Premium Essay

Design and Implementation

In: Other Topics

Submitted By koworu
Words 3417
Pages 14
Table of Contents INTRODUCTION 2 DIALOGUE INDIVIDUAL CUSTOMER INFORMATION 3 DIALOGUE ORDER STATUS 4 DIALOGUE SALESPERSON INFORMATION 5 USER REQUIREMENTS DIAGRAM 8 Forms 8 Report 13 DATABASE DESIGN 18 ARCHITECTURE DESIGN 22
CONCLUSION……………………………………………………………………………………………24

INTRODUCTION

In the System Development Life Cycle (SDLC), there are four phases that need to be done to develop a system for used of by the organization. The phases are system planning and selection, system analysis, system design and implementation and operation. Since the planning and analysis phase have successfully completed, now we are continue with the next phase, which is systems design of the POS System in ARZA Coffee & Cakes. System design under System Development Life Cycle was a conversion of description of the recommended alternative solution into logical and physical specifications for the system starting from the input until the output screens consists of report, databases and computer processes. By that action the company might ease to reveals the real systems from which all the programming and system construction can be accomplish.
This system could be implemented into any hardware and software since it is not tied up to any of the specific one. However, the logical design will illustrate the functions of the system in all aspects. In the physical design, the logical design will be interpret into the physical or technical specifications by convert the systems data to the structured systems design.

DIALOGUE INDIVIDUAL CUSTOMER INFORMATION

Figure 1 0 | Log-OnScreenSystem |

1 | MainMenu0, System |

5
Reports
0, 1
4
Salesperson Information
0, 1
3
Order Status
0, 1
2
Individual Customer Information
0, 1
2.1.1.3
Customer’s Contact Number
1, 2.1, 2.1.1
2.1.1.2
Customer’s Address
1, 2.1, 2.1.1
2.1.1.4
Customer’s Order
1, 2.1, 2.1.1
2.1.1.1
Customer’s Name
1, 2.1,…...

Similar Documents

Premium Essay

Implementation

...The Nature of Strategy Implementation Successful strategy formulation does not guarantee successful startegy implementation. It is always more difficult to do something (strategy implementation) than to say you are going to do it (strategy formulation). Although inextricably linked, startegy implementation is fundamentally different from strategy fromulation. Strategy formulation and implementation can be contrasted in the following ways: * Strategy formulation is positioning forces before the action. * Strategy implementation is managing forces during the action. * Strategy formulation focuses on effectiveness. * Strategy implementation focuses in efficiency. * Strategy formulation is primarily an intellectual process. * Strategy implementation is primarily an operational process. * Strategy formulation requires good intuitive and analytical skills. * Strategy implementation requires special motivation and leadeship skills. * Strategy formulation requires coordination among a few individuals. * Strategy implementation requires coordination among many individuals. Management perspectives Implementation problems can arise because of the shift in responsibility, especially if SF decisions come as a surprise to middle- and lower-level managers. Therefore, it is essential to involve divisional and functional managers in strategy-formulation activities. Management Issues Central to Strategy Implementation * Establish annual......

Words: 540 - Pages: 3

Free Essay

Design and Implementation

...Initial and Final Capacity Requirements for 48 Parts across NC FWC No. 7 (Con’t) PART 140 Set-Up Time Run Time Total PART 141 Set-Up Time Run Time Total PART 142 Set-Up Time Run Time Total PART 143 Set-Up Time Run Time Total PART 144 Set-Up Time Run Time Total PART 145 Set-Up Time Run Time Total PART 146 Set-Up Time Run Time Total PART 147 Set-Up Time Run Time Total PART 148 Set-Up Time Run Time Total 1966 120 24 338 1966 120 25 339 1966 120 24 335 1966 126 37 401 1966 126 37 401 1966 126 37 401 1966 126 37 401 1966 117 34 370 1966 117 34 370 1966 111 30 341 1966 111 31 346 1966 114 35 368 1966 117 50 435 1966 117 48 426 1966 117 50 433 1966 117 50 433 1966 1563 10 12 84 1563 10 12 84 1563 10 12 84 1563 10 12 84 1563 10 12 84 1563 10 12 84 1563 10 12 84 1563 10 12 84 1563 10 12 84 1334 71 34 493 1334 71 34 493 1334 71 10 238 1081 31 8 141 1081 31 8 141 1081 31 8 141 4035 7 46 561 4035 7 46 561 4035 7 46 561 709 7 2 34 709 7 2 34 709 7 2 34 709 7 2 34 709 7 2 34 709 7 2 34 709 7 1 26 709 7 1 26 709 7 1 26 4035 7 94 1136 4035 7 94 1136 4035 7 94 1136 4035 7 94 1136 4035 7 90 1092 4035 7 90 1092 4110 4 1 23 4110 4 1 23 4110 4 1 23 4110 4 1 23 4110 4 1 19 4110 4 1 19 4110 4 1 23 709 7 1 25 709 7 1 25 701 7 1 25 701 7 1 25 701 7 1 25 701 7 1 28 701 7 1 28 701 7 1 28 701 7 1 28 4110 4 0 9 4110 4 0 9 757 1 5 4.00 2.00 6 0 0 0 0 0 0 0 0 34 757 1 5 4.00 2.00 6 0 4110 9 3 29 4110 9 3 29 0 0 0 0 0 0 0 34 757 1 5 4.00 2.00......

