Premium Essay

Iso 9001 Unit 3

Submitted By
Words 991
Pages 4
Working groups of IEEE
The institute of electrical and electronics engineers is a body responsible for setting standards. There is the numbering of the standards, and the subset is the actual standard. One working group in the IEEE is the 802.11 wireless network standards. 802.11 is standards collections for wireless networking. Some of the popular standards include 802.11a, 802.11n, 802.11g, and 802.11b. They all use the standard to connect to the network and has a limit for data transfer speeds. The first wireless standard was the 802.11a. It operates in a 5 GHz radio band and can attain a maximum of 54Mbps. This standard was not popular as compared to its counterpart 802.11b due to its low range and higher pricing (Patel, 2015).
The 802.11b …show more content…
Another important function of the IEEE standards is collision detection. Before data is transferred in a network, there ought to be a check whether the network line if free. Once the network is free, then data can be transferred from one user to another. The IEEE 802 detects fragments of transmission in the network and signifies the users. The above functions justify the importance of IEEE 802 in a network system (Lu et al., 2015).
Standards Organizations
ISO is the international organization for standardization. ISO 9001:2000 standard is critical for quality systems that outside auditors analyze. The standard is based on design, documentation, testing, production, and servicing among others.
ANSI is the American national standards institute, which is the main standards body in the United States. It works together with ASQ and IEEE to ensure the provision of the best …show more content…
This is because such bodies come up with rules and regulations that govern the use of technology. Regulations ensure the users of these systems are taken into considerations. Also, these standards align with the safety of system users. The contractors should use systems are safe, and they are comfortable with.
Governments should have oversight authorities that ensure that while these bodies are creating standards they have the interests of the people in mind. Standards such as performance and design are critical. It provides the consumers with information when they want to acquire certain equipment. The prescriptive specification such as type, thickness, and dimension are crucial for system users (Ninkovich, Christensen, & Cameron, 2016). The consumer issues should be considered when developing system because it directly affects

Similar Documents

Premium Essay

Business

...British Gas ISO 9001:2000 Background: As a FTSE 100 company Centrica’s vision is to “become a leading supplier of energy and home services related provider in our chosen markets, in order to maximise value to our share holders.” Centrica business units comprise of the following, amongst others: British Gas Centrica Energy British Gas Business Direct Energy This case study focuses upon British Gas which was formed into a private company in 1986 from a nationalised concern. Since then British Gas has undergone a number of structural and business changes, most notably the separation of the transmission and distribution of gas supplies from the front end supply and service business. British Gas Organisation British Gas Headquarters are located in Stockley Park, Uxbridge, Windsor and Staines. The company is divided into two main functions: 1. British Gas Service: (BGS) consists of 6 Area Service Centres in Uddingston, Leeds, Stockport, Leicester, Oldbury and Edinburgh employing approximately 5,000 staff, serving approximately 9,000 service engineers and installers. In all British Gas serves over 4 million service contracts and carries out over 9 million jobs per year. 2. British Gas Residential Energy: (BGRE) has 6 contact and back office centres in Edinburgh, Glasgow, Leeds, Manchester, Cardiff Southampton employing approximately 15,000 staff. BGRE provides a billing service for its 15 million customers across the UK. ...

Words: 910 - Pages: 4

Premium Essay

Student

...Professional Achievements (Zafar Iqbal Khan) I am a proven professional with strong human resource management and operational/administration background. I started my career from Pakistan Navy. Complete basic training and start working in executive branch. I was best player of Hockey. Was member team of division in house unit and represents my division in inter division Cup hockey tournament. My performance bring the resulting on Top position. I was represent many time from my unit. Participate in all Pakistan Navy Inter Unit Championship and bring my unit’s team on Top continuously two time. After short while I volunteer for Special Services Group training and complete it. Done sensitive assignments during my service. Got chance to work as junior instructor with Turkish and Saudi Arabian classes. Pakistan Navy groom my capabilities, give me a confidence, worked with pressure and timely deadlines. I got opportunity to work with Bell Canada Telecommunications Company who was the main builder of Telecom Systems under the Ministry of Telecom in Kingdom of Saudi Arabia. This experience change me totally and learn multi national norms. Learn working style and culture of many types of nationalities like Arabian, Canadian, British and Philippines. After finish the contract of three years come back and join M/S Al-Wakeel Corporation Lahore. My responsibility were over here Maintain contact with companies working in Kingdom of Saudi Arabia to fulfill their manpower demand from Pakistan...

