Free Essay

Material Resource Planning

In:

Submitted By guidtwo
Words 441
Pages 2
MRP II is manufacturing resource planning. MRP II provides planning for many areas of manufacturing companies which includes purchasing, inventory, material planning, shop floor scheduling, capacity planning, and accounting. MRP II allows for standardization and streamlines automation of business processes which leads to improvements in cost control and revenue.
The MRP system assists the manufacturing company by suggesting purchase orders to be placed and exactly when to place them so that the materials required for the specific task arrive on time. The MRP system also recommends a start date for each work task required to perform the job. By knowing the materials needed parts and the start dates of the work tasks means that it is possible to pinpoint material shortages before they occur so that they can be avoided rather than finding out when it’s too late.
MRP systems assists companies particularly manufacturing companies in various ways, the most important contribution that the MRP inventory system gives are in:
• On-time material ordering which reduces expediting and material shortages.
• Combining of material orders to suppliers which reduces order placement.
• Real time planning of work which reduces rescheduling and increase productivity.
• Makes company information more integrated and gives it the accessibility which improves task specific progress.
Advantages: MRP II helps to standardize business processes by providing the business with automated methods for many different areas of the business. This eventually leads to an overall standardization which will lead to repeated processes and create a platform for improving those processes. A company that implements MRP II for the very first time is going to experience problems initially controlling the increase in selling transactions, as well as the manufacturing and purchasing that is associated with the company’s growth. MRP II allows employees in those specified business areas to do more by having increased visibility of information that is needed to perform their jobs. This will greatly improve how their work gets done which will allow the company to be more competitive within its market.
Disadvantages: The implementation of MRP II requires information to be accurate. If inaccurate quantities are entered in the inventory area, errors in automated planning processes will occur. The MRP II utilizes length of time to purchase or manufacture products and for quantities usually purchased on a purchase order or manufactured on a work order. If there is significant changes in the actual lot sizes purchased or produced and the lead times then the MRP II will not produce plans that match. Inaccurate information and lack of understanding of the impact of lot sizes and lead times will cause implementation failure of MRP II and costly reimplementation.

Similar Documents

Free Essay

Material Resource Planning

...4th International DAAAM Conference INDUSTRIAL ENGINEERING – INNOVATION AS COMPETITIVE EDGE FOR SME 29-30TH April 2004, Tallinn, Estonia MRP SYSTEMS RESEARCH Eduard Shevtchenko Tallinn Technical University Institute of Machinery. Ehitajate tee 5, EE0026 Tallinn, Estonia e-mail: eduard.shevtshenko@ttu.ee ABSTRACT Paper will give the analysis of theoretical MRP base and “Monitor” and “Scala” software efficiency analysis in the solution of “resource planning management” problems. The aim is to find out what are the original features of every solution on the way to profit maximisation at manufacturing enterprise. Paper will show what are the results of software implementation at the manufacturing enterprise compared to the period of work without software. Estimation of the efficiency of the “Scala” and “Monitor” software starts from the preparation of manufacturing process stage, and stretched up to financial results achieved. In this paper results achieved throw planning activities will be compared with real results. Analyses of manufacturing problems solutions throw software installed: using of work centre loading simulation possibilities for the optimisation of present and future manufacturing capacity; pre-calculation for future products; rating of subcontractors; EOQ calculation; delivery performance analysis; optimisation of inventory; supply chain management. Theoretical MRP base analysis gives the estimation of final profit sensitivity to different input data. This...

