Danshui Case Study

In: Business and Management

Submitted By irfan6191
Words 2251
Pages 10
Table of Contents

INTRODUCTION AND MAIN ISSUES 3 ANALYSIS 4 Qualitative 4 Quanitative 5 Breakeven Point (BEP) 5 Flexible Budget 6 Variances 7 RECOMMENDATION 8 Encourage, motivate, reward and recognize 8 Cellular Manufacturing System 8 Implement new accounting method 9 Extend the contract 9 ACTION PLAN 10 REFERENCES 12

INTRODUCTION AND MAIN ISSUES

Danshui was a contract manufacturer that assembled electronic products for companies wishing to save labour costs by locating in southern China. Because of high demand for iPhone 4, Apple had contracted with Danshui to assemble iPhone in Plant No. 2. The contract need Danshui to assemble 2.4 million iPhone in the period between June 1, 2010 and May 31, 2011. Wentao Chen, manager of Danshui Plant No. 2 was worried because in the third month of the contract production was only 180,000 units per month. Suppose to produce 2.4 million iPhone its need 200,000 units per month. After preliminary budget has come out, the company loss of $672,000.
The main issue of this case is the break contract between Danshui and Apple. The contract called Danshui to assemble 2.4 million in the period of one year, but Danshui only can produce 180,000 units per months. If Danshui still can produce that amount, it can’t reach 2.4 million in one year. This might happen because Danshui cannot find people to hire, even though they have raised wages by almost 30%. Another reason is they have problem with the Samsung flash memory installation. One thousand flash memories were damaged in August. Samsung is aware of this problem and has begun to install a shield to prevent the damage. However, it is just for prevention in the short time. Due to the contract has not been fulfilled, Danshui may be needed to pay back a lot of money for the contract and figure out to cover all the loss.
ANALYSIS…...

Similar Documents

Premium Essay

Danshui Case No. 2

...Managerial Accounting Case #3 (Danshui Plant No. 2) – Instructions I would like to see all of your calculations as a part of your write-up (except for Question 3). For Q3, please attach any relevant tables as an appendix. Question 1: You’ll use the data provided in the first column of Exhibit 3 to calculate the break-even point (see chapter 3 lecture notes for details). Question 2: You’ll just compute the expected and actual total cost per unit. Question 3: Prepare a table with four columns: (1) flexible budget, (2) actual results, (3) variances, and (4) a column indicating whether a variance is favorable or unfavorable. Attach this table to the end of your write-up. Question 4: You’ll calculate the following: (1) the price and usage variance for the flash memory material cost, (2) the price and usage variance for the labor cost, and (3) the total variance for the overhead cost. Read the August Report (page 3) carefully. In this case, you don’t need the standard labor price information in order to calculate the labor price and usage variance. But, note that the standard labor price (or rate) is $0.92 per hour just in case you cannot figure out how to calculate the variances without using that information. Question 5: Think about the various cost variances (i.e., materials, labor, overhead) you calculated. Which one(s) should be the major concern for the manager? What are the causes of these variances (i.e., price variance or efficiency variance)? How can the......

Words: 313 - Pages: 2

Free Essay

Case Study Case Study Case Study

...This case study is an excellent example of how different types of parties can be brought together in a large scale transaction and how the original energy of those early meetings can be lost over time. I imagine that when Anthony Athanas was purchasing those old piers back in the 1960s many, if not all, of his colleagues, friends, and family members told him that he was off his rocker. I’m sure Athanas was looking at this land as his family’s ticket to financial prosperity and somewhat of a legacy that he could leave to his descendants for years and years to come. One of the items I wish the case would have divulged is the amount of money that Athanas had invested in the properties. For me this information would have given an insight to his net worth and how much he had riding on this investment. I assume it was substantial given his actions later in the process. Twenty years later Athanas’ dreams came true and all those naysayers were more than likely green with envy. The amount of pride Athanas’ had in his investment at that moment had to have been insurmountable. Being approached by a big time real estate development company and their extremely wealthy client, Hyatt Corporation, must have made Athanas feel larger than life and made him feel like something he isn’t, which is a developer himself. The case doesn’t give much insight into whether Athanas had any representation or anyone consulting him throughout the process. From the beginning, I saw this as matchup...

