Free Essay

Mail System Project

In:

Submitted By robbycollazo2
Words 1249
Pages 5
Mail System Project

Author’s Note This annotated bibliography is being submitted on August 5th, 2013, for N234/CET2810C Section 01 Microsoft Exchange Server course.

Mail System Project When designing my Microsoft Exchange mailing system I will need to gather information about my environment. I will need to see if the installation is going to be a migration or am I walking in to a fresh setup. With a fresh installation I will have a lot of things to consider such as the customer requirements, mailbox profile requirements, geographic location, and server and data protection. I will also have to make assumptions based on all configurations. With the migration of an Exchange environment things become a little easier because some of the things you have to take into consideration during a fresh install are already done. You can just move the Exchange resources from one installation to the other such as mailboxes, public folders, and connectors. But you will need to determine the specific needs for the migration and I will need to archive non-essential data before I migrate to reduce cost and shorten my timeline. Also there are plenty of tools to assist in Exchange migration to where it becomes a simple task. So if you ask me if I want to go with a fresh install vs. migration if the already had Exchange in place my choice is Migration. Storage is also a big factor when setting up an exchange Server environment. There are a lot of architectural factors the play in to the storage design of my exchange server, the most important factors are, mailbox count, mailbox currency, mailbox size, mailbox user profile, E-mail client types, E-mail client extensions, server applications and also high availability requirements. When going over these specific requirements, this will allow me to base my design on the company’s growth and current state of storage usage. When setting up security for my exchange server there are a few options I have. One being relay restrictions which keep spammers from having a field day with my server. If relay restrictions are not implemented it means that anyone not just spammers can relay mail through my server. Another important security measure is a good virus protection. When it comes to virus protection for Exchange you have to purchase virus protection that is made especially for Exchange Server. The reason is because email viruses do not exist on Exchange Server in the form of a stand-alone file, instead they are stored in the Exchange mailbox with messages there for you need a virus protection that is designed to read the Exchange database. Another option for security is called RPC over HTTP it’s kind of like VPN but not, a RPC over HTTP connection is limits the scope of what resources can be accessed remotely. One more security measure is simple I’ll just run security and system updates regularly. When setting up and managing my mailing list I will more than likely go with the default address list this is called the global address list (GAL). Because it will automatically populate with new users, contacts, groups, or rooms as they are added to my OU (organizational unit). Setting up a solid back up strategy for Exchange Server is crucial regardless of system architecture and setup there is no running from the question, if something happens what is it exactly that I want to back up? I would have to have a plan set in place to make sure that if something where to happen that I would be backing up what is needed not wanted. On my list it would include Exchange database files (mailboxes, public folders), Exchange transaction logs, Message tracking logs, and protocol logs. Beyond using third party backup solutions to replicate everything I can also go virtual and back up everything in a snapshot this will protect even if I had total server failure.