Words: 3715 - Pages: 15

Premium Essay

The Affect of Shared Service Centers on Enterprise and Material Resource Planning

...Proposal The use of enterprise resource planning systems (ERP) is widespread. To maximize efficiency, companies of all sizes are implementing these systems and revising existing processes to increase efficiencies. The widespread influence on business by ERP systems requires investors to understand the benefits gained and the costs incurred by implementing them. Efficient conversions to ERP systems may provide a multinational corporation with enough of an edge to change the industry in which it participates. Determining and investigating key ERP benefits is important for a number of reasons. By evaluating how other firms have been affected by implementing ERP systems, a company can estimate how its processes will be benefit and whether the system will assist in solving the problems. Evaluating benefits “allows firms to investigate the alignment between their needs and what an ERP system can do” (O'Leary, 2004). Once the company has established ERP benefit benchmarks, it will have a point of reference by which to evaluate other ERP implementations. Once it is understood what ERP benefits are likely to be experienced, then those potential benefits can be used as the basis to set up measurements for those benefits. Then those measurements can be used to establish whether a company has attained the levels of productivity expected from the ERP implementation (O'Leary, 2004). Industry specific benefits must also be taken into account. In total, these are the reference points by...

Words: 3041 - Pages: 13

Premium Essay

Material Resource Planning

...| | | | |Beijing International Vocational Education School | |北 京 国 际 职 业 教 育 学 校 | |[pic] | |BTEC Higher National Diploma | | | |Assignment Cover Sheet | |Name(s) of Student |Lily Guo and Sherry Zhong | |Year / Class |Year 4 Management Class 1 | |Course Title |BTEC Higher National Diploma in Business (Management/Finance) | |Unit Title |Unit 43 – Small Business Enterprise...

Words: 444 - Pages: 2

Premium Essay

Design for Riordan Manufacturing

...analysis of the present process pertaining to the production of the Riordan electric fans is presented. The new process design attempts to eliminate bottlenecks within the process in order to make the supply-chain as optimal as possible. A production forecast for the Riordan electric fans is included and a Gantt chart is included as well. Lastly, a cover letter is included which details the coordination of the aggregate operations planning and TQM for the Riordan electric fans. Process Design for Riordan Manufacturing MRP for Manufacturing The present process at Riordan Manufacturing is centered on the China plant, which applies material requirement planning to adhere to the material requirements, which then go through a collection process at receiving units in order to make its way to the molding unit. The assembly unit then receives the products, which are forwarded to the appropriate packing unit for appropriate handling. Lastly, the shipping unit handles the electric fans’ distribution. Riordan Manufacturing is concerned about scrap materials from the respective units. As such, there should be a reduction in the level of wasteful products from every unit; this, in turn, would lower the price of producing each fan. One initiative already commenced is the Hangzhou plant’s utilization of extra parts within its products that are customized. There are, however, additional concerns pertaining to...

Words: 1488 - Pages: 6

Premium Essay

Research Paper

...Process Design for Riordan Manufacturing MRP for Manufacturing The present process at Riordan Manufacturing is centered on the China plant, which applies material requirement planning to adhere to the material requirements, which then go through a collection process at receiving units in order to make its way to the molding unit. The assembly unit then receives the products, which are forwarded to the appropriate packing unit for appropriate handling. Lastly, the shipping unit handles the electric fans’ distribution. Riordan Manufacturing is concerned about scrap materials from the respective units. As such, there should be a reduction in the level of wasteful products from every unit; this, in turn, would lower the price of producing each fan. One initiative already commenced is the Hangzhou plant’s utilization of extra parts within its products that are customized. There are, however, additional concerns pertaining to periodic orders in regard to the supply of fans. As such, it is difficult to properly assess material requirements. In order to make this process more effective and precise, the MRP process needs to factor in variability in regard to overall supply and demand within the electric fans’ production. A New Process Design Riordan Manufacturing's China plant’s operations focus is on quantity when it comes to the production of the fans. The necessary amount of inventory is maintained according to a production forecast. Nonetheless, the amount of inventory is...

