Server Virtualization and Consolidation - A case study

Ravi G Singh Consulting IT Specialist – System p rsingh@us.ibm.com

Special Notices
This document discusses Server Virtualization and Consolidation designed and implemented by the author for an IBM Customer. This document is presented “As-Is” without any warranty, guarantee or assurances of any kind, either express or implied. IBM does not assume responsibility for the statements expressed herein and it reflects the opinions of the author. If you have questions about the contents of this document, please direct them to the author at rsingh@us.ibm.com. Author is not responsible for errors in this document that may result in any kind of inaccuracies.

Acknowledgements
Thanks to John R Hock, IBM Certified IT Specialist – System p - Advanced Technical Support Americas (ATS) for reviewing this White Paper. Thanks to the customer and IBM team for their contribution and support to this project.

Trademarks
The following terms are registered trademarks of International Business Machines Corporation in the United States and/or other countries: AIX, AS/400, DB2, IBM, Micro Channel, MQSeries, Netfinity, NUMAQ, OS/390, OS/400, Parallel Sysplex, PartnerLink, POWERparallel, RS/6000, S/390, Scalable POWERparallel Systems, Sequent, SP2, System/390, ThinkPad, WebSphere. The following terms are trademarks of International Business Machines Corporation in the United States and/or other countries: DB2 Universal Database, DEEP BLUE, e-business (logo), GigaProcessor, HACMP/6000, Intelligent Miner, iSeries, Network Station, NUMACenter, POWER2 Architecture, PowerPC 604,pSeries, Sequent (logo), SmoothStart, SP, xSeries, zSeries. A full list of U.S. trademarks owned by IBM may be found at http://iplswww.nas.ibm.com/wpts/trademarks/trademar.htm. NetView, Tivoli and TME are registered trademarks and TME Enterprise is a trademark of Tivoli Systems, Inc. in the United States and/or other countries. Oracle, MetaLink are registered trademarks of Oracle Corporation in the USA and/or other countries. Microsoft, Windows, Windows NT and the Windows logo are registered trademarks of Microsoft Corporation in the United States and/or other countries. UNIX is a registered trademark in the United States and other countries licensed exclusively through The Open Group. LINUX is a registered trademark of Linus Torvalds. Intel and Pentium are registered trademarks and MMX, Pentium II Xeon and Pentium III Xeon are trademarks of Intel Corporation in the United States and/or other countries. Java and all Java-based trademarks and logos are trademarks of Sun Microsystems, Inc. in the United States and/or other countries. Other company, product and service names may be trademarks or service marks of others.

Copyright
© Copyright IBM Corp. 2007, All Rights Reserved.

URLs
This document can be found on the web under the category of Whitepapers in IBM TechDocs Library. Internet http://www.ibm.com/support/techdocs Intranet http://w3-03.ibm.com/support/techdocs/atsmastr.nsf/Web/TechDocs

Release Date
Apr 2007

Table of Contents
Abstract .……………………………………………. 4 Introduction .……………………………………………. 4 Background .……………………………………………. 5 Methodology .……………………………………………. 8 Technology refresh alternatives .……………………………………………. 8 Virtualized Server Architecture .……………………………………………. 11 APV and HA Features .……………………………………………. 13 Resource Planning and Management tools .……………………………………………. 18 Results .……………………………………………. 19 Conclusions .……………………………………………. 22 Appendix – Methodology and Tools .……………………………………………. 23 References .……………………………………………. 29

© Copyright IBM Corp. 2007

Page 3 of 29

Server Virtualization and Consolidation - A case study

Abstract
This Whitepaper discusses a case study of server consolidation and virtualization project using the Advanced POWER Virtualization (APV) feature of IBM System p Server for a Business Intelligence application environment of a large enterprise in Industrial Sector. The discussion is focused on business requirement, server architecture, APV features used, capacity planning and resource planning, methodology and tools, and benefits to the customer. The scope of this project was to enable a technology refresh of old hardware, Virtualize and consolidate twenty seven stand alone servers, upgrade the OS and middleware to the supported levels, improve utilization and availability of hardware, and adopt a industry standard network infrastructure to communicate and share data between servers. This paper highlights how the Server Virtualization enabled the customer to reduce the TCO by optimizing the utilization of computing resources.

Introduction
Server Virtualization has emerged as one of the top IT objectives for corporate and IT Management. The major factors driving Server Virtualization as one of the top IT goals are • • • • • • Consolidation of servers Real time response to changing business needs OnDemand computing model Sharing of computing resources to improve utilization Improving Flexibility, High Availability and Performance Reducing TCO

IBM’s Advanced POWER Virtualization (APV) feature of System p Server and AIX provide Server Virtualization capability to run multiple workloads in a shared and/or dedicated resource environment. APV can be used very effectively to balance resource utilization between LPARs on a server running commercial and engineering applications such as business critical, ERP, product development, Web/App/Database, datawarehouse and BI applications. Businesses are migrating standalone servers running these types of applications to LPAR environment using APV on IBM System p enterprise servers. Benefits of APV and Server Virtualization are many-fold and presented in the diagram below. Synergy of these benefits leads to a significant business advantage in IT operations.

© Copyright IBM Corp. 2007

Page 4 of 29

Server Virtualization and Consolidation - A case study

System p Server + Advanced Power Virtualization + AIX

=
Flexibility + High Availability + Better Performance + Improved Utilization + Resources on demand + Lower TCO

This paper discusses the architecture, design, and methodology of Server Virtualization for a multinational organization in industrial sector. The virtualization architecture deployed highlights APV features used and its Best Practices.

Background
Three Business Intelligence (BI) application environments using IBM UNIX servers provided critical warranty and quality information to customer’s management and plants. These business critical applications ran in a complex environment involving multiple servers, applications, middleware stack, dependency on other servers for data and applications, network and SAN connectivity, and infrastructure requirements. These BI applications with multiple TB of data running on clustered IBM pSeries servers were implemented in a Massive Parallel Processing (MPP) shared nothing architecture for DB2 queries. The parallel queries running on these servers used a private high speed network. The workload of these applications involved running complex parallel queries on databases using both real-time and historical data, and could take anywhere from hours to days to complete. These datawarehouse and datamart environments exchanged and updated information between them. The IBM UNIX servers deployed for this project went through several technology refreshes in the past. The first two generation of servers were RS/6000 Scalable Parallel (SP) nodes with SP Switch network and the next generation consisted of POWER4 pseries servers with a SP2 switch network. The customer preferred the SP clustering technology with a high speed SP private network due to the excellent application performance. The discussion in this paper is related to the implementation of the latest technology refresh of these servers using virtualization.
© Copyright IBM Corp. 2007

Page 5 of 29

Server Virtualization and Consolidation - A case study

Existing configuration

Production Landscape
CWS, p610-6C1 2P-2GB

HMCs

2 x SP Switch2

6M1 DWH 8P-20GB P4-630/4P-8GB P4/1.1GHz 8xDS, 5xQA , 9xIS Backup Server

2x375 MHZ Wide DWH nodes 4P-4GB

Production • Total Processors-Memory 112P-222GB • 22 x P630s (4P-8GB) • 7026-6M1 (8P-20GB) • 2 x 375 MHz wide node (4P-4GB) • Backup Node (2P-4GB) • 7028-6C1 Control Work Station (CWS) (2P-2GB) • 2x7315-C01 HMC • 2x9076-558 SP Switch2 Development • Total Processors-Memory 16P-16GB • 4 x 375 MHz wide node (4P-4GB) • 7028-6C1 CWS (2P-2GB) • 1x9076-558 SP Switch

