PMI Project of the Year Award
The Umatilla facility was asked to safely destroy one of the largest stockpiles of U.S. chemical weapons inventory in the country. They were asked to complete the task by April 29, 2012. The world would be watching as the company took on this colossal assignment. Jackson II (n.d.)
The Project Team Exhibited Exceptional and Ethical PM Practices
There are five project management process groups and the Umatilla facility initiated each of these activities to achieve their goal. The process was initiated, planned, executed and monitored. Schwalbe (2011)
To initiate the process the U.S. Army brought in the engineering firm of URS because they realized the extent of the risk that would have to be undertaken. Through the planning process, the team came up with a plan for the first phase which would be to package each nerve agent into different categories or “campaigns” whereas only the designated chemical could be incinerated. By executing this plan the risk would be reduced. This process would be executed over a designated span of months. Forming campaigns assisted the Umatilla factory in terms of safety because it helped them to know at all times what was being destroyed. Jackson II (n.d.)
Obstacles that Could Adversely Impact the Triple Constraints
One of the problems that URS faced was that even though they were able to recruit about 20 percent of employees who were to work on this problem from their current workforce, the majority of them were inexperienced. There weren’t many local employees who were able to decommission chemical weapons. Because of this concern, URS hired most of the employees early and began training them right away. Jackson II (n.d.)
They were able to simulate what the employee would actually be doing in a real life situation. It was like a practice run. This enabled employees to become familiar with what they would be doing and how to do it safely. When an employee ignored the rules and was exposed to mustard gas, the USR team responsibly shut down the site for a month so that there could be an investigation. A root-cause analysis was conducted and corrective actions were taken. This is where monitoring and controlling the process played a part. A new department was formed to take a look at possible risk conduct of employees. Specialists were assigned to the new department to monitor toxic entry performance to make sure that the employees were safe and to give opinions on how to increase performance. Jackson II (n.d.)
Monitoring and controlling should be conducted on a regular basis to make sure that the employees were not exhibiting behavior that would be conducive to violating safety precautions. If problems were found the Specialist would take corrective actions. They would identify any necessary changes that may be needed to keep the project on track. Schwalbe (2011)
The team came up with better way of handling the cake mustard agent it saved time when they found out there was a possibility that they wouldn’t be able to adhere to the timeline. The project was completed nearly six months ahead of schedule and was millions of dollars under budget. At the close of the project URS had incinerated over 155,000 sarin or GB nerve agent ammunitions, over 2,500 ton containers of mustard blister agent and over 60,000 VX nerve agent containers. Jackson II (n.d.)
Closing processes consist of the phase of project being formally accepted and the project being proficiently concluded. Some paperwork is sometimes involved in this activity, for example, filing project files, completing contracts, documentation and receiving formal acknowledgement of the work being completed as part of the project. Schwalbe (2011)

Similar Documents

Free Essay

Assignment 1: 2010 Project of the Year Award

...2010 Project of the Year Award 2010 PMI Project of the Year Award Citing groundbreaking technical achievement and exemplary management, the National Ignition Facility (NIF), the first laser expected to achieve fusion ignition in a laboratory setting, has been awarded the Project Management Institute's (PMI's) 2010 Project of the Year (Seaver, Lynda L, n.d.). The Lawrence Livermore National Laboratory in Livermore, CA was tasked to build the National Ignition Facility (NIF) by the Department of Energy (DOE). The NIF is a facility to produce intense pressures and temperatures that may, for the first time, simulate in a laboratory the thermonuclear conditions created in nuclear explosions. The NIF project was approved in 1995. Construction The stadium-sized facility was to be 500,000 square feet. They excavated over 210,000 cubic yards of soil, poured 73,000 cubic yards of concrete, and had more than 7,000 workers completed NIF project three week ahead of schedule and $2M dollars under budget. There were many challenges to overcome. One was the target bay which serves as the target point for 192 lasers had to be installed 45 feet below ground. Concrete had to be poured for 18 hours to overcome this challenge. Another challenge occurred 6 months after the ground breaking when heavy rains from El Nino flooded the NIF worksite. It took wet weather construction engineers 3 weeks to restore the project. Then a month later, crews unearthed the remains of 16,000 year old...

