Module 6 Questions 1. Discuss what needs to be done as part of closing a project. Why are these activities important?
The process of closing the project includes collecting and making final payments, recognizing and evaluating staff, conducting a post-project evaluation, documenting lessons learned, and organizing and archiving project documents. These activities are important to make sure that the customer is satisfied, to gather information about how to improve for future projects, to determine whether additional opportunities are available with the customer, and to obtain permission to use the customer as a reference (Gido & Clement, 2014).

2. Discuss the internal post project evaluation process and the two types of meetings involved.
The internal post-project evaluation process includes meetings with individual team members and a group meeting with the project team to gather feedback for improved future performance. The individual meetings allow the project manager to gather information and share performance appraisals describing how each team member's skills advanced while working on the project. The post-project team meeting is a time for the project manager to lead a discussion about how the team performed on the project in terms of technical competence, budget, schedule, project planning and control, risk management, customer and team relationships, communication, problem identification and resolution, lessons learned, and recommendations (Gido & Clement, 2014).

3. What are some ways you can obtain feedback from a customer after a project has been completed? How would you use this information?
The post-project evaluation can be conducted as a meeting with open-ended questions or through a customer evaluation survey. The information is used to assess the level of satisfaction of the customer, opportunities for future work, and

Similar Documents

Premium Essay

Ankur Chutiya Hai

...Module III: Financial Analysis Cost of Project, Means of Finance, Estimates of Sales and Production, Cost of Production, Working Capital Requirements and its Financing, Profitability Projections, Break Even Point, Projected Balance Sheets, Muti Year Projections, Basic Principles for Measuring Project Cash Flows, Components of the Cash Flow Stream, Biases in Cash Flow Estimation Module IV: Project Risk Types and Measures of Project Risk, Sensitivity Analysis, Scenario Analysis, Optimal Timing, Social Cost Benefit Anaysis, Net Benefit in terms of Economic Prices, Measurement of the Impact on Distribution, Savings Impact and its value, Income Distribution Impact, Little-Mirrlees Approach, Shadow Prices Examination Scheme Components CPA TP Q/S A ME EE Weightage (%) 5 5 5 5 10 70 References • Chandra P.(2002), Projects: Planning, Analysis, Financing, Implementation & Review, Tata McGraw-Hill Publishing. • Meredith J.R. & Mantel S.J., Jr.( 2000), Project Management: A Managerial Approach, Ed. John Wiley & Sons. • Machiraju H.R.(2001), Introduction to Project Finance: An Analytical Perspective, Vikas Publishing House Pvt. Ltd. • Patel B.M.(2000),Project Management: Strategic Financial Planning Examination & Control, Vikas Publishing House Pvt. Ltd. • Finnerty J. D.(1996), Project Financing: Asset-Based Financial Engineering, Wiley • Newbold C.R.,(1998), Project Management in the Fast Lane: Applying Theory & Constraints, St. Lucie Press • Anthony R.N. & Govindrajan...

Words: 1846 - Pages: 8

Premium Essay

Operations

...Module 1 Readings and Assignments Complete the following readings early in the module: Read the overview for Module 1 From the textbook, Operations management: Creating value along the supply chain (7th ed.), read the following chapters: Introduction to operations and supply chain management Project management From the Argosy University online library resources, read: Barney, J. B. (1991). Firm resources and sustained competitive advantage. Journal of Management, 17(1), 99–120. (ProQuest Document ID: 215258436) http://search.proquest.com.libproxy.edmc.edu/docview/215258436?accountid=34899 Barney, J. B. (2001). Resource-based theories of competitive advantage: A ten-year retrospective on the resource-based view. Journal of Management, 27(6), 643–650. Retrieved from http://jom.sagepub.com.libproxy.edmc.edu/content/27/6/643.full.pdf+html Gopalakrishnan, S., Kessler, E. H., & Scillitoe, J. L. (2010). Navigating the innovation landscape: Past research, present practice, and future trends. Organization Management Journal, 7(4), 262–277. doi:10.1057/omj.2010.36 (ProQuest Document ID: 820961459) Long, L.D., Ohsato, A. (2008). Fuzzy critical chain method for project sheduling under resource constraints and uncertainty. International Journal of Project Management, 26(6), 688–698. Retrieved from http://www.thecampuscommon.com/library/ezproxy/ticketdemocs.asp?sch=auo&turl=http://www.sciencedirect.com/science/article/pii/S0263786307001548 Assignment Summary: Module 1 Due...

