Free Essay

Material Resource Planning

In: Other Topics

Submitted By KALSIMANOJ
Words 3715
Pages 15
4th International DAAAM Conference
INDUSTRIAL ENGINEERING – INNOVATION AS COMPETITIVE EDGE FOR SME 29-30TH April 2004, Tallinn, Estonia

MRP SYSTEMS RESEARCH
Eduard Shevtchenko Tallinn Technical University Institute of Machinery. Ehitajate tee 5, EE0026 Tallinn, Estonia e-mail: eduard.shevtshenko@ttu.ee

ABSTRACT
Paper will give the analysis of theoretical MRP base and “Monitor” and “Scala” software efficiency analysis in the solution of “resource planning management” problems. The aim is to find out what are the original features of every solution on the way to profit maximisation at manufacturing enterprise. Paper will show what are the results of software implementation at the manufacturing enterprise compared to the period of work without software. Estimation of the efficiency of the “Scala” and “Monitor” software starts from the preparation of manufacturing process stage, and stretched up to financial results achieved. In this paper results achieved throw planning activities will be compared with real results. Analyses of manufacturing problems solutions throw software installed: using of work centre loading simulation possibilities for the optimisation of present and future manufacturing capacity; pre-calculation for future products; rating of subcontractors; EOQ calculation; delivery performance analysis; optimisation of inventory; supply chain management. Theoretical MRP base analysis gives the estimation of final profit sensitivity to different input data. This work will be practically approved on the manufacturing enterprises, under the pressure of real limits of enterprise, with analyses of results achieved. The aim is to find the most optimal solution, which enables to increase profitability Estimation of existing solutions and proposals for the possible improvements in the “Monitor” and “Scala” software will be included in this paper. Key words: MRP, ERP, integrated software.

production. Any demand that originates outside the system is called independent demand. This includes all demand for final products and some demand for components, sold as replacement parts. Dependent demand is demand for components used for producing of independent demand products. Production to meet dependent demand should be scheduled so as to explicitly recognize its linkage to production to meet independent demand. MRP adds the link between independent and dependent demand that is missing in statistical reorder point systems. MRP is called a push system, because it computes schedules of what should be started into the line based on demand. 1.2 Function of MRP. The basic function of MRP – plan material requirements. MRP used to coordinate orders within the plant and from outside. Outside orders is called purchase orders, and within orders called jobs. MRP focuses on scheduling purchase orders and jobs to satisfy material requirements generated by external demand. MRP dealing with two basic dimensions of production control: quantities and timing. The system determines suitable production quantities of all types of items, from final products that are sold to inputs purchased as raw materials. Production timing must also be determined, to ensure meeting order due dates. MRP works with end items and lower-level items. Bill of material (BOM) describes relationship between end items and lower level items. Demand for end items generates dependent demand for lowerlevel items. To facilitate the MRP processing, every item in the BOM is given a low-level code or LLC. By this code indicated the lowest level in the bill of materials. Low-level codes have the property that the lower a part is in the bill of material; the higher is its low-level code. Most commercial MRP packages include a BOM processor in order to automatically assign low-level codes. Also MRP requires information concerning independent demand, which comes from the master production schedule (MPS). The MPS contains gross requirements and scheduled receipts (status of outstanding orders). The basic MRP procedure is simple. MRP does next procedures for each part: • Netting: Determines net requirements by subtracting on-hand inventory and any scheduled receipts from gross requirements. • Lot Sizing: Divides the netted demand into suitable lot sizes to form jobs. Time Phasing: Determines start times through the offsetting the • due dates of the jobs with the lead times. • BOM Explosion: Generates the requirement of any required components at the next level. Iterate: Repeats previous steps until all level are processed.

1.

INTRODUCTION

In this paper are given analyses of two MRP software vendors; the “Scala Business solutions” and “Monitor Industriutveckling AB”. Analysis includes comparison of MRP theoretical knowledge base and software realization, comparison of MRP software with world trends for such programs and the analysis of feature situation in this sector. 1.1 Features of MRP systems in general. Before MRP (material requirements planning) most production control systems was dealing with some variant of statistical reorder points. Originators of MRP understood that such approach is more suitable for final products, than the components. The demand for final products originates outside the system and therefore subject to uncertainty. Components are used to produce final products, and they are known for given final assembly schedule. Treating with both types of demand in the same way, as is done in a statistical reorder point system, ignores the dependence of component demand on final product demand, and as a reason leads to inefficiencies in scheduling