Words: 1190 - Pages: 5

Premium Essay

Danshui Plant No.2 Case Study

...Danshui Plant No.2 Case Study Yuli Tang Rui Zhang Due Date: April 9, 2013 1. As we can see from the Exhibit 1, 176,087 Apple iPhone 4’s would have to have been completed for Danshui Plant No.2 to break even. 2. The total expected cost per unit was $205.7 per unit and the actual cost per unit was $211.93 per unit. See Exhibit 2. 3 & 4. The data is showing in the Exhibit 3 & 4. 5. From the data of question 3, the variance of revenue is favorable because Apple increased price of flash memory by $2. However the company didn’t gain profits from the revenue due to the increased price of flash memory provided by Samsung. The variance of flash memory is unfavorable because of two reasons: first reason is the price of each unit raised $2; the second reason is the company damaged 1,000 units of flash memory. So company used more flash memories than expected. The variance of 8 other chips is favorable, we cannot say the amount of chips decreased, so it should be the price of chips went down. The variance of supplies and tools is unfavorable. We think there are two reasons: company used the supplies and tools less efficient which means used more of supplies and tools, or company spend more money on purchase supplies and tools. The variance of labor is unfavorable, due to the wages of labor increased and working hours also increased, it was inefficient. The supervision is unfavorable because of the salary of supervisor increased. In conclusion, the actual net income is...

Words: 939 - Pages: 4

Premium Essay

Danshui

... MAIN ISSUE A part from reading the Danshui Plant No.2 case, we can see that there is no enough information to evaluate the performance of the pant for the first three contracts to assembly Apple iPhone 4. Analysis of the issue To get a clear picture a flexible budget was prepared for the month end of August 2010. (Shown in the table below) From the flexible that is prepared it can seen the performance of Danshui Plant NO.2 is not good enough as what it suppose to be. The budget show that Danshui has unfavorable variance in the assembly the flash memory part, variable tools and supplies, assembly and packing, shipping nad the last one on the supervision. As for the flash memory it has been stated that Samsung had raised the price by $2.00 which had been cover by the Apple as their neutralized the profit which supposedly to give a favorable variance. But for the budget it can seen that the flash memory is showing an unfavorable variance. This is due to lack of skills during the installation the labour which had lead wastage as they need to replace the damage flash memory with the new one. The replacement of the flash memory due wastage had increased the cost that is expected which had lead to unfavorable variance. Variable supplies and tools show an unfavorable variance has it has connection with installation of parts in the iPhone 4 especially on the flash memory installation part. .so when the labour done a wastage or reckless job during the installation of flash memory or......

Words: 1350 - Pages: 6

Premium Essay

Danshui

...MAIN ISSUE A part from reading the Danshui Plant No.2 case, we can see that there is no enough information to evaluate the performance of the pant for the first three contracts to assembly Apple iPhone 4. Analysis of the issue To get a clear picture a flexible budget was prepared for the month end of August 2010. (Shown in the table below) From the flexible that is prepared it can seen the performance of Danshui Plant NO.2 is not good enough as what it suppose to be. The budget show that Danshui has unfavorable variance in the assembly the flash memory part, variable tools and supplies, assembly and packing, shipping nad the last one on the supervision. As for the flash memory it has been stated that Samsung had raised the price by $2.00 which had been cover by the Apple as their neutralized the profit which supposedly to give a favorable variance. But for the budget it can seen that the flash memory is showing an unfavorable variance. This is due to lack of skills during the installation the labour which had lead wastage as they need to replace the damage flash memory with the new one. The replacement of the flash memory due wastage had increased the cost that is expected which had lead to unfavorable variance. Variable supplies and tools show an unfavorable variance has it has connection with installation of parts in the iPhone 4 especially on the flash memory installation part. .so when the labour done a wastage or reckless job during the installation of flash......

Words: 1349 - Pages: 6

Premium Essay

Case 1 Danshui Plant

...Contents INTRODUCTION................................................................................................................................... 1 IDENTIFICATION OF THE MAIN ISSUES OR PROBLEMS............................................................... 2 ANALYSIS OF CASES: ......................................................................................................................... 3 Analysis Of Data ............................................................................................................................. 3 Analysis Of Flexible Budget ............................................................................................................ 4 RECOMMENDATION ........................................................................................................................... 7 Increase Labor’s Wages ................................................................................................................... 7 Giving Reward ................................................................................................................................ 7 Training and Courses ....................................................................................................................... 7 Outsourcing or Sub Contract ............................................................................................................ 8 Overtime Payment ...................................................................................

