Website Migration
Mark Harris
Strayer University
Cis 210
Professor Flowe

WEBSITE MIGRATION
The purpose of this paper is to set the foundation and to explain and illustrate what it will take to build a web architecture to move the existing website for Tony’s Chips, with little to no down time, also to provide a disaster recovery strategy to guarantee the site is always accessible. I will also state the necessary steps to support the company’s migration from external to internal hosting. With the overall goal being to allow the customer the ability to order products in this case being a bag of chips from the website. Data migration will occur over a two week period with charts and diagrams to show the steps and timeline to accomplish the necessary tasks. The company is very concerned with redundant systems to ensure that there is no more than 5 minutes of down time in any given 365 day period.
With web hosting fees going down over the past several years, it makes little sense for a business to host their own web site on their own computers. Web hosting companies do a large volume business it only makes sense to allow them to host for and it is cheaper than trying to do it yourself. The Advantages of using a web hosting company include but are not limited to, studies show that self-hosted site are down on the average two weeks a year. While outside web hosting companies boast an amazing 99.9 % uptime, and as a business you know that every minute your site is down you are not making money.
Better security is provided by outside web hosted companies thus giving first rate protection from hackers. Another advantage enjoyed by having your site hosted by an outside company is not having a webmaster on your payroll, thus cutting your operating cost. When you add this up it makes self -hosting more expensive than having your site hosted by an outside company.
I recommend Microsoft Azure used with the cloud as a hosting service, azure supports the broadest selection of operating systems, it can be used build apps with JavaScript, and python and even android. Azure’s is very scalable as it a pay as you go service furthermore it can quickly scaled up or down, and grow with your company. It also allows for pay by the minute billing that allows your company the match rates with competors prices, it will you to match or beat prices for items such as bandwidth and storage to you are the best price and service for your money.
Azure is managed and runs on a worldwide network that is managed by Microsoft datacenters in which there as 19 (more than Amazon web services and google cloud service combined). Azure can handle any workload, as it is the first multinational cloud providers in mainland China. With more than 57% of fortune 500 companies using Azure this is the product I recommend for your company. I recommend a bus type topology for your network, and I will explain this type of network for as follows: In a Local area network where a bus type topology is used each station or node is connected to a single cable, by the use interface connectors. The central cable is the backbone of the network and is known as the bus this where the name of this type of network comes from. Signals from the source are sent out and travels in both directions until it finds the intended recipient. If the address does not match the machine it is intended for then the data is ignored. In the case that the address matches the address then the data is accepted. Bus topology consists of a single wire it is inexpensive to set up when compared to other types of topology.
A station on a bus network is known as a host or a workstation. In this type of network every station in the network will receive all network traffic and every station will have equal transmission priority. In this network bus forms a single network segment and collision domain A bus network forms a single network segment and collision domain, this allows the stations to transmit on the same bus at the same time, they use a media access control technology such as (CSMA) or a bus master. I will ensure the systems down time will meet the five 9’s by allowing the backup systems to run in parallel with the main system that is if the main system goes down for more than 1 millisecond the backup automatically kicks in and keeps the system up and running. Redundant system will include but not be limited to servers, firewalls, databases, routers and related equipment. Data migration will occur in a series of steps by shifting data between storage, layouts and or computer systems, this is a key condensation for any system upgrade or migration. By preforming this task using a computer program(s) it will more efficient and save man hour as opposed to doing this task manually.
