RIM SEAL FIRE PROTECTION SYSTEM.

FLOATING ROOF TANK (RIM SEAL) PROTECTION SYSTEM.
1. GENERAL DESCRIPTION.
Grishma's TANK GUARD - Floating Roof Tank protection is a fully automatic detection cum extinguishing system. The system is designed and manufactured for extremely fast detection and extinction of rim seal fires as per the International Safety
Standards.
2. WORKING PRINCIPLE.
To understand the complete working philosophy of the system, the system has been divided in the following sub-systems:a) Linear Heat Detection System.
b) The Foam Based Extinguishing System.
c) Fire Alarm Panel & Automation
a) Linear Heat Detection System.
The working of the UL listed & VDS Germany approved detection unit is based on the principle of rate of rise in temperature and maximum temperature beyond the pre-configured parameters, which is sensed by means of a microprocessor based intelligent evaluation unit. The Sensor element, i.e. the Stainless Steel /
Copper Tube, which is in non-pressurized state (ambient pressure only) senses the rate of rise in temperature (pressure) and triggers an audio visual alarm simultaneously activating the extinguishing systems. The Advance Detection System is Decentralize and has Pre Alarm facility for early warning.
Technical Specifications of ADW Linear Heat Detection System:

Approved and Listed by
Supply Voltage Range
Sensor tube Length
Sensor tube dia. (internal / external)
Temperature range of the sensor tube
Response Sensitivity
Ambient Humidity of Evaluation Unit
Ambient Humidity of Sensor tube
Output Signals

:
:
:
:
:
:
:
:
:

UL (USA) , VdS (Germany).
10.5 to 30 VDC.
20 – 130 m.
4/5 mm.
-40 o C to +160°C & above
Class AI as per EN54/4
95 % RH
100 % RH
Potential free contacts for
FIRE
Detection system fault

2/6

RIM SEAL FIRE PROTECTION SYSTEM.
b) The Foam Based extinguishing system.
Foam based extinguishing system is 100% proven substitute of Halon system and is environmental friendly. The foam module is of 250 liter capacity charged with 200 liters of pre-mixed foam solution as per the International Safety Standards. Each foam module can cater 40 Meter Circumference of rim seal area.
Foam Discharge Manifold with Spray Nozzles are evenly spaced along the Rim Seal and are designed to discharge required Foam solution to control the fire completely. On detection of smallest fire the detection triggers an alarm & immediately actuates the extinguishing system. The foam concentrate used are UL /
FM approved.
Technical Specifications of Foam Extinguishing System:
One module caters approx. 40 meters length of rim seal.
Capacity of Each Module
Foam Solution (Pre-mix)
Material of Foam Module
Foam Module Working Pressure
Foam Module Design Code
Pressure Monitoring Switch
Foam Discharge Nozzles

:
:
:
:
:
:
:

250 liters.
200 liters.
Stainless Steel.
14 to 15 Kg/cm2
ASME Sec VIII Div I.
ATEX Approved.
16 Nos (Min.)

c) Alternate Extinguishing system.
The system can also be equipped with clean gas as extinguishing agent as per the hazards application.

FOAM
MODULE

TANK SHELL
AUTOMATIC
ACTUATED
VALVE
DETECTION
TUBE

INSTRUMENT
PANEL

N2 CHARGING
SPRAY
NOZZLE

ISOLATION
VALVE

FOAM
DISCHARGE

RIM SEAL AREA

ROOF DECK

3/6

RIM SEAL FIRE PROTECTION SYSTEM.
3. FIRE ALARM PANEL & AUTOMATION:
a) Fire Alarm Panel
The detection system and suppression system are connected to a dedicated Fire Alarm Panel and the same panel can be located in fire station / control room.
The fire alarm panel configuration is microprocessor based.
The fire Alarm panel is UL / VdS certified.

Fire Alarm Panel
b) Automation:
The detection system is supported with compatible software, which is capable to run the system for feeding the parameters, event logging and continues monitoring of events. The dedicates software supports and provide vital information of the status of the system at the control room through PC or
Laptop and is capable of real time data acquisition, data and alarm processing, data base downloading excess security with password authentication and shall also display graphic resolution of temperature/pressure event history, user activity history, auto data printing of status of all such detection system installed and integrated with the software. The system has the feature to convey electronic mails during emergencies.
The automation software is capable to monitor continuously 250 tanks on single screen. 4/6

RIM SEAL FIRE PROTECTION SYSTEM.