Words: 820 - Pages: 4

Premium Essay

2011 Project Management Institute’s Project of the Year Award Research Paper

...2011 Project Management Institute’s Project of the Year Award Research Paper Naressa Hackney Menser Dr. Jacob Ogunlade CIS 517 Project Management October 16, 2011 The Project Management Institute is one of the world leading non-profit membership association organizations in the world. It specializes in education of project management typically for those who are in the project management profession, but is also useful for any person who works with projects in their career. Project Management Institute (PMI) is a Global advocate for program management which is supported by their globally recognized standards, extensive research programs and credentials. PMI offers professional development through offering project management certification and awards. One award that is offered through PMI is the Project of the Year Award. The Project of the Year Award is a annual award that recognizes the accomplishments of a project and the project team for performing superior work on a project and executing exemplary project management. This awards point out the highlights and achievements of a project that followed PMI standards and demonstrated successes throughout the project. Successes in a project could be that it was finished ahead of schedule or it was completed well under budget. The Project of the Year Award is a global award and is awarded regardless of organizational size or PMI affiliation or membership. The only exemptions for participation in the award is current PMI staff...

Words: 743 - Pages: 3

Free Essay

Fruit and Seed Disposal

...Ebony Little Firm Name - Wentworth studio Inc. or found ind date - for over twenty years Address – 8555 Conneticut Avenue Suite 200 Chevy Chase, Maryland 20815 PHONE: 240-383-1226 FAX: 240-383-1227 Principals & Staff Info - – Wentworth, Inc. was founded by Bruce Wentworth, AIA, a noted remodeling architect who has worked in the Washington, DC, metropolitan area for over twenty years. He has built hundreds of his own designs, ranging from modest bungalows to large-scale luxury residences. Passionate about historic architecture, Wentworth has also handled numerous historic renovations. He recently put his survey of residential architectural styles in the DC metro area online so that interested viewers can research and identify their own home's period and style, or those of other houses that interest them. Mr. Wentworth’s approach—sensitive remodeling with integrated aesthetics—has led to his work, and that of his creative team, to be featured in House Beautiful, American Bungalow, The New York Times, and on HGTV. His dedication to the fields of residential design and construction is expressed through his extensive writings and featured projects in Architecture DC, Washingtonian, Luxury Homes, and other publications. He continues to receive recognition from his industry with project awards from National Association of Remodeling Industry, Qualified Remodeler, Professional Remodeler, and Remodeling Magazine. Wentworth is a graduate of the School of Architecture—University...

Words: 3469 - Pages: 14

Premium Essay

Project of the Year

...Project Management Assessment Carolyn Aiken Strayer University PROJECT MANAGEMENT ASSESSMENT Summarize how the project manager or team exhibited exceptional and ethical project management practices. Virtusa is a provider of global IT services and they service many different areas both domestically and worldwide with a headquarters located in Massachusetts. They offer a wide range of consulting and outsourcing services to various industries and different software vendors and they have a strong presence in the IT field. In May 2010, Siemens decided to replace a vendor they were using to track orders placed online and chose Virtusa to handle the project.() Upon successful completion of the project, Virtusa Corporation was honored by Project Management Institute Atlanta as the winner of its 2011 Manufacturing Project of the Year Award. “PMI’s Project of the Year (POY) Award recognizes the accomplishments of a project and the involved project team for superior performance and execution of exemplary project management. This award is administered by PMI’s Global Operations Center in order to recognize and honor contributions to the Institute and for achievements in the project management field. Only one PMI Project of the Year Award is awarded per calendar year.”() Not only was Virtusa successful in recreating a carbon copy of the retired system right down to the way it originally performed, they were also able to upgrade the features and make them work better...

Words: 660 - Pages: 3

Premium Essay

Project Management

...APM Project Management Awards WINNER’S CASE STUDY Category Winner Programme of the Year 2014 Wylfa extended generation programme, Magnox Ltd Sponsor Overview Standing on the coast of Anglesey, North Wales, the Wylfa nuclear reactor began generating in 1971. Over 40 years and four extensions to its original life expectancy of 25 years later, it is still producing electricity. It is the largest of the 10 nuclear sites managed by Magnox on behalf of the Nuclear Decommissioning Authority (NDA). In 1996, it was deemed that Wylfa could safely generate for a further 10 years. In 2006 the NDA announced that the station would be shut down in 2010, but in 2010 it was given an extension to 2012. Wylfa then worked on a further project allowing generation to continue until December 2015. Generation beyond that date is constrained by the re-processing of fuel at Sellafield. Today, Wylfa has only one running reactor and two operational turbine generators, but with an output of around 460MW still supplies more than 20 per cent of Wales’ electricity needs. This has been possible because of an idea during a brainstorming meeting that developed into the innovative and ground breaking Extended Generation Programme. 1 APM Project Management Awards WINNER’S CASE STUDY Objectives In 2008, Wylfa had begun the transition process of moving towards shutting down and removal of fuel in 2010. From this arose the idea which grew into...

