have multiple access points in this building? | The data center is definitely not the best location for the AP do to all the walls in the way. In my opinion I would place the AP in the center of the conference floor plan maybe even next to the storage room. Positioning the AP in the middle of the floor plan will provide better signals throughout the whole floor. In this case I don’t believe another AP unit would be necessary after positioning the one we have appropriately. |

Customer Service Call Center Explain the major features of this floor plan. For example, are there large open spaces, large walls, cubes, or offices? | Main characteristics for this floor plan incorporates metallic shelving units which run north to south situated close to the center room. The metallic shelvings are roughly 75% of the distance from the southern wall to the north. There are concrete walls which cover the western meeting room and to the south of the meeting room you can find a rest room which has a microwave oven and vending machines. There are also blocks of cubicles and many other workplaces. | Identify areas of this floor plan that may present issues when designing your network. Why will these areas present issues? For each area identified, what can you do to overcome the issue? | The main area in this floor plan that is suffering from no frequency is located behind the metal shelving. This area has no signal getting to it because of the metal shelving blocking the signals from transmitting. One way of correcting the issue in this scenario would be to position the AP towards the upper middle section of the floor plan where it can send signals from the middles top of the floor. | According to your site survey, is the data center an ideal location for the wireless access point? Would you place the access point somewhere else in the building? If so, where and why? Do you think it will be necessary to have multiple access points in this building? | In this scenario I believe that the AP is located in a good location although more access points are needed for this floor. The data center that it’s being used in this plan provides a great connection to the right side of the floor plan or metal shelving, but the left side is dead. This is why I believe that placing another AP unit towards the left side of the floor plan maybe even in the conference room would be the ideal choice. |

Executive Office

Explain the major features of this floor plan. For example, are there large open spaces, large walls, cubes, or offices? | There are blocks of offices on the western portion of the floor. Additionally there is the records room which is centrally located and it is in the middle of concrete walls. A kitchen area in the southern end of the floor is also in the middle of a concrete wall. | Identify areas of this floor plan that may present issues when designing your network. Why will these areas present issues? For each area identified, what can you do to overcome the issue? | The areas on this floor plan that may cause issue with interference are the record room and the kitchen. Both of these areas consist of concrete walls that cause interference with any signal that may try to transmit through these areas. In order for this to be corrected several access points should be installed throughout the floor. | According to your site survey, is the data center an ideal location for the wireless access point? Would you place the access point somewhere else in the building? If so, where and why? Do you think it will be necessary to have multiple access points in this building? | The data center is located in a good location but more access points are needed in this scenario. In this floor two access points would be ideal. One AP towards the middle section around the lounge or break room and the other AP at the north end side of the building around the food court area. |

Outbound Call Center

Explain the major features of this floor plan. For example, are there large open spaces, large walls, cubes, or offices? | There are four sets of offices and each is segregated by concrete walls. I think that a number of APs will be required for this floor plan. There are meeting rooms in the eastern wall and rest area lines the north wall. We also have metallic shelving units close to the middle. | Identify areas of this floor plan that may present issues when designing your network. Why will these areas present issues? For each area identified, what can you do to overcome the issue? | One area in this floor plan that presents issues is the metallic shaving wall which interferes from the signals going beyond this point. The next area is the microwave and vending machine area. By having these devices near the AP it diminishes the signals strength from going even further then what they should. Following the microwave and vending machine area, comes the area with the four concrete walls. These walls alone weakens the signal strength in a major way and at times causing a dead zone like in this case in the lower left corner section. | According to your site survey, is the data center an ideal location for the wireless access point? Would you place the access point somewhere else in the building? If so, where and why? Do you think it will be necessary to have multiple access points in this building? | In this case I would move the current access point towards the middle of the floor maybe in the center where the walls unite and then following with two more AP units. One towards the right side of the floor plan maybe around the top first conference room and the second one toward the storage room area. |

Customer Relations Office

Explain the major features of this floor plan. For example, are there large open spaces, large walls, cubes, or offices? | We have concrete walls on the northern side, vending machines, a microwave and many glass walls. | Identify areas of this floor plan that may present issues when designing your network. Why will these areas present issues? For each area identified, what can you do to overcome the issue? | In this floor plan the area around the concrete walls have a weaker signal strength compared to the area below the data center with the glass wall. Another area with issue here is the area in the left bottom corner with the glass wall in the offices. In order to correct this issue we will need to relocate the existing AP unit to a more accessible location. | According to your site survey, is the data center an ideal location for the wireless access point? Would you place the access point somewhere else in the building? If so, where and why? Do you think it will be necessary to have multiple access points in this building? | For this floor plan I do believe that the data center should be relocated toward the center of the floor plan. In this floor plan most of the right section of the building has strong signals compared to the left side. If we would place the AP unit towards the middle section of the floor plan I believe the connection would work best. In this situation I don’t believe another AP unit is needed. |