4. FAIL SAFE PHILOSOPHY
The system have features that ensure fail safe operation of rim seal fire protection system on floating roof storage tanks even under abnormal conditions viz.
Case 1 – Self diagnostic features for fail safe operation.
The system have inbuilt debugging device to check the integrity of evaluation module and sensor tube at periodic interval.

Case 2 – Any problem in functioning of Fire Alarm Panel in Control Room
The detection system is independently capable to actuate the extinguishing system locally on the tanks upon detection of fire without any support from the control room (Fire Alarm Panel). The detection system is independent, decentralized and individual for each tank.

Case 3 – Failure / cut of any or all signal cables communicating from control room to tank
The detection system have the feature whereby it would still remain functional i.e. it will detect fire and actuate the extinguishing system locally on the tank and will also actuate local buzzer / flasher on tank.

Case 4 – Pressure in foam module
The low pressure module indication and alarm shall be displayed on the fire alarm panel in case of reduction in pressure on the foam module.

The above feature of fail sale philosophy makes the system intelligent to remain functional, detect the possible fault and also the decentralized and individual system for each tank ensures that a particular fault shall not affect the system installed on the other tanks.

5/6

RIM SEAL FIRE PROTECTION SYSTEM.
5. SALIENT FEATURES FOR DETECTION SYSTEM
1. Class A1 Approved Linear Heat Detection system as per EN 54/4 std.
2. Possible to adjust the detector sensitivity and response behavior at site from, - 40 to +160 deg
C & Above.
3. Non – Pressurized System, hence No Chance of leakage.
4. Pre Alarm configurable for Early Warning & High Reliability.
5. Cross zoning facility of Rate of Rise of Temperature & Max Temperature.
6. Each mm of the sensor tube functions as highly sensitive heat detector.
7. Fully automatic self-diagnostic feature for no false alarms.
8. Reusable sensor tube even after exposed to several Hydrocarbon Fires.
9. Continuous Detection at high temperatures.
10. Immune to atmospheric changes & hydrocarbon vapor.
11. Very low operating cost due to unique feature of re-usability of Sensor Tube even after several hydrocarbon fires.
12. System Approved by UL (USA) / VdS (Germany) / VKF (Switzerland).
13. System design Fail Safe.
14. Recommended by VdS Germany for use in tank farm area.
15. Decentralize system makes the system free from total collapse.
6. SALIENT FEATURES FOR FOAM BASED EXTINGUISHING SYSTEM
a. Highly effective in extinguishing of liquid hydrocarbon fire.
b. UL/FM Approved Foam
c. Nullifies the possibility of Re ignition.
d. Highly cost effective on refilling when compared with clean gas system.
e. Very low turn around time when compared with gas based system.
f. Stainless construction of foam module hence long life & sturdy performance.

6/6

RIM SEAL FIRE PROTECTION SYSTEM.
7. APPLICATION
This unique detection system coupled with & without appropriate extinguishing system is being used world over in critical / sensitive areas floating like roof tank / Tank Farms / Fuel filling stations / transformer protection & many more applications.

RIMSEAL FIRE PROTECTION

The above Rim Seal Fire Protection System is successfully operating in huge number of Floating Roof
Storage Tanks of various sizes from 20 meter dia up to 79 meter dia at Refineries, Oil Terminals,
Process Plants, etc.

Similar Documents

Premium Essay

Disel Reuirements

...rollovers. The vehicle chassis must be equipped with an effective roll bar that extends 5 cm around the driver’s helmet when seated in normal driving position with the safety belts fastened. This roll bar must extend in width beyond the driver’s shoulders when seated in normal driving position with the safety belts fastened. Any roll bar must be capable of withstanding a static load of 700 N (~ 70 kg) applied in a vertical, horizontal or perpendicular direction, without deforming (i.e. in any direction). Propulsion and Energy Storage System Isolation A permanent Bulkhead must completely separate the vehicle’s propulsion and energy storage systems from the driver’s compartment This bulkhead must be of fire retardant material and construction, effectively seal the driver’s compartment from the propulsion and fuel system, prevent manual access to the engine/energy compartment by the...

