Project Management Systems

Week 4: Planning and Monitoring the Projects:
Cost, Budget, and Earned Value
Jan 22-28, 2012

The Huntsville Plant Project
Planning and Monitoring Costs, Budget and Earned Value Analysis

It is important that the SEITZ Corporation understands our progress in relation to both the project team and the SEITZ Corporation’s strategic goals and objectives, regarding the progress of the Huntsville plant. As a continued effort to report the progress that is being made on the plant project we would like to report how our project team is planning and monitoring costs, budget and earned value.
As the project manager, I have used Key Performance Indicators (KPIs) to identify that the project is currently within budget.
We have assigned fixed costs to the following tasks: * Building Design = $32,000 * Site Cost = $216,000 * Permit Cost = $3,200 * Building Cost = $1,200,000 * Equipment Cost = $780,000 * Equipment Installation = $120,000 * Truck Cost = $135,000 * Landscaping = $26,000
Total fixed costs = $2,512,200 In addition to assigning the fixed costs we have identified the total cost for the allocated resources to be $119,268. Between the fixed costs of tasks scheduled and the allocated resource hours that are utilized during the ‘Planning Phase’, we are looking at a budget of $283,882 thus far. Currently the ‘Planning Phase’ is set to take 10 weeks to complete with a total of 1,066 hours of allocated resources. We have not identified all of the costs associated with the tasks in the ‘Planning Phase’ to date. The ‘Preparation Phase’ which is scheduled to take 47 weeks to complete and has 1,154 hours of total allocated resources, our team has identified costs totaling $128,442. The cost budgeted to date were calculated using fixed costs associated to tasks and currently scheduled allocated

Similar Documents

Premium Essay

No Title

...Project Management Plan Horace Bethea, Nicole Brown, Eric Cornick, Robin Evans, and Kristi Longstreet CPMGT/301 November 19, 2012 Steven Chardon-Strunk Project Management Plan Because of strict accreditation regulations and laws related to Title IV of the Higher Education Act of 1965 for institutions offering federal financial aid, an organization cannot offer traditional sales bonuses for employees who enroll students. Recently there has been a decline in employee morale. Senior management thinks that a new employee incentive program may boost employee morale (University of Phoenix, 2012, para. 3). This paper will include the work breakdown structure, activities, the sequenced activity diagram, a human resources plan, and a communication plan. The communication methods identified in the communication plan will be evaluated by identifying the communication tools and techniques most effective for the audience, and an explanation of why the methods of communication identified are most effective. The objective to this project management planning process is to successfully implement an employee incentive program within the university to boost employee morale that has declined because of the changes in compensation structure. Although the university cannot control what laws and regulations are changed governing federal financial aid, the university must abide by the changes to keep their accreditation. The university...

Words: 4553 - Pages: 19

Premium Essay

Project Implementation, Control, and Termination Paper

...MGT/437 Version 4 Project Management | Copyright © 2009, 2006, 2004 by University of Phoenix. All rights reserved. Course Description This course examines project management roles and environments, the project life cycle, and various techniques of work planning, control, and evaluation for project success. Policies Faculty and students/learners will be held responsible for understanding and adhering to all policies contained within the following two documents: University policies: You must be logged into the student website to view this document. Instructor policies: This document is posted in the Course Materials forum. University policies are subject to change. Be sure to read the policies at the beginning of each class. Policies may be slightly different depending on the modality in which you attend class. If you have recently changed modalities, read the policies governing your current class modality. Course Materials Kerzner, H. (2006). Project management: A systems approach to planning, scheduling, and controlling (9th ed.). Hoboken, NJ: Wiley. Meredith, J. R. & Mantel, S. J. (2006). Project management: A managerial approach (6th ed.). Hoboken, NJ: Wiley. All electronic materials are available on the student website. Software Microsoft® Project® 2007 (Virtual Desktop) Week One: Project Definition | | Details | Due | Points | Objectives | 1.1 Determine the importance of project management in the current...

