Bims

In: Business and Management

Submitted By dilwar007
Words 651
Pages 3
Summarizing and Presenting – BIMS, Inc.
Syed Dilwar

QNT/351, June 01, 2015

Question 5: Descriptive Statistics: Your supervisor treated you fairly.


Finding Data

|Descriptive statistics | | | | |


| | | | | | | | | | | | |Q5 | | | | | |cumulative | | | lower | |upper |midpoint |width | frequency |percent | frequency |percent | | |1 |< |2 |2 |1 |12 |15.4 |12 |15.4 | | |2 |< |3 |3 |1 |18 |23.1 |30 |38.5 | | |3 |< |4 |4 |1 |15 |19.2 |45 |57.7 | | |4 |< |5 |5 |1 |15 |19.2 |60 |76.9 | | |5 |< |6 |5 |1 |18 |23.1 |78 |100.0 | | | | | | | | | | | | | | | | | | |78 |100.0 | | | | | | | | | | | | | | |



| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |Descriptive Analysis

Based on above survey question, the intention of descriptive analysis is to provide a clear understanding by use of graphical and numerical result to visualize unique trends of statistic data set. The survey question was engineered to evaluate the how fairly BIMS employees was treated by their supervisors, in order to reveal the underlying issue, continuous concerns of high turnover, and low morale in the company. The analysis was use to find mean, median, mode, range, minimum, maximum, standard deviation, and central tendency of the descriptive statistics. Once the…...

Similar Documents

Information Systems

...Integrated project based information systems provide good quality information but are not commonly adopted in the property and construction industries. The modern world is shaped by technology as it is the means through which various economic sectors engage in while executing their duties. With advancement in technology, various changes have been adopted regarding the manner in which businesses carry on with their operations. A major attributable factor to this end is the aspect of globalisation whereby technology has played a very important role. In this respect, information systems are key players in meeting of organisations goals. According to Moursund (2003), information system refers to a wider system of activities, people and data that helps an entity to gather, process, store, and disseminate information through computerised or manual ways (p.11). As a major discipline in relation to promotion of organisation’s information needs, information systems focus to explore an interface between management, computer science and information science. Computer science a major attribute of information systems basically focuses on information technology. Two common opposing worlds such as human activity and information technology are brought together through the application of information systems. As per Devaux (1999), business businesses in the modern world have become more and more dependent on information systems as a measure of dealing with complex markets in which they...

Words: 2343 - Pages: 10

Bim, Busniess Information Management

...What are managers at strategic level responsible for? Managers at this level within an organisation generally set organisational objectives and plan how to achieve them. For this reason, it is also known as the planning level. They must deal with long-term plans that are concerned with securing the company’s future. Historical information is collected (both from within and outside the organisation) and used at this level by senior managers to: plan the objectives of the organisation (futuristic planning) assess whether or not objectives are being met. The information which managers at strategic level typically require includes: • overall profitability • economics – at micro and macro level • profitability of different segments of the business • future market prospects • social and demographic trends • availability and cost of raising new funds • total cash needs • total manning levels • capital equipment needs • competitors’ activities • legislation. • Strategic information will be used for strategic planning and decisions of a long-term nature. What are managers at tactical level responsible for? Managers at this level gather information (predominantly from within the organisation) on a weekly or monthly basis in order to plan for the medium term. This is also known as the information level. Information that is several years old is used for measuring past and...