Software Stack Operating System – AIX 5.2 Database - UDB 8.2 (8.1FP11) Websphere – 5.0 IHS (IBM HTTP Server) – 2.0.47.1 Cognos – 7.3 © Copyright IBM Corp. 2007 Server Virtualization and Consolidation - A case study

Page 6 of 29

JDK – 1.4.2 & 1.3.1 Perl – 5.8.2.30 SiteMinder – 5.5QMR7 Crystal Reports

During the technology refresh of these servers, several server solution alternatives were considered before selecting the virtual architecture. The following sections discuss the solutions architected and presented, architecture of the virtualization solution, tools used, and post-implementation benefits. Discussion of APV functionality and features, application requirements and implementation/customization details are beyond the scope of this White Paper. The APV architecture designed and implemented for this project is documented as best practices in the IBM Redbooks and papers mentioned in the References Section.

© Copyright IBM Corp. 2007

Page 7 of 29

Server Virtualization and Consolidation - A case study

Methodology
This technology refresh project was architected and built using a three phase methodology. Output from the preceding phase was used as the input in the next phase along with several other factors discussed below. 1. Capacity Planning: During this phase, replacement servers/LPARs were sized using a customized tool. Factors such as current utilization, desired target utilization, growth factor and spare pool were used to size each LPAR. APV best practices and recommendations, and customer configuration standards and practices were used in this sizing. 2. Resource Planning: In this phase, standards and guidelines were built for resource allocation based on the existing practices, type of LPAR (Web, App. Or Database), applications to be run, bandwidth requirement and APV best practices. The resources allocated to each LPAR were either dedicated or shared depending on these guidelines. LPAR sizing information from capacity planning was used in this phase. Processor, memory, boot disks and adapter requirements finalized in this phase were used in eConfig for server configuration. 3. Resource Management: Based on the Resource Planning, adapters, disks and HBAs were assigned to LPARs. Multiple adapters of same type required for a LPAR were assigned from multiple RIO units to eliminate RIO draw as a single point of failure. The information from this tool was used by Server Architects and System Administrators during LPAR creation and then later for LPAR management.

Capacity Planning and Technology refresh alternatives
The customer’s corporate standard performance monitoring tool was used to collect utilization data from all SP nodes and servers in the SP cluster. Processor utilization and projected workload growth during the next lease period for each server was used to compute and size replacement servers/LPARs and multiple server solutions were proposed. Customized scripts were used to collect network (intranet and SP2 Switch) and SAN bandwidth requirements. Two alternatives proposed to replace SP Switch2 network were 10 Gb/sec Ethernet and the Virtual Ethernet network feature of System p server to provide the required bandwidth for high speed data transfer between the LPARs to run parallel queries. Four server architecture solutions proposed for production environment were:

© Copyright IBM Corp. 2007

Page 8 of 29

Server Virtualization and Consolidation - A case study

Option 1 - Consolidation and virtualization using p5-595
P4-630/4P-8GB Building block P4/1.1GHz

22xP630s, 6M1 and 2xWide Node in T42 Racks 12xDS, 4xQA and 9xIS SP Switch2, CWS, 2xHMC, Backup node 112P-222 GB

P5-595, 1.9GHz, 64P-256GB 2xHMC, 4xRIO, Virtual ENT

Option 2 – One for one replacement using entry server
P4-630/4P-8GB Building block P4/1.1GHz P5-550/4P-16GB Building block P5/1.65GHz

22xP630s, 6M1 and 2xWide Node in T42 Racks 12xDS, 4xQA and 9xIS SP Switch2, CWS, 2xHMC, Backup 112P-222 GB

26 x P5-550 in T42 racks, 2xHMC P520 2P-4GB Management server, 10Gb ENT network 104P-416GB

© Copyright IBM Corp. 2007

Page 9 of 29

Server Virtualization and Consolidation - A case study

Option 3 – Consolidation and virtualization using midrange server
P4-630/4P-8GB Building block P4/1.1GHz P5-570/16P-64GB Building block P5/1.65GHz

22xP630s, 6M1 and 2xWide Node in T42 Racks 12xDS, 4xQA and 9xIS SP Switch2, CWS, 2xHMC, Backup 112P-222 GB

5 x P5-570 in T42 racks, 2xHMC P520, 2P-4GB Management server, 10Gb ENT network 80P-320GB

Option 4 – Consolidation and virtualization using BI server
P4-630/4P-8GB Building block P4/1.1GHz P5-575/8P-32GB Building block P5/1.90GHz

22xP630s, 6M1 and 2xWide Node in T42 Racks 12xDS, 4xQA and 9xIS SP Switch2, CWS, 2xHMC, Backup 112P-222 GB

12 x P5-575 in 24” racks, 2xHMC P520, 2P-4GB Management server, 10Gb ENT network 88P-352GB IO Drawers for FC adapters and ENT adapters

© Copyright IBM Corp. 2007

Page 10 of 29

Server Virtualization and Consolidation - A case study

Virtualized Server Architecture
Out of the four server solution alternatives architected and presented, the customer selected the p5-595 architecture to virtualize and consolidate servers running MPP datawarehouse applications. Virtualization and consolidation on the p5-595 server was preferred due to the flexibility in sharing resources, higher availability, and higher utilization allowing server provisioning for new workload. One of the key decision factors favoring this architecture was the opportunity to reduce the overall TCO and not just Total Cost of Acquisition (TCA) of the server. These are discussed in the Results section of this White Paper. This flexible server architecture was built using APV Best Practices to enable resource sharing for optimum utilization and a highly available environment to eliminate single points of hardware failure. The diagrams below show LPARs with the recommended processor and memory configuration based on the utilization and projected workload for the production and development environments.

Consolidation and virtualization using p5-595 - Production
11 x DS Micro-partitions 1.8 Processors, 7.2GB each 4 x QA Micro-partitions 2.4 Processors, 9.6GB each 9 x IS Micro-partitions 2.3 Processors, 9.2GB each Spare Pool 10 Processors, 43GB 4 x VIO Servers – 1P, 4GB each Virtual Ethernet high speed interconnect

Redundant HMC

P5-595 1.9 GHz, 64P-256GB Processors can be incremented in 0.01 and memory in 16 MB IO Drawers for FC and ENT adapters

© Copyright IBM Corp. 2007

Page 11 of 29

Server Virtualization and Consolidation - A case study

Six LPARs for test and development environment of these applications were consolidated with other workload onto a second p5-595 server as shown in the diagram below. This provided a development environment identical to the production environment using the same APV features such as micro-partitioning, dual VIO Servers, shared boot disks, Ethernet and SAN adapters, spare processor pool, and private high speed Virtual Ethernet network to run parallel queries and share data between LPARs.