Words: 1839 - Pages: 8

Premium Essay

Bus 519 Week 1 Bus519 Week 1

... http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 BUS 519 Week 1 Discussion "What is Risk?"  Please respond to the following: * There are three (3) schools of thought regarding risk. The first considers the positive and negative aspects of risk, but sees them as separate. The second group believes that there are benefits from treating threats and opportunities together, while the third school does not label uncertainties, but addresses uncertainty as part of “doing the job.” Argue the value of having a risk strategy despite the cost associated with it. Include an example to support your response. Provide a rationale for your selection and determine how this approach helps a project to be successful. BUS 519 Week 2 Discussion "Need for Risk Management" Please respond to the following: * There are four (4) critical success factors that are important for effective risk management: supportive organization; competent people; appropriate methods, tools and techniques; and simple, scalable process. Determine three (3) obstacles for an organization to manage risk effectively. Suggest strategies from the perspective of a project manager to avoid the obstacles. BUS 519 Week 3 Discussion "Project Initiation" Please respond to the following: * Using the “Stakeholder Analysis Template” (Appendix B2 in the Hillson and Simon text) for a company that you currently work...

Words: 2421 - Pages: 10

Premium Essay

Bus 519 Week 5 Bus519 Week 5

...Answer: http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 BUS 519 Week 1 Discussion "What is Risk?"  Please respond to the following: * There are three (3) schools of thought regarding risk. The first considers the positive and negative aspects of risk, but sees them as separate. The second group believes that there are benefits from treating threats and opportunities together, while the third school does not label uncertainties, but addresses uncertainty as part of “doing the job.” Argue the value of having a risk strategy despite the cost associated with it. Include an example to support your response. Provide a rationale for your selection and determine how this approach helps a project to be successful. BUS 519 Week 2 Discussion "Need for Risk Management" Please respond to the following: * There are four (4) critical success factors that are important for effective risk management: supportive organization; competent people; appropriate methods, tools and techniques; and simple, scalable process. Determine three (3) obstacles for an organization to manage risk effectively. Suggest strategies from the perspective of a project manager to avoid the obstacles. BUS 519 Week 3 Discussion "Project Initiation" Please respond to the following: * Using the “Stakeholder Analysis Template” (Appendix B2 in the Hillson and Simon text) for a company that you currently work...

Words: 2422 - Pages: 10

Premium Essay

Bus 519 Week 11 Bus519 Week 11

...Answer: http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 BUS 519 Week 1 Discussion "What is Risk?"  Please respond to the following: * There are three (3) schools of thought regarding risk. The first considers the positive and negative aspects of risk, but sees them as separate. The second group believes that there are benefits from treating threats and opportunities together, while the third school does not label uncertainties, but addresses uncertainty as part of “doing the job.” Argue the value of having a risk strategy despite the cost associated with it. Include an example to support your response. Provide a rationale for your selection and determine how this approach helps a project to be successful. BUS 519 Week 2 Discussion "Need for Risk Management" Please respond to the following: * There are four (4) critical success factors that are important for effective risk management: supportive organization; competent people; appropriate methods, tools and techniques; and simple, scalable process. Determine three (3) obstacles for an organization to manage risk effectively. Suggest strategies from the perspective of a project manager to avoid the obstacles. BUS 519 Week 3 Discussion "Project Initiation" Please respond to the following: * Using the “Stakeholder Analysis Template” (Appendix B2 in the Hillson and Simon text) for a company that you currently work...