Words: 1087 - Pages: 5

Premium Essay

Itm 423 - Module 2 Session Long Project

...TRIDENT UNIVERSITY INTERNATIONAL ITM 423: System Acquisition, System Development and Project Management Module 2: IT Organizations, Projects and Project Life Cycles Session Long Project May 2014 Term June 08, 2014 Assignment: Confirm your software choice, review specifics on D2L (Learning Environment, Learning Repository and Analytics Modules and finally use your individual software to develop an initial high level plan with respect to the D2L modules you have just reviewed. * Prepare a 2-3 page paper summarizing your activities regarding these three steps and also include your plan design so far. An Analysis of D2L Modules & Basecamp Project Management Software Throughout this Module we have analyzed in detail the various phases in the project lifecycle and for this particular session long project we’re tasked with synchronizing the information we’ve learned so far in the application of real-world software that is used to develop learning management systems. The overall objective for this course will be to create an implementation plan for a new TUI learning management system, and for the students it means comparing and contrasting the features of what their software delivers with respect to what Desire2Learn delivers. However, since the last Module we are now armed with an even deeper understanding of the project phases, such as the Concept Phase, Planning Phase, Development Phase, Implementation Phase and the Closeout Phase from the work we completed...

Words: 1085 - Pages: 5

Premium Essay

Hris Implementation Project Scope

...Project Scope Document Template HRIS Implementation Project Project Scope Document Gen-Rays 1/17/2014 Scope Description GenRays has just implemented a centralized finance, purchasing and logistics system. As a result of this implementation, the company realized that it saved cost and improved productivity. The management is now looking for a similar system for HR and is convinced that this implementation will replicate similar success. The following is the current scenario at GenRays HR operations: the HR system is not centralized and each location has its own HR team to carryout payroll and other HR duties. The downside of this setup is that it costs the company great deal of time and money. In order to integrate HR systems within the company, a new HRIS needs to be implemented to improve business functions. HRIS system will centralize employee database, payroll, performance management, career development and other HR operations. With the new system, recruitment process will be automated with a searchable database and capable of accessing opportunities available in the job portal. Customer Requirements: GenRays is looking for a system that would centralize its HR functions. Currently, employees are working from branch locations to support the legacy system – something the new HRIS system is supposed to address and replace. The customer is also looking for cost-effective system that would be able to automate most of the HR services such...

Words: 1038 - Pages: 5

Premium Essay

Database

...DSS 630 Database Management Systems Theory and Practice COURSE EXPECTATION FORM Course Description: The implementation of technology such as bar codes and scanners enable organizations to accumulate large volumes of data. Further, as the technology to collect data gets cheaper and more simplified, business organizations gather and process a huge amount of data and information. Thus, data management has become a key function for many organizations. Managers need high-quality information to manage change in a turbulent, global environment. Business organizations use information systems to store and retrieve data, the raw material in knowledge-based economies. This repository of data is organizational memory. Databases are an important component of the organizational memory. Thus, information systems professionals should develop a comprehensive understanding of data management principles to fully utilize the organizational role of information technology. This course provides core skills of data management for the relational database management systems. This course will review the theoretical concepts and applications of a modern relational database management system. In addition to a basic theoretical presentation of the database design concepts, students will be required to design and develop a database application using a modern fourth generation language system. This course teaches students data modeling and design...

