The project will not meet the deadline of June 30, 2012, there are numerous variables and tasks that must be completed in order to start the construction of the building. The construction of the building will begin July 25, 2011 and end in April 27, 2012. The planning phase alone will take ten full weeks to complete before the site preparation can begin. Not meeting the 2012 deadline may create a negative impact on the entire project and could potentially delay or jeopardize the introduction of the new plastic containers.
The goal was to make sure that the plant was fully operational by June 30, 2012. The deadline requirement would have assured that the equipment was properly installed tested and that the plastic products were tested for quality and thus guaranteeing full production capacity by the deadline of June 30 ,2012 set by the board directors.
The deadline that was set by the board of directors will be met promptly and ahead of time by six days. This will allow the production start-up to begin on June 25, 2012 and distribution by July 2, 2012.
My recommendation would be, to meet with the different team leaders of the specific tasks that are within the Critical Path of the current schedule and determine the slack in all the tasks and the total slack available in the entire project. By meeting with the leaders that have first hand experience, the team will be able to better analyze the possibility of realistically shortening the duration for each task. “The team should develop a realistic schedule, then determine how much negative total slack there is based on the customer’s required completion date. At that point, they can rationally determine how to reduce the negative slack to come up with an acceptable schedule that meets the project required completion date. This is done by making decisions about how to reduce the estimated

Similar Documents

Premium Essay

None

...Course Project Introduction | | In this course, you will have one course project and will require two different assignments – Course Project Part I and Course Project Part II.  This project will test your knowledge of all of the project management tools and techniques that we'll cover in this course.  Before you begin, please review the PM 586 Course Project Tour. [You'll find the link above.]  This audio/visual tool will take you on a "tour" of the project and will highlight many of the logistics and "need to know" information to successfully complete the two parts of the project. In addition, this course project does require use of Microsoft Project.  If you are not familiar with the software or just need a "refresher," please run through the tutorials above or look at the end of the chapters in the textbook for a mini-lesson of the software.  Course Project Description | | Johann Seitz founded the SEITZ Corporation in 1982. The main products of the firm were small- to medium-sized plastic bottles and containers, used mainly in the food and dairy industries. By 1985, the annual sales of the corporation had reached $31 million and the firm enjoyed a dominant market position in the upper Midwest. In 1998, Walter and Teri Seitz, Johann’s grandchildren, assumed the day-to-day operation of the business. Teri Seitz was a somewhat unstructured, but diligent, student of the latest business school theory and decided that in order to meet increased competition, especially...

Words: 3297 - Pages: 14

Premium Essay

Huntsville Charter

...Project Name | Huntsville Plant Project | Project Number | 1 | Project Manager | Thomas Parker III | Prioritization | 5 | Owner(s) | Johann Seitz | Start Date: | 17 April 2011 | Scheduled Completion Date: | 30 June 2012 | Mission | The end state of this project is to build a successful plant in Huntsville, Alabama. With having a successful plan, this will directly affect the number 5 priority (attain a national presence in the container industry) and number 6 priority (increase productivity). Then it will indirectly affect the rest of the priorities. | | Scope | The board expects the following to be in place when the project is completed: * Select resources such as: Architect, Real Estate Consultant, and General Contractor * Recruit and Train Managers for Huntsville Plant * Create a Pre-Production and Production Plan * Create a Building Concept and Design * Procure Building Site, Permits, and Appropriate Approvals * Construct the Huntsville Plant Building * Landscaping on Site * Personnel Recruiting for Plant Operations * Procure Equipment, Raw Material and Truck Fleet * Install Equipment * Create Product Distribution Plan and Pre-Production Plan * Start Up Production and Distribution The board doesn’t expect the following: * Geothermal Heating * Solar Powered Electric Feed * Multi-Level Parking Garage * In-House Food Court * Construction of Separate Distribution Facility | | Objectives | As the company...