Words: 1024 - Pages: 5

Premium Essay

Quality

...INTERNATIONAL STANDARD ISO 9001 Fourth edition 2008-11-15 Quality management systems — Requirements Systèmes de management de la qualité — Exigences Reference number ISO 9001:2008(E) © ISO 2008 Provided by Pronorm AS for Det Norske Veritas AS (DNV) 2008-11-19. Reproduction is not allowed. ISO 9001:2008(E) PDF disclaimer This PDF file may contain embedded typefaces. In accordance with Adobe's licensing policy, this file may be printed or viewed but shall not be edited unless the typefaces which are embedded are licensed to and installed on the computer performing the editing. In downloading this file, parties accept therein the responsibility of not infringing Adobe's licensing policy. The ISO Central Secretariat accepts no liability in this area. Details of the software products used to create this PDF file can be found in the General Info relative to the file; the PDF-creation parameters were optimized for printing. Every care has been taken to ensure that the file is suitable for use by ISO member bodies. In the unlikely event that a problem relating to it is found, please inform the Central Secretariat at the address given below. COPYRIGHT PROTECTED DOCUMENT © ISO 2008 All rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm, without permission in writing from either ISO at the address below or ISO's member...

Words: 13133 - Pages: 53

Premium Essay

Tqm Dpwh

...Table of Contents Section 1. Introduction 1.1 Profile 1.2 Vision 1.3 Mission 1.4 Core Values Section 2. Organizational Profile 2.1 Core Bureaus 2.2 Services 2.3 Regional Operations 2.4 Management Responsibilities 2.5 Organizational Structure as whole and per department Section 3. Journey Milestone Section 4. Application and Scope 4.1 Application 4.2 Scope of the Quality Management System Section 5. The Quality Management System 5.1 QMS Mandate 5.2 Description of QMS 5.3 Process Model Section 6. Quality Policy Section 7. Measurement, Analysis and Improvement 7.1 General 7.2 Monitoring and Measurement 7.2.1 General 7.2.2 Customer Satisfaction 7.2.3 Internal Audit 7.2.4 Monitoring and Measurement of Processes 7.2.5 Monitoring and Measurement of Product 7.3 Control of Non-Conformin Products 7.4 Analysis of Data 7.5 Improvement 7.5.1 Continual Improvement 7.5.2 Corrective Action 7.5.3 Preventive Action Section 8. Procedures 8.1 Control of Documents, DPWH-QMSP-01 8.2 Internal Quality Audit, DPWH-QMSP-03 8.3 Corrective Action, DPWH-QMSP-05 8.4 Preventive Action, DPWH-QMSP-06 Section 9. Appendices I. INTRODUCTION PROFILE The Department of Public Works and Highways (DPWH) is the state’s engineering and construction arm. As a public service agency, its primordial concern is to find the most effective and efficient ways to service its clientele- the Filipino people. The DPWH is one of the largest organizations in the executive branch in terms of size and budget. It is composed...

Words: 5382 - Pages: 22

Free Essay

Design, Simulation & Implementation of a Microcontroller Based Seed Dryer Machine for Farm Produce Interfaced with Computer System

...ijetae.com (ISSN 2250-2459, ISO 9001:2008 Certified Journal, Volume 5, Issue 7, July 2015) Design, Simulation & Implementation of A Microcontroller Based Seed Dryer Machine for Farm Produce Interfaced with Computer System Ezeofor J.C1, Okeke. R.O2, Ogbuokebe S.K3 1,2 Department of Electronic & Computer Engineering, University of Port Harcourt, Rivers State, Nigeria 3 National Space Research and Development agency, Abuja As a result of these, majority of the farmers end up bankrupt while some incur huge debt from banks, relatives or committee of friends in the process [3]. With the proposed drying system, farmers would be able to dry their farm produce using appropriate temperature and humidity control system. Abstract— this paper presents the design and implementation of a microcontroller based Seed Dryer Machine for farm produce interfaced with PC. Drying of farm produce and seeds in large quantity such as; melon, beans, corn, cocoa seeds, pumpkin seeds, rice, pepper seeds, tomato seeds etc., has been very challenging due to lack of drying facilities, drying space and poor weather. This gives low lifespan to the seeds and reduced quantity of stored seeds, which in turn could discourage farmers from further cultivations. In view of this problem, a microcontroller based Seed Dryer Machine is designed to aid and encourage farmers to dry in large scale different farm produce within a set time. The system is divided into nine units namely power supply, ...

