Premium Essay

System Integration and Validation

In:

Submitted By tobi0320
Words 984
Pages 4
System Integration and Validation
Computer technology has advanced enough to help auditors find more efficient ways to audit. By using different auditing techniques and utilizing audit productivity software auditors can find errors in a business computer system faster and easier. Using this type of computer technology improves Audit documentation and processes. Computer Assisted Auditing Techniques or CAAT’s can be used to validate data and system integrity by using different types such as testing data, integrated test facility and parallel simulation etc. Also by integrating Audit productivity software such as electronic working papers, groupware, and reference libraries, and document management, an auditor’s personal productivity is enhanced.
Validating Data
Auditors use CAAT’s or computer assisted auditing techniques to validate data. Auditors validate data by using audit productivity software such as ACL. With new technology auditors are now able to extract client data and input into an audit productivity program. The data can then be analyzed quickly and efficiently. Auditors also use data query models that productivity software can help create or one can be created without it. The purpose of the data query model is to determine if the evidence obtained fits with the context of other information obtained during the audit, such as, personnel interviews, tests of controls, risk assessment etc. Computer assisted auditing techniques for validating data have made it easier to keep up with more efficient auditing; because of this another technique used by auditors for validating data is continuous auditing. Continuous auditing can be performed daily to find errors as soon as they arise.

Validating System Integrity
The different techniques used in computer assisted auditing can help validate system integrity. One of the techniques used in validating

Similar Documents

Premium Essay

Nt1310 Unit 6.4 Testing

...6.4 Testing The different types of testing that may be carried out in the project are as follows: • Unit testing • Integration Testing • Validation Testing • System Testing • Regression Testing • Load Testing • Stress Testing • White Box Testing • Black Box Testing Unit Testing Unit testing focuses verification effort on the smallest unit of software design the software component or module. The relative complication of tests and uncovered errors is limited by the constrained scope established for unit testing. The unit test is white-box concerned with, and the step can be conducted in parallel for multiple components. The module interface is testing to ensure that information properly flows into an out of program unit under test. Local data structures are checked to ensure the data stored provisionally maintains it integrity during all the steps of algorithm execution. Edge is tested to have use of unit testing for each module during its coding. Once all the modules have suffered Unit Testing, they are assimilated and again tested for bugs using a technique called Integration Testing. Data can be lost over an interface; one module can have an adverse effect on the other and when combined may not yield the major desired function....

Words: 1167 - Pages: 5

Premium Essay

Nt1310 Unit 6.2 Unit Testing

...System testing is really a series of various tests whose primary purpose is to totally exercise the computer-based system. Though every check contains a totally different purpose, all work to verify that each one the system parts are properly integrated and perform allotted functions.The testing process is actually carried out to make sure that the product exactly does the same thing what is supposed to do. Testing is the final verification and validation activity. In the testing stage following goals are tried to achieve, • To affirm the quality of the project. • To find and eliminate any residual errors from previous stages. • To validate the software as a solution to the original problem. • To provide operational reliability of the system....

Words: 1616 - Pages: 7

Premium Essay

Drm-Fdm-Odi

...Solution of the year 2008 Oracle EPM Excellence Award 2009 Oracle EPM/BI Innovation Award One of the fastest growing companies in the world (Inc. Magazine, ‟08 & ‟09 & „10)  Two Hyperion Oracle ACE Directors and one Oracle Ace  Founding Hyperion Platinum Partner; now Oracle Platinum Partner  Focused exclusively on Oracle Hyperion EPM software  Consulting  Training  Infrastructure and Installation  Support  Software sales     4  7 Hyperion Books Available:         Essbase (7): Complete Guide Essbase System 9: Complete Guide Essbase System 9: End User Guide Smart View 11: End User Guide Essbase 11: Admin Guide Planning: End Users Guide Planning: Administrators To order, check out www.LuLu.com •5 •Copy right © 2007, Hy perion. All rights reserv ed. Select interRel Customers 6 Abstract  DRM, FDM (or is it FDQM), ODI, ERPI, EPMA…thanks, Oracle, for all of these tools but which tool should I use for my EPM system? Do I need all of them? Do I need any of them? In this webcast, we‟ll break down the acronyms and explain each one of these tools step by step. We‟ll evaluate the advantages to each solution and compare them side by side. By the end of this session, you‟ll have a good understanding of each solution and how it fits in with your current implementation. 10...