Words: 395 - Pages: 2

Bim Essay

...Student ID: 1075660 Student Name: Charmaine Fletcher Paper Number: 475120 Stream Number: 24 Assessment: Business Report Professional Practice Lecturer: Brendan McLister In submitting this work electronically I am declaring that: 1. This assessment has been written by me and is my own work 2. The work has not previously been submitted 3. All researched information has been acknowledged and referenced in APA 6th ed 4. I have and will continue to maintain the confidentiality of any persons/organisations referred to in the document 5. I permit this assessment to be copied for academic processes (eg. moderation). 6. I have retained an electronic copy of this assessment Business Report 2010 Image retrieved from the easy stay website (http://www.easystay.co.nz/prop-photos/skycity-002.jpg) Table of Contents Introduction 4 The Tourism Industry 5 Findings 6 Conclusions 10 Recommendations 11 Reference List 12 Appendices 13 Statistics 13 Accounting 17 Finance 21 Introduction The purpose of this investigation is to research the tourism industry in New Zealand and Sky City Entertainment Group Limited (SKC) and to discover whether it is recommended for you to invest your money in this industry or business. In this investigation I will be giving a brief background on the tourism industry and discussing the Statistical, Accounting and Financial analyses on SKC to come up with a logical recommendation for...

Words: 3847 - Pages: 16

Brands

...Analysis Organizational Background Before any on-site studies are initiated, an analysis of the organization’s internal structure should be conducted. The team should determine and document the purpose of the organization and their current public BIM use. This will be completed through the analysis of organizational websites and other publications. This will help to ensure that the organization’s internal processes are understood allowing for onsite meetings to be as productive as possible. The BIM Champion should verify the organizational background and add information if necessary. Meeting with BIM Champion Early in the process an informal meeting with the BIM Champion, the lead contact for the organization, should be conducted. In this meeting the research team will review the methodology for the case study and establish a more detailed plan and schedule. During this meeting, the team will begin to identify necessary personal for each operating unit to be interviewed. It may be helpful to this task, to diagram the hierarchy of the different operating units and their different basic tasks. The goals of the case study will also be distinctly defined during this meeting. Additionally the BIM champion will be asked to begin locating artifacts of the organization including products and publications. The artifacts should include general statements about the organization and also the details of their BIM Implementation. It is important to understand the background of the...

Words: 290 - Pages: 2

Sentec Singabore Facilities Assessment

...Assess the technology described in Suntec Singapore in the light of the latest technological developments for convention centres. Suntec Singapore convention centre is a state of the art convention centre, that prides itself in providing modern facilities and technology to its guests and clients. The world has become a global community and large multi-national conference centres have to cater to all nationalities. Having this in focus, Suntec Singapore has implemented Digital Congress Network in their conference halls, where a team of interpreters sits in an adjacent room or sound-proof booth, listen to what the presenter is saying, through headphones, and translate everything into fourteen other languages. Their voice is then picked up by a microphone that transmits the sound signals to Infra-Red translation receivers, via infrared panels placed around the conference room. They use invisible light waves to distribute the signal throughout the hall. As the convention centre has several conference halls, using infra-red receivers rather than FM receivers ensures that the sound signals do not leak into adjoining halls as infra-red signals will only work if the receiver is pointed at the panel. Since there conference hall doesn’t have any obstacles or columns, there is no recognizable drawback of using infra-red receivers. For a conference centre, it is important to have the right seating system. Suntec, therefore, has employed portable seating system, which is easy to set up...

Words: 2613 - Pages: 11

Cv Resume

...Vrushank Shah Post-Graduation in Construction & Project Management, CEPT University Bachelors of Technology (Hons.) in Civil-Construction, SBST, CEPT University Permanent Address: 12-B Sangita Society, Beside Ankur Complex, Ankur, Naranpura, Ahmedabad-380013. Email Address: vrushank.shah.cpm12@cept.ac.in ; vrushank5406@gmail.com ; Cell No. : 91-9924110902 PROFILE I have work experience of 32 months in execution and project management work in construction industry. I have keen knowledge of required software and tools of construction project management. My research paper "Challenges in Multi Project Management of Construction Company" has been approved and accepted for publication in the NICMAR-Journal of Construction Management. My objective is to work in challenging construction project, where I can use my experience and skills for advancement of the firm and enhance my skill sets. MAJOR INTEREST AREA * Advanced Construction Technology * Controlling and Monitoring - Project Management Techniques * Resource Optimization, Planning and Management - Construction Management Techniques * Building Information Modeling WORK EXPERIENCE (32 MONTHS) Duration | 2 months and 15 days - May '2013 to July '2013 | Company Name | Rohit Infraprojects Pvt. Ltd., Mumbai | Designation | Project Manager Trainee (Project Training of Post-Graduation CPM Course) | | | Duration | 4 months and 15 days - March '2012 to July '2012 | Company Name | HCP...