Words: 625 - Pages: 3

Premium Essay

It Implementation

...IT Project Implementation Failures Tykeshia James HCS483 February04, 2013 Linda Mesko IT Project Implementation Failures The typical implementation process or plan includes the following, “workflow and process analysis the organization needs to identify opportunities for improvement and as appropriate effect those changes. Identify sources of data including interfaces to other systems, redesign physical location as needed. Then comes the system installation determine system configuration, order and install hardware, prepare computer room upgrade or implement IT infrastructure, customize software test, retest, and test again. Next, the organization should have staff training so that they are up to date on the new system procedure manuals should be updated as well so if the occasion arises the staff can refer to the information. After this the data needs to be converted and system testing. Finally, preparation for go-live date select a date when patient volume is relatively low ensures sufficient staff is on hand. Setup mechanism for reporting and correcting problems and issues review and effect process reengineering. () During the implementation process there should be an organized implementation team and a system champion. The implementation team is responsible for planning, coordinating, budgeting and managing the new system. The team should include an IT professional with technical database and network administration expertise. They will be responsible for......

Words: 441 - Pages: 2

Premium Essay

Job Services Australia: Design and Implementation Lessons for the British Context

...Research report Job Services Australia: design and implementation lessons for the British context by Dan Finn Department for Work and Pensions Research Report No 752 Job Services Australia: design and implementation lessons for the British context Dan Finn A report of research carried out by the Centre for Economic and Social Inclusion on behalf of the Department for Work and Pensions © Crown copyright 2011. You may re-use this information (not including logos) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit http://www.nationalarchives.gov.uk/doc/open-government-licence/ or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or email: psi@nationalarchives.gsi.gov.uk. This document/publication is also available on our website at: http://research.dwp.gov.uk/asd/asd5/rrs-index.asp Any enquiries regarding this document/publication should be sent to us at: Department for Work and Pensions, Commercial Support and Knowledge Management Team, Upper Ground Floor, Steel City House, West Street, Sheffield S1 2GQ First published 2011. ISBN 978 1 84712 986 4 Views expressed in this report are not necessarily those of the Department for Work and Pensions or any other Government Department. Contents iii Contents Acknowledgements ..................................................................................................................................

Words: 20640 - Pages: 83

Premium Essay

It Implementation

...IT Project Implementation Failures HCS/245 September 16th, 2013 Marc Magill Project Implementation A typical IT Implementation process normally follows SDLC process. SDLC refers to Standard Development Life-Cycle. Below are the standard SDLC phases: 1) Initiation Phase 2) System Concept Development 3) Planning 4) Requirements Analysis 5) Design 6) Development 7) Integration & Testing 8) Implementation 9) Operations & Maintenance 10) Disposition Any project starts with an Initiation phase when a Business or Project Sponsor identifies a use case or need or opportunity to achieve some of the company’s strategic goal. Based on this proposal will be created. System Concept Development phase where we define the scope, business requirements trace matrix, Cost Benefit Analysis, Risk Management Plan and if the proposal can be feasible and define an approach. This is the phase where you identify all stakeholders and socialize the project for its approval. Planning phase is where you do vendor selection; create project management plan, project schedule and any other planning documents. Budget plan, Resource plan will also be defined in planning phase. Disposition provides end of system activities and lessons learned and close the project. Requirements Analysis is where you work closely with business users and understands their needs, develop user needs and create a detail functional design document and get approval from all stakeholders. Design phase......