Words: 2543 - Pages: 11

Premium Essay

Case #3 Danshui Plant No.2

...Case #3 Danshui Plant No.2 Answers 1. The break-even point for Danshui plant no 2 is 175874.54 units. The calculation of this number is simply from the break-even formula, fixed costs divided by contribution margin per unit. Fixed costs for the plant were 729 000 and the contribution margin is revenue minus variable costs which equals to 829 000 and the CM per unit is 829 000 / 180 000 which is 4,145. The break-even is therefore 175874.54 units. 2. The actual and expected cost per unit was 211,919 and 205,705 respectively. These numbers can be computed simply by dividing the total cost given in preliminary report-Exhibit 3 of the case- by the number of units. For actual cost per units it would be actual total costs which is 38 148 divided by 180 000 which will give 205.705 and for the expected cost per units, it is 41 140 divided by 200 000 which will give 211,919. 3. See exhibit 1 4. The price variance for the flash memory is equal to 362 000, it is calculated by multiplying 181 000 which is the actual quantity by the price difference (29-27) which is 2. The reason why the actual quantity is 181 000 and not 180 000 is because of the fact that in the production process, there were a thousand flash memories that were damaged. Therefore they actually used 181 000 flash memories. The usage variance is 27 000 and it is calculated by multiplying the standard price which is 27 by the quantity difference which is 1 000 (181 000- 180 000). ......

Words: 797 - Pages: 4

Premium Essay

Solution to Danshui Case

...Danshui Plant No.2 1. Variable Costs = Material Cost + Labor Cost + Shipping Cost = 187.89+13.11+1.06 = 202.06 / Unit Fixed Costs = 729,000 / Month Price = 41,240,000 / 200,000 = 206.2 Contribution Margin = 206.2-202.6 = 4.14 / Unit When it comes to the break even, Contribution margin * Unit(BE) = Fixed Costs. Unit(BE) = 729,000 / 4.14 = 176,086.96, So the break even for Danshui is 176,087. 2. Based on the data in Exhibit 3, Total expected cost / Unit = 41,140,000 / 200,000 = $205.7 / Unit Actual cost / Unit = 38,148,000/180,000 = $211.93 / Unit 3. Flexible Budget | Budget(180,000) | Actual(180,000) | Variance | Revenue | 37,116 | 37,476 | 360 F | Variable Costs: | | | | Materials | | | | Flash memory | 4,860 | 5,249 | 389 U | Application process | 1,935 | 1,935 | | Chips-phone | 2,529 | 2,529 | | Gyroscope | 468 | 468 | | 8 other chips | 12,771 | 12,643 | 128 F | Variable supplies and tools | 11,257.2 | 11,305 | 47.8 U | Subtotal | 33,820,2 | 34,124 | 303.8 U | Labor | | | | Assembly and packaging | 2,359.8 | 3,092 | 732.2 U | Shipping | 190.8 | 191 | 0.2 U | Total variable costs | 36,730.8 | 37,412 | 1041.2 U | Fixed costs: | | | | Factory rent | 400 | 400 | | Machine depreciation | 150 | 150 | | Utility fee and taxes | 52 | 52 | | Supervision | 127 | 134 | 7 U | Total fixed costs | 729 | 736 | 7 U | Total......

Words: 368 - Pages: 2

Premium Essay

Danshui Case

...Apple Corporation released iPhone 4 on June 24, 2010 and sold more than 1.7 million units in the first three days. To prepare for the launch of the new product, Apple contracted with the Danshui Plant No. 2 to assemble the new iPhones. Danshui Plant No.2, a contract manufacturer in southern China that assembles electronic products for companies wishing to save on labor costs, received a one-year contract starting on June 1, 2010 with the Apple Corporation to assemble 2.4 million iPhone 4s. In the first three months of the contract it became obvious that the plant was unable to assemble the expected 200,000 iPhones per month and was operating at a loss. Although the plant is known for hiring semi-skilled workers, the new iPhone contract required a complex assembly process entirely based on handwork by 325 workers, with 140 steps involving 100 components during 5 days. To anticipate the need for qualified workers, Danshui had raised their factory wages by almost 30%. But even with the wage increase, Danshui was not able to hire enough qualified workers to assemble the complex new product. Another issue was that, based on original modeling, Danshui was actually operating at a loss and was unable to fill the expected 200,000 per month iPhone quota in the first three months. To begin analyzing the root causes for the shortfall, the controller had considered preparing a “flexible budget” to provide a more realistic comparison of the performance to the budget. If the plant...