Words: 1374 - Pages: 6

Premium Essay

Hotel Management System

...ONLINE HOTEL MANAGEMENT Mini Project Report On 2010 ONLINE HOTEL MANAGEMENT In the partial fulfillment of 4th semester of MCA By Priyesh Kumar Regn_no:95580034 DEPARTMENT OF COMPUTER APPLICATIONS COCHIN UNIVERSITY OF SCIENCE AND TECHNOLOGY COCHIN -22 PRIYESH KUMAR, DCA, CUSAT, Kochi-22 1 ONLINE HOTEL MANAGEMENT CERTIFICATE 2010 COCHIN UNIVERSITY OF SCIENCE AND TECHNOLOGY COCHIN-22 This is to certify that the project report entitled “ONLINE HOTEL MANAGEMENT” is a bonafide record of the work done by PRIYESH KUMAR (Regno.95580034) As The M.C.A 4TH semester Mini project.. JUNE 2010 ______________ Internal Examiner ______________ Head of the Department Submitted on: ______________ PRIYESH KUMAR, DCA, CUSAT, Kochi-22 2 ONLINE HOTEL MANAGEMENT CONTENTS  ACKNOWLEDGEMENT  SYNOPSIS 1. INTRODUCTION 1.1. OBJECTIVE 1.2.PROBLEM DEFINITION 1.3. SYSTEM ENVIRONMENT 2. SOFTWARE QUALITY ASSURANCE PLAN 2.1. PURPOSE 2.2. SCOPE 2.3. DOCUMENT OVERVIEW 2.4. TASKS 2.5. IMPLEMENTATION 2.6. DOCUMENTATION 2.7. AUDIT 2.8. SOFTWARE DEVELOPMENT PROCESS 2.9. DOCUMENT REVIEW 2.10 TESTING 3. SYSTEM ANALYSIS 3.1 SYSTEM STUDY 3.2FEASIBILITY STUDY 2010 PRIYESH KUMAR, DCA, CUSAT, Kochi-22 3 ONLINE HOTEL MANAGEMENT 4. SOFTWARE REQUIREMENTS SPECIFICATION 2010 4.1User Interface Requirements 4.2Database Requirements 4.3Functional Requirements 4.4Non-Functional Requirements 4.5Other Requirements and Constraints 5. SYSTEM DESIGN 5.1 ARCHITECTURAL DESIGN 5.2 PROCESS DESIGN 5.3 ER-DIAGRAMS 6. DATA...

Words: 7751 - Pages: 32

Premium Essay

Six Sigma Lean Module 2

...The Impact of ‘Lean’ The purpose of this module: This module will look at how to manage within a lean environment and what considerations need to be taken account of when making management decisions. We will then look at the impact of lean across several industry sectors and conclude my looking at the way Lean and Six Sigma have become closely integrated. Timing: 60 – 90 minutes Lean Process Management  When you start to undertake Lean reviews within an organization you have the opportunity to integrate it into the corporate strategy and long term vision for the business. Agreeing to review all production areas within a business to ensure they are efficient using lean methodology can make a big difference to the way you perform and deliver. Lean Process Management  Many organizations use the balanced scorecard to report on their performance. The balanced scorecard reports on performance by four quadrants or areas to demonstrate how the business is moving towards its vision or corporate strategy. These areas are Financial, Customer, internal business processes and learning and growth. Lean has significant overlap with these areas to help develop and achieve the corporate goals. Lean Process Management  It focuses on the customer and their values, it measures structured improvements, often with financial values, it puts quality and internal process improvement as a continual cycle and it engages with all employees offering ...

Words: 6096 - Pages: 25

Premium Essay

Sksn

...Review for ERP/Systems Integration & Administration Lec. Dr. Abdullatif Ghallab ghallab@gmail.com ‫أسئلة للمراجعة قبل امتحان نصف الفصل الدراسي الثاني – للعام الجامعي 5102-6102م‬ ‫اسم المقرر: تخطيط موارد المؤسسة/تكامل وإدارة النظم‬ TYPES OF QUESTIONS A. END-OF-CHAPTER QUESTIONS B. ESSAY QUESTIONS C. DISCUSSION QUESTIONS D. CASE QUESTIONS E. TRUE & FALSE QUESTIONS F. MULTIPLE CHOICES QUESTIONS CH1 X X √ CH3 X X √ √ CH4 √ √ √ X X X X X X √ √ √ 1 CH2 X √ X √ √ Review for ERP/Systems Integration & Administration Lec. Dr. Abdullatif Ghallab ghallab@gmail.com CH01- INTRODUCTION TO ENTERPRISE SYSTEMS FOR MANAGEMENT A. DISCUSSION QUESTIONS 1. Refer to the Hershey case. What were the goals and details of the Enterprise 21 project? 1. 2. 3. 4. 5. 2. Establish a single supply chain across all divisions. Streamline all business processes by reengineering them across all functional areas. Increase the gross margin and maintain sales growth. Save $75 – 80 million through corporate restructuring and closing of older distribution sites. Fix their Y2K problem and replace existing mainframe environment. Refer to the Hershey case. What were some of the key problems that Hershey encountered when choosing, integrating and implementing their new ERP system? The implementation of the ERP for Hershey was beset with difficulties due to a number of failures: a. Project management issues...