Data migration occurs for a variety of reasons, including server or storage equipment replacements, maintenance or upgrades, application migration, website consolidation and data center relocation. This will be a full data migration that will include data mapping form the old system to the new. The old data format will moved and will fit the new systems format and requirements, it will be seamless with little to no interrupting in normal day to day operations of the system.
Now I will explain the web design concepts involved in the migration from the old to the new site. To move from an old or existing (sometimes called a legacy system), the data must be loaded or transferred to the new system, this can be done via a wireless connection data transfer tool also called data mapping. This process may involve various phases but it normally involves data extraction where data is read from the legacy system and transferred or downloaded to the new system, in this case it will allow customers to order online. After the mapping is complete the results are to be checked and verified to ensure that are accurate and that the data base is running in third normal form with no duplicate information. Now I will explain verification and data migration during verification the system will be run in parallel to ensure that both the primary and the secondary system are up and running, but also to look for and find areas of disparity and to prevent data loss. There will programmed and manual data cleaning in the migration process to increase the quality of the data, and remove duplicate data, also to equal the requirements that the new data may require for the website. The five phases of data migration are design in the design phase the data will are as follows: Assess in this phase we will describe and evaluate the process to migrate and the requirements to begin this phase.
The next phase is the planning phase in this phase the performance and the cost of the migration comes into play in accordance to the clients budget constraints. The next phase is the extraction phase in this phase we will use state of the art equipment to extract information from the existing system to migrate to the new system. The next phase is the cleaning phase in this phase all incoming data is cleansed from any probable problems thus ensuring high quilty data translation from legacy to new system.
The next phase is the load phase in this phase the data is now loaded to the new system or device. The next phase Now the verify phase can commence, in the verify phase the data is authenticated to ensure it is accurate and ready for use in the application. These five phases are repeated several times to ensure that they are accurate and usable before being implemented in and the new system is deployed. WeRecoverData.com data migration and conversion solutions are flexible to your company’s business process and operational needs providing you with a solution that minimizes expensive downtime and loss of productivity.
Next I will explain the disaster recovery/ backup strategy and recovery options for the migration of the system. I recommend www.recoverData.com, this is the leading provider of data recovery solutions, brining years of experience in the data recovery market, with professional and highly trained team of recovery management experts. Provides service to major Fortune 500 companies, on time delivery, accurate and on time. Guaranteed policy no recovery, no charge 24/7 emergency response.
In order to ensure the site is up and running at all times a backup site is need among the jobs are duties the backup sit will provide will include. I will now explain the backup app for the new web site to ensure data is maintained in the case of total system failure. In this case I recommend. Barracuda back up as a service, with this system you get a low cost high and highly efficient system that will deliver all the “bells and whistles” of a must more costly system at a fraction on the cost.
Not only is Barracuda a lost cost award winning system it has all the features and benefits of the much more costly systems. At a cost of $13900.00 I ac install Barracuda as a backup, this will you to have a piece of mind knowing that in addition to redundancy you will also have a back app if your system were to fail. You can get it all with an annual subscription which include Barracuda backup, Energize Updates, Instant Replacement, and unlimited Barracuda storage. No other system on the market today is going to give as much as this does for the price.