Words: 2488 - Pages: 10

Free Essay

Cool

...EH&S Leadership At All Levels It Starts With You Workshop Pre-Reading The Fatal Flaw In Flight 51-L Contents Instructions 3 Study Questions 3 The Fatal Flaw In Flight 51-L 5 Challenger's final hours 6 The history of the flawed joint 7 Certified in spite of the flaws 8 Accepted as acceptable 9 The lesser of two evils 9 The problems grow worse 9 Anatomy of a tragedy 10 Why wasn't the design fixed? 11 Why wasn't erosion seen as a danger sign? 11 Operational and then what? 12 Why no second sources? 12 How did NASA and Thiokol view the odds? 12 What role did NASA's safety office play? 13 Was NASA or Thiokol pressured to launch? 14 Why didn't they talk to each other? 14 How about NASA's past success? 15 What lessons have been learned? 15 Defining terms 16 Figures Figure 1: The Launch Decision Chain 17 Figure 2: Anatomy Of A Booster Field Joint 18 Figure 3: Joint Rotation 18 Figure 4: Titan Joints vs. Shuttle Booster Joints 19 Figure 5: Joint Putty 19 Figure 6: O-Ring Distress 20 Figure 7: Joint Distress vs. Temperature At Launch 20 Figure 8: 7/31/85 Memo, Boisjoly 21 Figure 9: 10/1/85 Memo, Ebeling 22 Figure 10: 10/1/85 Memo, Stein 24 Figure 11: 10/4/85 Activity Report, Boisjoly 25 Instructions On the first day of the workshop, we will discuss the management system failures associated with the Space Shuttle...

Words: 11483 - Pages: 46

Free Essay

Baking

...HISTORY OF BAKING On today’s market there is a never ending variety of the most delicious sweets and pastries to please both the palate and the eyes. We have become so used to this diverse range of bread, mouth watering pastries and cakes that seldom we ask just how they come into existence. I guess my initial interest in the origin of the baking industry was not aroused by accident; rather I suspect it was kindled by a chain of events occurring earlier in my life... My Grandfather owned a small hotel and bakery in Switzerland and when he retired my father who was an excellent pastry cook continued the business. As a small child I spent many hours watching my dad at work and later followed in his footsteps almost as a matter of course. Then again, I have a suspicion that it may have been “fate-by-design” that made me take up pastry-cooking. The question still remains, was my career pre-determined by the fact that my grandfather had thousands of letterheads printed for his bakery which included his name? The prospect of a hefty quantity discount would no doubt have made perfect sense to my frugal fore bearer; it must have been so much cheaper getting all this printing done in a big way. Grandfather should have realised (and I suspect that he might have) that there was not the slightest chance that any one generation could ever use up this huge mountain of stationery. Granddad’s first name “Fritz” was also my father’s first name and when I was born there was never any question...

Words: 19791 - Pages: 80

Premium Essay

Experiments

...the sun through binoculars, but you can view the bright disc on the wall as large and clear as in the movies. Clouds and birds passing over can also be distinguished and. if the binoculars are good even sunspots. These are a few hot areas on the glowing sphere, some so big that many terrestrial globes could fit into them. Because of the earth’s rotation, the sun’s image moves quite quickly across the wall. Do not forget to re-align the binoculars from time to time onto the sun. The moon and stars cannot be observed in this way because the light coming from them is too weak. 2. Sun clock Place a flowerpot with a long stick fixed into the hole at the bottom in a spot, which is sunny, all day. The stick’s shadow moves along the rim of the pot as the sun moves. Each hour by the clock mark the position of the shadow on the pot. If the sun is shining, you can read off the time. Because of the rotation of the earth the sun apparently passes over us in a semi-circle. In the morning and evening its shadow strikes the pot superficially, while; it midday, around 12 o’clock, the light incidence is greatest. The shadow can be seen particularly clearly on the sloping wall of the pot. 3. Watch as a compass Hold a watch horizontally, with the hour hand pointing directly to the sun. If you halve the distance between the hour hand and the 12 with a match, the end of the match points directly to the south. In 24 hours the sun ‘moves’, because of the earth’s...