Words: 776 - Pages: 4

Premium Essay

Hunstville

...- 1 PM586 SEC H PROJECT PART 1 SEITZ HUNTSVILLE PROJECT PROJECT REPORT Introduction Project Planning is the key to the success of a Project. Seitz Huntsville Project is a very large project with a budget of $2,750,000 to be completed in only 18 months. Janis Clark, the Project Manager for Seitz Huntsville Project seems very determined in implementing this Project, having all the support from board of directors and access to functional elements at the corporate plant. Steve Pokorski, the Vice President of Operations, and Joe Downs (was also a Project Manager candidate for this project), the Director of Plant Engineering, were also asked to help Janis in anyway, even if they had to go out of the way. 2 Janis Strategy Mark Green, the Project Sponsor asked Janis to furnish the Project artifacts before proceeding further and Janiss approach was to convert her task list to Project Charter, Scope Statement and WBS. Since she had already created a task list, it was easier for her to build a WBS but that certainly is correct path. Janis, to the best of my knowledge, should have created a Project Charter first with the help of her assistants. A charter document is the WHAT of a project and if not planning properly, the Project is destined to fail. Charter document is used to communicate between the Project Teams, Stake holders and the rest of the company about the Project. This document is the foundation of the Project. It authorizes the project manager to proceed with the project. After...

Words: 1105 - Pages: 5

Free Essay

Awesome

...Huntsville Obedience Training Club, Inc. HOTC offers classes for puppies between 8 weeks and 18 weeks on the first day of class. Classes meet 50 minutes per week for 8 weeks. Day Time Start Date End Date Monday Monday Wednesday 10:00 AM 6:30 PM 6:30 PM 3/14/16 3/14/16 4/6/16 Notes 5/2/16 5/2/16 5/25/16 skip The total fee for Puppy Class is $95.00 This fee includes class time, a leash and a training manual. The first class is an orientation without puppies. Classes are limited in size. A $25 fee will be charged for all checks returned by the bank. Registrations must be accompanied by a check or money order. They will be accepted on a first-come, first-serve basis and must be received prior to the start of class. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Cut Here, Keep Upper Portion - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Mail the registration form and fee to: Make check payable to: Huntsville Obedience Training Club Registration email address: hotcpuppyclass@gmail.com LaDonna Madden, HOTC Puppy Registration 2504 Amberhurst Circle, Huntsville, AL 35810 PUPPY CLASS - REGISTRATION FORM Fee MUST be enclosed in order to register. Name (handler must be 12 or older): ____________________________________________________________________ Address: __________________________________________ City/State: ________________________ Zip: _________ Phone...

Words: 272 - Pages: 2

Premium Essay

Pm586 Week 4

...PM586 Week 4 Assignment 1. What is your total budget for this project? Was the project within the budget as set forth by the board of directors? The total budget for the project is $2,634,172. This amount is about $100,00 less than the current allotted amount of $2,750,000, showing that the project is currently within budget. To continue on this projected path of being within budget, we would need to ensure that the current budget allocations for activities such as training and recruiting of staff members is kept. We need to ensure that the personnel that we recruit are well trained to or can be easily trained so that no extra monies are spent . 2. What is your budget for the Planning Phase? What is the Planning Phase duration in weeks? [5 points] The current budget for the Planning Phase of the Huntsville Project is $285754 with duration of roughly10 weeks. This Phase of the project is scheduled to last from April 18th 2011 to June 24th 2011. 3. What is your budget for the Preparation Phase? What is the Preparation Phase duration in weeks? The current budget for the Preparation Phase of the Huntsville Project is $1,282,441 with duration of roughly 49 weeks. This Phase of the project is scheduled to last from June 27th 2011 to June 27th 2011 to May 18th 2012. 4. As your project launches, what are some of the key performance indicators that you will monitor and control? Why are these performance indicators critical to manage during the...