Similar Documents

Premium Essay

Floor Plan Site Survey Assignment.Doc

...Axia College Material Appendix D Floor Plan Site Survey Data Sheet The following tables will help you gather the data necessary for analyzing each of the five floor plans in the Floor Plan Site Survey exercise. As you go through the exercise, complete the information in each table. The information gathered in this assignment will assist you in your final project. Conference Center |Explain the major features of this floor plan. For example, are there large open spaces, large walls, cubes, or offices?| |Within this plan there are a lot of walls. This plan also has a lot of offices. | |Identify areas of this floor plan that may present issues when designing your network. Why will these areas present | |issues? For each area identified, what can you do to overcome the issue? | |The areas what I see that may present a problem would be the back hall way because it does not have any signal strength.| |I believe this happened because of all of the walls in between the access point and the back offices. One thing that | |can be done for this is to install another access point on the other end of the building or move the access point that | |already exists. | |Based on your site survey, do you think that placing the wireless access point in the data center is an ideal location...

Words: 1232 - Pages: 5

Free Essay

Tars

...Cwp to be on site night of install to assist with qst cable management due to bandit barriers along teller row pic CWP- To be onsite night of install to assist with horizontal shelf install due to bandit barriers pic CWP- There are Vertical QST’s requiring a Horizontal Stand and Shelf (TWQHS) - pic. Be on site NOI to assist with QST relocation. Will be required to install the shelf and may include new cable hole drilling. Remove vertical stand and mask any damage on the teller wall. pics CWP widen QST cable holes to 1 inch or larger on front and/or back of backsplash to accommodate QST, ferrite bead prior to the QST cable management pic Carl - fyi There is an empty power cord plugged into the server UPS pics Cwp to be on site night of install to assist with qst cable management due to bandit barriers along teller row pic(s) 20,24,11. FYII QST cables are at 1 inch. Cwp to be on site night of install to assist with false walls pic(s) SV3 tech drill QST cable holes to 1 inch or larger on front and/or back of backsplash to accommodate QST, ferrite bead prior to QST cable management pic(s) 9,10. Mount QST on customer right on horizontal shelf. SV3 Tech existing vertical QST will move to the new horizontal stand pic This will be the new TAR to change the vertical qst to a horizontal shelf. Include picture references. CWP to be onsite in support of QST installation. Work may include, but is not limited to, false wall removal, drilling, cable routing...

Words: 3539 - Pages: 15

Free Essay

Student

...Cisco BTS 10200 Softswitch Building Environment and Power Site Survey Document Brief The Building Environment and Power Site Survey provides essential information about the customer site for the Cisco BTS 10200 Softswitch. The Cisco BTS 10200 Softswitch is a software-based class-independent telephony switch that utilizes MGCP as the control protocol for voice. Modification History |Ver. |Date |Comment | |R332a |06/30/2002 |Initial draft for Rls.Release 3.3.2 | |R33b |10/29/2002 |Page 1 – Added electrical requirements warning. | | | |Sec. 3 – Changed upper temperature limit to 104°F (40°C) | | | |Sec. 4.1 – Clarified requirements for redundant “A” and “B” feeds. | | | |Sec. 4.2 – Clarified requirements for redundant “A” and “B” feeds. | | | |Sec. 9 – Clarified requirement for modem numbering. | |R33c |01/22/2003 |Updated headers and footers. No content changes. ...

Words: 3441 - Pages: 14

Free Essay

Survey

...Summary This report summarizes a plan to conduct a wireless site survey, also called a radio frequency (RF) survey, at Orchard Street Art Center. This survey will generate recommendations for maximizing network security, coverage, and capacity. Expert Advice Earlier this year, the board of directors of Orchard Street Art Center asked me to propose a plan to improve wireless coverage throughout the center’s public areas, offices, classrooms, music studios and indoor and outdoor theaters. To make sure I proposed the most effective plan possible, I decided to seek the advice of experts. Fortunately, one of the area’s top experts in wireless networking, Jamie Brookstone, president of Brookstone Network Consulting, offered the services of his staff pro bono. Thanks to his offer, I was able to meet several times with the following consultants: Lyn Luzerne Our conversations focused on ways to improve network connections for the center’s staff and patrons. I also studied information obtained from leading hardware manufacturers and software distributors. This research suggests that our first step is to conduct a site survey of our entire facility. Final Recommendation A high availability, secure wireless network is crucial to our mission at Orchard Street Art Center. Lighting and sound systems in our two theaters increasingly rely on wireless signaling, as do our classroom facilities. Furthermore, patrons and instructors now consider a secure wireless network essential for a variety...