Consolidation and virtualization using p5-595 - Development
6 x DS-QA-IS Micropartitions 1.5 Processors, 6GB each LPARs for Other Applications Spare Pool of Processors and Memory Redundant HMC 4 x VIO Servers – 1P, 4GB each Virtual Ethernet high speed interconnect

P5-595 1.9 GHz, 64P-256GB Processors can be incremented in 0.01 and memory in 16 MB IO Drawers for FC and ENT adapters

© Copyright IBM Corp. 2007

Page 12 of 29

Server Virtualization and Consolidation - A case study

APV and High Availability features
APV and AIX offer several features and options to design a flexible server with high availability features to eliminate single points of failure. The APV features used in this server solution architecture are listed below. Micro-partitioning – Processing units are allocated in 0.1 increments, and can be added and removed using DLPAR without a reboot. Max. processor utilization - Virtual Processors are used to limit the maximum utilization of processing units. Shared processor pool - Uncapped LPARs can dynamically add more processing units from the pool On Demand for the changing workload. Memory – Can be added and removed from the LPARs without a reboot. Dual Virtual I/O Servers - Enables sharing of resources with dual paths to LPARs for SAN and network connectivity. Shared Boot Disks – 146GB Ultra 320 SCSI disks are shared by four LPARs. Each LPAR gets three VSCSI disks for OS: boot, mirror and alt. Shared Ethernet Adapters – Two adapters for intranet network and two adapters for Backup network are shared by multiple LPARs. Network Interface Backup (NIB) is configured at VIOS and client LPARs for high availability. Shared SAN Adapters – Each pair of VIOS using EMC Powerpath drivers present SAN disks as VSCSI disks to client LPARs for path availability and load balancing. Virtual Ethernet – An internal high speed private network connects LPARs to share data. Multiple OS levels - LPARs can run either AIX 5.2 or AIX 5.3 level of the operating system. Security - 100% safe, secure and isolated LPARs. High Availability - Single Points of Failures (SPOF) for boot disks, Ethernet and SAN adapters eliminated. LPAR Types APV offers options to create shared and/or dedicated LPARs using shared and/or dedicated resources. Both the production and development p5-595 servers were designed and configured for the following type of LPARs. • • • • VIO Servers – Dual LPARs to enable sharing of I/O resources. Database LPARs – LPARs with shared resources for parallel database. Web and App. LPARs – LPARs with dedicated resources to run web server and applications. NIM LPAR – Management and administration LPAR with dedicated I/O resources to install and manage AIX on client LPARs, to run scheduled DLPAR operations for other LPARs, and to collect performance data from all the LPARs.

Virtualization of I/O Resources Two pairs of VIO servers were configured and built to host groups of LPARs serving the three BI applications.
© Copyright IBM Corp. 2007

Page 13 of 29

Server Virtualization and Consolidation - A case study

VIO Server 1 and 2 hosting the first BI application using nine client LPARs. VIO Server 3 and 4 hosting the second and third BI application running on twelve client LPARs. Physical I/O resources (adapters and disks) were allocated to VIO Servers. Each pair of VIOS presented the following shared resources to client LPARs • Shared boot disks • Shared adapters for intranet • Shared adapters for Backup network • SAN disks with multiple paths High speed private Virtual Ethernet network was configured for LPARs to communicate with each other. Shared Processor pool and Capped/Uncapped LPARs The shared processor pool was configured to enable LPARs to dynamically add more processing units in two situations: fluctuating and peak workload demands, and provision for the estimated growth in workload. This requirement was sized during the capacity planning phase. All the AIX 5.3 LPARs were uncapped micro-partitions and capable of allocating additional processing units beyond the entitled capacity as and when required from the shared pool. The Power Hypervisor released the additional processing units back to the shared processor pool when no longer required by the LPARs. Three AIX 5.2 LPARs were built with dedicated resources (processors, memory and I/O devices) due to application requirements. Virtual Processors (VP) and Weightage The maximum processing units that could be used by the uncapped LPARs was controlled by the Virtual Processors. The desired Virtual Processors (VP) was set to twice the quantity of the desired Processing units, rounded-off to the nearest integer value. Users ran complex interactive and batch database queries and these could take anywhere from hours to days to complete. To accommodate these spikes and fluctuating workload, additional processor capacity beyond the entitled capacity for each LPAR was provided from the shared pool as and when required. Virtual Processors feature of APV allocated physical processors for multi-threading and additional capacity to LPARs on demand. The priority for allocating additional processing units to LPARs was controlled by the Weightage factor and its assignment to LPARs was as follows. • • • • VIOS – 255 Database LPARs – 196 Web and Application LPARs - 128 NIM LPAR - 64

Virtual SCSI The SCSI disks from dual VIO Servers were presented as Virtual SCSI boot disks to AIX 5.3 client LPARs. Two 36GB Logical Volumes presented from the first VIOS to each LPAR were used for rootvg and alt_rootvg. One 36GB Logical Volume presented from the second VIOS was used to mirror rootvg. This eliminated a LPAR failure either due to a SCSI disk failure on a VIOS &/or a VIOS failure.

© Copyright IBM Corp. 2007

Page 14 of 29

Server Virtualization and Consolidation - A case study

Virtualization of Boot Disks

VIO Server1
VIOS Mirror Disk

VIO Server2 SAN

SAN
VIOS Boot Disk

Shared Disks for LPARs 146GB each

….. ….................................

…..

VIOS Boot Disk

LPAR1

LPAR9

SAN

Boot Disk 36GB

Alt Disk 36GB

Mirror Disk 36GB

Boot Disk 36GB

Alt Disk 36GB

Mirror Disk 36GB

SAN

• •

146GB Disk from a VIO Server allocated to 4 LPARs, each 36GB in size. Boot disk failure and/or a VIO Server failure will not crash a LPAR

Two 73GB disks were allocated to each VIO Server and NIM LPAR for boot and mirror and three 73GB disks were assigned to AIX 5.2 LPARs for boot, mirror and alt disks. alt_disk_install clones rootvg and altinst_rootvg disk can be used to boot when the OS on the boot and mirror disk is corrupted or when both the boot and mirror disks fail. Virtual Ethernet Four options available to replace the SP2 high speed private network for LPARs to communicate and share UDB EEE data with each other were 10Gb network High Performance Switch (HPS) Infiniband (IB) Virtual Ethernet The 10Gb and IB options required a new network infrastructure to be built while the HPS option required redesigning the database architecture from MPP to dB logical partitions on a single large SMP server. Since all the LPARs were configured and built on one p5-595, Virtual Ethernet was the best alternative and it eliminated the need for building a 10Gb Ethernet or HPS or IB network. Virtual Ethernet adapters were created for all LPARs and a private non-routable 192.x.y.z network was configured. Shared Ethernet Adapters (SEA) Two network connections required to all LPARs were: corporate intranet for user access and Backup network to backup the data. Dual VIO Servers serving a group of LPARs were assigned either a two single port or one dual port Ethernet adapter.
© Copyright IBM Corp. 2007

Page 15 of 29

Server Virtualization and Consolidation - A case study

These adapters/ports were configured as the primary and standby adapter using Network Interface Backup (NIB) feature on each VIOS. Shared Ethernet Adapters (SEA) were created to all the LPARs using this NIB adapter from each VIOS. Two SEAs for each network on the client LPARs presented from dual VIOS were configured in NIB mode. This configuration provided high availability to both network connections and eliminated network failures due to an adapter, cable, switch port and/or VIOS failure. The network traffic from the client LPARs was distributed between the two VIO Servers by changing the primary adapter in NIB configuration. One half of the LPARs used the SEA from VIOS1 as the primary adapter and the second half of LPARs used the SEA from VIOS2 as the primary adapter thereby distributing the network traffic between a pair of VIOS.