Words: 803 - Pages: 4

Premium Essay

System Analysis, Design and Implementation

...Stephanie Cook ITM 5400 FALL I 2013 System Analysis, Design and Implementation Professor Al Marcella Cook_7A 1. Should Top Sail implement a Web-based system? Why or why not? I do feel that Top Sail should implement a Web-based system in order to be effective in the time-sharing and rental broker business. Most every major company as well as brick and mortar companies are breaking through with Web based systems. Customers look to make everything convenient for them. Purchases and rentals of most all products via the Internet is how most customer are buying now days therefore this is a must for Top Sail. They need a system that will display relevant information pertaining to rentals, availability and prices and exactly what potential renters prefer and/or looking for. 2. What software acquisition options are available to Top Sail? The software acquisition options that are available to Top Sail must begin with the acquisition process. Step 1 is to evaluate the Information System requirements and prepare a request for proposal or a request for quotation, Step 2 is to identify potential vendors or outsourcing options, Step 3 evaluate the alternatives, Step 4 is to perform cost-benefit analysis, Step 5 prepare a recommendation and Step 6 implement the solution. They can develop a system, buy a software package or customize a software package. In Top Sail’s case customizing a software package would probably be the best route to take and in......

Words: 466 - Pages: 2

Premium Essay

Systems Design, Implementation, and Operation

...CHAPTER 22 SYSTEMS DESIGN, IMPLEMENTATION, AND OPERATION SUGGESTED ANSWERS TO DISCUSSION QUESTIONS 22.1 Prism Glass is converting to a new information system. To expedite and speed up implementation, the CEO asked your consulting team to postpone establishing standards and controls until after the system is fully operational. How should you respond to the CEO’s request? The consulting team should strongly advise the CEO that postponing standards and controls is not advisable. Rather than save time and money, the company will probably lose time in the future when unanticipated problems and weaknesses arise due to the lack of standards and controls. The following are reasons why performance standards and control procedures should be established before the system becomes operational: * Internal control considerations must be taken into account when assigning job responsibilities. * Job descriptions and work schedules must include the various control procedures. * Performance standards associated with each position must be considered when selecting personnel to operate the system. * Documentation standards and data security provisions must be formulated before the system can be operational. * Error checks must be built into all computer......

Words: 8326 - Pages: 34

Free Essay

Implications of Big Data for the Design, Implementation and Use of Enterprise-Level Information Systems in Defense

...Implications of Big Data for the design, implementation and use of enterprise-level information systems in Defense While technology rapidly advances and information becomes a strategic asset, Big Data arouses the demand of politicians and military leaders to make use of possible information advantages to allegedly better support the military mission (DOD, 2010). However, the defense sector is still struggling with the implementation of adequate enterprise-level information systems. Therefore, militaries have to assess the necessity of using Big Data within the different business processes, and they have to ensure that the current implementation of enterprise-level information systems remains adaptable and scalable for future business needs. The amount of data is continuously on the rise due to the rapid growth of mobile devices and applications, smart sensors and devices, cloud computing solutions, and […] portals (“Impact,” 2013). Also, the capability to analyze and to correlate structured with unstructured data will enhance. But militaries must avoid getting distracted from implementing a good information management system that serves current business needs, rather than trying to rapidly dominate Big Data. Instead, the success of todays mission has to gain center stage. Thus, one has to focus on three principles. First: One has to act now but also has to keep in mind that there has to be a transition from information management to Big Date in the future, as Big Data will......