Words: 2902 - Pages: 12

Premium Essay

Im Maturity Case Study

...operating companies, investments and joint ventures. A second requirement is the development of monthly performance reports to the boards of the 5 Holdings where strategic decisions are based. External requirements are mainly the exchange of data with financial institutions and prospect partners as needed. A business challenge in aggregating data from diverse systems, highly manual processes and shortage in skilled resources, slow adoption of business processes automation, and minimal internal analysis due to excessive time needed to produce consolidated reports. Budgeting and distribution of capital is managed centrally. Due to the nature of the shareholders, financial information security is fundamental in any process. Industry Trends 1. Enterprises are widely adopting Enterprise performance management systems with focus on planning, budgeting and forecasting; management reporting; and financial reporting and consolidation. 2. Mobile technology has become pervasive as workers embrace the convenience of anytime, anywhere computing. Strong demand from executives to extend the capabilities of systems to mobile where review and approval of critical processes can be done on the go. 3. Big Data is a new Signal for Finance; with the big data...

Words: 4774 - Pages: 20

Premium Essay

Acc542-Week6-System Integrity and Validation

...Running Head: System Integrity and Validation SYSTEM INTEGRITY AND VALIDATION Kudler Fine Foods (KFF) DEBORAH OKAI ACC 542 – ACCOUNTING INFORMATION SYSTEMS December 16, 2013 DAVID PHILLIPS   Running Head: System Integration and Validation BRIEF This brief will focus on computer assisted audit tools and techniques (CAATTs) for the audit process and documentation of Kudler Fine Foods (KFF). The purpose of the CAATTs is to facilitate and quicken the audit process for KFF’s accounts receivable, payable, inventory, and payroll systems. Preface KFF has implemented internal controls on its accounting and information systems. It has also targeted four areas of the business system for audit purposes – accounts receivable (AR), accounts payable (AP), inventory, and payroll. Considering the fact that KFF’s business is run on computers, it would be ideal to run the audit process using computer assisted audit tools and techniques (CAATTs). This would increase the efficiency of the audit process. In today’s world of advancing technology and corporate accounting scandals, I think the best technique for auditing KFF would be in the form of continuous auditing. An example is the embedded audit module. This is a procedure where the audit data is collected at the same time as when the client is performing its business operations. The audit module will give the auditor online access to KFF’s data whenever needed....

Words: 1157 - Pages: 5

Premium Essay

Skill Validation

...Skills Validation PNCI Eliana Ruiz Age: 86 Weight: 55 kg Base: Standard Adult Overview Synopsis The learner will be providing care to an 86-year-old Hispanic female admitted to the MedicalSurgical Unit with a non-healing wound on her right upper leg where a femoral-popliteal bypass graft was performed two weeks ago. She is diabetic and injured her left ankle by tripping on a curb on the way to the hospital. She is anxious about not being able to care for herself when she returns home. She lives alone but has a daughter close by, and has no insurance. This Simulated Clinical Experience™ (SCE™) has five states, that are transitioined manually. With manual transitions, the instructor should advance to the applicable state when appropriate interventions are performed. Initially, in State 1 0900 Hours Assessment, the learner is presented with a patient who is febrile and exhibiting other signs of infection. Initial assessment reveals a temperature of 38.6o Celsius, HR in the 80s, BP in the 140s/80s, RR in the low 20s and SpO2 in the mid 90s on room air. Breath sounds demonstrate crackles bilaterally. The patient is anxious and incontinent of urine. She has a non-productive cough and reports tenderness over the left ankle. Initial treatment includes application of an elastic bandage to the left ankle, assessment of pain level, administration of pain medications, insertion of a urinary catheter and a sterile wet-to-moist dressing change to the graft site. If learners request...

Words: 4609 - Pages: 19

Premium Essay

Business Analysis - Solution Assessment

...either develop a real-time gross settlement (RTGS) system for the settlement of large-value, interbank payments in the country in-house, or purchase an off-the-shelf solution. The example used in this case study is an evaluation of a vendor’s reply to a request for proposal. 2. Assess proposed solution 2.1 Assess the value delivered by the proposed solution(s) or the actual proposal The acceptance criteria were compiled during internal requirement elicitation work sessions with representatives from the different departments in the bank. These criteria were then weighted based on importance. Number | Acceptance criteria | Weight | Compliance rating |   | Weight x compliance rating |   |   |   | Vendor A | Vendor B | In-house | Vendor A | Vendor B | In-house | 1 | Application software product requirements | | | | | | | | 1.1 | All settlement shall be prefunded | 20 | 3 | 3 | 2 | 60 | 60 | 40 | 1.2 | The system shall provide for different settlement options | 30 | 1 | 3 | 1 | 20 | 60 | 20 | 1.3 | The system shall facilitate intraday credit extension against collateral | 10 | 2 | 3 | 1 | 40 | 60 | 20 | 1.4 | The system shall be able to interface with existing back-office systems | 5 | 2 | 2 | 3 | 40 | 40 | 60 | 1.5 | Settlement should be final and irrevocable | 3 | 3 | 1 | 3 | 60 | 20 | 60 | 2 | Infrastructure requirements | | | | | | | | 2.1 | All communication between the System and participants must go via SWIFT or the online web...