Words: 366 - Pages: 2

Free Essay

Material Flow Improvement

...Material Flow Improvement By Léo Belime Diploma work No. 35/2010 At Department of Materials and Manufacturing Technology CHALMERS UNIVERSITY OF TECHNOLOGY Göteborg, Sweden Diploma work in the Master in Production Engineering Program Performed at: Société des Ateliers Louis Vuitton Supervisor(s): Florence Laprade Société des Ateliers Louis Vuitton 36100 Issoudun - France Peter Almström Department of Materials and Manufacturing Technology Chalmers University of Technology, SE-412 96 Gothenburg Marie-Agnès Girard Ecole Nationale Supérieure des Mines de Saint Etienne 42023 Saint Etienne - France Examiner: Bertil Gustafsson Department of Materials and Manufacturing Technology Chalmers University of Technology, SE-412 96 Gothenburg Material flow improvement Léo Belime © Léo Belime 2010 Diploma work no 35/2010 Department of Materials and Manufacturing Technology Chalmers University of Technology SE-412 96 Gothenburg Sweden Telephone + 46 (0)31-772 1000 Chalmers Repro Service Gothenburg, Sweden 2010 Material flow improvement Léo Belime Department of Materials and Manufacturing Technology Chalmers University of Technology Contents Abstract ............................................................................................................................. i Acknowledgements........................................................................................................... ii Foreword ..............................................................

Words: 9966 - Pages: 40

Premium Essay

Mrp-Toyota

...Mrp-Toyota Materials Requirements Planning (MRP) Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in scheduling and placing orders for dependent demand items. Dependent demand items are components of finished goods—such as raw materials, component parts, and subassemblies—for which the amount of inventory needed depends on the level of production of the final product. For example, in a plant that manufactured bicycles, dependent demand inventory items might include aluminum, tires, seats, and derailleurs. The first MRP systems of inventory management evolved in the 1940s and 1950s. They used mainframe computers to explode information from a bill of materials for a certain finished product into a production and purchasing plan for components. Before long, MRP was expanded to include information feedback loops so that production personnel could change and update the inputs into the system as needed. The next generation of MRP, known as manufacturing resources planning or MRP II, also incorporated marketing, finance, accounting, engineering, and human resources aspects into the planning process. A related concept that expands on MRP is enterprise resources planning (ERP), which uses computer technology to link the various functional areas across an entire business enterprise. MRP works backward from a production plan for finished goods to develop requirements for components and raw materials. "MRP begins...

Words: 291 - Pages: 2

Free Essay

Operations Management

...Context March 6, 2015 II. View Point Manager of XYZ Company III. Statement of the problem The problem in the case is to contemplate installing a Materials Requirement Planning (MRP) System to the XYZ Company. The most pertinent questions in the problem are, How will it be done?, How much will be its cost? And what action will be needed to lead this project into success? IV. Objectives Short-range Objective - To set up the new system in order to have a smooth flow of production and avoid interruption. Long-range Objective – To be able to upgrade equipment which will help fit to the new system. V. SWOT Analysis STRENGTHS | WEAKNESSES | * Has workers with expertise in using company’s equipment & following the system * High availability of raw materials * Near to target market | * Poor manufacturing system * Inefficient use of resources * Higher percentage of employee turnover & scrap/waste | OPPORTUNITIES | THREATS | * Possible development of the production system * Affordability in the cost of production | * Breakdown of existing system * Competitors build stronger relationship with other customers | VI. Alternative Courses of Action * ACA# 1: Execute Materials Requirement Planning System. Advantages: Reduce the levels of inventory. Minimize the holding cost Disadvantages: Execution of the system will be at high cost. . ...