284

1.3 Manufacturing resources planning – MRP II. Over time, additional procedures have been developed, in order to eliminate such problems in Material Requirements systems as: capacity infeasibility, long planned lead times, system nervousness. Belong simply addressing deficiencies of MRP, MRP II also brings together other functions to make a truly integrated manufacturing management system. The additional features of MRP II are: demand management, forecasting, capacity planning, master production scheduling, rough-cut capacity planning, capacity requirements planning, dispatching and input/output control. 1.4 The Instance of MRP II hierarchy. The world instance is used because there are probably as many different hierarchies for MRP II as there are MRP II software vendors. In general the MRP II system could be divided: long-range planning, intermediate planning and short-term control. 1.4.1 Long-Range Planning. Long-Range Planning is the top of the MRP II hierarchy. It involves three functions: forecasting, resource planning and aggregate planning. •



• a. b. c. d.

Basic idea of job dispatching is to develop a rule for arranging the queue in front of each workstation that will maintain due date integrity while keeping machine utilization high and manufacturing times low. I/O control provides an easy way to check releases against available capacity and works in the following way. Monitor the work in process (WIP) level in each process centre. If the WIP goes above a certain level, then the current release rate is to high, reduce it. If it is goes below a specified lower level, then the current release rate is too low, so increase it. If it stays between these control levels, the release rate is correct for the current conditions.

2. Comparison of “Monitor” and “Scala” software with theoretical know-how. MRP basic inputs are: forecast of demand for end items, the associated bills of material, current inventory status and any data needed to specify production policies. Data came from three sources: the master production schedule (MPS), the item master file and inventory status data. 2.1 The master production schedule.

The forecasting function seeks to predict demands in future. Long range forecasting is important to determine what are the capacity, tooling and personnel requirements. Short-term forecasting converts a long-range forecast of part families into shorter-term forecasts of individual end items. • Resource planning is the process of determining capacity requirements over the long term. An important output of resource planning is projected available capacity over the longterm planning horizon. • Aggregate planning is used for determining levels of production, staffing, inventory, overtime, and so on over the long term. To assist the aggregate-planning process optimisation techniques are often used. 1.4.2 Intermediate Planning. Intermediate Planning is at the intermediate level. It has the bulk of the production-planning functions: demand management, rough-cut capacity planning, master production scheduling, material requirements planning, capacity requirements planning and job release. • Function of demand management is the process of converting the long-term aggregate forecast into a detailed forecast while tracking individual customer orders. • Rough-cut capacity planning (RCCP) is used to provide a quick capacity check of a few critical resources to ensure the feasibility of the master production schedule. • The material requirements planning module of MRP II is identical to the MRP procedure described earlier. • Capacity requirements planning (CRP) provides a more detailed capacity check on MRP-generated production plans than RCCP. 1.4.3 Short-Term Control Short-Term Control is at the low level. Once a job or purchase order is released, control must be maid to ensure it is completed on time with the correct quantity and specification. If the job is for purchased components, the purchase order must be tracked. This is a straightforward practice of monitoring when orders arrive and tracking outstanding orders. Job for internal manufacture falls under the function known as shop floor control. Within SFC are two main functions: job dispatching and input/output control.

Master production schedule (MPS) is the source of demand for the MRP system. It gives the quantity and due dates for all parts with independent demand. It includes demand for all end items, and also external demand for spare parts. Minimum information contained in the master production schedule is a set of records containing a part number, a need quantity, and a due date for each purchase order. MRP use this information in order to obtain the gross requirements. Usually MRP uses the part number to link to the item master file where other processing information is located. In “Scala” we have special MPS module. A Master Planning Schedule shows all expected events for a stock item on the top level, and re works them for production. Examples of expected events are Sales Orders, current Work Orders, Forecasts, stock balance, etc. This routine is used for creation of proposed work orders. Forecasts are the basis for proposals generation. Also the purchase Schedule could be created, based on Master Schedule. The Purchase Schedule creates Purchase Order Proposals for all shortages that occur in the Master Schedule. Master Planning Schedule could be used as a basis for the Net Requirement Calculation. In order to perform requirements planning based on manufacturing forecast the “Monitor” has special procedure “Register manufacturing forecast”. Manufacturing forecasts are then used for requirement planning in the “Run netting manufacturing forecast” procedure, where requirement calculations are performed. In “Monitor” we have special feature Manufacturing order suggestion. A customer order, registered for the manufactured parts will create stock reservations for those parts. If the sold parts are structure parts, the system will create also material requirement for the incorporated manufactured parts, stocked parts, fictitious parts and purchased parts. When the available stock balance for the affected parts falls below the safety stock level, system automatically places manufacturing order suggestions for these parts. In this procedure order suggestions are loaded and generated into actual manufacturing orders. Also the Quantity and Finish period of each order suggestion could be changed manually. The order suggestions that have generated into orders are deleted automatically. 2.2 The Item master file. The item master file contains: a description of the part, bill of material information, lot-sizing information, and planning lead times. The BOM (bill of material) list the components and quantities