Words: 575 - Pages: 3

Foreign Exchange Guideline

... Presentation on Development Project Proposal (DPP) Project Title: Strengthening of BIM Prepared & Presented by Milestones Advancement of BIM Set up ‘Management Development centre’ under an UNDP funded project to assist in the improvement of the industrial productivity through the process of human resources development. Started operating under the administrative control of the ministry of Health, labor and Social welfare of than Central Government. The administrative control transferred to the provincial Government. Launching the postgraduate diploma in personnel management (PGDPM). Educational and training Milestones Advancement of BIM Educational and Training Institutions ordinance,1961 (East Pakistan ordinance No XXVI of 1961) was made Management applicable for Development Center Entrusted with the responsibilities of buildup human resources of the Newly independent Country as Bangladesh Management Development centre.(BMDC). Post Graduate Diploma in industrial Management was introduced. Milestones Advancement of BIM There academic prog Programs- Postgraduate Diploma in Marketing Management, Postgraduate Diploma in Financial Management, Postgraduate Diploma in Computer Science were introduced. Converted into an Institute –Bangladesh...

Words: 559 - Pages: 3

Does It in the Aec Industry Create Disruptions Rendering It Ineffective?

...Does IT in the AEC industry create disruptions rendering IT ineffective? Information technology in the AEC industry has presented positive effects such as improved education, increased competitiveness and heightened training solutions. Conversely, information technology has also introduced negative effects, for instance, file incompatibilities, outages and the improper use of technology by staff. This essay explores the ways information technology creates disruptions in the AEC industry and whether or not that is reason to deem them ineffective. This essay also asserts that the introduction of new information technologies in the AEC industry, such as Geographic Information System (GIS), Building Information Modelling (BIM), metres and mathematical models do cause temporary disturbances, but that does not make them worthless because their positives outweigh their negatives. Information technology bestows both positive and negative effects, but information technology has the capacity to reverse negative effects. The operation of information technology requires costly education, and information technology can provide education. For example, a BMS system will relay information that will help educate people on how to better manage buildings. In the AEC industry, GIS technology has been implemented to also inform and educate people. Borce Dimeski during his presentation enunciated “GIS can be used to produce a variety of maps that can relay information involving demographics...

Words: 1455 - Pages: 6

Bims

...The Ballard Integrated Managed Services or (BIMS) is support Service Company, headquartered in New York. BIM it is responsible for providing housekeeping and food services to many corporations and institutions to include 22 Fortune-100 businesses. The focus of the research is the BIMS site at Douglas Medical Center (BIMS-DMC). The problem BIMS is facing is to determine the cause for the decrease in worker productivity and morale, which resulted in an increase in complaints from the hospital staff and administration. The purpose of the survey is for BIMS-DMC employees to express their view about their job and to compute descriptive and frequency techniques and further study data for possible correlations. The research questions ask if respondents enjoy working for BIMS, how many times they have called in sick, if they are well trained, if they are paid fairly, and if they like their supervisor. Our assumption is that at 17% participation, this survey will not have enough participants to get enough data to determine the problems in BIMS-DMC; a larger sampling or new sampling method may have to be acquired. The instrument used in collecting the data was from a sample survey. In some sample surveys a couple of questions that may be included could stem from demographics and age brackets. Also, some of other areas of consideration that may be included are a rating scale. For example, a rating scale is stated poor, fair, good, very good, and excellent, but in this survey......