Words: 806 - Pages: 4

Free Essay

Site Survey Report

...Wireless Site Survey Recommendation Wireless Site Survey Recommendation Orchard Street Art Center Orchard Street Art Center Summary This report summarizes a plan to conduct a wireless site survey, also called a radio frequency (RF) survey, at Orchard Street Art Center. This survey will generate recommendations for maximizing network security, coverage, and capacity. Expert Advice Earlier this year, the board of directors of Orchard Street Art Center asked me to propose a plan to improve wireless coverage throughout the center’s public areas, offices, classrooms, music studios and indoor and outdoor theaters. To make sure I proposed the most effective plan possible, I decided to seek the advice of experts. Fortunately, one of the area’s top experts in wireless networking, Jamie Brookstone, president of Brookstone Network Consulting, offered the services of his staff pro bono. Thanks to his offer, I was able to meet several times with the following consultants: Lyn Luzerne Associate Engineer Dean Armstrong Senior Engineer Suzanne j. Sheffield-Harper Project Manager Our conversations focused on ways to improve network connections for the center’s staff and patrons. I also studied information obtained from leading hardware manufacturers and software distributors. This research suggests that our first step is to conduct a site survey of our entire facility. What Is a Wireless Site Survey? A wireless site survey is an analysis of a facility’s wireless networking...

Words: 896 - Pages: 4

Premium Essay

802.11ac Migration Guide

...Aruba Migration Guide 802.11AC MIGRATION GUIDE 802.11ac Aruba Migration Guide Table of Contents Introduction 802.11AC basics Why 802.11ac? 802.11ac technology overview Backward compatibility RF spectrum Multistation MAC throughput > 1 Gbps 256 QAM Wider channels More spatial streams Downlink multi-user MIMO Pros of 802.11ac Cons of 802.11ac Strategy and planning for 802.11ac migration Site planning basics Planning process Minimum requirements and actions to implement 802.11ac Aruba recommendations for 802.11ac migration General Capacity RF planning Installation Wireless RF coverage considerations and questionnaire Summary 3 3 3 4 4 4 5 5 5 5 6 6 6 6 6 6 7 8 8 8 8 8 9 10 Aruba Networks, Inc. 2 802.11ac Aruba Migration Guide Introduction Wi-Fi has become such an amazingly successful technology because it has continuously advanced while remaining backwards compatible. The current state-of-the-art Wi-Fi is known as Wi-Fi CERTIFIED n or 802.11n. 802.11n has become popular because it improves performance. As 802.11n has become a standard interface on PCs, tablets and smartphones, the applications used by these devices have continued to progress. Mobile technology has encountered the next frontier – video. Whether delivering YouTube to smartphones or moving HDTV signals around the office or home, video has become a significant driver of network traffic, chiefly because it requires one or two orders of magnitude more bandwidth than other IP services. Now...

Words: 3787 - Pages: 16

Free Essay

Term Paper

...Style. Robert Sewall contracted the main section of the house in 1799 however, the type of brick used on the section of the house facing Second Street NE, on the west side of the structure indicates that this area was built much earlier, anywhere from 1680-1750. This area of the house is now the kitchen of the Sewall Belmont House. The way the house stands today is a rectangular, two and one half stores high set on a raised basement. The house is joined at the northeast corner with attachments at the kitchen and the stable. The main façade is three bays across with a central doorway. The front door features sidelights on both sides and a keystone molded archway. A double staircase leads to the central entrance. The Georgian style floor plan is based around a center...

Words: 1746 - Pages: 7

Free Essay

It 241 Appendix a

...Designs with a plan that outlines how you intend to design their wireless network. The plan must be based on the recommended steps for designing a WLAN, outlined in the following bulleted list. In addition to the design of the network, Apex Designs has asked that you provide a basic wireless security policy. To that end, your plan must consist of the following elements: • Deployment scenario • IEEE wireless network type • Access point management • Location of wireless devices • Wireless security policy Final Project Timeline Budget your time wisely and work on your project throughout the course. Some of the discussion questions, CheckPoints, and assignments in the course will assist you in creating your final project. If you complete your course activities and use the feedback provided by the instructor, you will be on the right track to complete your project successfully. □ Suggested in Week One: Read the Final Project Overview and Timeline in Appendix A. Review Appendix I and Appendix J. □ Suggested in Week Three: Begin to identify the hardware components that your network may use based on the list of components compiled in the Wireless Network Components assignment. You will not be able to finalize this list until you select the floor plan on which your network will be based. Research the cost of each component from the Wireless Network Components assignment or another approved resource. □ Suggested in Week Five: Select the floor plan from Appendix...