Words: 6253 - Pages: 26

Free Essay

Analysis and Optimization of Logistic Chain

...University of Žilina Faculty of Operation and Economics of Transport and Communications Student: Diana-Cristina CONTENTS 1. Introduction ………………………………………………………………………….. 3 2.1 The Activity of the company………………………………………………3 2.2 Logistics activity…………………………………………..……………….4 2. The product and suppliers …………………………………………..………………....5 3. Chosen suppliers…………………………………………..………..……………….....9 4. Logistic System …………………………………………...………..………………...11 5.3 Distribution …………………………………………....………………....11 5.4 Warehousing …………………………………………....………………..12 5.5 Information flow …………………………………………....…………..12 5. Optimization of the logistic activity………………………………………………….13 6. Solving solution…………………………………………....………………................14 7. Conclusion …………………………………………....……………….......................15 1. Introduction The company “S.C. SPICUL S.A” translated by “joint stocks Company, the (wheat) EAR, with registration code J 40/567/1991, have the central office in the district Ilfov, Rudeni Street, nr. 39, Romania. The shared capital of this company is 5,689,525 thousand RON (meaning 1,281,078.312 thousand Euros) divided in 227,581 inscribed stocks. The company “SPICUL” has an interesting background ever since 1630 when it was just a water mill. As time went on, the company developed into one of the biggest bread producers in Romania. 1.1 The Activity of the company According to the article...

Words: 3054 - Pages: 13

Premium Essay

Cca Logistics

...In view of the supply chain of CCA, we have a specific of the analysis for the quality management systems, transportation and warehousing system, inventory management systems during our report. Besides of the manufacturing in CCA, amatil have their responsibility in distributing the products during two kinds of the operation patterns delivery partner and out delivery partner. To maintain the quality of their product, CCA based on the implementation of ISO 9001, ISO 14001, ISO 22000 and OHSAS 18001 Coca-Cola created a system called Coca-Cola Operating Requirements (KORE) system. CCA has an cooperation with Swisslog to build its own warehouse system and logistics system to ensure distribution system in normal running. Forecasting is important for CCA to review the past and planning the strategy in inventory for the future by using technology and collaborative planning. Table of Contents Table of Contents - 2 - 1. Background - 3 - 2. Supply Chain Structure - 4 - 3. Quality Management - 6 - 3.1 ISO 9001, ISO 14001, ISO 22000 and OHSAS 18001 Accredited - 6 - 3.2 KORE System - 8 - 3.3 Recommendation - 10 - 4. Distribution system - 10 - 4.1 Transportation - 10 - 4.2 Warehouse - 11 - 5. Forecasting System - 14 - 5.1 Forecasting techniques - 14 - 5.2 Collaborative planning, forecasting & replenishment - 15 - 5.3...

Words: 6060 - Pages: 25

Free Essay

Pepsi Company

...Walton is manufacturing every product with latest technology, innovative design, excellent quality and a wide range of models & capacities. The main products of Walton are; (1) Motorcycle (2) Refrigerator & Freezer (3) Air Conditioner (4) Mobile Phone (5) Television (3D LED, Smart TV, LED, LCD, CRT) (6) DVD Player (7) Microwave Oven & Steam Oven, (8) Washing Machine (9) Iron (10) Domestic and Industrial Generator & (11) Various kinds of home appliances (Blender, Juicer, Grinder, Rice & Pressure Cooker, Washing Machine, Electric Kettle, Induction Cooker, Sewing Machine, Hair Dryer) etc. Walton Hi-Tech Industries Ltd. and other sister concerns are furnished with a strong Research and Development (R&D) division comprising a large team of 12000 accomplished employees and 600 plus highly skilled dedicated engineers & technical personnel from home and abroad. Walton HIL has a fully equipped industrial set-up with annual production capacity of 1.4 million Refrigerators and Freezers, 0.3 million Motorcycles, 0.3 million Air Conditioners, 1.0 million Televisions (3D, LED, LCD, CRT). Walton has its own Mold & Die making sections, VMC, CNC Wire-Cut, EDM machines, 08 Poly Urethane Foaming Plants, 15 Thermoforming (Vacuum forming) Units; highly equipped Metal Forming Units with Powder Coating, 3D Scanner & Printers, Nickel-Chrome Plants and Die-Casting Sections....