Words: 9433 - Pages: 38

Free Essay

Eia Tools

...TO 3 ENVIRONMENTAL IMPACT ASSESSMENT TOOLS AND TECHNIQUES Jonathan Randall, World Wildlife Fund Emma Jowett, Consultant A NOTE TO USERS: The Green Recovery and Reconstruction Toolkit (GRRT) is a training program designed to increase awareness and knowledge of environmentally sustainable disaster recovery and reconstruction approaches. Each GRRT module package consists of (1) training materials for a workshop, (2) a trainer’s guide, (3) slides, and (4) a technical content paper that provides background information for the training. This is the technical content paper that accompanies the one-day training session on environmental impact assessment tools and techniques. Cover photo © Brent Stirton/Getty Images/WWF © 2010 World Wildlife Fund, Inc. and 2010 American National Red Cross. This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivs 3.0 Unported License. To view a copy of this license, visit http://creativecommons. org/licenses/by-nc-nd/3.0/ or send a letter to Creative Commons, 171 Second Street, Suite 300, San Francisco, California, 94105, USA. ACKNOWLEDGEMENTS Project Manager Training Specialist Creative Director Advisory Committee Jonathan Randall, World Wildlife Fund Paul Thompson, InterWorks LLC Melissa Carstensen, QueenBee Studio Erika Clesceri, U.S. Agency for International Development Veronica Foubert, Sphere Christie Getman, American Red Cross Ilisa Gertner,...

Words: 21593 - Pages: 87

Premium Essay

Laudon Ch5

...Management Information Systems MANAGING THE DIGITAL FIRM Kenneth C. Laudon New York University f Jane P. Laudon Azimuth Information Systems PEARSON feerttifie tall Pearson Education International Brief Contents Part One Chapter 1 Chapter 2 Chapter 3 Chapter 4 Part One Project Organizations, Management, and the Networked Enterprise 1 Information Systems in Global Business Today 2 Global E-Business: How Businesses Use Information Systems 38 Information Systems, Organizations, and Strategy 80 Ethical and Social Issues in Information Systems 124 Analyzing Business Processes for an Enterprise System 165 Part Two Chapter 5 Chapter 6 Chapter 7 Chapter 8 Part Two Project Information Technology Infrastructure 167 IT Infrastructure and Emerging Technologies 168 Foundations of Business Intelligence: Databases and Information Management 222 Telecommunications, the Internet, and Wireless Technology 260 Securing Information Systems 312 Creating a New Internet Business 351 Part Three Chapter 9 Chapter 10 Chapter 11 Chapter 12 Part Three Project Key System Applications for the Digital Age 353 Achieving Operational Excellence and Customer Intimacy: Enterprise Applications 354 E-Commerce: Digital Markets, Digital Goods 388 Managing Knowledge 428 Enhancing Decision Making 470 Designing an Enterprise Information Portal 508 Part Four Chapter 13 Chapter 14 Chapter 15 Part Four Project Building and Managing Systems 509 Building Systems 510 Project Management:...

Words: 3508 - Pages: 15

Premium Essay

Advanced Corporate Finance

...to each content area. This document also lists the topics, the level of competence for each topic, and the related learning objectives and competencies. The learning objectives have been designed to ensure that the competencies are met. In addition, information is provided on the proportion of each question type presented in the examination (that is, multiple choice, quantitative problems, and so on). Use Candidates should use the examination blueprint to prepare for the course examination. The blueprint may not include all the topics listed in the course materials; however, candidates are still responsible for acquiring a broad-based knowledge of all topics not listed in the blueprint since these topics will be tested in assignment and review questions. The topics not listed in the blueprint will also provide candidates with a greater depth of understanding of finance concepts. Examination Objectives The objective of the 4-hour comprehensive examination is to test CGA candidates on the prerequisite knowledge required for advancement into PA1 and PA2, so as to ensure that the candidates have the broad-based knowledge in finance needed to function properly in the association’s capstone courses. Examination Guidelines for Questions i) Question Type The following are guidelines on the type of questions and their approximate weightings: Question Item Multiple-choice questions Short-answer and/or short case-type problems of both a qualitative and quantitative nature ii) Description...