Words: 256 - Pages: 2

Aurangzeb Last Word Brought a Change in Bim's Life

...Aurangzeb – a moment of epiphany in Bim’s Life Bim, the Central character in the novel, envisages life as full of adventure. She as­pires to be a heroine and a rebel. But ironically, it is she who stays in the same place, doing the same dull routine and does not move beyond Old Delhi. She lives in the house she was born in and teaches in the college where she studied. However, she is not a highly strung and neurotic creature. The present does not torment her; what agonises her filters in from the past. She is as angry, unhappy and frus­trated as the other in the family. But Bim, being a stoic, conceals her anguish. The lines from D. H. Lawrence’s “Ship of Death” reflect her death-wish. From too much love of living From hope and fear set free, We thank with brief thanks giving Whatever gods may be That, no man lives forever, That dead men rise up never; That even the Weariest river Winds somewhere safe to sea. But Bim eventually masters this death-wish and comes to terms with herself. For twenty years, she torments herself with the rejection, the desertion of Raja, her elder brother, whom she idealises with a near incestuous passion. Raja runs away to Hyder Ali in Hyderabad, leaving her in the crumbling house with an alcoholic aunt and a mentally retarded brother. She feels alienated as he marries Benazir, daughter of Hyder Ali and begets five chil­dren. He...

Words: 1171 - Pages: 5

Level of Detail vs. Level of Development in Construction

...Level of Development and Level of Detail came into play with the advancement of computers and BIM technology. As the AEC industry began move towards using computer renditions for design and analysis, it became necessary to define the certainty with which drawings could be trusted. The detailing of elements changes throughout the duration of a project, so it is important for the team to be able to recognize what level of detail is provided and how trustworthy it is. For this reason, different levels of development were created to allow for a standardized system of analyzing drawings and details. Level of Development vs. Level of Detail The level of Development (LOD) enables construction teams to specify and distinguish the content and reliability of Building Information Models at various stages of the design and construction process with high levels of clarity and reliability. The LOD describes the minimum dimensional, spatial, quantitative, and qualitative data included in a Model Element to support the authorized uses associated with such LOD. Since each Model Element develops at a different rate, the Level of Development (LOD) framework allows the project team to understand the progression of a Model Element from conceptual idea to precise final definition and description. The LOD of a given Model Element informs other Project Participants how developed the information is expected to be. This allows participants to extent to decipher which that information can be...

Words: 648 - Pages: 3

Asia Pacific Aviation Competitive Challenges & Growth Dynamics

...International Conference on Economics, Social Science, Arts, Education and Management Engineering (ESSAEME 2015) Study on trade-off of time-cost-quality in construction project based on BIM XU Yongge 1, a, Wei Ya 1, b 1 Xi’an Univ.of arch.﹠Tech., Xi’an 710055, China; a 15829690177@163.com, b631931577@qq.com Keywords: Building information modeling; Construction project; Time-cost-quality trade-off optimization; Genetic algorithm. Abstract. With the development of BIM technology, BIM provides a new direction for the project management of three objectives. Based on the current situation of the project time cost-optimized mass balance studies, pointing out the implementation mechanism of achieving the trade-off of time-cost-quality in construction project based on BIM mainly oriented components of the BIM model based; the use of Structured Query Language query statistics data information needs combined bill of quantities calculation method for the specification, preliminary engineering scale generation; establishment of Project relations system model. In the process duration is subject, for the construction of uncertainty factors such as interest rates and prices, through the establishment of quality, cost and schedule function, the establishment of quality balanced schedule cost optimization model, using genetic algorithm model of the optimal solution are obtained. With BIM case finally proves the rationality of the model and the effectiveness of...