Words: 23291 - Pages: 94

Free Essay

Third Edition

...Laboratory biosafety manual Third edition World Health Organization Geneva 2004 WHO Library Cataloguing-in-Publication Data World Health Organization. Laboratory biosafety manual. – 3rd ed. 1.Containment of biohazards - methods 2.Laboratories - standards 3.Laboratory infection - prevention and control 4.Manuals I.Title. ISBN 92 4 154650 6 (LC/NLM classification: QY 25) WHO/CDS/CSR/LYO/2004.11 This publication was supported by Grant/Cooperative Agreement Number U50/CCU012445-08 from the Centers for Disease Control and Prevention (CDC), Atlanta, GA, USA. Its contents are solely the responsibility of the authors and do not necessarily represent the official views of the CDC. © World Health Organization 2004 All rights reserved. Publications of the World Health Organization can be obtained from Marketing and Dissemination, World Health Organization, 20 Avenue Appia, 1211 Geneva 27, Switzerland (tel: +41 22 791 2476; fax: +41 22 791 4857; email: bookorders@who.int). Requests for permission to reproduce or translate WHO publications – whether for sale or for noncommercial distribution – should be addressed to Publications, at the above address (fax: +41 22 791 4806; email: permissions@who.int). The designations employed and the presentation of the material in this publication do not imply the expression of any opinion whatsoever on the part of the World Health Organization concerning the legal status of any country, territory, city or area or of its authorities, or concerning...

Words: 50038 - Pages: 201

Premium Essay

Case Study Handbook

...1/22/07 3:37 PM Page i RP OS T ElletFM.qxp THE DO N OT C OP YO CASE STUDY HANDBOOK 1/22/07 3:37 PM Page ii DO N OT C OP YO RP OS T ElletFM.qxp 1/22/07 3:37 PM Page iii RP OS T ElletFM.qxp YO THE OP CASE STUDY HANDBOOK How to Read, Discuss, and OT C Write Persuasively About Cases DO N William Ellet Harvard Business School Press Boston, Massachusetts 1/22/07 3:37 PM Page iv RP OS T ElletFM.qxp Copyright 2007 William Ellet YO All rights reserved Printed in the United States of America 11 10 09 08 07 5 4 3 2 1 OP No part of this publication may be reproduced, stored in or introduced into a retrieval system, or transmitted, in any form, or by any means (electronic, mechanical, photocopying, recording, or otherwise), without the prior permission of the publisher. Requests for permission should be directed to permissions@hbsp.harvard.edu, or mailed to Permissions, Harvard Business School Publishing, 60 Harvard Way, Boston, Massachusetts 02163. The copyright on each case in this book unless otherwise noted is held by the President and Fellows of Harvard College and they are published herein by express permission. Permission requests to use individual Harvard copyrighted cases should be directed to permissions@hbsp.harvard.edu, or mailed to the Permissions Editor, Harvard Business School Publishing, 60 Harvard Way, Boston, MA 02163. OT C Case material of the Harvard Graduate School of Business Administration is made possible by the...

Words: 99835 - Pages: 400

Premium Essay

Case

...THE ON OT C OP YO CASE STUDY HANDBOOK RP OS T ON OP YO RP OT C OS T THE ON OT C Write Persuasively About Cases OP CASE STUDY HANDBOOK How to Read, Discuss, and William Ellet Harvard Business School Press Boston, Massachusetts YO RP OS T Copyright 2007 William Ellet All rights reserved Printed in the United States of America 11 10 09 08 07 5 4 3 2 1 No part of this publication may be reproduced, stored in or introduced into a retrieval system, or transmitted, in any form, or by any means (electronic, mechanical, photocopying, recording, or otherwise), without the prior permission of the publisher. Requests for permission should be directed to permissions@hbsp.harvard.edu, or mailed to Permissions, Harvard Business School Publishing, 60 Harvard Way, Boston, Massachusetts 02163. The copyright on each case in this book unless otherwise noted is held by the President and Fellows of Harvard College and they are published herein by express permission. Permission requests to use individual Harvard copyrighted cases should be directed to permissions@hbsp.harvard.edu, or mailed to the Permissions Editor, Harvard Business School Publishing, 60 Harvard Way, Boston, MA 02163. ON OT C Case material of the Harvard Graduate School of Business Administration is made possible by the cooperation of business firms and other organizations which may wish to remain anonymous by having names, quantities, and other...