Words: 928 - Pages: 4

Premium Essay

Assignment 1: It Project Management Assessment

...Fernald closure project 12 years early and $7.8 billion below estimates. The overwhelming success of the project earned the 2007 Project Management Institute’s (PMI) Project of the Year Award. (Project Management Institute, 2012) The objective of the project was the environmental cleanup and site closure of the U.S. Department of Energy’s Fernald uranium production facility. The project was undertaken with the knowledge that government funding may not always be available, the public had a very poor perception of the project and current workers at the site would be laid off when the project was complete. One of the ethical issues that developed early came from reports in the local press about waste, fraud and abuse. The Department of Energy (DOE) had to report to the U.S. Congress to address these allegations. DOE has not exercised adequate management and oversight of the vitrification and uranyl projects or of the contractor’s safety and health activities. In addition, the contractor has not complied with some required procedures in maintaining its major performance and financial systems. As a result of these weaknesses, costs have increased, schedules have slipped, and safety and health risks exist. (United States General Accounting Office, 1997) After the report was published, DOE and Fluor changed the way they did business. The project became more successful because DOE took a less hands on role and Fluor stepped up to the challenge to make sure the project was run according...

Words: 1049 - Pages: 5

Free Essay

The Adelaide Desalination Project

...THE SUCCESS OF THE ADELAIDE DESALINATION PROJECT Abstract The PMI Project of the Year for 2013 was won by the South Australia Water Corporation for the Adelaide Desalination Project. This project was performed to raise Adelaide out of its worst droughts. It was also completed ahead of schedule and within budget. Though the project ran into some uncertainties even before its start, due to some exceptional management practices followed by the Project Director and his team, the project was a resounding success. This report studies some of the key aspects that led to the success of this project and it eventually winning the coveted PMI Project of the Year Award. THE SUCCESS OF THE ADELAIDE DESALINATION PROJECT The Project that won the Project Management Institute’s Award for the year 2013 was the Adelaide Desalination Project Adelaide, Australia by the SA Water Corporation. South Australia, as the "driest state in the driest inhabited continent", experienced severe water shortages during periods of drought. As drought conditions worsened during 2006-2007, reduced inflow into the River Murray lead to the introduction of harsher water restrictions. The need for climate-independent sources of drinking water was clear to government leaders and residents. The South Australian Water Corporation (SA Water) responded with a plan to build an AU$1.8 billion desalination plant in Adelaide.  Launched in February of 2008, the project originally aimed to construct a 50-gigaliter...

Words: 1065 - Pages: 5

Premium Essay

Pmi Project of the Year

...Project Management Institute's 2010 Project of the Year Award Gary Blake Strayer University Author Note Project Management Institute's 2010 Project of the Year Award The National Ignition Facility Project was the winner of the 2010 PMI Project of the Year Award competition. The project managed by Lawrence Livermore Laboratory was a great success because of the certified project personnel and the thorough application of the PMI standards and principals. It was put together to serve a large scientific community to explore new technologies in energy production involving new frontiers in astrophysics, material science, and nuclear science (Institute, 2012). The facility had the goal of developing self-sustaining nuclear fusion, which is the process that powers the sun and the stars, in the laboratory for the first time. It is well known by scientist that fusion power has many of the benefits of long-term renewable energy sources, such as being a sustainable energy supply compared to presently utilized sources and emitting no greenhouse gases. The finished facility contains more than 3,000 pieces of amplifier glass, 8,000 large optics, and 30,000 small optics that have been assembled into 6,206 replaceable units (PMI.org, 2010). By using PMI principles and ethics, the project design and commissioning was completed with the help of a worldwide collaboration of governments, academia and lots of industrial groups. The groups themselves were sometimes picked over...