Online order use case digram Log into site Bank

Customer Provide Info Validate

Order Chips Validate Payment info Pay Confirm shipping info Log out www.tonys.com

Similar Documents

Premium Essay

Website Migration

...Website Migration Project Strayer University CIS 210 Systems Analysis and Development 6/16/2013 Executive Overview The Tony’s Chips web site is to be moved from and external hosting solution to an internal solution. In addition, the site will be redesigned to enable customers to place orders. These are two separate work tasks that should be treated separately and performed by different team members. There are many options for hosting the web site internally, including software choices to hardware architecture. This document will review the tasks that need to be performed, document the process of performing those tasks, and justify the software and hardware choices. Hosting Solutions There are a couple different alternative to how this web site is hosted. The company could host the web site with an external service that maintains their own servers and services. This method is commonly used by start-up businesses and web sites that do not require a huge amount of customization, monitoring, bandwidth, and storage. When a company wishes to have more control over their site and how it is hosted, they can chose to use a server service. With this kind of service, a company that owns a large server farm leases out one or more servers to the company. This allows the company to dedicated servers which they have control over without the need to physically store the server or perform the regular maintenance. Web sites that involve database-driven web applications can eventually require...

Words: 2358 - Pages: 10

Premium Essay

Website Migration Project

...Explaining a concept: Website migration project Name Course Instructor Date Website Migration Project In this current era, every business is going online, and most of the selling and buying of goods and services is being done n online. That is why Tony chips should also have a website where it can be able to advertize its business and reach many customers. This paper will cover the steps and requirements on how Tony chips will transfer web hosting from an external source to internal as well as how to make their website redundant. In the efforts to build that redundant and scalable website, the key principles of availability, performance, reliability, scalability, manageability and cost require much attention (Matsudaira, 2012). Also, the SDLC must be duly followed as it is the requirement of any system. These are systems planning, system analysis, system design, system implementation, and lastly system support/security (Shelly & Rosenblatt, 2012). System Planning In this phase, the familiarization of the processes involved and objectives of the business must be well highlighted. A formal business plan needs to be in place to show which operations the company will undertake. There is a need to know all participants in the whole migration process and the time when they will you require then in the migration process. As the one of the requirements is that the website needs to be hosting should be internal, it means that a server there is a server requirement. Besides that...

Words: 3258 - Pages: 14

Premium Essay

Website Migration Project

...MIKE | michaelngugi@gmail.com | November 3, 2015 MIKE | michaelngugi@gmail.com | November 3, 2015 Kusoma High School Website development proposal Kusoma High School Website development proposal Introduction. My name is Michael, From Adva-tech website (www.advatech.com). I’m a full time high end professional website developer with an extensive knowledge in websites designs and development, looking to build an ongoing relationship with your Institution. Background. I have worked as a freelance website developer for a period of 10 Years and 5 more in related field of website engineering and development. Some of the finished work I have engaged in include: St Christian High School – (www.stchristian.ac.ke) Malindi High School – (www.Malindi.ac.ke) makadara High School – (wwwMakadarahigh.ac.ke) Kiprotich Secondary school– (wwwKiprotichsec.ac.ke) This and other website are a glimpse of the websites I have created in the course of my career. Scope. The scope will cover a wide area of the schools management and organizational structure. I would like to build your institution an advanced website with all full features that come with the current technology in the market. The project will take approximately three weeks by which the activities I propose will be as follows: Week 1: Initial study of the feasibility and viability of the project in relation to the current policies and axioms of the school, Activities and structure of management and all such other things as will be MIKE | michaelngugi@gmail...

Words: 498 - Pages: 2

Free Essay

Website Migration Project

...Web architecture refers to the structure or the organization of a website. It involves the description of the ways in which different pages relate to each other and also ensures that the information is organized in a predictable and consistent way in every page. In order to build the web architecture, the system analyst should into the company’s business needs, and come up with a clear statement of the goals. As there is an already existing old site running, it is crucial that the analyst understands the business and its technological issues involving the implementation of the project. Since we have an already running Tony’s chips website, it is important to gather the existing functional requirements of the website. The system analyst can get information from the employees of the old company; gather system documentation, production support and also using Fact finding techniques. On gathering this information the system analyst should make a decision on whether to go for a packed solution or develop the software in-house. If we decide to go for in-house development of the website, I recommend that we use; Apache as the web server, JEE as the language to develop the website, Linux as the Operating System and MYSQL for the database of the website. Since MYSQL, Apache and Linux are all open sources the company needs not to worry about their licenses and also by writing the software in Java helps us to deploy the code on any platform and the fact that it is not difficult to find...

Words: 1686 - Pages: 7

Free Essay

Website Migration

...Term Paper Website Migration CIS University 09/07/15 Tony’s Chips has recently been sold to a new independent company. The new company has hired me to manage a project that will move the old Website from an externally hosted solution to an internal one. The company’s leadership is very concerned about redundancy for their site, insisting that a back-up site be available as a failover in case the main site goes down. Therefore, the site will be redesigned so that customers will be able to place orders through the website and have them delivered as before. The design of the new system will be able to provide more data storage, faster retrieval, better security features and recovery solutions in the event that the website has any problems. With the operational reliability of the existing system, this will make it easier to improve the new system. The first part of the project goal is to discuss what it will take to build the web architecture, then what will have to be done to move the existing Website with minimal downtime, and then provide a disaster recovery plan in the event that the website should crash or stop working. In order to build the architecture, migrate the existing website along with adding the ability for the customers to place orders online and providing for redundancy of the site the system development life cycle (SDLC) will be used. The SDLC consists of five phases that will be utilized in this project and the five phases are systems planning, systems analysis...