Words: 96750 - Pages: 387

Free Essay

Mode Bill 2012

...ARCHITECTURAL SERVICES DEPARTMENT MODEL BILLS OF QUANTITIES FOR BUILDING WORKS The Government of The Hong Kong Special Administrative Region Architectural Services Department Quantity Surveying Branch Queensway Government Offices 66 Queensway Hong Kong 2012 EDITION CONTENTS Demolitions and Alterations Piling and Caissons Diaphragm Walling Excavation Underpinning Concrete Works Brickwork and Blockwork Drainage (including Underground Pipe Ducts) Waterproofing Stone Works Roof Tiling Wood Works Ironmongery Steel and Metal Works Plastering and Paving Plumbing and Water Supply Systems Glazing Painting Landscaping External Works Electrical Installation Air Conditioning Installation Fire Service Installation Low Voltage Cubicle Switchboards Installation Diesel Generating Sets Installation Uninterruptible Power Supply System Broadcast Reception Installation Compressed Air System Steam Boiler System Liquefied Petroleum Gas Installation Fuel Supply System Swimming Pool Water Treatment Installation MODBQ.1/1 MODBQ.2/1 MODBQ.3/1 MODBQ.4/1 MODBQ.5/1 MODBQ.6/1 MODBQ.7/1 MODBQ.8/1 MODBQ.9/1 MODBQ.10/1 MODBQ.11/1 MODBQ.12/1 MODBQ.13/1 MODBQ.14/1 MODBQ.15/1 MODBQ.16/1 MODBQ.17/1 MODBQ.18/1 MODBQ.19/1 MODBQ.20/1 MODBQ.21/1 MODBQ.22/1 MODBQ.23/1 MODBQ.24/1 MODBQ.25/1 MODBQ.26/1 MODBQ.27/1 MODBQ.28/1 MODBQ.29/1 MODBQ.30/1 MODBQ.31/1 MODBQ.32/1 6 22 3 8 4 18 7 12 10 7 3 23 8 22 30 19 5 10 7 19 27 55 30 9 5 4 10 6 10 9 7 14 Bill Nr. MODBQ.1 DEMOLITIONS AND ALTERATIONS DEMOLITIONS...

Words: 71251 - Pages: 286

Free Essay

Vstar Manual

...EB000000 XVS1100 (L) SERVICE MANUAL ©1998 by Yamaha Motor Co.,Ltd. First edition, October 1998 All rights reserved. Any reproduction or unauthorized use without the written permission of Yamaha Motor Co., Ltd. is expressly prohibited. EB001000 NOTICE This manual was produced by the Yamaha Motor Company primarily for use by Yamaha dealers and their qualified mechanics. It is not possible to include all the knowledge of a mechanic in one manual, so it is assumed that anyone who uses this book to perform maintenance and repairs on Yamaha motorcycles has a basic understanding of the mechanical ideas and the procedures of motorcycle repair. Repairs attempted by anyone without this knowledge are likely to render the motorcycle unsafe and unfit for use. Yamaha Motor Company, Ltd.is continually striving to improve all its models. Modifications and significant changes in specifications or procedures will be forwarded to all authorized Yamaha dealers and will appear in future editions of this manual where applicable. NOTE: Designs and specifications are subject to change without notice. IMPORTANT INFORMATION Particularly important information is distinguished in this manual by the following notations. The Safety Alert Symbol means ATTENTION! BECOME ALERT! YOUR SAFETY IS INVOLVED! Failure to follow WARNING instructions could result in severe injury or death to the motorcycle operator, a bystander or a person inspecting or repairing the motorcycle. CAUTION: NOTE: ...