Words: 446 - Pages: 2

Premium Essay

Organizational Security Survey

...Evaluation of Security Programs SECURITY SITE SURVEY REPORT THE DEVRY CENTER  9210 HIGHER EDUCATION DRIVE NEW YORK, NY 11747 OVERVIEW A security survey is the official procedure utilized to review specific applications, areas, or Processes of residence or a business to document security, risk vulnerabilities, and authenticate the program in place (Broder & Tucker, 2011). One could perform a survey from all the risk perspectives such as facility security, physical security, or life safety. An expert conducts a involving a pre-determined constraint of checklist as well as an official reporting system. A security survey is a significant element of the general risk and security program (Craighead, 2009). When carrying out a security survey one must set clear goals. The goals would also be extensive from reviewing the fitness of the whole security program to more summarizing goals, such as the value and effectiveness of the physical security of the programs (Luis, 1994). SITE DESCRIPTION The Devry center building is located in downtown New York City on a four-acre piece of land. The building is a thirty story high containing 1,250 underground garage parking spaces and a rooftop garden. The building has a maximum capacity of 2000 tenants, and the tenants occupy the 27th and 30th floor of the building. SCOPE I conducted the security survey at Devry Center on December 1, 2013 to December 5, 2013. This report...

Words: 1939 - Pages: 8

Premium Essay

Health and Safety Culture

...SEVERFIELD-REEVE STRUCTURES [pic] Developing Total Ownership A Strategy to Improve Health and Safety Developing a positive Health and Safety Culture Written by Dave Atkinson Contents Page: Section Title Page: 1 Contents Page Page: 2 1: Executive Summary Page: 3 2: Introduction 2a: Business organisation Page: 9 3: Assessment of existing culture 3a: Report of Indicators 3b: Report of methodology and conduct of survey 3c: Report of findings with interpretation 3d: Conclusion Page: 35 4: Strategy for Improving the Health and Safety Culture 4a: Aims and objectives 4b: Priorities for action 4c: Resources and constraints 4d: Implementation plan 4e: Methodology for monitoring success Page: 61 5: Business Case 5a: Requirements for resources 5b: Cost benefit analysis 5c: Reference to legislation 5d: Case Page: 72 6: Bibliography Page: 73 7: Appendices Section 1 Executive Summary Following an assessment of the current Health and Safety culture and climate within the business, areas of weakness have been identified that are holding back the progression towards the ultimate aim and objective in Health and Safety – Employee participation creating “Total Ownership". The assessment of the Health and Safety Culture covered such areas as an analysis of the 2009 employee Health and Safety questionnaire, a review of audits carried out, a check on the progress against 2009...

Words: 20466 - Pages: 82

Premium Essay

Mkt Using Perceptual Maps

...interested in what the merchandise represents. The other reason for the product decline consists of the younger customers out in the world seeking the motorcycle at a lesser cost; it is for the fact that they would not otherwise have high salaries as in the older age group. These young customers are not able to identify with the Lifestyle image of CruiserThorr for the reason of the bike and its features have matured a small amount according to the market standards. The sales down turn caused Thorr’s challengers to gain industry shares and a competitive market gain. The tasks used were to turn around sales rejections by generating a strategic marketing plan, producing a perceptual map, and assembling the choice of to upgrade the CruiserThorr or construct an upgraded side that fits in with recent more current trends in motorcycles. This plan should make certain Thorr’s place in the marketplace if the process is successful. In the beginning phase it is recognizing the parameters and how they could be necessary for the product and vital to the consumers. The Lifestyle image of the bike is important for the reason of the right of owning a manly bike. Lifestyle image supplies to a lot of sales in spite of the weather. Motorcycles are an image and it has always been, from the 1900s until today. Pricing strategies play a big role in the success of the product also. It is also important for the product to be priced accordingly; so it can target the market it is alluring towards. For example...