Virtualization of Networks
Intranet BKUP Intranet BKUP

VIO Server1 SAN
One ENT Adapter sharing with LPARs

VIO Server2 SAN
Backup Adapter

Primary Adapter

LPAR1

….................................

Backup Adapter

Primary Adapter

LPAR9

SAN
Dual adapters at VIOS and LPARs are configured for NIB

Virtual Ethernet
High Speed Private Network

SAN
Backup adapter and Backup VIOS provide high network availability

Dedicated SAN adapters Two dedicated HBAs were allocated to database LPARs for SAN connectivity and to provide the required I/O bandwidth. HBAs were also dedicated to AIX 5.2 LPARs running Web and App. Servers as AIX 5.2 does not support sharing of resources. Shared SAN adapters SAN disks for data storage were configured and presented from dual VIOS to LPARs using shared HBAs. Three HBAs were assigned to each VIOS and the same SAN disks or LUNs were presented to a pair of VIOS. EMC Powerpath was installed on all the VIO Servers to provide multiple paths to SAN and balance the I/O between the HBAs. Dual VIOS presented the same power disks as VSCSI disks to client LPARs. The MPIO
© Copyright IBM Corp. 2007

Page 16 of 29

Server Virtualization and Consolidation - A case study

feature of AIX on client LPARs configured the same LUN presented from dual VIOS as a single disk. The SAN traffic was distributed between a pair of VIOS by changing the primary or active path on client LPARs. The SAN adapters on VIOS1 provided primary path to one half of the LPARs and HBAs on VIOS2 provided primary path to the second half of the LPARs. Sharing of HBAs on both VIOS enhanced the availability and increased the bandwidth by effectively using all the six paths. This configuration on client LPARs made the SAN disks highly available and eliminated path failures due to a HBA, SAN cable, switch port and/or VIOS failure.

Virtualization of HBAs and SAN Disks
SAN VIO Server1
Thee HBAs provide three paths to the same LUN

SAN VIO Server2

Lun1 Lun2 Lun3

EMC Powerpath

EMC Powerpath

Lun1 Lun2 Lun3

Each LUN is presented as a hdisk from each path

Each LUN is presented as a hdisk from each path

Three hdisks are presented as one hdiskpower on each VIOS This architecture protects from a path/HBA failure and VIOS failure. LPAR1 may use HBAs on VIOS1 as the primary path and LPAR2 may use HBAs on VIOS2 as the primary path for load distribution Lun1

LPAR1 MPIO
MPIO presents VSCSI disks from two VIOS as one single disk

Lun2

Lun3

© Copyright IBM Corp. 2007

Page 17 of 29

Server Virtualization and Consolidation - A case study

Resource Planning and Management tools
1. Resource Planning: Resource allocation standards and guidelines for LPARs were built based on the existing practices, type of LPAR, applications to be run, bandwidth requirement and APV Best Practices. I/O resources allocated to each LPAR were either dedicated or shared depending on these guidelines. Typically a Web and App. LPAR needed large network bandwidth while a database LPAR required large bandwidth to SAN. The standards defined were: a. Web and App. LPARs: Dedicated Ethernet adapter for intranet and shared HBAs using a pair of VIOS. b. Database LPARs: Dedicated HBAs for SAN connectivity and shared Ethernet adapters for intranet via a pair of VIOS. c. Backup network: LPARs to use shared network adapters presented from a pair of VIOS to connect to Backup network. d. Private Gb network: To share data between LPARs and other servers in the same datacenters and transfer mainframe data to LPARs, shared ethernet adapters presented from a pair of VIOS to LPARs provided connectivity to a private Gb network. e. Multiple DMZs: Best Practices and guidelines were built to connect LPARs to multiple DMZs on a single p5 server. f. Boot disks: Two 73 Gb disks were allocated to each VIOS and the NIM LPAR, three 73GB disks were allocated to AIX 5.2 LPARs and three 36GB LVs created from multiple 146GB disks were allocated to each AIX 5.3 LPAR. The total no. of disks required were consolidated and distributed between disk packs. As each disk pack with four slots could be allocated to only one LPAR, disks packs were populated with the required no. of disks. g. Dual loops were used to connect each RIO draw to the p5-595 server CEC. The sizing information for LPARs from the capacity planning was used in the Resource Planning. Processor, memory, boot disk and adapter requirements from the Resource Planning step were used in eConfig to configure the p5595 server with dual HMCs. 2. Resource Management: Based on the resources allocated in Resource Planning, adapters, disks and HBAs were assigned to LPARs. Multiple adapters of same type required for a LPAR were assigned from multiple RIO units to eliminate RIO draw as a single point of failure. This information was used by the Server Architects and System Administrators during LPAR creation and then later for LPAR management. Sample output from these tools is given in the Appendix.

© Copyright IBM Corp. 2007

Page 18 of 29

Server Virtualization and Consolidation - A case study

Server Virtualization and Consolidation results
The desired Server Virtualization benefits are very distinct and different at each management level in a corporation. This section highlights the results and benefits to the Senior Management, IT Management and Business Unit after migrating standalone servers to a virtualized enterprise p5-595 server.

1. Management perspective
Optimum utilization of computing resources. Reduced cost (TCO). Simplification of server operations and management. Standardized Infrastructure. Improved business agility/flexibility. Real time response to dynamically changing computing needs. Product differentiation and competitive edge in the market place due to innovation and collaboration in IT Infrastructure.

2. IT perspective
Flexible to allocate resources – On Demand allocation of processors and memory to accommodate changing workload. Consolidation - No. of servers reduced from 27 to one. Sharing of resources - No. of network adapters and drops reduced from 54 to 12. No. of SAN adapters and drops reduced. High Speed network - Virtual Ethernet eliminated the need to build a new high speed private network (HPS or 10Gb Ethernet). New workload – Unutilized processor and memory resource could be used for additional &/or new workload to further reduce TCO. High Reliability and Availability – Mainframe like features and redundancy provides better server reliability. Better utilization of resources due to sharing.