Words: 438 - Pages: 2

Free Essay

Chapter 3

...DISSERTATION.doc DownloadSign up for Dropbox * Sign in ------------------------------------------------- Top of Form Email Password Remember me Create an account Bottom of Form 1 CHAPTER I THE PROBLEM AND ITS BACKGROUND Introduction National University was founded on August 1, 1900 by Don Mariano Fortunato Jhocson and was previously known as Colegio Filipino, the first private non- sectarian school in the country. It stood as one of the respected institution for engineering, architecture, education, and business. In 1998, National University met a great ordeal, a great fire burned the original main building to ashes, crippling one of the pioneer universities in Manila. Nevertheless, National U proved its commitment by continuing to strive for quality education. In late 2008, majority of its share was acquired by the SM Group of Companies, paving way to the erection of a new Main Building. Along with the joint venture were new improvements in facilities and a better perspective as a higher education institution. 2 Currently, National U has eleven colleges, a basic education department, and a graduate studies department. This Legarda-based institution annually serves more than one thousand and three hundred tertiary students, new and old, and more than five hundred elementary and high school students. The campus is currently composed of three buildings, the New Main Building, the Jhocson Memorial Building (JMB) and the Pharmacy-Dentistry Building...

Words: 1893 - Pages: 8

Premium Essay

Case Study

...ONES-BLAIR® has been assessed by... AJA Registrars and registered against the requirements of ISO 9001:2008 for design and manufacturer of paints and coatings for sale to the industrial and construction markets. ISO 9001:2008 specifies requirements for a quality management system where an organization * needs to demonstrate its ability to consistently provide product that meets customer and applicable statutory and regulatory requirements, and * aims to enhance customer satisfaction through the effective application of the system, including processes for continual improvement of the system and the assurance of conformity to customer and applicable statutory and regulatory requirements. Providing the Highest Quality Products... JONES-BLAIR Company is a fully integrated research, manufacturing and marketing organization headquartered in Dallas, Texas. We consist of two divisions: (1) JONES-BLAIR High Performance Coatings for industrial OEM, maintenance applications and corporate re-imaging coatings, and (2) NEOGARD surface-applied waterproofing, seamless epoxy flooring, elastomeric roofing and wall coating systems.   Since 1928 our mission has been to provide the business community with the highest quality products accompanied by unparalleled customer service. Our record of longevity and growth speaks volumes about our accomplishment of these simply stated goals; however, you deserve to know the business philosophy that drives our success. After all, any product, sold to...

Words: 2115 - Pages: 9

Premium Essay

Socio-Economic Analysis of Bale Zone, Ethiopia

...CHAPTER IV STATISTICAL PROCESS CONTROL * This chapter covers two topics that are increasingly important in business organizations: quality control and continuous improvement. * Quality control focuses on the conversion of inputs into outputs. * The purpose of quality control is to assure that processes are performing in an acceptable manner. * This is accomplished by monitoring process output using statistical techniques. * If the results are acceptable, no further action is required; unacceptable results call for corrective action. * In the best companies, the emphasis is on designing quality into the process, thereby greatly reducing the need for inspection or control efforts. -As you might expect, different business organizations are in different stages of this revolutionary process: * The least progressive rely heavily on inspection. * Many occupy a middle ground that involves some inspection and a great deal of process control. And the most progressive have achieved an inherent level of quality that is high enough that they are able to avoid wholesale inspection activities as well as process control activities. That is the ultimate goal. Figure 4-1 illustrates these phases of quality assurance. Figure 4-1 Phases of quality assurance Acceptance Sampling Inspection before/after production Corrective action during production Quality built into the process process Acceptance Sampling ...