285

directly required to make only that part. This information used by BOM processor for displaying complete bill of materials for any item. MRP accumulates total demand of a part before it processes that part, by using low-level codes. The others two pieces of information necessary for performing of MRP processing are the lot-sizing rule (LSR) and the planning lead time (PLT). The LSR determines how the jobs will be sized in order to balance the competing requirements of reducing the inventory and increasing capacity. Within EOQ and Wagner are possible lot sizing rules. To determine job start times PLT used. In MRP this procedure is simple: the start time is equal to the due date minus the PLT. In “Scala” we have special tool “BOM manager” which enables inserting and editing BOM structure and contains information about items, accessories, open items, routing and costing. Also there is convenient possibility for graphical representation of BOM tree. “Scala” has different LSR for recalculating net requirements for planned work orders: Lot for Lot (Each requirement (work order, sales order, and so on) creates a planned work order.), EOQ (Economic Order Quantity - When the requirement reaches the EOQ value, a planned work order is created.), FOQ (Fixed Order QuantityWhen a requirement arises, the same number of planned work orders are created to cover the requirement as the number in the Order Quantity field. This method means a temporary over production.), Fixed Period Time (All requirements during the time period specified in the Stock Planning file create a planned work order.). In “Scala” the lead time in days is automatically calculated for manufactured stock items using operation data. The lead-time for purchased items is the time from order until delivery (7 * Number of delivery weeks). There are two tipes of lead times in “Scala”: Cumulative Lead Time Excluding Purchased items(Contains the total cumulative production time in days, excluding the lead time for purchased items..), Cumulative Lead Time including Purchased items (contains the total cumulative production time in days, including the lead time for purchased items The calculation uses the Lead Time Calculation routine. The routine calculates the time required to manufacture a stock item accordingly to formula (Queue Time) + (Set up Time) + (Run Time) + (Move Time). “Scala” uses this information for calculating the load of work centres and capacity. In “Monitor” in addition to BOM we have special tool for Structure List presentation. Procedure allows you to see all the incorporated parts and operations that relate to the part viewed. The structure list displays a complete breakdown of the part in as many levels as necessary. The right part of the window consists of a graphic structure map. In “Monitor” LSR is used for order suggestions during requirement calculation or as part information. The lot sizing rule determines the quantity the order suggestion should have, when a requirement arisen. Lot sizing rules available are: Lot for Lot, Fixed Quantity(EOQ must be filled in), Bucket Part(earlier known as Reorder point), Period Requirement(provides an order suggestion that will be sufficient for a period of the same length each time). In “Monitor” lead times are only used for purchased parts. Lead time describe the “replacement time” for the purchased parts. During order suggestions system uses lead times to calculate a reorder period based on a requested delivery period. During pre-calculations, the system calculates the throughput time including material procurement. 2.3 Inventory Status Data. It is important to no know the status of inventory during the determining net requirements. The procedure is frequently named coverage analysis – it determines how much demand is covered by current inventory. Current inventory consists of on-hand inventory and scheduled receipts (SR). Scheduled receipts are jobs released