Words: 430 - Pages: 2

Premium Essay

Huntsville Project Plan

...Project Scope: The expansion project for JS Corporation to spread out its operations in Huntsville, Alabama in order to capitalize on potential growth and meet its strategic plan will begin April 17, 2006 with an expected completion date of June 16, 2007. An amount of 25,000 sq. ft. will be renovated in the existing "Boeing Corporation" facility. Total operating capital for the project is $3,450,000. For the project to be considered complete, the following deliverables must be met: Project Deliverables include • A completely operational manufacturing and distribution facility • Acquisition of equipment required for production and distribution • Meet and/or exceed all building code and safety standards • Complete testing equipment • Extensive walk through 1 week before completion and sign off by management. • Recruiting and training of new personnel. • Provide all appropriate Permits and approvals Management Plan The Board of Directors will be responsible for the final approval of the project and will determine the success level at completion. The Program Team will facilitate risk probabilities and scope changes. This committee will meet with the Project Manager should cost or duration problems arise. The Production Management is responsible for the plant operations and will conduct the final inspection and audit, which will be presented to the Program Team and the Board of Directors. Completion will be judged based upon success of the pre-production...

Words: 1312 - Pages: 6

Premium Essay

Week 4 Essay Questions

...Week 4 Essay Questions Essay Question #1: What is your total budget for this project? Was the project within the budget as set forth by the board of directors? In the Microsoft Project that I have compiled it gives an estimated total budget of $2,631,468 which is $118,562 dollars less than the total approved budget for the Huntsville Project of $2,750,000 as set forth by the board of directors. This amount would be under the approved budget. Essay Question #2: What is your budget for the Planning Phase? What is the Planning Phase duration in weeks? The Budget for the Planning Phase is $283, 882. The planning phase is to be completed in 10 weeks consisting of 1,066 hours. The planning phase breaks down as followed: Task Name Fixed Cost Fixed Cost Accrual Total Cost Recruit and Train Managers $0.00 Prorated $4,608.00 Select Real Estate Consultant $0.00 Prorated $1,096.00 Create Pre-Production Plan $0.00 Prorated $3,272.00 Create Production Plan $0.00 Prorated $3,504.00 Establish Building concept $0.00 Prorated $4,312.00 Create Building Design $32,000.00 Prorated $34,568.00 Procure Site $216,000.00 Prorated $221,952.00 Select General Contractor $0.00 Prorated $1,732.00 Obtain Permits & approval $3,200.00 Prorated $7,574.00 Essay Question #3: What is your budget for the Preparation Phase? What is the Preparation Phase duration in weeks? The Budget for the Preparation Phase is $1,282,442. The planning phase is to be completed in 47 weeks consisting of...

Words: 541 - Pages: 3

Premium Essay

Project Management Charter

...Overview A student project is required in PROJ586 and is to be completed on an individual basis. Use of Microsoft Project software is required. The project will consist of the Huntsville plant construction effort, the details of which are in the "project tabs" in the course shell for each week's assignment This course project assignment follows the Huntsville project from a Project Charter (where the effort is initially approved), through the Project Scope Statement (where the scope is elaborated in more detail), through the WBS (where the major tasks and sub-tasks are documented), and finally to a completed project schedule in Microsoft Project, with resources and costs added in. Along the way we also complete a Risk Plan and a Communications Plan for the Huntsville project, and deal with scheduling and resource issues, all normal and customary actives in most project environments. However all a bit mysterious to the uninitiated! So I'm going to try and walk you through all of that with these Part-1 through Part-5 instruction documents. Please do listen to the Course Project Tour Video (in the Course Home/Course Project tab). It lays out in summary all the deliverables for the Course Project. Since the effort is worth 25% of your grade, you really need to understand what we are asking for and when all the pieces are due! As you complete this course project effort, remember; think of this as a set of business communications as well as a class assignment. In part this...