Words: 5888 - Pages: 24

Premium Essay

A Case Analysis for “Does This Milk Shake Taste Funny?? “

...A case Analysis for “Does this milk shake taste funny?? “ For RKC MBA, Unit # 1, Assignment # 3 Class #442 - MBA 57597 - Organisational Behaviour Analysis: There are four things / persons involved in this situation; we must go thru all these characters. 1) Paul 2) George 3) The Eastern Dairy company 4) The Union & Colleagues Paul has taken the head of operators / production for the night shift. The other operators are following for the plan and production even though he is in the same position with others. His main objective is to produce at any quality and clean up the pipes before end of the shift George looks a social person & friendly nature with other colleagues. This nature he might have been learnt from local teenage gathering place ( a drive in restaurant)). He is a loving nature person (We come to know from his romance with Cathey). His family looks old convention & tradition family. He is not high achiever, is not interested in the studies even his parents are ready to support. He took menial jobs in the past summers and not a challenging job. He took Eastern Dairy job for money that he needs for dating & for car (physiological & social needs).He likes excitement and challenge, as we can see that he has interest in Hot Cars. Eastern Dairy company looks a good pay master (with this many employees may stick to longer years by motivated with good pay scale). The company has given a free hand to the night shift operators, no manager for the night shift. The day shift...

Words: 745 - Pages: 3

Premium Essay

Tqm Total Quality Management

...TOTAL QUALITY MANAGEMENT Manufacturing unit of Ashok Leyland BY SELVA PREETHI.P INTRODUCTION Ashok Leyland is a commercial vehicle manufacturing company based in Chennai, India. Founded in 1948, the company is one of India's leading manufacturers of commercial vehicles, such as trucks and buses, as well as emergency and military vehicles. Operating six plants Ashok Leyland also makes spare parts and engines for industrial and marine applications. It sells about 60,000 vehicles and about 7,000 engines annually. It is the second largest commercial vehicle company in India in the medium and heavy commercial vehicle (M&HCV) segment .With passenger transportation options ranging from 19 seaters to 80 seaters, Ashok Leyland is a market leader in the bus segment .The company claims to carry over 70 million passengers a day more people than the entire Indian rail network. In the trucks segment Ashok Leyland primarily concentrates on the 16 ton to 25 ton range of trucks. However Ashok Leyland has presence in the entire truck range starting from 7.5 tons to 49 tons. Mr Raghunandan Saran an industrialist, started automotive manufacturing company in 1948 as Ashok Motors to assemble Austin cars. The company’s destiny and name changed soon with equity participation by British Leyland and Ashok Leyland commenced manufacture of commercial vehicles in 1955. Today the company is the flagship of the Hinduja Group, a British- based and Indian originated transnational conglomerate...

Words: 2383 - Pages: 10

Premium Essay

Process Change

...BUSINESS PROCESS CHANGE PLAN GB560 Designing, Improving and Implementing Processes Session # (1202D) Jenna Marerra Kaplan University March 8, 2012 UNIT 1 ASSIGNMENT (With Diagram Response Should Run 2-3 Pages in Length) Q#1 Provide the name of the organization (this must be a real organization and you may use the organization where you currently work; describe the organization’s size and summarize the primary mission of the organization. Don’t simply copy from the organization’s mission statement. I chose to use WalMart for this assignment; WalMart’s primary mission is to bring consumers high quality goods at a low, discounted price. Sam Walton’s original vision was to accomplish this; although WalMart has grown substantially since its initial founding, this mission has not changed. WalMart employs just over 2 million people worldwide and has 8,970 locations. Q#2 From your research of the organization, identify a single Business Process Change that the organization will need to contemplate and undertake in the coming year. These changes can result from new technologies, economic issues, or changes in the marketplace. WalMart has successfully navigated the marketplace over the years, from green initiatives to economic slowdowns. A Business Process Change it currently faces is its employee relations. WalMart has taken a lot of heat recently for its labor relations, with issues running the gambut from wage violations (some employees...

Words: 3750 - Pages: 15

Free Essay

Supply Chain Quality and Performance Management

...good people. The main component that was missing from their TQM implementation was Systems Thinking. They did not implement a system that allowed issues which required improvement to become new projects. Thus even though they claimed they were continuously improving, there were very few new initiatives. Prepared by: Deon du Plessis Page 2 of 19 Created on 04/04/15 Individual Examination: British Telecom Individual Examination: British Telecom The solution will be to become a true BSPM learning organisation. This will involve some more changes to the structure where the continuous improvement projects will be programme managed across the value chain. 2 Question1: What role has the Quality Management system and the ISO 9001 standard played in BT’s total quality journey? If one looks at the ideal QMS system as portrayed in Figure 4 then one will see that BT have implemented major parts of the QMS system from the time that they decided to implement TQM in 1986. 2.1 The timelines of major QMS milestones. 1984: Privatise. 1986: Decide to implement TQM and announce a value...

Words: 3803 - Pages: 16