Words: 584 - Pages: 3

Premium Essay

Grants

...Eligible Applicants Eligible Applicants: clarification) Others (see text field entitled “Additional Information on Eligibility” for Additional Information on Eligibility Eligibility Explanation: Only private, 501(c)- certified non-profit organizations that are currently in SBA’s WBC program that will have successfully completed an Initial 5year WBC project by September 29, 2014 or those centers that will have successfully completed a 3-year Renewal WBC project by September 29, 2014, will be considered. Agency Name: Award Information Small Business Administration Cost Sharing or Matching Requirement: Yes Expected Number of Awards: Estimated Total Program Funding Award Ceiling: Award Floor: 37 125882 125882 0 Funding Opportunity Text Description: The U.S. Small Business Administration (SBA) has issued Program Announcement No. OWBO-2014-02 to invite private, 501(c)- certified non-profit organizations that are currently in SBA’s WBC program that will have successfully completed an Initial 5-year WBC project by September 29, 2014 or those centers that will have successfully completed a 3-year Renewal WBC project by September 29, 2014, the opportunity to apply for...

Words: 529 - Pages: 3

Premium Essay

Project Assessment

...I.T. Project Management Assessment October 19, 2012 This passage is a discussion of recent award winner of the Project Management Institute’s Project of the Year Award. We will take a look at what the manager and/or his team did to exhibit exceptional and ethical project management practices. There will be a look into the role played by this project manager or project team, the organizational setting, the approach to project integration management, and the potential threats to the triple constraint, which includes scope, time, and cost goals [ (Schwalbe, 2011) ]. Exceptional and Ethical Various organizations around the world were considered for the honor of this year’s project of the year award. There are no restrictions on the size or industry category as to whether you are eligible to win. This makes the competition very open. Though there was a project general manager by the name of Steve Warren (Peterson, Josh, 2012), this year’s award was presented to a team rather than individually to the Umatilla Chemical Agent Disposal Facility [ (NBC Right Now, 2012) ]. Overall the team was recognized for the project and the team for “superior performance and exemplary execution of project management” (Peterson, Josh, 2012). Identifying the need for a project of this scope alone has its own ethical merits but to deliver the project before some 900 plus days before projected completion showed that there was a clear since of urgency on getting a job of this magnitude...

Words: 878 - Pages: 4

Free Essay

Tax Incentive of Cit in Singapore

...activities, expand their operations in the country, and procure advanced machinery and equipment by offering a reduced tax in the range of 5%-10% on incremental income derived from qualifying activities. 2. International / Regional Headquarters Award (IHQ / RHQ) The Regional Headquarters Award and International Headquarters Award provide a reduced corporate tax rate on incremental income from qualifying activities. * Regional Headquarters Award: Under the (RHQ) Award, qualifying companies can enjoy a concessionary tax rate of 15% for five (3+2) years on incremental qualifying income from abroad, instead of the regular Singapore corporate tax rate of 17%. In other words, if applicant company satisfies all the minimum requirements by the third year of the incentive period, it will enjoy the 15% concessionary tax rate for an additional 2 years on qualifying income. This scheme applies to all companies that have their Asia-Pacific headquarters in Singapore. * International Headquarters Award: This tax incentive scheme is open to all entities that have setup a company in Singapore in order to carry out their headquarter activities. More specifically, companies that commit to exceed the minimum requirements of the Regional Headquarters Award, can enjoy an even lower...

Words: 1917 - Pages: 8

Premium Essay

Cis 517 Wk 2 Assignment 1 It Project

...ASSIGNMENT 1 IT PROJECT To purchase this visit here: http://www.activitymode.com/product/cis-517-wk-2-assignment-1-it-project/ Contact us at: SUPPORT@ACTIVITYMODE.COM CIS 517 WK 2 ASSIGNMENT 1 IT PROJECT CIS 517 WK 2 Assignment 1 - IT Project Management Assessment Research and read an article on recent recipients of the Project Management Institute’s Project of the Year Award. Write a two to three (2-3) page paper in which you: 1. Summarize how the project manager or team exhibited exceptional and ethical project management practices. 2. Discuss the role of the project manager or team, the organizational setting, the recipient’s approach to project integration management, and obstacles that had the potential of adversely impacting the triple constraints. More Details hidden... Activity mode aims to provide quality study notes and tutorials to the students of CIS 517 WK 2 Assignment 1 IT Project in order to ace their studies. CIS 517 WK 2 ASSIGNMENT 1 IT PROJECT To purchase this visit here: http://www.activitymode.com/product/cis-517-wk-2-assignment-1-it-project/ Contact us at: SUPPORT@ACTIVITYMODE.COM CIS 517 WK 2 ASSIGNMENT 1 IT PROJECT CIS 517 WK 2 Assignment 1 - IT Project Management Assessment Research and read an article on recent recipients of the Project Management Institute’s Project of the Year Award. Write a two to three (2-3) page paper in which you: 1. Summarize how the project manager or team exhibited exceptional and ethical project management...