Words: 1466 - Pages: 6

Premium Essay

Huntsville Project

...| Project Risk, Communication and DocumentationCourse Project: Week 5 | PM 586: Project Management SystemsInstructor: Rich EllimanShari HollowayFebruary 16, 2012 | | | | | ------------------------------------------------- Huntsville, Alabama ------------------------------------------------- Production Plant Communication Plan Risk Management – Step #1 Risk Matrix Identification | Assessment | Response Plan | Risk | Consequence | Probability | Impact | Trigger | Resp. | Response | Cost | May not have enough in the budget |  High |   |   |   |  Make sure that the Financial administrtor stay on top of the allocated budget and try to communicate how to cut cost as much as possible. | Weather Permitting | Weather could put a hold on building the foundation and or areas of the building |  Moderate |   |   |   |  Assure that the PM’s along with the Team Members are monitoring the weather within a 24 hr advance period. | Physical Events beyond Control | Contractors... Get injured Sick or They are not able to obtain building permit or license. |  Moderate |   |   |   |  Train Personnel on safety and mishaps, talk to the PM’s and TM’s about the importance of | Manufacturing of Equip /purchasing of equipment | Equipment does not arrive on time or not the correct equipment. |  High |   |   |   |  Reorder the correct equipment and estimate the turn around time of getting the equipment so the delay won’t be weeks.Talk with Safety Inspectors daily...

Words: 1813 - Pages: 8

Premium Essay

Auto Body

...English II April 30, 2012 Automotive Collision Body Technician After an accident most damaged vehicles are towed to a auto collision shop, once at the shop someone who works at the shop will give you or your insurance company an estimate of what it will cost to repair your vehicle. Most people will experience this at least once in their lifetime, some will experience it many times. Automotive collision body technicians are knowledgeable in the field of auto body repair and possess the necessary skills to perform related repairs and custom refinishing according to the vehicle manufacturer’s specifications. Collision technicians fix damaged bodies and body parts of automotive vehicles such as cars, vans, trucks, buses, campers, and trailers. An automotive body technician with proper training, in a controlled environment, and the proper tools will return wrecked or damaged vehicles to the original condition. “Automobile collision repairers repair the damage vehicles sustain in traffic accidents and through normal wear.” (Automobile Service Technicians 209) The collision technician will attempt to repair the body damage with the tools he as in the shop. If the body part can not be repaired the technician will order a new body part to replace the damaged part. The technician will use many different types of tools to repair a vehicle. He may need to only use basic hand tools such as hammers, drills, and sandpaper. Many times the technician will fix damaged areas with solder or...

Words: 1288 - Pages: 6

Premium Essay

Communication Plan

...Communication Plan Huntsville Production Plant Seitz Corporation PM586 Project Management Systems October, 2010 Week 5 VERBAL COMMUNICATION | WHAT | WHEN | WHERE | OWNER | ATTENDEES | Project Kickoff Meeting | Per project schedule | Building CC203Teleconference1-777-472-0493Code: 55555 | Project Manager | Project TeamKey Project Board Members | Project Status Meetings | 2nd and 4th Thursdays of the month1:00 – 2:30PM | Building CC203Teleconference1-777-472-0493Code: 55555 | Project Manager | Project Team | Technical/Production Review Meetings * Pre-production plan * Production plan * Pre-production run review * Performance startup | Per project schedule | TBD | Project Manager | Project TeamFunctional Area Manager | Building Design Review | Per project schedule | TBD | Facility SpecialistArchitect | Project TeamProject Board Members | Progress Review Meetings | Quarterly4th business day of quarterTime TBD | Building AA209(Net Meeting as necessary) | Project Manager | Project Board MembersAdd’l Team Members, as needed | Problem-Solving Meetings | As needed | TBD | Person who calls and leads the meeting | TBD | Immediate Action Required | As needed(via phone and/or IM) | n/a | Person requiring action | TBD | WRITTEN COMMUNICATION | WHAT | DUE WHEN | METHOD OF DELIVERY | SENDER | RECEIVER | Meeting Agendas | 3 business days prior to meeting | EMAIL | Owner of the Meeting or facilitator...

Words: 845 - Pages: 4

Premium Essay

Brief Summary Of Willingham's Argumentative Essay

...rescue him. “You can’t imagine what it’s like to be here, with people I have no business even being around,” he wrote. For a while, Willingham shared a cell with Ricky Lee Green, a serial killer, who castrated and fatally stabbed his victims, including a sixteen-year-old boy. (Green was executed in 1997.) Another of Willingham’s cellmates, who had an I.Q. below seventy and the emotional development of an eight-year-old, was raped by an inmate. “You remember me telling you I had a new celly?” Willingham wrote in a letter to his parents. “The little retarded boy. . . . There was this guy here on the wing who is a shit sorry coward (who is the same one I got into it with a little over a month ago). Well, he raped [my cellmate] in the 3 row shower week before last.” Willingham said that he couldn’t believe that someone would “rape a boy who cannot even defend himself. Pretty damn low.” Because Willingham was known as a “baby killer,” he was a...