Words: 2274 - Pages: 10

Premium Essay

Website Migration Project

...Website Migration Student’s name Institution Date   Website Migration Introduction The process of moving the old Website from an externally hosted solution to an internal one requires a lot to be put in place. There is a need to follow the system development life cycle (SDLS) for it to be successful and have transformational effect on the company’s operation (Klein, S. 2007). If there is redundancy in the site of the company, some measures should be carried out to ensure that it functions well to serve the company’s information needs. There should be a back-up site available as a failover in case the main site goes down. There is also a need for the site to be redesigned to allow customers to order products online. The system development life cycle (SDLS) is involves seven phases or steps that are followed in developing an information system from conception up to disposition. The following is the seven-step phase of developing an information system by a software engineer: 1. Conceptual Planning 2. Planning and Requirements Definition 3. System design 4. Development and Testing 5. Implementation phase 6. Operations and Maintenance phase 7. Operations and Maintenance phase Conceptual Planning This is the first phase in the system development life cycle. In this phase the information system conceptual framework is constructed. This will include the evaluation and assessment of the system to be developed to determine the cost and risks associated with the system...

Words: 3420 - Pages: 14

Premium Essay

Term Paper: Website Migration Project

...Term Paper: Website Migration Project Term Paper: Website Migration Project Dimitri A. Brydie Professor Jennifer Merritt Systems Analysis and Development December 18, 2013 Tony’s Chips has recently been acquired by a new independent company and the organization leaders have decided to move the current website, which is hosted externally, to an internal host. The company wants the website to be redesigned so that after migration, customers will then be able to make orders online. The company’s leadership would also like to have a disaster recovery solution in place in case the main site goes down. The overall objective of the project is to plan and design a new effective platform to host the website and to efficiently transfer the current website with minimal downtime. In order to accomplish successful migration of the current website, the five phases of the systems development life cycle will be utilized. The five phases are: systems planning, systems analysis, systems design, systems implementation, and finally, systems support and security (Shelly & Rosenblatt 2012). The first phase in the website migration project will be to become familiarized with the business process and identify the objectives of the project. For an IT professional, this may consist of meeting with business leaders and studying the formal business plan to get a feel for the operations of the company. In this case, the company makes potato chips and distributes them. Another objective...

Words: 1977 - Pages: 8

Premium Essay

Term Paper - Website Migration Project

...to move the current website, which is hosted externally, to an internal host. The company wants the website to be redesigned so that after migration, customers will then be able to make orders online. The company’s leadership would also like to have a disaster recovery solution in place in case the main site goes down. The overall objective of the project is to plan and design a new effective platform to host the website and to efficiently transfer the current website with minimal downtime. In order to accomplish successful migration of the current website, the five phases of the systems development life cycle will be utilized. The five phases are: systems planning, systems analysis, systems design, systems implementation, and finally, systems support and security (Shelly & Rosenblatt 2012). The first phase in the website migration project will be to become familiarized with the business process and identify the objectives of the project. For an IT professional, this may consist of meeting with business leaders and studying the formal business plan to get a feel for the operations of the company. In this case, the company makes potato chips and distributes them. Another objective in phase one of the website migration project, is to decide who will be involved and at what point during the project their involvement will be required. One of the purposes of the redesigned website is to give customers the ability to place orders online. Currently the website is hosted externally...