Words: 344 - Pages: 2

Premium Essay

Danshui

...Introduction Danshui Plant No.2 is a contract manufacturer locating in southern China and was assembles electronic products for companies wishing to save labor costs and they are using semiskilled labor for less than 1 dollar an hour. In August 2010, Danshui Plant No.2 in southern China has a 1 year contract in the period between 1 June 2010 and 31 May 2011 with Apple incorporation to assemble the Apple iPhone 4. Based on the contract, Danshui need to assemble 2.4 million iPhones within 1 year. However, Wentao Chen, manager of Danshui Plant No.2 was anxious about the plant is not able to assemble 2.4 million as their expected and is operating at a loss when the third month of the contract. Their current production was only 180,000 units per months compared to their planned monthly budget is 200,000 units. Therefore, manager was called the plant controller to analyze the budget and request a summary of monthly operations for August as soon after the end of the month as possible in order to identify the source of performance problem. Problem statement In the contract between Apple and Danshui Plant No.2, Danshui need to assemble 2.4 million iPhone within 1 year. This means that Danshui need to produce 200,000 units iPhone 4 per month but now in the third month of the contract they only produce 180,000 per month. Therefore, there are unable to assemble the iPhone 4 within 1 year this may because of they are lack of qualified labor. Danshui Plant No.2 are employs those......

Words: 1750 - Pages: 7

Premium Essay

Case Study

...The Case Study Approach Linda P. Williams Liberty University Online Author Note Linda P. Williams, Department of Psychology, Liberty University Online Correspondence concerning this article should be addressed to Linda P. Williams, Department of Psychology, Liberty University Online, 1971 University Blvd, Lynchburg, VA 24515, E-mail: lwilliams91@liberty.edu The Case Study Approach Introduction At some point during the pursuit of a degree psychology, the time comes when a student must learn various research techniques. One of the many approaches is case study, which this paper will focus on. Areas of discussion include reasons for using a case study, advantages/disadvantages to the approach, and ways acquire information to perform a case study. The essence of a case study A case study is used to offer a mental accounting of a person, school, neighborhood, business, or group of individuals over the course of time, way of research. It is sometimes referred to as naturalistic observation, but does not always follow the same protocol. Mental accounting is done by means of observation of various behavior or mind sets operating in their natural environment. This is noteworthy, especially when participants have a distinct disorder worthy of being studied to further the cause of research and development. Depending on the purpose of the investigation, the case study may present the individual’s history, symptoms, characteristic behaviors, reactions to......

Words: 671 - Pages: 3

Premium Essay

Danshui Plant No.2 Case Study

...Danshui Plant No.2 1. Variable Costs = Material Cost + Labor Cost + Shipping Cost = 187.89+13.11+1.06 = 202.06 / Unit Fixed Costs = 729,000 / Month Price = 41,240,000 / 200,000 = 206.2 Contribution Margin = 206.2-202.6 = 4.14 / Unit When it comes to the break even, Contribution margin * Unit(BE) = Fixed Costs. Unit(BE) = 729,000 / 4.14 = 176,086.96, So the break even for Danshui is 176,087. 2. Based on the data in Exhibit 3, Total expected cost / Unit = 41,140,000 / 200,000 = $205.7 / Unit Actual cost / Unit = 38,148,000/180,000 = $211.93 / Unit 3. Flexible Budget | Budget(180,000) | Actual(180,000) | Variance | Revenue | 37,116 | 37,476 | 360 F | Variable Costs: | | | | Materials | | | | Flash memory | 4,860 | 5,249 | 389 U | Application process | 1,935 | 1,935 | | Chips-phone | 2,529 | 2,529 | | Gyroscope | 468 | 468 | | 8 other chips | 12,771 | 12,643 | 128 F | Variable supplies and tools | 11,257.2 | 11,305 | 47.8 U | Subtotal | 33,820,2 | 34,124 | 303.8 U | Labor | | | | Assembly and packaging | 2,359.8 | 3,092 | 732.2 U | Shipping | 190.8 | 191 | 0.2 U | Total variable costs | 36,730.8 | 37,412 | 1041.2 U | Fixed costs: | | | | Factory rent | 400 | 400 | | Machine depreciation | 150 | 150 | | Utility fee and taxes | 52 | 52 | | Supervision | 127 | 134 | 7 U | Total fixed costs | 729 | 736 | 7 U | Total costs | 37,099.8 | 38,148 | 1,048.2 U | Net......