Words: 2422 - Pages: 10

Premium Essay

Week 1

...MGMT- 404 PROJECT MANAGEMENT STATEMENT OF PARTICIPation This document will contain the information needed for your team operations, guidelines and commitment. It should be kept in doc sharing and each update should have a version control identifier (e.g., Team A SOP v1, v2, v3, etc.). IMPORTANT NOTE: The statement of participation must be posted in the team’s doc sharing area and the final submission must be available for the team to review and approve each week. Approval can be achieved by downloading the document. If you have disagreements, it is critical to contact your project leader and get a correction posted immediately. The professor should be notified of any disagreements. If the statement of participation is not submitted, the entire team will receive the same grade (including any point loss from other team members). I. Team Information PROJECT NAME: | MEMBER NAME | # | PHONE # | | EMAIL | | MEETING AVAILABILITY | Jade Xiong | 1 | | | | | Monday at 5 / email/ phone | Raquel Godoy | 2 | | | | | Monday at 5/ email/ phone | Genaro Zavala | 3 | | | | | Monday at 5/ email /phone | | 4 | | | | | | | 5 | | | | | | | 6 | | | | | | II. Weekly meeting schedule The most successful teams schedule at least (2) meetings a week throughout the course. Scheduling standing meetings allows everyone to schedule this time in advance and coordinate other activities around the scheduled meeting times. Meetings can change...

Words: 1698 - Pages: 7

Premium Essay

Bus 519 Complete Course Bus519 Complete Course

... http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 BUS 519 Week 1 Discussion "What is Risk?"  Please respond to the following: * There are three (3) schools of thought regarding risk. The first considers the positive and negative aspects of risk, but sees them as separate. The second group believes that there are benefits from treating threats and opportunities together, while the third school does not label uncertainties, but addresses uncertainty as part of “doing the job.” Argue the value of having a risk strategy despite the cost associated with it. Include an example to support your response. Provide a rationale for your selection and determine how this approach helps a project to be successful. BUS 519 Week 2 Discussion "Need for Risk Management" Please respond to the following: * There are four (4) critical success factors that are important for effective risk management: supportive organization; competent people; appropriate methods, tools and techniques; and simple, scalable process. Determine three (3) obstacles for an organization to manage risk effectively. Suggest strategies from the perspective of a project manager to avoid the obstacles. BUS 519 Week 3 Discussion "Project Initiation" Please respond to the following: * Using the “Stakeholder Analysis Template” (Appendix B2 in the Hillson and Simon text) for a company that you currently work...

Words: 2421 - Pages: 10

Premium Essay

Bus 519 Week 4 Bus519 Week 4

...Answer: http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 BUS 519 Week 1 Discussion "What is Risk?"  Please respond to the following: * There are three (3) schools of thought regarding risk. The first considers the positive and negative aspects of risk, but sees them as separate. The second group believes that there are benefits from treating threats and opportunities together, while the third school does not label uncertainties, but addresses uncertainty as part of “doing the job.” Argue the value of having a risk strategy despite the cost associated with it. Include an example to support your response. Provide a rationale for your selection and determine how this approach helps a project to be successful. BUS 519 Week 2 Discussion "Need for Risk Management" Please respond to the following: * There are four (4) critical success factors that are important for effective risk management: supportive organization; competent people; appropriate methods, tools and techniques; and simple, scalable process. Determine three (3) obstacles for an organization to manage risk effectively. Suggest strategies from the perspective of a project manager to avoid the obstacles. BUS 519 Week 3 Discussion "Project Initiation" Please respond to the following: * Using the “Stakeholder Analysis Template” (Appendix B2 in the Hillson and Simon text) for a company that you currently work...

Words: 2422 - Pages: 10

Premium Essay

Bus 519 Week 7 Bus519 Week 7

...Answer: http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 BUS 519 Week 1 Discussion "What is Risk?"  Please respond to the following: * There are three (3) schools of thought regarding risk. The first considers the positive and negative aspects of risk, but sees them as separate. The second group believes that there are benefits from treating threats and opportunities together, while the third school does not label uncertainties, but addresses uncertainty as part of “doing the job.” Argue the value of having a risk strategy despite the cost associated with it. Include an example to support your response. Provide a rationale for your selection and determine how this approach helps a project to be successful. BUS 519 Week 2 Discussion "Need for Risk Management" Please respond to the following: * There are four (4) critical success factors that are important for effective risk management: supportive organization; competent people; appropriate methods, tools and techniques; and simple, scalable process. Determine three (3) obstacles for an organization to manage risk effectively. Suggest strategies from the perspective of a project manager to avoid the obstacles. BUS 519 Week 3 Discussion "Project Initiation" Please respond to the following: * Using the “Stakeholder Analysis Template” (Appendix B2 in the Hillson and Simon text) for a company that you currently work...