Words: 810 - Pages: 4

Free Essay

Mrp 2

...MANUFACTURING RESOURCES PLANNING What is MRP II and why it is being used Definition and History According to American Production and Inventory Control Society, MRP II can be defined as a method of the effective planning of all the resources of a manufacturing company (Higgins, Leroy and Tierney 1996). It is actually advancement or can be said as a upgrading of Material Requirement Planning System (MRP) system, which is a set of technique that uses bills of material, data and a master production schedule to calculate the requirements for materials in a manufacturing company. The MRP system was initiated in the 1960s and was spearheaded by a team of IBM innovators comprising Joe Orlicky, George Plossl and Ollie Wright who sought to create a structured methodology for planning and scheduling materials for complex manufactured products. Over the past 30 years MRP has spawned an entire industry in manufacturing and professional services. It has evolved hand in hand with technological advancements in the computer hardware industry. At the beginning, MRP systems were run on large mainframe computer costing a lot of money and required large technical staff to support them. However in the 1970s they underwent refinements that saw disparate modules get included and critical business concerns such as cost accounting and Capacity Requirements Planning get added. This gave rise to a new generation system called MRP II. Continued changes spurred by increased technological advances coupled...

Words: 610 - Pages: 3

Premium Essay

Managerial Application of Information Technology

...Levels 4 c. Benefits of MRP System 5 i. How will ABC, Inc. benefit 5 d. High Level Approach 6 i. Assessment of resources and costs ii. Presentation to Management 6 e. Audience 6 i. Who will benefit 6 ii. How the beneficiaries will benefit 6 iii. The role of senior management in the implementation 6 Milestone 1 a. Business problem relooked 7 i. Problems facing ABC 7 b. Company background 7 ii. ABC’s business 7 iii. ABC’s current state 7 c. Discussion of business issue 8 i. Why MRP Implementations Fail 8 ii. Risks associated with implementation 8 d. Benefits of Solving the problem 8 i. Benefits From Good Design 8 ii. Benefits From Correct Implementation 8 e. Initial business/Technical Approach 9 i. Implementation Approach 9 ii. Management Commitment Required 9 f. High Level Solution 9 i. Requirements and Design 9 ii. Specific Functions 9 Milestone 2 a. Implementation 10 i. Configuration 10 ii. Integration 10 iii. User Education 10 b. Design 10 i. Modules 1. Demand Management Customer Related Files (DM) 11 2. Rough Cut Capacity Planning File (RCCP) 11 3. Master Production Schedule File (MPS) 11 4. Capacity Requirements Planning Routing File (CRP) 11 5. Shop Floor Control (SFC) 11 Milestone 3 a. Technology or Business Practice Used 12 ...

Words: 3853 - Pages: 16

Free Essay

Mrp-Toyota

...Materials Requirements Planning (MRP) Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in scheduling and placing orders for dependent demand items. Dependent demand items are components of finished goods—such as raw materials, component parts, and subassemblies—for which the amount of inventory needed depends on the level of production of the final product. For example, in a plant that manufactured bicycles, dependent demand inventory items might include aluminum, tires, seats, and derailleurs. The first MRP systems of inventory management evolved in the 1940s and 1950s. They used mainframe computers to explode information from a bill of materials for a certain finished product into a production and purchasing plan for components. Before long, MRP was expanded to include information feedback loops so that production personnel could change and update the inputs into the system as needed. The next generation of MRP, known as manufacturing resources planning or MRP II, also incorporated marketing, finance, accounting, engineering, and human resources aspects into the planning process. A related concept that expands on MRP is enterprise resources planning (ERP), which uses computer technology to link the various functional areas across an entire business enterprise. MRP works backward from a production plan for finished goods to develop requirements for components and raw materials. "MRP begins with...

Words: 2834 - Pages: 12

Premium Essay

Material Requirement Plannin

...IEOR 4000: Production Management 1 page 1 Professor Guillermo Gallego Material Requirements Planning (MRP) Material Requirements Planning (MRP) is a computer-based production planning and inventory control system. MRP is concerned with both production scheduling and inventory control. It is a material control system that attempts to keep adequate inventory levels to assure that required materials are available when needed. MRP is applicable in situations of multiple items with complex bills of materials. MRP is not useful for job shops or for continuous processes that are tightly linked. The major objectives of an MRP system are to simultaneously: 1. Ensure the availability of materials, components, and products for planned production and for customer delivery, 2. Maintain the lowest possible level of inventory, 3. Plan manufacturing activities, delivery schedules, and purchasing activities. MRP is especially suited to manufacturing settings where the demand of many of the components and subassemblies depend on the demands of items that face external demands. Demand for end items are independent. In contrast, demand for components used to manufacture end items depend on the demands for the end items. The distinctions between independent and dependent demands are important in classifying inventory items and in developing systems to manage items within each demand classification. MRP systems were developed to cope better with dependent demand items. ...