Words: 1950 - Pages: 8

Free Essay

Tech

...Website Migration Project What is information architecture (IA)? Information architecture (IA) refers to the structure or organization of your website. It describes the ways in which the different pages of your site relate to one another and ensures information is organized in a consistent and predictable way on each page. It involves steps such as: 1. assessing existing and needed content, 2. organizing the pages, 3. providing clues to help use the site efficiently, and 4. developing navigational structure The website architect needs to have a solid understanding of usability, in-depth knowledge of web development tools, online marketing technologies, and everything else involved in the construction and maintenance of a website. The following are the general overview of website architecture process: 1: Project Brief- Gathering the needed data from the client and your team can usually take 2 days figuring out the information in the architecture process. Info such as Determine Goals and Expected Outcomes, Brainstorm with the Client, Client Idea Summary, Determine the Target Audience, Determine Competitors, Meet the Decision Makers. 2: Website Goal Definition- The goals define the direction of the entire website production process. 3: Define the Target Audience- This stage involves researching the target audience. We need to identify what types of users will go to the site, and also define the needs of each group. This involves gather characteristics data,...

Words: 1171 - Pages: 5

Free Essay

Cis 210 Term Paper

...Website Migration – Tony’s Chips Website Migration – Tony’s Chips With Tony's Chips being purchased by the Acme Company, they would like a new change the way the website is used for the business. The old method was an externally hosted site with no online ordering options. The new website plan is for it to be redesigned to allow for online ordering, onsite web hosting, and site redundancy to allow for maximum uptime. What they are asking for is called the system development life cycle (SDLC). Systems development life cycle is defined as "activities and functions that systems developers typically perform, regardless of how those activities and services fit a particular methodology” (Shelly & Rosenblatt, 2011). The systems development life cycle contains the following steps in the model: required analysis, testing, implementation, documentation, deployment, and maintenance. Discuss what it will take to build a Web architecture, move an existing Website with minimal downtime, and provide a disaster recovery solution to ensure the site is always available. The new web architecture is a complete change from the previous implementation of the site causing an entirely new template and architecture. Previous setup used manual ordering, so they would have to call in or physically come in to order the chips. The new architecture will allow for online ordering that will free up more user time in answering phones taking orders. I am assuming the previous network architecture is...

Words: 2926 - Pages: 12

Premium Essay

Learning Team B Week 3 Assignment

...Learning Team B - Week 3 Assignment Learning Team B - Week 3 Assignment Kudler’s Fine Foods – Current Website Taking in consideration the basic concept of the current Kudler’s Fine Foods web site design, it is recommended the implementation of an e-commerce module or platform without having to drastically change the content of the current design. E-commerce is not being used by Kudler yet, even though there is great opportunity to include an interface that can potentially help upsell the current inventory of goods not only to the local area but also to the rest of the United States. The current site is designed using ASP, which is an older version of the ASP.NET language developed by Microsoft. While the site uses ASP, it does not serve any type of dynamic content, web application or web service, which can easily help start the migration of the current content to HTML5, along with a small implementation of animation if requested. Proposed Prototype for Kudler’s Web Site Based on the above recommendations, the prototype of the Kudler’s web site e-commerce will have a front-end developed using HTML and CSS for structure consistency. The basic theme of the site, including colors and fonts will be maintained in order to provide users with a newer, yet familiar interface. No external plug-ins will be used to run animations if the requirements need it. No Java, Adobe Flash or ActiveX will be used in the elaboration of the site in order to avoid proprietary technology...

Words: 362 - Pages: 2

Free Essay

Cis 210 – Systems Analysis and Development Website Migration Term Paper

...Website Migration Project Chinnasut Nhurod CIS 210 – Systems Analysis and Development Dr. Wesley E. Phillips Strayer University September 15, 2013 Website Migration Project for Tony’s Chips Building the Web Architecture In order to build the web architecture, the system analyst would be required to analyse the business requirements of the organization and then develop a clear statement of goals of the organization. Since, the old site of the company is running it would be vital to understand the technological and business related issues associated with the previous website. Along, with that it should also be determined whether the IT staffs of the company possesses necessary experience and skills essential for the implementation of the project. The company might have to consider additional resources, training programs, and hiring of consultants for the project’s success (Nelson et.al, 2010). The project should be developed on a modular manner so the users can approve and test the various functional elements of the website. Since the Tony’s Chips website was already operating, it would be essential for the developer to gather the existing functional requirements for the website. During the data collection process the system analyst will conduct interviews of the people from the product support department, and they will gather the system documentation using the fact finding techniques (McArdle et.al, 2010). Once all the requirements are fulfilled the next step would...