Words: 52990 - Pages: 212

Free Essay

Sanitary Napkin Feasibibilty

...CHAPTER 1 Problem and its Setting Introduction Most women finding difficulties with their ordinary sanitary pads during menstrual period that’s why the researchers of this feasibility studies will give consumers the comfort they’ve been waiting for by combining the sanitary pads and negative ion. The researcher assure that the product will give the satisfaction from the money they spent by choosing the Negative-ion Infused Sanitary Pads. And even in the first try, users could really find ease because of positive effect in the body of the users. The negative-ion as it is said above has a mint-like feature that helps the women to feel more relaxed and very easy to move with confidence even if they have a period. The product will solve the growing concerns of the women finding difficulties and discomfort with their sanitary pads. The researchers believe that this product may not just solve the issues but also hit the market in a healthy way because of these unique features. Statement of the Problem This study is intended to evaluate the feasibility of manufacturing and selling negative ion- infused sanitary napkins. Specifically, it aims to evaluates and analyze the different areas of the product such as its marketing, technical, management, financial and socio economic aspects. Objectives of the Study The objective of this project was to determine the feasibility of manufacturing sanitary pads that are infused with negative-ion. All required information to...

Words: 11792 - Pages: 48

Premium Essay

Term

...SEED PROCESSING AND STORAGE Principles and practices of seed harvesting, processing, and storage: an organic seed production manual for seed growers in the Mid-Atlantic and Southern U.S. Copyright © 2004 by Jeffrey H. McCormack, Ph.D. Some rights reserved. See page 28 for distribution and licensing information. For updates visit www.savingourseeds.org For comments or suggestions contact: jeff@gardenmedicinals.com For distribution information please contact: Cricket Rakita Carolina Farm Stewardship Association www.carolinafarmstewards.org www.savingourseed.org P.O. Box 448, Pittsboro, NC 27312 (919) 542-2402 or Jeff McCormack Garden Medicinals and Culinaries www.gardenmedicinals.com www.savingourseeds.org P.O. Box 320, Earlysville, VA 22936 (434) 964-9113 Seed Processing and Storage: Principles and Practices TABLE OF CONTENTS Principles of seed harvesting and processing..................................................................................... Seed harvesting and extraction.............................................................................................................. Harvesting..................................................................................................................................... Dry seed processing ................................................................................................................... Wet seed processing .................................................................................

Words: 16181 - Pages: 65

Free Essay

Be Prepared

...GREEN BUILDING GUIDE Design Techniques, Construction Practices & Materials for Affordable Housing RCAC GREEN BUILDING GUIDE Design Techniques, Construction Practices & Materials for Affordable Housing Principal Author Craig Nielson, LEED AP Rural Community Assistance Corporation Co-authors Connie Baker Wolfe Rural Community Assistance Corporation Dave Conine Rural Community Assistance Corporation Contributor Art Seavey Rural Community Assistance Corporation Design Dave Conine Sharon Wills Rural Community Assistance Corporation Managing Editor and Production Sharon Wills RCAC Corporate Office: 3120 Freeboard Drive, Suite 201, West Sacramento, California 95691 916/447-2854 | 916/447-2878 fax | www.rcac.org Published by Rural Community Assistance Corporation (RCAC), a nonprofit organization dedicated to assisting rural communities achieve their goals and visions by providing training, technical assistance and access to resources. RCAC promotes quality, respect, integrity, cooperation and commitment in our work. Copyright © 2009 RCAC. All rights reserved. For reprint permission, please call 916/447-2854. Disclaimer: The material in this document has been reviewed by RCAC and approved for publication. The views expressed by individual authors, however, are their own and do not necessarily reflect those of RCAC. Trade names, products or services do not convey, and should not be interpreted as conveying, RCAC approval, endorsement or recommendation...