Words: 1318 - Pages: 6

Premium Essay

Apex Design Plan

...1/19/2015 1/19/2015 One Giant Leap for Apex Design Wireless Network Plan One Giant Leap for Apex Design Wireless Network Plan Team B Team B Apex Design has found the need to incorporate a wireless network to collaborate with their existing wired network. Team B found this opportunity to display to Apex what they can do to bring their company to enjoy the modern conveniences of a wireless network. This deployment plan will cover Team B’s recommendations based off of the site survey provided by Apex. We will discuss our recommended wireless network type. The access point layout and how these points will be managed. We will go over the foreseen obstacles and what our plan is to overcome these obstacles. Finally, we will go over the security policy that should be implemented to keep Apex as secure with our wireless network as they are with their current wired network. IEEE Network Type Apex Designs has asked our company to design a wireless network for their business. This network will consist of several different pieces of hardware that all will work together to meet Apex’s needs. To ensure that the new network is operational, special considerations must be made as to which IEEE network standard to be used. Since Apex Designs is a business that has a preexisting network installed, the new network must be compatible with the legacy systems already in use. Failure to meet this requirement would cause major interruptions in work flow, thus hindering...

Words: 1940 - Pages: 8

Premium Essay

Net Sec

...CHAPTOR 12 In the early 1930s, a mathematician developed a formula that could be used to make accurate weather forecasts, something that was unheard of at that time. However, because there were no computers or calculators at that time, it took almost three months of hand calculations to come up with the next day’s forecast. This obviously was far from useful, and many individuals scoffed at such a preposterous solution to weather forecasting. However, with the introduction of computers by the late 1940s, the amount of time needed for the calculations was dramatically decreased. Suddenly, this model became very popular, and today it forms the basis for all weather forecasting. The point here is that it sometimes requires vision to see how an idea or technology could be used. This vision also applies to new technologies like wireless communications. Some users question why we should consider wireless technology when the existing wired system seems to work just fine. In this chapter, you will learn what it takes to convert the potential of wireless technology into a successful business reality. We’ll look at the steps needed to incorporate wireless technology into a business, and at the advantages and challenges that face business users who consider adopting this new technology. Advantages of Wireless Technology The advantages of incorporating wireless technology into a business are far-reaching and can positively impact an organization in many ways. In addition to the...

Words: 8259 - Pages: 34

Free Essay

Restoration

...Appraisal Appreciation & Conservation Assignment 2 Conservation Plan & Feasibility Study ------------------------------------------------- Module Title: BUILDING Appraisal Appreciation & Conservation Assignment 2 Conservation Plan & Feasibility Study Ian Scott Student ID 471727 Module Code: 6104 BEUG Module Leader: P.Kenny & S.Buxbaum Submission Date: 16/04/12 Ian Scott Student ID 471727 Module Code: 6104 BEUG Module Leader: P.Kenny & S.Buxbaum Submission Date: 16/04/12 Liverpool John Moores University School of the Built Environment Conservation Plan & Feasibility Study Of The Wellington Rooms (Known locally as the Irish Centre) The Wellington Rooms 2011 http://flickr.com/photos Report prepared by Mr Ian Scott: Student ID: 471727 Report Contents 1. Executive Summary 3 2. Introduction 3 3. Site Location & Description 3 4. Listing Extract 4 5. Statutory Controls 5 6. Evaluation of Development 5-6 7. Development Options 6-7 8. Appraisal of Repairs 7-9 9. Adaption Works 9-10 10. Conclusion 10 11. References & Bibliography 11 12. Photographs & Illustrations 12-16 ------------------------------------------------- 1.0 Executive Summary This executive summary provides a conservation plan and feasibility study considering the options for the proposed development...

Words: 3390 - Pages: 14

Premium Essay

Site Survey

...ITNT 1700 | Site Survey Project | CWNA | | Name | 12/13/2010 | | Requirements Summary Business Requirements * Wireless Connection * The organization would like to provide GHSIA in the hotel and conference center * The business requires a high level of mobility for Wireless VOIP throughout hotel and conference center * Our equipment will be compatible with the existing equipment * Wireless Coverage * Covering the Hilton Hotel customers in their rooms, bedside and at their writing stations * Covering the Hilton management team in their offices with a dedicated wired connection and support for a wireless connection * Coverage in all meeting rooms, lounge area, pavilion, and pool side * Coverage in University Conference room for approximately 100 client stations * Optional coverage for kitchens, break rooms, and rest rooms User Requirements * Hilton hotel guests to receive unlimited guest access upon checking in and will expire upon checkout * Hilton guests to connect via Wi-Fi connection in meeting rooms, lounge area, pavilion and pool side * Hilton 12 managers to connect wireless with laptop and have a dedicated wired connection in offices Functional Requirements * Wireless PoS Access * Provide Hilton Hotel with 6 PoS stations to have WPA 2 with AES encryption * Shall be isolated to the PoS VLAN and separate from the GHSIA * Shall be PCI compliant * Shall...

Words: 952 - Pages: 4