© Copyright IBM Corp. 2007

Page 19 of 29

Server Virtualization and Consolidation - A case study

2.1. Improved Resource utilization

A customized script was used to monitor the CPU and Memory utilization on all the LPARs and p5-595 server. DLPAR was used to change the Processor and Memory allocation to LPARs. Server Processor utilization was increased from 25% to 65%.
CPU

Oct 10 2006 CPU Utilization
70

Peak Utilization - CPU & Mem for shi001

Memory

30
60

25 CPU Utilization
50

20
% Utilization 40

15 10

Average

30

20

5
10

0
0

8: 00 10 :0 0 12 :0 0 14 :0 0 16 :0 0 18 :0 0 20 :0 0 22 :0 0 0: 00 2: 00 4: 00

00

11/1/2006

11/2/2006

11/3/2006

11/4/2006

11/5/2006

11/6/2006

11/7/2006

11/8/2006

10/13/2006

10/14/2006

10/15/2006

10/16/2006

10/17/2006

10/18/2006

10/19/2006

10/20/2006

10/21/2006

10/22/2006

10/23/2006

10/24/2006

10/25/2006

10/26/2006

10/27/2006

10/28/2006

10/29/2006

10/30/2006

Time

2.2. Flexibility in Resource Allocation Dynamic changes to Resource Allocation
11 x DS Micro-partitions 1.8 Processors, 7.2GB each 4 x QA Micro-partitions 2.4 Processors, 9.6GB each 9 x IS Micro-partitions 2.3 Processors, 9.2GB each Spare Pool 10 Processors, 43GB 4 x VIO Servers 1P, 4GB each Total Allocated Processors 54
© Copyright IBM Corp. 2007

11 x DS Micro-partitions 1.0 Processors, 7.2GB each 4 x QA Micro-partitions 1.0 Processors, 9.6GB each 9 x IS Micro-partitions 1.3 Processors, 9.2GB each Spare Pool 36.3 Processors, 43GB 4 x VIO Servers 0.5P, 4GB each Total Allocated Processors 28.7
Page 20 of 29

Server Virtualization and Consolidation - A case study

10/31/2006

11/9/2006

6:

The performance data from all the LPARs was collected and utilization graphs for LPAR and server were plotted using the scripts developed by the customer. The average processor utilization for all the LPARs was increased from 25% to 65% by reducing the desired processing units from each LPAR using DLPAR operation. As all the AIX 5.3 LPARs were uncapped and configured with adequate VPs to use additional processing units as and when required from the spare pool, there was no performance impact on the applications. This resulted in a bigger size spare pool and the no. of unused processors increased from 10 to 36.

2.3. Additional &/or new Workload

26 additional spare processors are available in the shared processor pool. New workload can be deployed on the production server without procuring additional computing resources. This flexible environment enables provisioning of computing resources.

3. Business Unit Perspective

Application and database Queries run faster in the virtual environment. Database Backup from all LPARs takes less than half the time compared to the old environment. Benchmark tests show performance improvement ranging from 40% to 70%. New environment has better reliability and stability due to built-in high availability characteristics. Virtual Ethernet is faster and eliminates hardware failures compared to the SP Switch2 private network in the old environment. LPARs can scale-up to accommodate the workload growth. LPARs provide a safe and secure environment as per the Business Unit requirements. AIX and Middleware stack was upgraded to supported levels and eliminated unsupported PSSP software, SP2 Switch and adapters. Reduced Software licensing cost (IHS, WAS, UDB, Cognos, SiteMinder) due to smaller no. of processors allocated to each LPAR.

© Copyright IBM Corp. 2007

Page 21 of 29

Server Virtualization and Consolidation - A case study

Conclusions
Virtualizing and consolidating twenty seven stand alone servers to one single enterprise server provided a standardized server architecture, reliable, flexible and cost effective server solution to the customer. This implementation reduced the overall TCO due to cumulative savings in the infrastructure (power, cooling, and floor space), reduced network and SAN connections, reduced boot storage, Virtual Ethernet eliminating the need to build a new high speed private network, reduced Software Licensing, reduced server maintenance cost, and provisioning of computing resources due to higher utilization. Provisioning of processor, memory and shared I/O resources helped to quickly deploy a new workload on the same server by reducing the time required to plan and provide the datacenter infrastructure. The APV architecture and the methodology used to design and implement this project can be considered as Best Practices for projects involving similar server virtualization configuration and implementation.

© Copyright IBM Corp. 2007

Page 22 of 29

Server Virtualization and Consolidation - A case study

Appendix – Methodology and Tools
1. Methodology Flowchart

Customer Input IBM

Capacity Planning Tool

Resource Planning Tool

IBM

Customer Input

IBM eConfig Customer Input

Server Built, delivered, installed

IBM

Customer Input

Resource Management Tool

IBM

Customer

LPARs built, OS installed, and configured

IBM

© Copyright IBM Corp. 2007

Page 23 of 29

Server Virtualization and Consolidation - A case study

2. Capacity Planning and Server sizing
A customized capacity planning tool was used to compute the processor and memory required for the replacement servers. A sample screen shot of this tool below shows the details. This tool was used to size LPARs, desired no. of VIO Servers and the spare pool. Variables used in sizing these LPARs were utilization, projected workload growth and maximum utilization factor. 1. Present configuration
Server TypeModel Serial # Clock Speed & Type Proces sors Memory in GB Max CPU utilized % Max. rPerf of the config. Utilized rPerf Applications

Production DS dsc01 dsc03 dsc05 dsc07 dsc09 dsc11 dsc13 dsc15 wp01 isp01 wp02 Backup CWS Other H/W - SP Switch2, HMC Totals Dev DS-IS QA tdv6 Totals
1xSP Node 3xSP Nodes

p630 p630 p630 p630 p630 p630 p630 p630 p630 p630 p630 p630 p610

1GHz, p4 1GHz, P4 1GHz, P4 1GHz, P4 1GHz, P4 1GHz, P4 1GHz, P4 1GHz, P4 1GHz, P4 1GHz, P4 1GHz, P4 1GHz, P4 450MHz

4 4 4 4 4 4 4 4 4 4 4 2 2

8 8 8 8 8 8 8 8 4 8 4 4 2

75 75 90 75 80 95 100 100 50 60 60 0 0

7.12 7.12 7.12 7.12 7.12 7.12 7.12 7.12 3.59 7.12 3.59 4 2.27

5.34 5.34 6.41 5.34 5.70 6.76 7.12 7.12 1.80 4.27 2.15 0.00 0.00

UDB UDB UDB UDB UDB UDB UDB UDB UDB WAS WAS

13

48

86

77.53

57.35

375 MHz

12

12

100

10.77

10.77

UDB IHS, WAS

375 MHz

4 16

4 16

100

3.59 14.36

3.59 14.36

3

© Copyright IBM Corp. 2007

Page 24 of 29

Server Virtualization and Consolidation - A case study

2. Capacity Planning and server sizing
Server Max. rPerf of the present config. 77.53 28.48 64.08 Utilized rPerf Growth Factor Desired Max CPU utilization Sizing Factor Required rPerf Reqd. Processors Memory in GB Model/ Type

Production 11xDS 4xQA 9xIS Totals for Prod 4xVIO Servers Shared pool @ 20% Totals Recommended Configuration 57.35 28.05 61.09 1.3 1.3 1.3 0.8 0.8 0.8 1.63 1.63 1.63 93.19 45.59 99.27 238.05 19.14 51.44 308.62 306.21 19.5 9.5 20.7 49.75 4.00 10.75 64.50 64 78 38 83 199 16.00 43 258 256 16x4-way P5-595 block, 1.9GHz

Dev 6xDS-IS-QA 1xWeb AIX52 Totals 2xVIO Servers Shared pool @20% Totals Recommended Configuration 14.36 3.59 14.36 3.59 2.15 1.90 0.8 0.8 2.69 2.38 38.59 8.54 47.13 8.54 11.13 66.81 68.32 9.0 2 11.04 2.00 2.61 15.65 16 36 8 44 8 10 63 64 16x4-way P5-595 block, 1.65GHz