Words: 2798 - Pages: 12

Bim Course

...DLN: To be filled up by BIR BIR Form No. Application for Registration Republika ng Pilipinas Kagawaran ng Pananalapi Kawanihan ng Rentas Internas 1902 July 2008 (ENCS) For Individuals Earning Purely Compensation Income, and Non-Resident Citizens / Resident Alien Employee New TIN to be issued, if applicable (To be filled up by BIR) Fill in all applicable white spaces. Mark all appropriate boxes with an “X”. 1 Taxpayer Type Local Employee 2 Date of Registration 3 (To be filled up by BIR) Resident Alien Employee Part I 4 TIN Taxpayer / Employee Information 5 Sex RDO Code (To be filled up by BIR) (MM/ DD/ YYYY) Male 7 Citizenship Date of Birth Female Taxpayer's Name 9 6 8 (For Taxpayer w/ existing TIN) Local Residence Address Last Name First Name Middle Name (MM/ DD/ YYYY) 10 Telephone No. No. (Include Building Name) Street Barangay/Subdivision 12 Municipality Code 11 Zip Code District/Municipality City/Province 13 Foreign Residence Address 14 Tax Type Form Type ATC II 011 Income Tax BIR Form 1700 - (For Individual Earning Compensation Income/Resident Alien Employee) Personal Exemptions Part II 15 Civil Status 16 Employment Status of Spouse: Single Widow/Widower Unemployed Legally separated Married Employed Locally Employed Abroad with qualified dependent child/ren without qualified dependent child/ren Engaged in Business...

Words: 778 - Pages: 4

Assessment of Bim in the Aec Industry

... ASSESSMENT OF THE USE OF BUILDING INFORMATION MODELING (BIM) IN THE NIGERIAN AEC INDUSTRY. A case study of selected firms. BY GYET, DAVID U11AT1038 PROJECT SUBMITTED TO THE DEPARTMENT OF ARCHITECTURE, FACULTY OF ENVIRONMENTAL DESIGN, AHMADU BELLO UNIVERSITY ZARIA IN PARTIAL FULFILLMENT FOR THE AWARD OF BACHELOR OF SCIENCE (BSc.) DEGREE IN ARCHITECTURE AUGUST 2015 DECLARATION I hereby declare that the work in this project titled “ASSESSMENT OF THE USE OF BUILDING INFORMATION MODELING (BIM) IN THE NIGERIAN AEC INDUSTRY. A case study of selected firms.” has been performed by me in the department of Architecture, Ahmadu Bello University Zaria under the supervision of Arc A.S Salisu. The information derived from the literature has been duly acknowledged in the text and a list of references provided. No part of this project report was previously presented for another degree or diploma at this or any other institution. ____________________________ _______________________ Gyet David Date (U11AT1038) . CERTIFICATION This project report entitled “ASSESSMENT OF THE USE OF BUILDING INFORMATION MODELING (BIM) IN THE NIGERIAN AEC INDUSTRY. A case study of selected firms.” By GYET DAVID (U11AT1038) meets the regulations governing the award of the degree of Bachelor of Science in Architecture (BSc. Architecture) of Ahmadu Bello University, and is approved...

Words: 12168 - Pages: 49

Ethhff

...Uttara University Office of the Controller of Examinations Fall Semester Result-2015 Department: Business Administration Program: MBA Batch: 33th Course Code, Number, Credits & Grade Point Name of the Student ID Number Reg. No. MGT-524 POM-534 MIS-612 MKT-602 FIN-606 HRM-604 ACN-531 IBS-611 SYS-614 MGT-512 INT. 3 Cre. Sl. No. 3 Cre. 3 Cre. 3 Cre. 3 Cre. 3 Cre. 3 Cre. 3 Cre. 3 Cre. 3 Cre. 4 Cre. 1 AL MAHMUD M21411121002 - - - - - - I - - - - 2 SAFIQUL ISLAM M21411121003 - - - - - - - - - 2.50 - 3 KAZI SOHENUL ALAM M21411121004 ACN-602 (3 Cre.) I 3.00 2.75 - - - - 2.75 - - - 4 MD. FAISAL AHMED M21411121009 4.00 I 3.25 - - - - - - - - 5 SHERIN KHAN M21411121011 - I - - - - - - - - 6 KAMRUN NAHAR SHIRIN F21411121012 - - - - - - - - - - 7 M. A. HAJJAZ M21411121014 - - - - - - - - - 8 FARHANA SHARMIN F21411121015 - - - - - - - - - 9 MUNMUN AKTER ANY F21411121016 - - - - - - - - - - 3.00 10 A. K. M. MOKADDEMUL KALLOL M21411121020 - - - - - - - - - - 3.25 11 YEASIN PATAWARY...

Words: 695 - Pages: 3