Words: 647 - Pages: 3

Premium Essay

Implementation

...Name Instructor Class Date Implementation Rehearsal must be considered in plan implementation because you have to make sure you practice your plan to see if it is planned out enough and to see if it will work. You should always rehearse a plan before making it official so you can weed out any mistakes or bad ideas. Maintenance must be considered in plan implementation because if you have any errors, you need a way to fix them quickly. Just like buying a used car, you need maintenance every once in a while to fix things that aren’t working right. Benchmarking must be considered in plan implementation because you should always evaluate your plan for mistakes and make sure it is as good as other plans. It’s all about competition in this world, and if your plan isn’t as good as others, you will have some problems in your business. If your plan doesn’t pass the test, it will not work and needs to be fixed. Assurance and Audit must be considered in plan implementation because it helps to assure that your plan can be fixed and molded into the best plan it can be. All of the errors are removed to perfect the plan with assurance audit. Not only is it a good idea to make sure others within the company inspect your plan for a second opinion, but it is also a good idea that you also inspect your plan personally also. You are the one that created it and you are the one that knows what’s best for it and what needs to stay and what needs to go. Reference Reference: ......

Words: 293 - Pages: 2

Premium Essay

The Design and Implementation of a Leadership Development Program for Greenheck Fan Corporation

...THE DESIGN AND IMPLEMENTATION OF A LEADERSHIP DEVELOPMENT PROGRAM FOR GREENHECK FAN CORPORATION by Kathleen A. Drengler A Research Paper Submitted in Partial Fulfillment of the Requirements for the Master of Science Degree in Training and Development Approved for completion of 4 Semester Credits 198-750 Field Problem in Training and Development _________________________ Research Advisor The Graduate College University of Wisconsin-Stout December 2001 2 The Graduate College University of Wisconsin-Stout Menomonie, Wisconsin 54751 ABSTRACT Drengler (Writer) (Last Name) Kathleen (First) A (Initial) The Design and Implementation of a Leadership Development Program for Greenheck Fan Corporation Training & Development (Graduate Major) Jerry Coomer (Research Advisor) December 2001 (Month/Year) (No. Pages) Publication Manual of the American Psychological Association (Name of Style Manual Used in this Study) The purpose of this field problem was to design and implement a leadership development program for Greenheck Fan Corporation. Consistent growth over the prior five years and aggressive growth projections created leadership opportunities throughout the organization. A corporate culture that supports promotions from within and a projected workforce labor shortage required development of the skills of existing employees to fill emerging leadership roles. This leadership development program defines the competencies......

Words: 8058 - Pages: 33

Premium Essay

Physical Design and Implementation

...Physical Design and Implementation Strayer University Physical Design and Implementation SQL Injection is one of the many web attack mechanisms used by hackers to steal data from organizations. It is perhaps one of the most common application layer attack techniques used today. It is the type of attack that takes advantage of improper coding of your web applications that allows hacker to inject SQL commands into say a login form to allow them to gain access to the data held within your database. In essence, SQL Injection arises because the fields available for user input allow SQL statements to pass through and query the database directly. SQL Injection is the hacking technique which attempts to pass SQL commands (statements) through a web application for execution by the backend database. If not sanitized properly, web applications may result in SQL Injection attacks that allow hackers to view information from the database and/or even wipe it out. Oracle database privileges are of two types, system privileges and object privileges. The system privileges grant users power to perform the specified actions system-wide, whereas the object privileges let users perform particular actions on specified database objects. Microsoft SQL Server allows individual users to create private objects in the database. The system records the owner of every user object. Users can access objects only if the owner of the object has granted them access. Administrators can......

Words: 495 - Pages: 2

Free Essay

Design, Simulation & Implementation of a Microcontroller Based Seed Dryer Machine for Farm Produce Interfaced with Computer System

...International Journal of Emerging Technology and Advanced Engineering Website: www.ijetae.com (ISSN 2250-2459, ISO 9001:2008 Certified Journal, Volume 5, Issue 7, July 2015) Design, Simulation & Implementation of A Microcontroller Based Seed Dryer Machine for Farm Produce Interfaced with Computer System Ezeofor J.C1, Okeke. R.O2, Ogbuokebe S.K3 1,2 Department of Electronic & Computer Engineering, University of Port Harcourt, Rivers State, Nigeria 3 National Space Research and Development agency, Abuja As a result of these, majority of the farmers end up bankrupt while some incur huge debt from banks, relatives or committee of friends in the process [3]. With the proposed drying system, farmers would be able to dry their farm produce using appropriate temperature and humidity control system. Abstract— this paper presents the design and implementation of a microcontroller based Seed Dryer Machine for farm produce interfaced with PC. Drying of farm produce and seeds in large quantity such as; melon, beans, corn, cocoa seeds, pumpkin seeds, rice, pepper seeds, tomato seeds etc., has been very challenging due to lack of drying facilities, drying space and poor weather. This gives low lifespan to the seeds and reduced quantity of stored seeds, which in turn could discourage farmers from further cultivations. In view of this problem, a microcontroller based Seed Dryer Machine is designed to aid and encourage farmers to dry in large scale different......