Annotated Bibliography Simpson, R. (2011, January 21). Exchange 2010 Tested Solutions: 500 Mailboxes in a Single Site Running Hyper-V on Dell Servers. Retrieved August 5, 2013, from technet.microsoft.com/en-us/library/gg436085(v=exchg.141).aspx In this analysis Robert Simpson presents facts on how he set up Microsoft Exchange 2010 on five hundred mailboxes in a single site running Hyper-V on Dell Servers. He begins by telling the importance of the customers’ requirements, stating the first steps in Exchange solution design is to accurately summarize the business and technical requirements that are critical to making the correct design decisions. He also presents the importance of geographic location requirements, by stating that understanding the distribution of mailbox users and datacenters is important when making design decisions about high availability and site resiliency. TechNet (2013, June 11). Migrate Public Folders to Exchange 2013 From Previous Versions: Exchange 2013 Help. Retrieved August 5, 2013, from technet.microsoft.com/en-us/library/jj150486(v=exchg.150).aspx In this analysis the TechNet authors present facts on how easy is it for the migration of all Exchange information such as public folders from one server to the next. Then begin to go in to detail on how to accomplish this by following a step by step guide. By downloading migration scripts, creating public folder mailboxes on the new exchange server, and then finalizing and testing the migration. TechNet (2012, July 23). Mailbox Storage Design Process: Exchange 2010 Help. Retrieved August 5, 2013, from http://technet.microsoft.com/en-us/library/ff367907(v=exchg.141).aspx In this analysis the TechNet authors touch on some major key points to take when designing your storage architecture for you Exchange Server Environment. With providing me with the performance, Capacity, and reliability standards for every design factor to take into effect when setting up my storage configurations. Posey, B. (2006, September 27). 5 Exchange Server security tips - TechRepublic. Retrieved August 5, 2013, from http://www.techrepublic.com/article/5-exchange-server-security-tips/ In this article Brien Posey explains the importance of keeping you Exchange environment secure. By explaining the different option you had to make your Exchange Server safer. He goes in to great detail on how relay restrictions keep your Exchange Server safe from spammers or anyone for that matter trying to relay messages through your mailbox. He also explains the importance of getting a good virus protection that is made specifically for Exchange databases. Also the importance of keeping current on security and system updates. TechNet (2013, March 18). Address Lists: Exchange Online Help. Retrieved August 5, 2013, from http://technet.microsoft.com/en-us/library/bb232119(v=exchg.150).aspx#DALists In this analysis by the TechNet authors they explain the difference between the default address list and the custom address list. Explaining that with the global address list, when anyone or anything is added to your OU it will automatically add them or it to this list such as users, groups, contacts, and rooms. Mah, P. (2011, December 16). 4 Steps to Developing a Solid Backup Strategy for Exchange. Retrieved August 5, 2013, from http://www.gfi.com/blog/4-steps-to-developing-a-solid-backup-strategy-for-exchange/ In this article Paul Mah describes what practices he would use in back up strategy’s that he recommends for his Exchange Server Environment, by creating a check list for people to use during the set up of there back up procedure for Exchange. Also he provided some other tips and examples for people to use.

Similar Documents

Free Essay

Mail System Project – Diagram

...Mail System Project – Diagram Author Note This diagram is being submitted on August 21st, 2013 for N234/CET2810C Section 01 Microsoft Exchange Server course. Mail System Project – Diagram Explanation All outside messages will be routed through the edge transport server to control the flow of messages that are sent to or received from the Internet. And will also to its part in protecting us against viruses and spam. Then from within my organization the hub transport server will handle all flow of mail from within the company. All messages will be using SMTP to submit messages to the hub transport server. I have kept RPC encryption enabled for protection between my hub transport servers, mailbox servers, and my client access servers. But do to issues with RPC encryption and versions of outlook I am using Https between my client access server and the outlook web application. We have our second site that replicates with site 1 for redundancy and the communication between these two sites our secured by SMTP over TLS (SSL) this enables a certificate-based authentication and helps provide security-enhanced data transfers by using symmetric encryption keys. The shared secret key is appended to the data to be hashed. This helps enhance the security of the hash because both parties must have the same shared secret key to verify that the data is authentic. Site 2 houses the domain controller with active directory and the global address list. And again everything in Site...

Words: 254 - Pages: 2

Premium Essay

Leviton's Scanning Project

...“Leviton’s Scanning Project” By Dream Makers March 19, 2010 Business Communications/BSA314/BBA 1156 Instructor: Marietta Sanford Leviton’s Scanning Project According to Levito’s website Leviton was founded by Evser and Isidor Leviton in 1906. After migrating from Russia to the United States, the two opened up a small tinsmithing business producing mantle tips used for gas lighting. Today it manufactures more than 2 million parts per day worldwide. Their portfolio has more than 25,000 different products which can be found in over 100 countries. From its simple beginnings more than a century ago, manufacturing one item – gas mantle tips – Leviton has evolved into one of the largest privately-held global providers of electrical wiring devices, data connectivity solutions and lighting energy management systems. Leviton leads the electrical industry in providing the most comprehensive range of smart solutions for professionals in global residential, commercial and industrial markets. Today, Leviton is committed to developing solutions that help customers work faster, smarter and more efficiently. Donald J. Hendler has been President of Leviton Manufacturing Co., Inc., since 2005 and has also been its Chief Executive Officer since September 2007. In a career spanning more than 37 years, Mr. Hendler has served key positions at Leviton. Mr. Hendler served as Executive Vice President of Leviton Manufacturing Co., Inc., where he directed strategic planning, human...