Words: 2977 - Pages: 12

Free Essay

Invntrymgmt

...Context March 6, 2015 II. View Point Manager of XYZ Company III. Statement of the problem The problem in the case is to contemplate installing a Materials Requirement Planning (MRP) System to the XYZ Company. The most pertinent questions in the problem are, How will it be done?, How much will be its cost? And what action will be needed to lead this project into success? IV. Objectives Short-range Objective - To set up the new system in order to have a smooth flow of production and avoid interruption. Long-range Objective – To be able to upgrade equipment which will help fit to the new system. V. SWOT Analysis STRENGTHS | WEAKNESSES | * Has workers with expertise in using company’s equipment & following the system * High availability of raw materials * Near to target market | * Poor manufacturing system * Inefficient use of resources * Higher percentage of employee turnover & scrap/waste | OPPORTUNITIES | THREATS | * Possible development of the production system * Affordability in the cost of production | * Breakdown of existing system * Competitors build stronger relationship with other customers | VI. Alternative Courses of Action * ACA# 1: Execute Materials Requirement Planning System. Advantages: Reduce the levels of inventory. Minimize the holding cost Disadvantages: Execution of the system will be at high cost. . ...

Words: 810 - Pages: 4

Premium Essay

Master Requirement Planning

...Material Requirements Planning (MRP) Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in scheduling and placing orders for items of dependent demand. Dependent demand items are components of finished goods—such as raw materials, component parts, and subassemblies—for which the amount of inventory needed depends on the level of production of the final product. For example, in a plant that manufactured bicycles, dependent demand inventory items might include aluminum, tires, seats, and bike chains. The first MRP systems of inventory management evolved in the 1940s and 1950s. They used mainframe computers to explode information from a bill of materials for a certain finished product into a production and purchasing plan for components. Before long, MRP was expanded to include information feedback loops so that production personnel could change and update the inputs into the system as needed. The next generation of MRP, known as manufacturing resources planning or MRP II, also incorporated marketing, finance, accounting, engineering, and human resources aspects into the planning process. A related concept that expands on MRP is enterprise resources planning (ERP), which uses computer technology to link the various functional areas across an entire business enterprise. MRP works backward from a production plan for finished goods to develop requirements for components and raw materials. MRP begins with a schedule...

Words: 1616 - Pages: 7

Premium Essay

Inventory Management

...Material handling 1.1 Introduction The section below will represent the techniques that are being used for handling inventories, putting orders and outsourcing the finished goods within the Giant factory positioned in Lelystad. The managerial processes within the company are aimed at the very best way in which inventory levels can be handled in order to minimize cost, ensure an on time production and provide the highest possible quality to the customers. The successful handling of those processes is assured by the use of the so – called software Microsoft Axapta. With the help of the use of this software program the management can assure a smooth work flow within the assembly factory and provide the best services possible. The paragraphs below contain vital information containing the basic approaches of the management to the processes of material handling. Those processes are summarized by points such as material purchase planning, inventory decisions and finished goods outsourcing. 1.2 Basic managerial approach to inventories The main goal of the processes of inventory management is to keep inventories at such levels that there is no an overstock of raw material within the warehouses of the assembly factories and at the same time to make sure that there is no lack of such at any point of time. The assembly factory of Giant which is under discussion is aimed at keeping as low as possible levels of the different parts that are needed for the creation a of the bike. This means...

Words: 2585 - Pages: 11