Words: 2422 - Pages: 10

Premium Essay

Bus 519 Week 8 Bus519 Week 8

...Answer: http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 BUS 519 Week 1 Discussion "What is Risk?"  Please respond to the following: * There are three (3) schools of thought regarding risk. The first considers the positive and negative aspects of risk, but sees them as separate. The second group believes that there are benefits from treating threats and opportunities together, while the third school does not label uncertainties, but addresses uncertainty as part of “doing the job.” Argue the value of having a risk strategy despite the cost associated with it. Include an example to support your response. Provide a rationale for your selection and determine how this approach helps a project to be successful. BUS 519 Week 2 Discussion "Need for Risk Management" Please respond to the following: * There are four (4) critical success factors that are important for effective risk management: supportive organization; competent people; appropriate methods, tools and techniques; and simple, scalable process. Determine three (3) obstacles for an organization to manage risk effectively. Suggest strategies from the perspective of a project manager to avoid the obstacles. BUS 519 Week 3 Discussion "Project Initiation" Please respond to the following: * Using the “Stakeholder Analysis Template” (Appendix B2 in the Hillson and Simon text) for a company that you currently work...

Words: 2422 - Pages: 10

Premium Essay

Project Management-for This Project, You May

...Project management-For this project, you may Click Link Below To Buy: http://hwcampus.com/shop/project-management-for-this-project-you-may/ Project management-For this project, you may For this project, you may choose one that is of interest to you, or you may choose to begin planning for your senior project. When selecting a project, avoid picking one that is either too big or too small. For example, do not decide to build a new stadium for your local sports team (too big) or to plant your summer garden (too small). Here are some successful past project ideas. • The opening of a coffee shop • A charity event for a local social service agency • A meditation pool and platform in the center of town • A redevelopment of a local playground • Design and installation of a computer network for a small business • Software development project A project to build a house or create a website is NOT acceptable. You are not limited to the list of projects above. Please refer all questions concerning what is acceptable as a class project to your instructor. Milestones: • Due Week 1: Project Outline Proposal/Approval • Due Week 2: Project Charter • Due Week 3: Scope Statement • Due Week 4: Work Breakdown Structure/Gantt Chart • Due Week 5: Risk Management Plan • Due Week 6: Project Schedule and Budget • Due Week 7: Communication Plan • Due Week 8: Final Project Package Week 1 Back to Top Due Week 1: Project Outline Proposal/Approval To begin Week 1, all...

Words: 1512 - Pages: 7

Premium Essay

Bus 519 Week 2 Bus519 Week 2

... http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 BUS 519 Week 1 Discussion "What is Risk?"  Please respond to the following: * There are three (3) schools of thought regarding risk. The first considers the positive and negative aspects of risk, but sees them as separate. The second group believes that there are benefits from treating threats and opportunities together, while the third school does not label uncertainties, but addresses uncertainty as part of “doing the job.” Argue the value of having a risk strategy despite the cost associated with it. Include an example to support your response. Provide a rationale for your selection and determine how this approach helps a project to be successful. BUS 519 Week 2 Discussion "Need for Risk Management" Please respond to the following: * There are four (4) critical success factors that are important for effective risk management: supportive organization; competent people; appropriate methods, tools and techniques; and simple, scalable process. Determine three (3) obstacles for an organization to manage risk effectively. Suggest strategies from the perspective of a project manager to avoid the obstacles. BUS 519 Week 3 Discussion "Project Initiation" Please respond to the following: * Using the “Stakeholder Analysis Template” (Appendix B2 in the Hillson and Simon text) for a company that you currently work...