Words: 32710 - Pages: 131

Premium Essay

Jared Diamond Collapse

...COLLAPSE HOW S O C I E T I E S CHOOSE TO FAIL OR S U C C E E D JARED DIAMOND VIK ING VIKING Published by the Penguin Group Penguin Group (USA) Inc., 375 Hudson Street, New York, New York 10014, U.S.A. Penguin Group (Canada), 10 Alcorn Avenue, Toronto, Ontario, Canada M4V 3B2 (a division of Pearson Penguin Canada Inc.) Penguin Books Ltd, 80 Strand, London WC2R ORL, England Penguin Ireland, 25 St. Stephen's Green, Dublin 2, Ireland (a division of Penguin Books Ltd) Penguin Books Australia Ltd, 250 Camberwell Road, Camberwell, Victoria 3124, Australia (a division of Pearson Australia Group Pty Ltd) Penguin Books India Pvt Ltd, 11 Community Centre, Panchsheel Park, New Delhi—110 017, India Penguin Group (NZ), Cnr Airborne and Rosedale Roads, Albany, Auckland 1310, New Zealand (a division of Pearson New Zealand Ltd) Penguin Books (South Africa) (Pty) Ltd, 24 Sturdee Avenue, Rosebank, Johannesburg 2196, South Africa Penguin Books Ltd, Registered Offices: 80 Strand, London WC2R ORL, England First published in 2005 by Viking Penguin, a member of Penguin Group (USA) Inc. 13579 10 8642 Copyright © Jared Diamond, 2005 All rights reserved Maps by Jeffrey L. Ward LIBRARY OF CONGRESS CATALOGING IN PUBLICATION DATA Diamond, Jared M. Collapse: how societies choose to fail or succeed/Jared Diamond. p. cm. Includes index. ISBN 0-670-03337-5 1. Social history—Case studies. 2. Social change—Case studies. 3. Environmental policy— Case studies. I. Title. HN13. D5 2005 304.2'8—dc22...

Words: 235965 - Pages: 944

Free Essay

Current Issue Management

...A GUIDE TO APPLICATION FOR RESTAURANT LICENCES Food and Environmental Hygiene Department (January 2012 Edition) -1- FOOD AND ENVIRONMENTAL HYGIENE DEPARTMENT (FEHD) PERFORMANCE PLEDGE APPLICATION FOR RESTAURANT LICENCES We are pleased to state below our performance targets in respect of applications for restaurant licences. Processing Steps To return proposed layout plans which fail the Preliminary Screening to the applicant To arrange Application Vetting Panel (AVP) meeting with the applicant To issue Letter of Requirements for provisional licence and/or full licence To conduct inspection final verification Standard Response Time within 10 working days after receipt of proposed layout plans within 20 working days of acceptance of the licence application for further processing before or at the AVP Meeting upon confirming the premises are suitable for licensing within 8 working days of receipt of notification of compliance with the licensing requirements from the applicant within 7 working days upon confirmation of compliance with all licensing requirements within 1 working day upon receipt of acceptable Certificates of Compliance with licensing requirements from the applicant within 7 working days upon receipt of acceptable Certificates of Compliance with licensing requirements from the applicant To issue Full Licence To issue Provisional Licence a) if the documents are submitted to the Licence Issuing Office b) if the documents are submitted...

Words: 61953 - Pages: 248

Premium Essay

Save Days

...BMW 3- & 5-Series Service and Repair Manual A K Legg Models covered 3-Series (E30) 316 (83 to 88), 316i (88 to 91), 318i (83 to 91), 320i (87 to 91), 325i (87 to 91). Also Touring and Convertible versions of these models 5-Series (E28) 518 (81 to 85), 518i (85 to 88), 525i (81 to 88), 528i (81 to 88), 535i (85 to 88), M535i (85 to 88) 5-Series (E34) 518i (90 to 91), 520i (88 to 91), 525i (88 to 91), 530i (88 to 91), 535i (88 to 91) Engines covered 1596 cc, 1766 cc, 1795 cc, 1990 cc, 2494 cc, 2788 cc, 2986 cc & 3430 cc Does not cover Diesel, dohc or V8 engines, or four-wheel-drive models LAE MIMI and Larry Warren (1948-256-11AA3) © Haynes Publishing 1997 A book in the Haynes Service and Repair Manual Series ABCDE FGHIJ KLMNO PQRST 123 Printed by J H Haynes & Co. Ltd, Sparkford, Nr Yeovil,Somerset BA22 7JJ, England Haynes Publishing Sparkford, Nr Yeovil, Somerset BA22 7JJ, England Haynes North America, Inc 861 Lawrence Drive, Newbury Park, California 91320, USA Editions Haynes S.A. 147/149, rue Saint Honoré, 75001 PARIS, France Haynes Publishing Nordiska AB Box 1504, 751 45 Uppsala, Sweden All rights reserved. No part of this book may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording or by any information storage or retrieval system, without permission in writing from the copyright holder. ISBN 1 85960 236 3 British Library Cataloguing in Publication Data A catalogue record for this book is...

Words: 146734 - Pages: 587