Words: 335 - Pages: 2

Premium Essay

Danshui

...DANSHUI PLANT NO. 2 CONTENTS | PAGE | 1.0 Introduction | | 2.0 Main issue | | 3.0 Problem statement | | 4.0 Data Analysis 4.1 Breakeven analysis 4.2 Total cost variance analysis 4.3 Flexible budget performance analysis 4.4 Variance analysis | | 5.0 Strategies, interpretations, recommendations and justifications | | 6.0 Conclusion | | 7.0 References | | 1.0 INTRODUCTION Danshui Plant No. 2 in southern China has a one-year contract with Apple Inc. to assemble 2.4 million iPhones. In the first three months of the contract, the plant is unable to assemble as many phones as expected and is operating at a loss. The plant manager must analyze the budget and prepare a summary of monthly operations to help identify the source of performance problems. The plant has had difficulty hiring enough workers despite raising wages over 30%. In addition, the assembly process for an iPhone is complicated, with 140 steps involving over 100 components. The plant manager considers whether a flexible budget would be more useful for uncovering problems than the static budget currently being used. Wentao Chen, manager of Danshui was anxious upon reviewing the monthly operation’s performance for August as in the third month of the contract, production was only about 180,000 units. Meanwhile, Jianye Ma, the plant controller requested a summary of monthly operations for August as soon after the end of the month as possible. 2.0 MAIN ISSUE Danshui Plant manager......

Words: 2997 - Pages: 12

Free Essay

Danshui

...Danshui Plant No.2 The following case focuses on Danshui, a contract manufacturer that assembled electronic products. Danshui is currently in the third of a 12 months’ contract to assemble 2.4 million units of Apple’s iPhone 4. Monthly production target for Danshui is 200,000 units but three months’ study reflects that Danshui may not meet this target in 12 months and would also overrun the cost barrier thus landing in an unprofitable situation. Plant controller, Jianye Ma presented her analysis for August production to the plant manager, Wentao Chen. According to this report, the main difficult the plant is facing is being able to hire enough people to get the production to the 200000 units per month budgeted, despite having increased wages by a 30%. Questions 1. A. Total expected Cost – 41,140,000$ for 200,000 units ------------------------------------------------- Cost per unit – 205.70$ B. Actual Cost – 3,8148,000$ for 180,000 units ------------------------------------------------- Cost per unit – 211.91$ 2. The flexible budget variances can be seen in Appendix1. According to the results, there is an overall unfavourable variance of 1048.2$. this means, that even if production has been 180,000 instead of 200,000, there is still a variance NOT EXPLAINED by the reduction in volume. The colours in appendix one represent whether the impact of the variance is positive (green) or negative (red). It can be seen, that assembly and packaging represents the......

Words: 689 - Pages: 3

Premium Essay

Solution to Danshui Case

...Solution to Danshui Case Danshui Plant No.2 1. Variable Costs = Material Cost + Labor Cost + Shipping Cost = 187.89+13.11+1.06 = 202.06 / Unit Fixed Costs = 729,000 / Month Price = 41,240,000 / 200,000 = 206.2 Contribution Margin = 206.2-202.6 = 4.14 / Unit When it comes to the break even, Contribution margin * Unit(BE) = Fixed Costs. Unit(BE) = 729,000 / 4.14 = 176,086.96, So the break even for Danshui is 176,087. 2. Based on the data in Exhibit 3, Total expected cost / Unit = 41,140,000 / 200,000 = $205.7 / Unit Actual cost / Unit = 38,148,000/180,000 = $211.93 / Unit 3. Flexible Budget | Budget(180,000) | Actual(180,000) | Variance | Revenue | 37,116 | 37,476 | 360 F | Variable Costs: | | | | Materials | | | | Flash memory | 4,860 | 5,249 | 389 U | Application process | 1,935 | 1,935 | | Chips-phone | 2,529 | 2,529 | | Gyroscope | 468 | 468 | | 8 other chips | 12,771 | 12,643 | 128 F | Variable supplies and tools | 11,257.2 | 11,305 | 47.8 U | Subtotal | 33,820,2 | 34,124 | 303.8 U | Labor | | | | Assembly and packaging | 2,359.8 | 3,092 | 732.2 U | Shipping | 190.8 | 191 | 0.2 U | Total variable costs | 36,730.8 | 37,412 | 1041.2 U | Fixed costs: | | | | Factory rent | 400 | 400 | | Machine depreciation | 150 | 150 | | Utility fee and taxes | 52 | 52 | | Supervision | 127 | 134 | 7 U | Total fixed costs | 729 | 736 | 7 U | Total costs | 37,099.8 |......

Words: 341 - Pages: 2