Words: 2421 - Pages: 10

Premium Essay

Bus 519 Week 9 Bus519 Week 9

...Answer: http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 BUS 519 Week 1 Discussion "What is Risk?"  Please respond to the following: * There are three (3) schools of thought regarding risk. The first considers the positive and negative aspects of risk, but sees them as separate. The second group believes that there are benefits from treating threats and opportunities together, while the third school does not label uncertainties, but addresses uncertainty as part of “doing the job.” Argue the value of having a risk strategy despite the cost associated with it. Include an example to support your response. Provide a rationale for your selection and determine how this approach helps a project to be successful. BUS 519 Week 2 Discussion "Need for Risk Management" Please respond to the following: * There are four (4) critical success factors that are important for effective risk management: supportive organization; competent people; appropriate methods, tools and techniques; and simple, scalable process. Determine three (3) obstacles for an organization to manage risk effectively. Suggest strategies from the perspective of a project manager to avoid the obstacles. BUS 519 Week 3 Discussion "Project Initiation" Please respond to the following: * Using the “Stakeholder Analysis Template” (Appendix B2 in the Hillson and Simon text) for a company that you currently work...

Words: 2422 - Pages: 10

Premium Essay

Bus 519 Week 10 Bus519 Week 10

...Answer: http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 BUS 519 Week 1 Discussion "What is Risk?"  Please respond to the following: * There are three (3) schools of thought regarding risk. The first considers the positive and negative aspects of risk, but sees them as separate. The second group believes that there are benefits from treating threats and opportunities together, while the third school does not label uncertainties, but addresses uncertainty as part of “doing the job.” Argue the value of having a risk strategy despite the cost associated with it. Include an example to support your response. Provide a rationale for your selection and determine how this approach helps a project to be successful. BUS 519 Week 2 Discussion "Need for Risk Management" Please respond to the following: * There are four (4) critical success factors that are important for effective risk management: supportive organization; competent people; appropriate methods, tools and techniques; and simple, scalable process. Determine three (3) obstacles for an organization to manage risk effectively. Suggest strategies from the perspective of a project manager to avoid the obstacles. BUS 519 Week 3 Discussion "Project Initiation" Please respond to the following: * Using the “Stakeholder Analysis Template” (Appendix B2 in the Hillson and Simon text) for a company that you currently work...

Words: 2422 - Pages: 10

Premium Essay

Drew

...Syllabus NT2799 Network Systems Administration Capstone Project SYLLABUS Credit hours: 4.5 Contact hours: 56 (34 Theory, 22 Lab) Prerequisite(s): Completion of a minimum of 72 credits earned in the program of study including NT2640 IP Networking or equivalent. © ITT Educational Services, Inc. All Rights Reserved. -1- 13/01/2013 Network Systems Administration Capstone Project SYLLABUS COURSE SUMMARY COURSE DESCRIPTION This course provides an opportunity for students to work on a comprehensive project that includes the design, planning and implementation of a network solution for solving specific business problems. Common project management processes are applied to identify deliverables and outcomes of the project. MAJOR INSTRUCTIONAL AREAS 1. Project Management Techniques 2. A Fundamental Review of the Basics of Electronics in the AASNSA Program 3. Capstone Project 4. Research of Current and Emerging Technology COURSE OBJECTIVES 1. Apply important concepts of project management to the actual capstone project proposed for this course. 2. Use Microsoft Office Project to help plan and manage the actual capstone project. 3. Analyze the requirements for the capstone project. 4. Integrate and apply the knowledge acquired in the program to provide effective technological solutions for given problems. 5. Work in teams on a large-scope project. 6. Document solutions to a problem in detail by applying...

Words: 7871 - Pages: 32