Words: 2801 - Pages: 12

Premium Essay

Events Description

...Project Phase | Education/Training Event Name | Description | Client Attendees | Duration | Location | ENGAGE PHASE - Project Planning & Team Preparation | Client Executive Session | ● Executive level project kickoff ● Review Cerner's implementation methodology, key dates, project success factors, roles/responsibilities, governance structure/project staffing needs, benefits/outcomes and Meaningful Use Objectives (in the US) etc. | Executive & Clinical Leadership Team, (Note: ensure the Quality Director is also included as benefits will be discussed) | 2-4 hrs | Client Site | | Strategic Assessment | The Strategic Assessment is a diagnostic approach that assesses an organization’s culture and readiness for change. During this assessment, leadership, end-users and prospective project team members are engaged to assess the healthcare organization’s current situation, challenges and opportunities. | Client Physician ResourcesClient Transformation Consultant | Assessments are conducted over a wk period and results presented in a combined session | Client Site | | Project Preparation Session | ● Project Overview Presentation - Review Project Roles/Expectations, Key Events/Dates, Meaningful Use objectives for project etc. ● Solution and Tools Workshop - MethodM Online (Online Project Plan and Sharepoint Site), WBTs (Web-based training tools to introduce the project team to Millennium), Bedrock (Wizards used to design/build components of the database) ● Open House...

Words: 1664 - Pages: 7

Premium Essay

Database

...Case Study: Database Development ALEXANDRA DESINORD PROFESSOR OSAMA MORAD CIS 515- STRAT PLAN FOR DBASE SYSTEMS Week 7 Assignment February 29, 2016 The more companies base their large elements of their business strategy around data, the need for IT team and executives with deep understanding of data and analytics is growing rapidly. Data changes all of the time. That is why it is essential that companies should try to stay up to par with the ever changing technology so that they can ensure that the system can withstand anything that comes about. Down below I will discuss briefly the various aspects of the SLDC and the tasks that can be completed to help solve certain common problems that exist from within. Customer data management is not high on many organizations' lists of priorities until it has to be. The term used in systems engineering, information systems and software engineering to describe a process for planning, creating, testing, and deploying an information system is called Systems development life cycle (SDLC). This term is also referred to as the application development life-cycle, which is a term used in systems engineering, information systems and software engineering to describe a process for planning, creating, testing, and deploying an information system. The task of optimizing the software development process has faced many obstacles. The main obstacle is a lack of accurate and complete data on the development process. The use of the Personal...

Words: 2352 - Pages: 10

Premium Essay

Fast Cargo Vessel

...Describe how these Critical Validation Issues are to be tested. This is pitched at the Test and Evaluation Master Plan level, but may show aspects of lower level documentation to justify certain decisions. a. What major activities are required and when could they be carried out? b. Are there validation issues that should be carried out as (or before) the system is under development to minimize or mitigate risk? c. Describe the resources that would be required for these test programs, including assessing when they might be realistically available? Shonky Enterprises have identified a shortfall in the market between slow sea freight and expensive air freight. Market research and analysis of historical data conducted as part of the Needs Analysis has identified what the end-user (the customer) requires and how Shonky will meet the needs of this niche market. Information on how the vessel will be used and any risks that the project may or may not be financially viable for the company have be identified as a number of Critical Operational Issues (COIs). The COIs are the absolutes required for the project as they detail what is operationally expected of the system. Failure to meet any of the COIs can not be tolerated. Validation of the vessels suitability and effectiveness will occur during OT&E; however, there is a critical requirement for validation of the T&E resources, primarily Modeling and Simulation (M&S) systems, to ensure the results...

Words: 5542 - Pages: 23

Premium Essay

Computers

... | | | | | |[pic] | | | |Quality Assurance Plan Authorization | | |Memorandum | I have carefully assessed the Quality Assurance Plan for the (System Name). This document has been completed in accordance with the...