Words: 6253 - Pages: 26

Premium Essay

Design and Implementation of a Bio-Metric (Fingerprint) Clocking System

...organizations is a more secure platform where staff mark their attendance with their fingerprint. 1.2 AIM AND OBJECTIVES OF THE STUDY The aim of the study is to design and develop a robust, reliable, scalable and cost effective Fingerprint based Biometric Clocking System. The said system is to achieve the following objectives: i. To carry out the analysis of manual processes involved in staff attendance in an organization ii. To design a new system for the (i) above and iii. To implement the design using Microsoft Visual Basic.net. 1.3 METHODOLOGY OF STUDY This research work is based on the design and implementation of staff biometric attendance system using fingerprint authentication. The proposed system can be used to monitor, identify and check the IN and OUT timings of staff an organization. The system requires that all staff enroll his/her fingerprint for the device to identify and verify if he/she is a valid staff and also to record daily resumption and closure timings for the staff, before payment of salaries are effected. The primary idea behind this is to avoid a situation where staff records fake timings in the manual register and yet receiving full payment at the end of the month/day. This greatly affects output to input ratio of staffs and in earnest the organization as a whole. The proposed design enhances compilation of each staff’s attendance by remote workstations, which can then be sent to a central database server at the end of each month for easy......

Words: 1919 - Pages: 8

Premium Essay

Systems Design, Implementation and Operatio

...SYSTEMS DESIGN, IMPLEMENTATION AND OPERATION In chapter 18 we focused on the first phase of the Systems Development Life Cycle – Systems Analysis. Chapter 20 deals with the remaining four phases: - conceptual systems design - physical systems design - systems implementation and conversion - operation and maintenance CONCEPTUAL SYSTEMS DESIGN In the conceptual systems design phase, the developer creates a general framework for implementing user requirements and solving problems identified in the analysis phase. As shown in Figure 20-1 on page 747 HC (page 637 SC), there are three main steps in conceptual design: 1. evaluating design alternatives, 2. preparing design specifications, and 3. preparing the conceptual systems design report. [pic] Evaluate Design Alternatives There are many ways to design an AIS, so accountants and others involved in systems design must continually make design decisions. [pic] The design team should identify a variety of design alternatives and evaluate each with respect to the following standards: 1) how well it meets organizational and system objectives, 2) how well it meets user needs, 3) whether it is economically feasible, and 4) what its advantages and disadvantages are. The steering committee evaluates the alternatives. Table 20-1 on page 748 HC (page 638 SC) presents examples of conceptual and physical design considerations and their corresponding design......

Words: 3220 - Pages: 13

Premium Essay

Design and Implementation of Solar System Simulation

... Similarly, Inverters are static power converters that produce an ac output waveform from a dc power supply. The dc power from SEPIC is fed to inverter to get ac output power (Chenvidhya et al, 2008). A Bi-Directional DC-DC Converter (BDC) is connected between the Sepic Converter and Inverter. BDC is used to store the dynamic energy in battery and supply to load when there is overcast sky or at night (Lin et al, 2008). For sinusoidal ac outputs, the magnitude and frequency should be controllable. This is done by comparing a sinusoidal wave of the same frequency as inverter output against triangular carrier frequency wave. This technique called sinusoidal pulse width modulation (SPWM) mainly used because of its simplicity and ease of implementation. The output voltage magnitude is controlled by closed loop control system using PI controller (Balathandayuthapani et al, 2010). As the capacity of PV system growing significantly, the impact of PV modules on power grid can’t be ignored. They can cause problems on the grid like flicker, increase of harmonics, and aggravated stability of the power system. To both increase the capacity of PV arrays and maintain power quality, it’s necessary to comply with the technique requirements of the PV system, such as fault-ride-through capability and harmonic current regulation. Especially when a large scale PV module is connected to the grid, the effects on the grid may be quite severe. Therefore, the system operation and system stability......

Words: 1799 - Pages: 8