during prior runs of MRP and are currently in process, or purchase orders that have not yet arrived from the vendor. If internal jobs are not yet arrived at an inventory are named as work in process (WIP). Scheduled receipt data is organized by job number and contains the information: part number, the current quantity, the desired quantity and the due date. “Scala” has special module Material Requirement Planning, which includes the procedure for net requirements calculation. Also “Scala” contains possibility for testing the availability of the material. In “Monitor” we have special routine Material Clearance, which enables to estimate the availability of materials for the work order specified. 2.4 MRP Outputs. The output of an MRP system includes planned order releases, change notices, and exception reports. Planned order releases eventually become the jobs that are processed in the plant. In “Scala” there are different possibilities for order release. The manufacturing and purchase order proposals could be released at the base of customer order. Release order proposal could be made from net requirement calculation. Work order could be released from the batch file. “Monitor” creates stock reservations for registered customer order for manufactured parts. And at the base or material requirement the purchase order proposal could be made. 2.5 Analysis of the possibilities of MRP II systems. Here are given average medium Estonian enterprise requirements to MRP II systems, and analysis of how “Scala” and “Monitor” software covers them. Table 1. Analysis of how “Scala” and “Monitor” software cover average Estonian enterprise requirements.( x-included, ¤partly included, - not included) Requirements to software possibilities Supporting of main processes connected with production. Own price calculation Material requirements planning and scrap management Planning of production resources Material resource planning Cost calculation Salary and working time management Accounting support Estonian language support Scala Monitor

x x ¤ x x x x x x

x x x x x x ¤ x -

3. HOW “SCALA” AND “MONITOR” SOFTWARE REACT TO THE WORLS TREND FOR ERP SYSTEMS.
3.1 World trend for ERP systems. ERP (Enterprise resource planning) systems have been around since the mid-1970s when they first ran on mainframe computers. Enterprises that invested huge sums in these big and complex systems now have elaborate legacy setups that they are absolutely dependent upon to run their companies. Because there's so much at stake, ERP

286

providers and customers introduce changes to technology and deployments gradually to avoid costly mistakes. Nonetheless, ERP systems do change--albeit slowly. For example, people started talking about adapting ERP software to client/server technology at the beginning of the 1980s, but it wasn't until the late 1990s that more client/server versions shipped than mainframe versions. Today, ERP is still evolving--adapting to developments in technology and the demands of the market. Today the ERP systems became collaborative. Four important trends are shaping ERP's continuing evolution: improvements in integration and flexibility, extensions to e-business applications, a broader reaches to new users, and the adoption of Internet technologies. • Improving integration, flexibility • Embracing e-business • Reaching out to new users • Adapting to the Internet Improved ERP software helps customers: • Reduce cost and time of business processes • Improve end user productivity • Provide better information on time for decision making • Provide new business opportunities 3.2 How “Scala” and “Monitor” software react to the world trends. “Scala Business Solutions” started moving in the ERP world trend direction with new product “iScala”. This process was started 3 years ago, and feature trend is producing one new version of product every year. Deployed Connectivity Solutions are: CRM (Customer Relationship Management) Integration, SCM Integration, Ecommerce site integration, XML-EDI solutions, Warehouse integration, Bar-Code for distribution, SAP integration. “iScala” is planned to be ready for Web Services in 2 years. Today the program could be accessed throw the Interned throw the XML to predefined functions. The source code in “Monitor” and window designs was developed in Sybase PowerBuilder together with Microsoft Visual C/C++. The database design is made using Platinum ERwin/ERX. This makes the program very accessible to other databases and operating systems. “Monitor Industriutveckling AB” have supplementing eCommerce solution for Monitor Enterprise Resource Planning System. The eCommerce supplement is mainly intended for business between companies, the so-called "B2B" (Business to Business), but can also be adjusted for business between companies and consumers, called "B2C" (Business to Consumer). At the moment “Monitor” has no trends to work throw Internet without code preinstalled.

Fig.1. Graph of total implemented “Scala” solution by sector.
45.0 40.0 35.0 30.0 25.0 20.0 15.0 10.0 5.0 0.0

Pr od

5.