Words: 1082 - Pages: 5

Premium Essay

Elektra Products

...Solar Energy Businesses in the Philippines Solutions) - AVGarcia Power Systems Corp. - AVODROC D MARKETING - Ace Electech Center Importer and Distributor of LED Bulbs, LED Fluorescent, Solar Panel, Solar Fan, Solar Refrigerator, Solar Cooker, Wind Generator, CCTV system, PABX Communication System, Telephones, AVR, Battery Chargers, Sine wave Inverters, Square Wave Inverters, Solar Water Pump and many more. • Business type: manufacturer, wholesale supplier, importer, distributor • Product types: LED lighting, solar street lighting, LED light bulbs, solar lighting systems, wind turbines (small), DC lighting, CCTV Systems, PABX Communication systems, AVR, Inverters, Telephones, . • Service types: engineering • Address: 555 Raon st. (G. Puyat), Sta. Cruz, Manila Philippines • Telephone: 3097535 • FAX: 7401983 • Web Site: http://www.aceelectechcenter.com • E-mail: Send Email to Ace Electech Center AFMI. Global Phils. Inc. • Business type: distributor • Product types: LED lighting, solar electric power systems, batteries deep cycle, uninterruptible power supplies UPS, generators diesel, air filtering and purification system components, ESD and Conductive Tiles. • Service types: consulting, design, construction, engineering, site survey and assessment services, contractor services, maintenance and repair services, testing services • Address: P3 Aurora Building Alabang Zapote Road, Muntinlupa, Philippines Philippines...

Words: 9284 - Pages: 38

Premium Essay

Denver International Airport

...Denver International Airport Project Communication Plan Prepared by: Date: 6/15/12 Version: Master Plan Document Purpose Communication is a critical component in project delivery. It must be delivered in a timely and effective manner to all project stakeholders in order to meet objectives and achieve project goals. This document will detail the execution of all communication regarding the Denver Airport Project. This includes, but is not limited to, communication to and from executives, managers, and the project team. It will also discuss the means and frequency by which communication will be delivered. Overview The Denver International Airport project consists of designing and constructing a new airport, based upon a “Home-on-the-Range” design. The City of Denver requires a wide open entry point for visitors. The airport is to maintain a distinctive look that will be easily identified by travelers. This design must meet specifications provided by the City of Denver. The new airport should allow for more traffic in and out of the airport, while also becoming less congested. Improvements to runways will lead to a more efficient operation of the regional airspace, significantly reducing aircraft delays and airline operating costs. The new airport will also result in reduced noise impact, as it is being built on a relatively large site in an unpopulated area. The overall layout will be more efficient in reducing passenger walking distance, while also having...

Words: 1331 - Pages: 6

Free Essay

School Fees Management System

...FEES MANAGEMENT SYSTEM COUPLED WITH E-MAIL AND MOBILE MESSAGING TECHNOLOGY Case Project: Maryhill High School BY MUZOORA SAVIOR MASTER OF SCIENCE IN INFORMATION SYSTEMS FACULTY OF SCIENCE DEPARTMENT OF INFORMATION SYSTEMS Email:lunsavioz@hotmail.com Tel: 0753404044 / 0774922487 A Concept Paper Leading to a Project Proposal Submitted to the Office of Graduate Studies in Partial Fulfillment for the Award of the Degree of Master of Science in Information Systems of Uganda Martyrs University August 2013 Introduction The domain of this project is Information Systems and the sub domain is Management Information Systems (MIS). Laudon (2012) defines MIS as the study of computer-based information systems in business and management. MIS provide reports on the organization’s performance. This project will result into a Fees Management System (FMS), coupled with E-mail and mobile messaging technology. FMS for Maryhill High School will serve administrators with reports about students’ fees collection. It will also provide parents and guardians with reports about students’ invoices, payments and balances through E-mail and mobile messages. Background Maryhill High School is located at Nyamitanga hill, Mbarara district. At present, the school’s enrollment is at about 1500 students. The school generates revenue from students’ fees, therefore all students are required to pay school fees. Students pay for Tuition, PTA...