Words: 3871 - Pages: 16

Premium Essay

Finance Paper 1

...Overview Solutions, Scope of Work, and Deliverables 1. Preliminary Research 2. Strategic Planning 3. Interface Design - Graphic Design Work 4. Web application Front End Programming 5. Web application Back-end Development 6. Quality Assurance and Launch Maintenance and Hosting Seward and Co. currently hosts and maintains over 50 websites, ranging in size from very large custom CMS E-commerce websites to small personal websites. Our hosting packages are based on the budget of our clients. We do this because we feel that hosting should not interfere with our client’s main focus – their business or image. Our monthly maintenance and hosting fees usually range from $50 to $1,500 a month depending on what our clients’ needs are. Fees – special recession rates For website hosting, we are currently offering all new clients a year free hosting for shared server hosting. Payment plan and turn-around time As requested a 50% percent deposit is due to begin your project. A project the size and scope of OrganiX FOOD LOUNGE, LLC., has a turnaround of about three weeks. Turnaround time may be longer or shorter based upon the availability of information, media and text from the client. Copy writing is also available upon request. Seward & Co. Qualifications, responsibilities and commitment 1. Cutting Edge Technologies & Open Source Philosophy 2. Our experience 3. No outsourcing. Period. 4. The team allocated to this project 5. Our Work. 6. Our Principal, CEO and chief designer, Tabari...

Words: 2653 - Pages: 11

Premium Essay

Web Design Proposal

... Strategic Planning 3. Interface Design - Graphic Design Work 4. Web application Front End Programming 5. Web application Back-end Development 6. Quality Assurance and Launch 7. SEO, Web Promotion, Statistics and Reporting Maintenance and Hosting 7 Fees – special recession rates 8 Payment plan and turn-around time 9 Noam Design Qualifications, responsibilities and commitment 10-11 1. Cutting Edge Technologies & Open Source Philosophy 2. Our experience 3. Our Clients 4. No outsourcing. Period. 5. The team allocated to this project 6. Our Website Your responsibilities 12 Next Steps 12 ------------------------------------------------- OVERVIEW General: The purpose of the project is to execute a complete design & development of a professional Ecommerce website for Client...

Words: 2413 - Pages: 10

Premium Essay

Imed 2409 Lesson 1

...Exercises: 1. Companies that sell luxury goods such as Channel, Lilly Pulitzer, and Vera Wang, were reluctant to offer their products for sale on their web sites for many years. These businesses preferred to use their Web sites to display information about their products only and to sell their products only through exclusive retail stores. Summarize the reasons these luxury good producers might have been hesitant to sell online and speculate why they might have changed their thinking. These high-end luxury item sellers were reluctant to sell their products online because, the need of the individuals to pay a close inspection to the quality of the products. People couldn’t touch items like and jewelry to inspect them closely. My speculation of why these business have change their mind is that, as more people spend more time online they gain trust on the transactions they make online; Also, higher resolution screens in computers help customers to have a broader idea of the quality/ condition of the items they are buying. 2. You have decided to buy a new color printer for your home office. You have not decided yet whether an ink-jet or laser printer would be best for you. List specific activities that you must undertake as you gather information about printer capabilities and features. Use the HPshopping.com, Office depot, Best Buy, Office Max, and Staples Web sites to gather information. Write a short summary for the process you undertook to serve as a model for others...

Words: 1237 - Pages: 5