Words: 4207 - Pages: 17

Premium Essay

Default Papaer

... (for e.g. Finance & Banking, Insurance, Fund Transfer, Retail, etc.) PROFESSIONAL EXPERIENCE Duration : 01-June-2011 to 31-Dec-2011 Environment : VME Cobol, Legacy Skill/Tools : Quality Center 10.0, StarTeam 2008 Release 2 Role : Module Lead / Test Lead Description : Social Fund Computer System (SFCS) is a government fund for helping those in need to cope with sudden or irregular demands on their finances. SFCS caters to the needs of the citizens of UK .The reward which is given to its citizens it termed as Social Fund. Depending on the needs the funds are given to the customers. This project mainly supports the processing and payment of social fund awards. Responsibilities: • Conduct peer review of test deliverables and technical documents. • Track project issues and risks & mitigation on a continuous basis. • Responsible for Green status of overall testing activities and progress status. • Ensure optimal distribution of work / tasks to team members. • Ensure all deliverable are happening on time. • Mentor and guide team to perform quality work. Duration : 13-Feb-2012 to 31-May-2012 Environment : Web Based Skill/Tools : SharePoint 2007 Role : Module...

Words: 2762 - Pages: 12

Premium Essay

Project Manager

... | |Applied Position | | |Education |2002/09 -- 2006/07 East China University of Science and Technology Bachelor | | |20011/12 -- now East China University of Science and Technology Master | Self Assessment: ← Master in Project Management & Bachelor in computer science or related major with good command. ← At least 6+ years’ solid experience in software, 3+ years’ experiences of people management and project management. ← In-depth business knowledge in software project management related business processes. ← Experience in evaluating and selecting suppliers and creating and managing service level agreements.. ← Proven ability to concurrently manage a complex range of tasks and projects, where achievement is dependent on other’s efforts. ← An innate ability to foresee problems, identify risk and develop plausible solutions. Ability to think strategically ← Familiar with control the scope, the progress,...

Words: 1030 - Pages: 5

Premium Essay

Rohan

...Indian Institute of Management Bangalore Customer Relationship Management Faculty: Prof. G. Shainesh Term VI PGP (2008-09) 3 Credit Course Background – The primary purpose of any business is to win and keep customers. Its competitors also seek to do the same. Most successful firms have developed capabilities for attracting customers through their marketing programs. But they have shown mixed results when it comes to retaining these customers. Customer Relationship Management helps businesses in successfully implementing strategies aimed at winning and retaining customers profitably. It is also helping businesses shift from a short-term transaction based mode of operation in their interactions with customers to a long-term relationship mode. Objectives – The objective of this course is to help students understand the concept and practice of CRM derived from research and applications across businesses. These concepts and applications from real life case studies will help identify opportunities, which can be successfully implemented for long term profitability. Pedagogy – The teaching methodology will include a mix of lectures, discussions of pre-readings, presentations by practitioners, exercises and case analysis. The cases are integrative in nature but will also help develop an appreciation of specific elements of CRM. Group Project – Option 1 - Identify any organisation which is practicing some form of CRM. Start working with them to understand...

Words: 1490 - Pages: 6

Premium Essay

Pak Electron - Converting Systems to Erp

...w rP os t S W12945 PAK ELEKTRON LIMITED: CONVERTING SYSTEMS TO ERP Muntazar Bashir Ahmed wrote this case solely to provide material for class discussion. The author does not intend to illustrate either effective or ineffective handling of a managerial situation. The author may have disguised certain names and other identifying information to protect confidentiality. op yo Richard Ivey School of Business Foundation prohibits any form of reproduction, storage or transmission without its written permission. Reproduction of this material is not covered under authorization by any reproduction rights organization. To order copies or request permission to reproduce materials, contact Ivey Publishing, Richard Ivey School of Business Foundation, The University of Western Ontario, London, Ontario, Canada, N6A 3K7; phone (519) 661-3208; fax (519) 661-3882; e-mail cases@ivey.uwo.ca. Copyright © 2012, Richard Ivey School of Business Foundation Version: 2012-04-26 On October 12, 2011, Syed Mohsin Gilani, the general manager finance of Pak Elektron Limited (PEL) was in a meeting to discuss the cash flow situation of the company with Manzar Hassan, the chief financial officer (CFO). During the discussions, he commented on the new enterprise resource planning (ERP) systems: “Data is being input by the data entry personnel, but reports still need to be adjusted in Excel, as before. The quality and timeliness of data is a major issue for processing the information...

Words: 9242 - Pages: 37