Words: 800 - Pages: 4

Premium Essay

It 221 Final

...United Mail Presort Department Third Shift Implementation [pic] Axia College of University of Phoenix IT 221 Analysis and Design of Information Systems February 28, 2010 TABLE OF CONTENTS 1 PROJECT Definition 5 2 PROJECT EXECUTIVE SUMMARY 5 3 PROJECT OVERVIEW 5 4 PROJECT SCOPE 6 4.1 Goals and Objectives 6 4.2 Project Deliverables 6 4.3 Deliverables Out of Scope 6 4.4 Project Estimated Costs & Duration 6 5 PROJECT CONDITIONS 7 5.1 Project Assumptions 7 5.2 Project Risks 7 5.3 Project Constraints 7 6 Project Structure Approach 7 7 Project Team Organization Plans 8 8 Communication Plan 8 8.1 Risks and issues management 8 8.1.1 Potential exceptions and problems 8 8.1.2 Appropriate corrective measures 8 8.2 Change management process 8 8.2.1 Change management process steps 8 8.2.2 Change control board (CCB) 8 9 Development and Implementation 8 9.1 Quality Plan Processes Error! Bookmark not defined. 10 Measurement and Project Closing 9 10.1 Quality Management 9 10.2 Communication Management 9 10.3 Customer Expectation Management 9 10.4 Asset Management 9 10.5 Lessons Learned 9 10.6 Postproject Tasks 10 10.7 Project Closure Recommendations 10 PROJECT DEFINITION The United Mail Presort Department will be implementing a third shift operation to assist the existing first...

Words: 3087 - Pages: 13

Premium Essay

Genrays Project Charter

...Project Charter Template Human Resources Information System (HRIS) Project Charter GenRays September 11th 2012 Table of Contents Project Title Purpose Description Objective Success Criteria or Expected Benefits Funding Major Deliverables Acceptance Criteria Milestone Schedule Approval Requirements Project Manager Authorized by  Project Title Human Resources Information System. Purpose In order to allow employees to track their own careers, facilitate transparency in hiring, improve the payroll functions, improve recruiting and automate number of different time consuming and costly processes GenRays will be implementing a new Human Resources Information System. Description Due to better than anticipated financial savings from the implementation of new financial application, GenRays plans to invest the savings into growth and expansion. In order to meet the anticipated growth GenRays needs a streamline human resources system that can facilitate the growth at the same time save money and assist employees. Objective The objective of this project is to implement the new Human Resources Information System in order to improve and streamline various aspect of employee information. Success Criteria or Expected Benefits The expected benefits of this project are as follows: Improved Recruiting. Savings due to automatic calculations. Savings due to auto-fill functionality. Funding $103,000 has been budgeted for procurement...

Words: 667 - Pages: 3

Premium Essay

A Day in the Life

...Chapter 1 Modern Project Management 19 Note: If you have any difficulty accessing any of the Web addresses listed here or elsewhere in the text, you can find up-to-date addresses on the home page of Dr. Erik Larson, coauthor of this text: http://www.bus.oregonstate.edu/faculty/bio .htm?UserName=Larson References Ball Parks of Baseball, “Cisco Field,” http://www.ballparksofbaseball.com/future/ CiscoField.htm (accessed June 2, 2009). Benko, C., and F. W. McFarlan, Connecting the Dots (Boston: HBS Press, 2003). Cohen, D. J., and R. J. Graham, The Project Manager’s MBA (San Francisco: Jossey-Bass, 2001). Faylor, C., “Next Generation Wii Is Rumored to Hit the Market in 2011,” Shacknews.com (Oct. 1, 2008). Kay, J., “US Box Office Spellbound by Harry Potter and the Half-Blood Prince,” www.guardian.uk.co.filmblog (accessed July 15, 2009). Krisher, T., “GM Product Chief Says New Vehicles Must be Hits,” www. businessweek.com (accessed July 20, 2009). Larkowski, K., “Standish Group Report Shows Project Success Improves 50 Percent,” www.standishgroup.com, 2004, Third Quarter. Lunar Energy, “British Firm Announces World’s Largest Tidal Power Development,” Lunarenergy.co.uk (March 11, 2008). Peters, T., PM Network, January 2004, Vol. 18, No. 1, p. 19. Project Management Institute, Leadership in Project Management Annual (Newton Square, PA: PMI Publishing, 2006). Project Management Institute, A Guide to the Project Management Body of Knowledge (PMBOK), (Newton Square, PA: PMI...