Note:
1. In a LPAR environment, rPerf is estimated/CPU ( rPerf of 64P/p595-1.65GHz is 273.1 with a rPerf/CPU of 4.27 and for 1.9 GHz is 306.21 and rPerf/CPU is 4.78). 2. RPE2 is the Relative Performance Matrix published by Ideas International. 3. Memory has been configured 4 GB/processor. 4. P5 servers offer several options to consolidate and configure servers, the option recommended here is one of them. 5. For Servers with no, performance data, it is assumed to be 75% utilized. 6. Growth rate is estimated to be 30% for servers/LPARs during the next three years lease period. 7. The performance of sized servers/LPARs may vary and depend on many factors including varying peak load, system hardware configuration, software installed and tuned, applications installed and configured, I/O and network performance, tuning of H/W, OS and application for optimum performance. The suggested configuration is a best estimate to run the projected workload and does not provide a guaranteed system performance. 8. Performance in a virtualized environment depends on VIO servers resources, shared resources such as Virtual SCSI (internal disks and LAN disks), Virtual Ethernet, Shared Ethernet and Shared processor pool. 9. rPerf (Relative Performance) is an estimate of commercial processing performance. It is derived from an IBM analytical model which uses characteristics from IBM internal workloads, TPC and SPEC benchmarks and does not represent any specific benchmark results. Although rPerf

© Copyright IBM Corp. 2007

Page 25 of 29

Server Virtualization and Consolidation - A case study

may be used to compare estimated IBM UNIX commercial processing performance, actual system performance may vary and dependent upon many factors including Hardware configuration and Software design and configuration.

3. Resource Planning
The resources required for each LPAR were estimated and allocated using the Resource Planning tool. The table below shows the I/O resources – boot disks, Ethernet adapters and SAN adapters required and if these resources were either shared or dedicated. Based on this information, eConfig tool was used to configure and order p5-595 servers.

Production LPAR 9xDS 2x Web & App 4xQA 8xIS Web/App 4 x VIOS Total Spare pool @ 20% Total required NIM P5-595 Config. Development LPAR 6xDS-IS-QA 1x Web AIX5.2 2 x VIOS Total Spare pool @ 20% Procs 16.1 4 9.5 18.4 2 4 54 10.42 64 1 64 Mem 64 16 38 74 8 16 216 40 256 2 256 17x72 24x146 2 x 36 17x72GB 24x146GB 4x2P 3x4P S11 11x2P 7x4P Pvt. GB 4x4P 7x2P 0x4P S15 60 S16 60 Drives
(Bt+Alt+Mir)

Intranet S11 2x4P S11 S11 1x4P 4x2P 4x2P 3x4P

BKUP S12

Similar Documents

Free Essay

Virtualization

...Virtualization Across the Board CIS512 Enterprise Architecture Technology is one aspect of business that can universally enhance any company’s capabilities and add resources to offer a positive impact on the bottom line. However, information technology comes with its own implementation barriers that can complicate matters when making IT investments with an expectation to generate a return on that investment. The biggest impact of virtualization in cost structures is the radical change in how technology is implemented and paid for. Previously, any new technology could require a capital investment, lead times for setup and training, and continuing overhead in the form of support and maintenance personnel. In order to justify this risk, the return on investment had to be exceptionally strong and the company would require excess free capital. All virtualization services are offered without the need for any capital outlay or lead time; once a subscription plan is worked out, the resources are automatically available through any internet connection (Kishore 2012). For companies with existing IT departments, additional servers or services can be brought online immediately and seamlessly. The services offered also allow businesses to enjoy economies of scale, even for miniscule implementations. This also means that companies have access to the latest technology upgrades and updates along with security features and protocols without having...

Words: 1616 - Pages: 7

Premium Essay

Virtualization

...Virtualization and Its Benefits Virtualization and Its Benefits AITP – Research and Strategy Advisory Group Christine, Leja, CCP, Chair Richard C. Barnier Charles L. Brown, CCP Paul F. Dittmann Paul Koziel Mark Welle J.T. Westermeier, JD, CCP Abstract Virtualization provides many benefits – greater efficiency in CPU utilization, greener IT with less power consumption, better management through central environment control, more availability, reduced project timelines by eliminating hardware procurement, improved disaster recovery capability, more central control of the desktop, and improved outsourcing services. With these benefits, it is no wonder that virtualization has had a meteoric rise to the 2008 Top 10 IT Projects! This white paper presents a brief look at virtualization, its benefits and weaknesses, and today’s “best practices” regarding virtualization. The Association of Information Technology Professionals (AITP) recommends these “best practices” to obtain the benefits that virtualization offers. Copyright 2008, Association of Information Technology Professionals. Permission to copy for personal non-commercial use granted. When the paper is referenced or quoted, direct the reader to www.aitp.org. Special thanks to the following editor: Mike Hinton, Southwestern Illinois College AITP Research and Strategy Advisory Group October 14, 2008 Page 1 of 40 Virtualization and Its Benefits Executive Summary Virtualization has quickly evolved from concept...

Words: 16382 - Pages: 66

Free Essay

Assignment 3

...Assignment 3: Virtualization across the Board Chris Brown Strayer University CIS512 Dr. Gideon U. Nwatu ABSTRACT Virtualization is simply when a virtual version of a device or resources such as server, a storage device, network or even an operating system, which divides the resources into one or more execution environment is created. Virtualization has provided greater efficiency in CPU utilization, save energy (less energy consumption), greener IT, and better management through central environment control, reduce project timelines by eliminating hardware procurement, improved disaster recovery capability. Virtualization is sure the best innovation in the IT environment of the present age. The core idea behind virtualization is to make efficient use of hardware resources, such as CPU, memory and disk. In any computing environment it’s highly unlikely that hardware resources are being used to their full capacity. For example a typical desktop does not use more than 10% of its hardware resources under normal operational conditions. By using hardware virtualization, we can more effectively distribute our hardware resources among multiple virtual instances of operating systems according to that particular environment computing needs. Virtualization provides a mean to dynamically allocate hardware resources when needed and essentially unbinding software from hardware. Thus bringing down the overall requirements for hardware, which ultimately result in reduction of...

Words: 1691 - Pages: 7

Free Essay

Physical vs Virtualization

...The concept of virtualization began in the 70s thanks to IBM, which invested a lot of time and money in developing time-sharing solutions, however the hardware and more specifically the processor and memory capacity at that time was not enough powerful to permit the implementation of this technology. Thanks to the technical evolution, nowadays we have all the necessary hardware to implement a virtual computing infrastructure. The concept of virtualization began in the 70s thanks to IBM, which invested a lot of time and money in developing time-sharing solutions, however the hardware and more specifically the processor and memory capacity at that time was not enough powerful to permit the implementation of this technology. Thanks to the technical evolution, nowadays we have all the necessary hardware to implement a virtual computing infrastructure. The concept of virtualization began in the 70s thanks to IBM, which invested a lot of time and money in developing time-sharing solutions, however the hardware and more specifically the processor and memory capacity at that time was not enough powerful to permit the implementation of this technology. Thanks to the technical evolution, nowadays we have all the necessary hardware to implement a virtual computing infrastructure. The concept of virtualization began in the 70s thanks to IBM, which invested a lot of time and money in developing time-sharing solutions, however the hardware and more specifically the processor...