Words: 633 - Pages: 3

Free Essay

Film Production

...Abstract This paper supply practical experiences in analysis and evaluation proposed projects. In order to perform the organization’s objectives and strategic plan, the film division must analyze and evaluate seven proposed film projects in ranking priority system. Leadership of this organization only can choose from four to six feasible projects among these projects to produce during a year. I am supposed to be a member of priority team. In order to perform this task sucessfully, I frirsly understand clearly about the company mission. The company mission creates the value for shareholder by developing company to be one of the famous entertainment industry in the world from its excellent strategy . Evaluation and ranking will reply on the corporate ‘ must ‘ objectives and ‘ want’objectives. These projects will be ranked on the provided evaluation form. the project meets many the corporate objectives, it will increase points in ranking system. Company will determine feasible projects with high points to produce. This paper will show all processing of evaluation and gives the result of selected projects. Keywords : Projects; Mission; Objectives, Introduction The company is the film division for a large entertainment conglomerate that includes theme parks, home videos, a television channel, interactive games and theatrical productions. The company’s mission must create the shareholder’s value by developing to be the leading entertainment company over the world...

Words: 1898 - Pages: 8

Premium Essay

Xlri Brochure

...Exploring Excellence PGDM (GM) (GMP 2013–14) AN AICTE APPROVED FLAGSHIP FULL-TIME MBA PROGRAM FOR EXPERIENCED PROFESSIONALS E-brochure http://www.placementkloud.com/xlrigmp 01 02 03 04 05 06 08 10 12 14 16 MESSAGE FROM THE DIRECTOR Learning and growth are vital for a healthy environment in organizations. We at XLRI have structured our programmes in such a manner as to equip the future managers of tomorrow with learning, competencies and skills that can significantly contribute to the growth of the organization. XLRI has always been proudly associated with academic excellence, personal values and social concern. It has been the crucible of leadership training for over 60 years and its banner is held high by a fine breed of alumni who serve as “change agents” thereby adding a new dimension to their corporate role. This integral and value based formation will greatly assist our students to be innovative, competent and creative leaders. They are groomed in a manner as to serve as agents of continuous improvement and change. It was in 1997 that XLRI recognized an unfulfilled need for formal management training at middle and senior levels of corporate strata. The result of that thought process was the General Management Programme, which has ever since, transformed several industry professionals into veritable leaders who reflect the standards and values of XLRI at various organizations. Recognized by AICTE, the programme places emphasis on stringent admission procedures...

Words: 25500 - Pages: 102

Free Essay

National

...Building Project Specific The project must be specific. Being specific includes detailing out the project's structure, goals, benefits, milestones and costs. When building NLB there was a structure goal that it is to become an independent Library in Singapore. The benefits is that to provide public access to the Library resources and materials to provide references for local scholar and local students so that they can access and borrow books. The milestones of the NLB is it was developed during 19th century. The project was completed and came to effect on 1st April 1958. In 1994: Dr Christopher Chia become the first CEO and NLB Board formation was started Reference section was opened in 1996.The cost build NLB was 203 million estimated. It is located in bugis, Singapore and it is a 16-stoery building. Measurable The project must be measurable in terms of its benefits and achievements. There should be tangible, intangible as well as in terms of monetary benefits. It has benefited local scholars by having a reference library. It has been very useful for students where they could access estimation of six million books. It has been a reliable library for many local students and it provide tangible trusted reference services. It has become a well-known knowledge institution in the people's mind. It has achieved 2nd place in Asian Libraries website competition. NLB also won National IT award for innovative use of IT in 1998. In 2005, NLB was awarded the prestigious gold award for...

Words: 566 - Pages: 3