Words: 1380 - Pages: 6

Premium Essay

Wgu Mgt1 Project Charter

...Genrays Project Charter Project Charter Template Human Resources Information System (HRIS) Project Charter GenRays September 11th 2012 Table of Contents Project Title Purpose Description Objective Success Criteria or Expected Benefits Funding Major Deliverables Acceptance Criteria Milestone Schedule Approval Requirements Project Manager Authorized by  Project Title Human Resources Information System. Purpose In order to allow employees to track their own careers, facilitate transparency in hiring, improve the payroll functions, improve recruiting and automate number of different time consuming and costly processes GenRays will be implementing a new Human Resources Information System. Description Due to better than anticipated financial savings from the implementation of new financial application, GenRays plans to invest the savings into growth and expansion. In order to meet the anticipated growth GenRays needs a streamline human resources system that can facilitate the growth at the same time save money and assist employees. Objective The objective of this project is to implement the new Human Resources Information System in order to improve and streamline various aspect of employee information. Success Criteria or Expected Benefits The expected benefits of this project are as follows: Improved Recruiting. Savings due to automatic calculations. Savings due to auto-fill functionality. Funding $103,000 has...

Words: 673 - Pages: 3

Premium Essay

Kudler Kfsp

...program will automatically track those items, which are purchased during those visits, and in what quantities those items are purchased by that specific customer. This information, which is critical to inventory control and would be used by the management team and Kathy Kudler in their monthly operations review meetings to maintain customer service levels, control excessive merchandise, and curtail inventory stock outs (Virtual Organizations Portal, 2007). The scope of Kudler’s Fine Foods Frequent Shopper Program (KFSP) will focus on the business and technical applications of the processes, which shall structure a new system for enhancing revenue by increasing the faithfulness, and financial benefit of its customers. Project scope will include upgrades to the current system and entails business and process requirements, which will change the system design and the manner in...

Words: 1910 - Pages: 8

Free Essay

The End of Email

...The End of E-Mail INC. Magazine, February, 2006 Issue Author: Darren Dahl Submitted to Dr. Akpan Strayer University By Angela D. Davis Information Systems for Decision Making (CIS 500) Article Review 1 Week 4 April 30, 2006 2 This article seems to suggest that e-mail which has become a way of living, and communicating will eventually become another thing of our past. The article written by Darren Dahl makes a good assertion on why this may become the wave of the future to no longer need or use e-mail in business and in our personal lives. With e-mail becoming so demanding in just the volume a person may receive in a matter of hours, the volume of constant e-mailing is literally overwhelming no matter if it is business or personal. We don’t have a lot of time to read or to respond back to coworkers, communication between people who are in our groups to discuss or review projects by e-mail tend to get lost in e-mail shuffle, notification of interoffice schedule meetings sometimes will be missed due to too much e-mailing, and at home we just may not have the time to even look at our e-mail because of our family obligations once we are home. In this article, Tom Biro shares his thoughts about a possible new way of saving time and keeping track of how we communicate by using the “wiki” software to create webpages that can be used on the Internet or in the company’s Intranet. After reading this article, I agree that...

Words: 1558 - Pages: 7

Premium Essay

Project Charter

...Genrays Project Charter  Project Charter Template  Human Resources Information System (HRIS)  Project Charter  GenRays  September 11th 2012  Project Title  Human Resources Information System.  Purpose  In order to allow employees to track their own careers, facilitate transparency in hiring, improve the payroll functions, improve recruiting and automate number of different time consuming and costly processes GenRays will be implementing a new Human Resources Information System.  Description  Due to better than anticipated financial savings from the implementation of new financial application, GenRays plans to invest the savings into growth and expansion. In order to meet the anticipated growth GenRays needs a streamline human resources system that can facilitate the growth at the same time save money and assist employees. Objective  The objective of this project is to implement the new Human Resources Information System in order to improve and streamline various aspect of employee information.  Success Criteria or Expected Benefits  The expected benefits of this project are as follows:  Improved Recruiting.  Savings due to automatic calculations.  Savings due to auto-fill functionality.  Funding  $103,000 has been budgeted for procurement and implementation of this HRIS.  Major Deliverables  The major deliverables for this project are as as follows:  Work Package  Deliverable  Recruiting Requirements Analyze and monitor applicant pool  Career...