Words: 1341 - Pages: 6

Free Essay

It Watch

...ITDM IT WATCH ON VIRTUALIZATION SUBMITTED BY GROUP 9 CONTENTS 1. INTRODUCTION TO VIRTUALIZATION 2. TYPES OF VIRTUALIZATION 3. ADVANTAGES OF VIRTUALIZATION 4. VIRTUALIZATION IN INDIA 5. REFERENCES INTRODUCTION Virtualization is the creation of a virtual (rather than actual) version of something, such as an operating system, a server, a storage device or network resources. In layman's term, virtualization allows you to run an independent operating system within an existing operating system using the existing hardware resources. So if you want to learn another operating system like Linux, you can use virtualization to run Linux on top of the existing operating system. Virtualization is the abstraction of IT resources, separating their physical instance and boundaries from their function. Virtualization has brought important innovation to IT Virtualization concept was first developed by IBM in the 1960s to fully utilize mainframe hardware by logically partitioning them into virtual machines. These partitions will allow mainframe computers to perform multiple tasks and applications at the same time.. During the 1980s and 1990s, desktop computing and x86 servers become available and so the virtualization technology was discarded eventually. Client-server applications and the emergence of Windows and Linux made server computing significantly inexpensive...

Words: 1666 - Pages: 7

Premium Essay

Rlyt Task 3

...benefits of virtualization would impact the city of Seabreeze. There are many benefits to migration of a datacenter to a virtual environment. The most understated benefit is true power savings. The reduction of the overall hardware footprint literally means the organization doesn’t have as many servers or desktops to power on a daily basis. These saving which have to be measured over time will contribute to a sizeable decrease in power consumption. As a result of a reduced footprint, less space will be required to house required hardware since multiple servers can be housed on a single hardware host. After virtualization the amount of time to provision a new server is reduced from sometimes weeks to minutes. There is no new hardware to purchase. Only an operating systems license is required if the chosen OS is not free. Server uptime is also increased because of High Availability and Disaster recovery features that are built-in to the product. Explain how to offset potential negative implications of the adoption of virtualization for the city of Seabreeze. The biggest concern for most pre-virtualization users is fear. The fear of cost and application compatibility were some of the largest obstacles for early adopters. Over the years this has changed tremendously. One of the biggest opposing companies to virtualization was Oracle. They refused to support or adopt any form of virtualization for their products. A company the size of Oracle steered away from the virtualization path for...

Words: 2697 - Pages: 11

Free Essay

City of Seabreeze

...save money and one of those areas is technology. It is impossible to eliminate technology such as computers all together because it’s a big part of the city daily operations. One of the potential options is virtualization of city’s physical servers, storage devices, and end user computers would result in significant savings in cost to the city of Seabreeze. Benefits of Virtualization Virtualization is defined as a technology that uses software to run multiple applications and operating systems on one or more physical host servers all at the same time. Within the host server is comprised virtual computers known as VM (Virtual Machines) are running the operating systems and applications similar to a physical PC. VM are setup as virtual servers and virtual desktops. Below is an example how a virtualization server operates. Example of Virtualization Server One of the benefits of virtualization is consolidation of servers since the city has 72 physical servers. The physical servers could be reduced from 72 to 4 host servers due to virtualization. By consolidating the physical servers, it will reduce cost of maintenance, software licenses, and hardware. One example of cost savings, in 2009, Landmark Healthcare had 63 physical servers and used virtualization to replace them. Those servers were replaced with 3...

Words: 2736 - Pages: 11

Free Essay

Virtualization

...Virtualization is a technology which allows one physical server to run many virtual servers. By virtual server, I mean a software container that contains a full operating system and set of software, just like a traditional server would. Each virtual server “believes” that it is running on physical hardware, and thus any software you would run normally on real physical machines will work without modification in a virtual server. Furthermore, each virtual server appears to the outside world – to clients which connect to them – to be traditional physical machines with dedicated hardware. The operating system of the physical server provides hardware interfaces to the virtual servers via simulation in softwre: CPUs, hard drives, network interfaces, displays, CD roms, etc.. The physical server translates I/O to these virtual devices to the I/O to the requisite physical devices, if necessary. The resources allocated to virtual machines can be changed nearly on-demand (disk, memory, network interfaces); most operating systems need merely to be rebooted in order to see the new resources. Limiting factors in how many virtual machines an individual virtualization server can run are simply how much memory, disk space and network bandwidth the virtualization server has available to it, and to how many resources each virtual machine consumes. A very basic virtualization server could host eight to twenty virtualized machines. Furthermore, most implementations of virtualization...

Words: 597 - Pages: 3

Premium Essay

Braveheart Cloud Storage 2014 Student Showcase

...The Mist: Securing Cloud Storage Dinesh Devkota1 Travis McAdams2 Dr. Ihssan Alkadi3 Dr. Ghassan Alkadi4 Dr. Theresa Beaubouef5 Introduction In the past, people would run applications on their local machines, with data stored in same physical location. Today, people are moving to “the cloud” to run those application and store their data. Since data is valuable, security is essential in a world where one’s data is stored in the public domain. It is important to be aware of the physical locations where data is stored and the laws that impact rights to that data. The Mist Security Algorithm Technology & Implementation We utilized VMware's virtualization platform in concert with an enterprise grade server to meet our goals of building this solution on the latest enterprise software and hardware infrastructure. • Hardware: • Dell PowerEdge Server • RAID 1 Data Store • Hypervisor: • VMware ESXi 5.5.0 • OS: • Debain 7.2 (Wheezy) • Apps: • Apache • MySQL • OwnCloud Traditionally, people are provided with email verification, phone verification, and security questions as verification for resetting forgotten passwords. “The Mist” implements an enhanced security question verification algorithm that allows users access to their accounts and data. http://scale.wpengine.netdna-cdn.com/wp-content/uploads/2013/05/ILLUST_Cloud_Syncing_0723-1024x869.png http://cdn3.techworld.com/cmsdata/products/3230674/VMware_Stack.PNG • What if a copy of your data is located in a region where...

Words: 610 - Pages: 3

Free Essay

Virtual Desktop Infrastructure

...Infrastructure Jeanette Johnson Lawrence Technological University MIS 7463 – Virtual Work Environments – Spring 2013 Dr. Anne Kohnke, Assistant Professor of IT, College of Management April 13, 2013 Contents Product Description and Application 3 Major Issues 4 Why the Need for VDI? 4 Is VDI for Everyone? 5 Successful Application of VDI 5 What Exactly Does VDI Offer Organizations? 5 Oracle Virtual Desktop Infrastructure Specifications….at a Glance 7 Reviews 8 What Oral Roberts University has to say about VDI 8 Scripps Networks’ Review of VDI 10 What Small Business Computing Reviewer, Joe Moran, Thinks of VDI 10 Summary and Interpretation of Reviews 11 Implementation 12 VDI Project Plan: Start with Using the Proper Apps and Utilize Pilot Program 13 VDI Licensing: Be Wary about Going for the $40 (or less) per Desktop Guarantee 13 Ensure you Tackle VDI Storage Challenge with Network-Attached Storage (NAS) System and Data Deduplication 14 Factors to Consider When Considering Whether or Not to Implement VDI 15 Conclusion 16 VDI offers Better Support 16 VDI Helps Strengthen Security 16 The BYOD Crowd will Be Happier with VDI 17 Product Description and Application Virtual Desktop Infrastructure (VDI) is simply the practice of hosting desktop operating systems (OS) in a virtual machine (also called VM) running on centralized servers. Virtual desktop...