Words: 911 - Pages: 4

Premium Essay

Appendix E

...Appendix E Title:Pros and cons of online education for educators and students Author(s):Hadley Leavell , Balasundram Maniam and Sara Lange Nagel Source:International Journal of Business Research. 11.6 (Nov. 2011): p136. From Academic OneFile. Document Type:Report Abstract:  Online education offers students an anytime/anywhere method of receiving an advanced knowledge. Proponents point out the increased access will level the playing field for all. This study explores the benefits and issues for those tasked with those who are teaching the students and the students themselves. This study focuses on the higher education faculty and students who enroll in online courses. The pros of online education will be balanced with the possible cons of Internet education versus face-to-face education. Finally, the study also presented the results of student perception of technology use in classroom (traditional as well as online classes). Keywords: Online Education, technology, distance learning, web-based learning 1. INTRODUCTION Higher education started in 1088 in Europe at the University of Bologna and although many changes have occurred, brick and mortar classrooms have been the primary means of education ever since. (Universitas de Bologna). However, the social media changes in the past ten years have altered the landscape more dramatically. The computer has transcended from a data manipulation tool to a means of constant communication between individual and among large groups...

Words: 4928 - Pages: 20

Premium Essay

Medical School Research Paper: University Of Alabama School Of Medicine

...school if they plan on completing the minimum requirements after submitting the application. There are two applications that are involved in the completion process. This includes the AMCAS application and secondary application. After the secondary application is submitted, no further information is needed. For early decision, the AMCAs application is due on August 1 and the secondary application is due on August 15. For the regular admissions program, the AMCAs application is due on November 1 and the secondary application is due on November 15. Both processes require an $80 secondary fee. Within the student profile for admissions, the applicant needs to include a head and shoulder photograph, letters of evaluation either from a committee of 3 individuals, and both completed applications. The decision for Early Decision is released by October 1. For the regular applicant process, all decisions are made no later than April 30th. In the year of 2013, out of 2,866 applicants, only 286 were accepted. The student body profile in that year consisted of 29% females and 71% males. 47% of the population that year was Caucasian making up majority of the student body. 8% of the accepted applicants were Asians and the rest of the population was in the minority category. The tuition and fees for the first year of medical school is $29,048. Books and supplies are $4,872 and living expenses are rounded to be about $18,452. With all these expenses calculated together, the total cost for the first...

Words: 1801 - Pages: 8

Premium Essay

Consumer Behavior: Jetblue vs Southwest Airlines

...Consumer Behavior Consumer Behavior: Contrast Jet Blue vs. Southwest Airlines Trident University MKT501 CS1 Identify key external factors that affect the passenger airline industry and explain how that impact occurs There are several external factors that affect the passenger airline industry. Some of the factors that affect the industry are economic crisis, instability in aviation fuel price, and environmental factors. I will elaborate more in detail in the following paragraphs on these factors. The first area I want to talk about is our countries current Economic Crisis, and in my opinion drives all the other factors that affect airline industry’s the most. The current economic situation is not good and therefore will have an effect on what a customer will or will not do. Air travel is very expensive as it is, in my opinion, so a sluggish economy will add more pressure on an individual or family thinking of flying anywhere. The second area that affects the airline industry is the cost of aviation fuel. If fuel prices are high, the airline will have to charge more for tickets. As I mentioned earlier, higher ticket prices is not what the public wants in our current economy. The airline industry is a business and in order to make money and continue to provide the service, the company has a breakeven price, approximately 66% of their operating cost (Airline Economics Break Even Load Factors Paragraph). If the company doesn’t...

Words: 2861 - Pages: 12