Words: 647 - Pages: 3

Free Essay

Mr Victor Kajwahula

...Bank of Africa, Dar es Salam, Tanzania. E-mail address: victorkajwahula@gmail.com +255788189881/ +255769644280 PROFILE: Ability to lead and motivate project team to success EXPERIENCE: * Designing, developing and maintaining database (MYSQL & MS ACCESS) * Programming skills by using C++ * Web design and developing by using HTML, CSS * Networks Design and Implementation OPERATING SYSTEM PLATFORMS Microsoft windows OS ,Mac OS ,Linux (Ubuntu) TYPE OF PERSON: A driven IT Professional with Extensive Experience in Support, Administration and Network troubleshooting. STRENGH: Motivate a team work, Managing IT projects to be completed on time, within a budget and satisfy customer. With Agile project management and PRINCE2 (Projects IN Controlled Environments) Training knowledge EDUCATION: 1985-1991 Primary School 1994-1997 O-level 1998 -2000 High School PPROFESIONAL EXAMS 2007 Derby College UK- IT Certificate. 2007 Derby College UK- IT Diploma. 2013 BCS Certificate in IT. 2013 BCS Diploma in IT. 2013 BCS Graduate Diploma in IT. (BCS- BRITISH COMPUTER SOCIETY) - THE CHARTERED INSTITUTE FOR IT (UK AWARDING BOARD) AREA OF STUDY: Software Development, Computer and Network Technology and Information Systems, Professional Issues in IS Practice/IT laws, Computer Networks, IT Project Management, System...

Words: 581 - Pages: 3

Free Essay

Sharepoint

...Research Paper: Enterprise Collaboration Systems Introduction Enterprise Collaboration Systems or ECSs are systems that create team and workgroup collaboration. They enhance communications, productivity and provide support in business operations. Some basic examples of ECSs are e-mail, chat, and videoconferencing (O’Brien & Marakas, 2011). As we dive into this research paper more detailed explanations will be made of what the systems are and how they help organizations collaborate and enhance quality of work. ECSs also include applications that are sometimes called office automation systems, which are systems that create workflows to get rid of paper and create a smoother experience for users (O’Brien & Marakas, 2011). Organizations have many systems and ECSs are not ones to be left out. Information systems perform three vital roles in business firms. They support organization’s business processes and operations, give users more valuable information to help with good business decision making, and create strategic competitive advantages. Information technology, with the help of the Internet, provides us with the avenues to communicate ideas, share resources, and coordinate our cooperative work efforts. The goal of ECSs are to enable us to work together easily and effectively by helping us to, communicate, by sharing information with each other, coordinate, by helping us organize our work efforts and use of resources, and collaborate, by helping us work together cooperatively...

Words: 3522 - Pages: 15

Free Essay

Pm in Cement

...Publication: Project Management - The Managerial Process Authors: Clifford F. Gray & Erik W. Larson Reference: Leadership - Being an Effective Project Manager Western Oceanography Institute - Conversion to Windows NT It was already 72 degrees when Astrid Young pulled into the parking lot at the Western Oceanography Institute (WOI). The radio announcer was reminding listeners to leave out extra water for their pets because the temperature was going to be in the high 90s for the third straight day. Young was three-quarters of the way through the Microsoft NT conversion project. Yesterday had been a disaster, and she was determined to get back on top of things. Astrid Young Astrid Young was a 27 year old graduate from Western State University (WSU) with a B.S. degree in management information systems. After graduation she worked for five years at Evergreen Systems in Seattle, Washington. While at WSU she worked part-time for an oceanography professor, Ahmet Green, creating a customised database for a research project he was conducting. Green had been recently appointed director of the Western Oceanography Institute (WOI), and Young was confident that this prior experience was instrumental in getting her the job as Information Services (IS) director at the institute. Although she took a significant pay cut she jumped at the opportunity to return to her former college. Her job at Evergreen Systems had been very demanding. The long hours and extensive...

Words: 2242 - Pages: 9