Words: 4825 - Pages: 20

Free Essay

Distance Learning Computer-Based Hands-on Workshop: Experiences on Virtual and Physical Lab Environments

...Workshop: Experiences on Virtual and Physical Lab Environments Patcharee Basu, Shoko Mikawa, Achmad Basuki, Achmad Husni Thamrin, Keiko Okawa, Jun Murai Keio University Plenary Sessions Waseda University Presentations {yoo, funya, abazh, husni, keiko, jun}@sfc.wide.ad.jp Abstract In response to the educational demands of computer-skilled human resources, distance learning with ability to support hands-on computer lesson is needed. In this paper, a platform for region-wide distance learning computer-based hands-on workshop is presented through the actual developments. The proposed platform supports 1) teaching/learning activities in a hands-on computer workshop 2) efficient large-scale remote computer laboratory. Computer virtualization and StarBED large-scale computing testbed were utilized to create a distance learning computer laboratory, virtual and physical. This paper discusses various aspects of deploying virtual and physical lab environments for region-wide learners in a synchronous-style distance learning workshop. Keywords Hands-on computer workshop, remote laboratory, distance learning, educational technology 1 Introduction With digital and telecommunication technologies, distance education has been developed to extend boundary of knowledge sharing to be more location and time independent. It has been widely deployed in academic or training programs to mobilize knowledge within or across organizations, countries and regions. With its characteristic...

Words: 4133 - Pages: 17

Free Essay

Fsfdfdfd

...Oracle VM VirtualBox R User Manual Version 5.0.0 c 2004-2015 Oracle Corporation http://www.virtualbox.org Contents 1 First steps 1.1 Why is virtualization useful? . . . . . . . . . . . . . . . 1.2 Some terminology . . . . . . . . . . . . . . . . . . . . . 1.3 Features overview . . . . . . . . . . . . . . . . . . . . . 1.4 Supported host operating systems . . . . . . . . . . . . 1.5 Installing VirtualBox and extension packs . . . . . . . . 1.6 Starting VirtualBox . . . . . . . . . . . . . . . . . . . . 1.7 Creating your first virtual machine . . . . . . . . . . . 1.8 Running your virtual machine . . . . . . . . . . . . . . 1.8.1 Starting a new VM for the first time . . . . . . 1.8.2 Capturing and releasing keyboard and mouse 1.8.3 Typing special characters . . . . . . . . . . . . 1.8.4 Changing removable media . . . . . . . . . . . 1.8.5 Resizing the machine’s window . . . . . . . . 1.8.6 Saving the state of the machine . . . . . . . . 1.9 Using VM groups . . . . . . . . . . . . . . . . . . . . . 1.10 Snapshots . . . . . . . . . . . . . . . . . . . . . . . . . 1.10.1 Taking, restoring and deleting snapshots . . . 1.10.2 Snapshot contents . . . . . . . . . . . . . . . . 1.11 Virtual machine configuration . . . . . . . . . . . . . . 1.12 Removing virtual machines . . . . . . . . . . . . . . . . 1.13 Cloning virtual machines . . . . . . . . . . . . . . . . . 1.14 Importing and exporting virtual machines . . . . . . . 1.15 Global Settings . . . . . . . . . . . . . . . . . . . . . ....

Words: 143714 - Pages: 575

Premium Essay

Riordan Finance and Accounting Process Improvement Proposal Cis/207

...California. In addition to the core entities, Riordan Manufacturing has a joint business venture located in Hangzou, China. Investigation into the company’s operating procedures and expenses revealed several shortfalls requiring immediate attention. The implementation of a streamlined Enterprise Resource Plan (ERP) and Electronic Database Interchange (EDI) is expected to reduce operational costs by 10% while improving cycle time by 15%. The finance and accounting departments are struggling with their existing record keeping and database configuration. The resources identified at each facility are made up of disparate and antiquated equipment. Current operations for the consolidated close of the General Ledger are completed, at a minimum, 15-20 days past deadline. Additionally, the current system adds unnecessary administrative costs for personnel re-adding documents that are manually written or not compatible with HQ IT systems. Monthly audits are daunting, costly, and labor intensive. Additionally, there is an immediate need for government compliance to meet the specific demands of that customer base. The entire financial and accounting focus can benefit greatly and exceed current operating goals by the implementation of a standardized and modern information system upgrade. The standardized systems will streamline support efforts, resolving a majority of current administrative inconsistencies. Operational efforts will also benefit through reliable information dissemination...

Words: 2329 - Pages: 10

Premium Essay

Techn

...White Paper WHAT’S NEW WITH TIMEFINDER FOR EMC SYMMETRIX VMAX Applied Technology for traditional and virtual environments Abstract This white paper describes the latest EMC® TimeFinder ® features available for traditional and virtual environments running open systems and using Symmetrix VMAX™. Throughout this paper the basis for “traditional environments” will describe hard disk drive or thick device technologies, and the basis for “virtual environments” will describe virtually provisioned thin device environments. June 2011 Copyright © 2011 EMC Corporation. All Rights Reserved. EMC believes the information in this publication is accurate of its publication date. The information is subject to change without notice. The information in this publication is provided “as is.” EMC Corporation makes no representations or warranties of any kind with respect to the information in this publication, and specifically disclaims implied warranties of merchantability or fitness for a particular purpose. Use, copying, and distribution of any EMC software described in this publication requires an applicable software license. For the most up-to-date listing of EMC product names, see EMC Corporation Trademarks on EMC.com. VMware is a registered trademark of VMware, Inc. All other trademarks used herein are the property of their respective owners. Part Number h8264 What’s New with TimeFinder for EMC Symmetrix VMAX 2 Table of Contents Executive summary .........................

Words: 5721 - Pages: 23

Free Essay

Sams Dan

...VMWARE WHITE P A P E R W H I T E PAPER Virtualization Overview 1 VMWARE WHITE PAPER Table of Contents Introduction .............................................................................................................................................. 3 Virtualization in a Nutshell ................................................................................................................... 3 Virtualization Approaches .................................................................................................................... 4 Virtualization for Server Consolidation and Containment ........................................................... 7 How Virtualization Complements New-Generation Hardware .................................................. 8 Para-virtualization ................................................................................................................................... 8 VMware’s Virtualization Portfolio ........................................................................................................ 9 Glossary ..................................................................................................................................................... 10 2 VMWARE WHITE PAPER Virtualization Overview Introduction Among the leading business challenges confronting CIOs and IT managers today are: cost-effective utilization of IT infrastructure; responsiveness in supporting new business initiatives;...

Words: 2715 - Pages: 11