Premium Essay

01.01 05 Thru 01: 05 Hazard Case Study

Submitted By
Words 237
Pages 1
Assess the Hazard (01:05 thru 01:36, Not only is the ceiling being destroyed from him falling through it, which most likely includes electrical work, but many products are being destroyed causing a mess. The owner needs to address the fact that there will most likely be rewiring needed in the ceiling in order to prevent an electrical fire. Also, the spillage and broken glass in the store will be very hazardous to any employee who attempts to clean it up. The fiberglass from the insulation falling will also warrant a hazard on multiple surfaces throughout the store.
Make Risk Decisions (01:05 thru 01:36, The mess created is going to cause harm. These hazards will need to be thoroughly examined in order to reduce the level of risk. The electrical

Similar Documents