Words: 5473 - Pages: 22

Premium Essay

Going Up

...diagram is an instrument used to detail the cause and effects of materials, machines, methods, and measurements on the overall quality of a product. In order to construct it, draw a single arrow towards quality and from the arrow branches out the different causes based on the 4Ms. 4. What is total quality management (TQM)? What is the difference between TQM and TQC? * Total quality management is taking steps to figure out the defects of a product before it reaches the final stage, whereas total quality control is the running and shipping stage and if a defect is found it is sent back to the TQM stages or thrown out. 5. Explain the differences between validation and verification. * The difference between validation and verification is the level of assurance that comes with the terms. Whilst validation assures the quality of something, verification simply determines whether something has attained set standards.  6. Explain the differences between failure, error, and...

Words: 585 - Pages: 3

Free Essay

Go Live Checklist

...Activity Production Go Live Checklist Dependency Status Responsible Group/ Person Comments Hardware Setup Time System Server Setup, OS Build, connections Setup and Test printers APO server setup; Optimizer Cache server setup Document server setup Printer Server Setup Coordinate activities between HR go live and other SAP go live related to hardware, dual clocks, etc. Engineering Drawing Package(s) Server setup Set batch jobs printers Hardware Purchased (PCs, Printers, Clocks, Labor Collection) CHECKPOINT: Hardware Is Installed, Time System Clocks Ready Mass Transport to Production (48 hrs) LOAD SETUP IN SAP PROD Open Client for Manual Numbers set Change customer number range to external Check various Number Ranges Add "plant" vendors Change vendor number range to external Manual - Number Range Batch Manual - Number Range Tranfer Requirement & Transfer Order Update table T185 as per SAP note 847810 Create Bin Numbers Set A/P Check Number Activate various conversion exit Change material number range to external APO-R/3 Basis connection settings Finance Setup Activate Material Ledger Activity Types Check FICO Number Ranges Co-PA activation Cost center hierarchy Cost element Groups Load Chart of Accounts Load Cost Centers Load Profit Centers Open MM Periods Primary and Secondary Cost Elements SET FI Periods APO & General Setup SETUP activate integration models create alert profiles Start Date Start Time Finish Time Finish Date Activity Production Go Live...

Words: 1397 - Pages: 6

Premium Essay

Risk Management

...Qualitest Compliance Wire Integration Risk Management Plan Revision History Date | DocumentVersion | Author | Comments/Notes | 10 April 2015 | V 1.0 | Levi Schenk | Initial Version | 12 April 2015 | V 1.1 | SAF | First edit | 14 April 2015 | V 1.2 | Levi Schenk | Second edit | 15 April 2015 | V 1.3 | SAF | Third edit | 17 April 2015 | V 1.4 | SAF | Fourth edit | Approvals Prepared By: _____________________________ Date: __________________ Levi Schenk Project/Validation Manager Signature below indicates this document has been determined to be accurate and complete. Approved By: ____________________________ Date: __________________ Cynthia KramerDaggett, Senior Director Quality systems (Qualitest Business Owner) Approved By: ____________________________ Date: __________________ David Haas Director IT (Qualitest IT Owner) Approved By: ____________________________ Date: _________________ Larry Kass Dir Compliance & Supplier Quality Third Party Quality (Qualitest - QA Compliance) Approved By: To be signed electronically in Master Control Ed Perazzoli IT Quality & Computer Validation Mgr (IT RM) Table of Contents Revision History 1 Approvals 2 1. Purpose 4 2. Project / System Overview 5 3. Definitions 5 4. INDEX OF ABBREVIATIONS AND ACRONYMS 6 5. References 7 6. Roles and Responsibilities 8 7. Risk Methodology – revisit with change forms. 9 8. Risk Management and assumptions 10 9. Risk Handling 12 10. Deviation Management 14 11...

Words: 2265 - Pages: 10

Free Essay

Brm of M.Com

...government asked for international tenders for the Dubai Metro Project and the following year placed an order with the Dubai Rapid Link Consortium (DURL), a five-company consortium lead by Mitsubishi Heavy Industries (MHI), with three other Japanese companies and one from Turkey. DURL was responsible for delivering a fully automated driverless railway system including all related engineering and construction. The Civil Works including the design, engineering and construction of tunnels, elevated viaducts, and station buildings and depots were performed by our civil works partner, a joint venture consisting of Obayashi Corporation, Kajima Corporation, and the Turkish firm Yapi Merkezi. MHI, in collaboration with Mitsubishi Corporation, was responsible for the design, manufacture, integration, construction and delivery of all railway systems including railcars, the automatic driverless control system, communications, operation control and SCADA systems, automatic fare collection, platform screen doors, depot equipment and facilities, the power distribution system and substation equipment, and the track facilities. |1. Railway system overview The Dubai Metro...

Words: 1398 - Pages: 6