CONCLUSING REMARKS

Estonia has one of the smallest IT markets in Central and Eastern Europe. In recent years the country has seen a surge in demand for software and related IT services, and as a result the number of international vendors present on the Estonian market has increased substantially. At the beginning in the early 1990s the demand was initially limited to the basic accounting functionality. As the IT, integration, and connectivity needs of Estonian businesses have become more complex; the country has embarked on a second wave of investment into ERP solutions. IDC believes. Next few years will be critical in establishing the place of many of these vendors in the ERP arena. With joining the European Union the level of government and corporate investment in infrastructure is expected to intensify. Estimation of situation in the world showed that future belongs to the APS (Advanced Planning and Scheduling) systems. Advanced Planning & Scheduling enhances existing manufacturing capabilities by effectively closing the loop between ERP business functions and the shop floor, while giving managers useful, real-time information on the current shop floor activities with advanced scheduling and quality control functionality. In Estonia however for present period will growth the trend of growth for the integrated ERP software for small and medium size enterprises, but bigger companies began to look over for the advanced solutions and after some period the APS software will be in use at the Estonian market. 6. REFERENCES Wallace J.Hopp Mark L.Spearman. (2000). Factory physics: foundations of manufacturing management, Jeffrey J.Shelstad, ISBN 0-256-24795-1, New York Scala International AB (1997). Manufacturing planning and control, Nacka, EN-1141-B-1097, Sweden Anna Orrnert, Torben Pedersen, Alan Taylor (August 2002). The Enterprise Application Suite Market in the Baltic States,2001-2006, Central and Eastern European Enterprise Application Software, IDC ER20J Wallace J.Hopp Mark L.Spearman. (1996). Factory physics, The McGraw-Hill Companies, ISBN 0-256-15464-3, USA Adrian Mello (February 7, 2002), 4 trends shaping ERP, Available from: http://techupdate.zdnet.com/ Accessed: 2004-03-12

4. PRESENT SITUATION IN ESTONIA .
At the moment “Scala” software is used in 85 Estonian companies, and the “Monitor” software is used in 5 Estonian companies. The difference is that “Scala” software are used by different sector enterprises. “Monitor” is used only at “Manufacturing” enterprises. Percentage of total implemented “Scala” solutions by sector could be seen at the graph.

287

Te le co m

m

a un ic at io n

Se rv ic es

uc tio n

Sa le s

is t ic s Lo g

M

ed i

Similar Documents

Free Essay

Material Resource Planning

...MRP II is manufacturing resource planning. MRP II provides planning for many areas of manufacturing companies which includes purchasing, inventory, material planning, shop floor scheduling, capacity planning, and accounting. MRP II allows for standardization and streamlines automation of business processes which leads to improvements in cost control and revenue. The MRP system assists the manufacturing company by suggesting purchase orders to be placed and exactly when to place them so that the materials required for the specific task arrive on time. The MRP system also recommends a start date for each work task required to perform the job. By knowing the materials needed parts and the start dates of the work tasks means that it is possible to pinpoint material shortages before they occur so that they can be avoided rather than finding out when it’s too late. MRP systems assists companies particularly manufacturing companies in various ways, the most important contribution that the MRP inventory system gives are in: • On-time material ordering which reduces expediting and material shortages. • Combining of material orders to suppliers which reduces order placement. • Real time planning of work which reduces rescheduling and increase productivity. • Makes company information more integrated and gives it the accessibility which improves task specific progress. Advantages: MRP II helps to standardize business processes by providing the business with automated methods...

Words: 441 - Pages: 2

Premium Essay

The Affect of Shared Service Centers on Enterprise and Material Resource Planning

...Proposal The use of enterprise resource planning systems (ERP) is widespread. To maximize efficiency, companies of all sizes are implementing these systems and revising existing processes to increase efficiencies. The widespread influence on business by ERP systems requires investors to understand the benefits gained and the costs incurred by implementing them. Efficient conversions to ERP systems may provide a multinational corporation with enough of an edge to change the industry in which it participates. Determining and investigating key ERP benefits is important for a number of reasons. By evaluating how other firms have been affected by implementing ERP systems, a company can estimate how its processes will be benefit and whether the system will assist in solving the problems. Evaluating benefits “allows firms to investigate the alignment between their needs and what an ERP system can do” (O'Leary, 2004). Once the company has established ERP benefit benchmarks, it will have a point of reference by which to evaluate other ERP implementations. Once it is understood what ERP benefits are likely to be experienced, then those potential benefits can be used as the basis to set up measurements for those benefits. Then those measurements can be used to establish whether a company has attained the levels of productivity expected from the ERP implementation (O'Leary, 2004). Industry specific benefits must also be taken into account. In total, these are the reference points by...

Words: 3041 - Pages: 13

Premium Essay

Material Resource Planning

...| | | | |Beijing International Vocational Education School | |北 京 国 际 职 业 教 育 学 校 | |[pic] | |BTEC Higher National Diploma | | | |Assignment Cover Sheet | |Name(s) of Student |Lily Guo and Sherry Zhong | |Year / Class |Year 4 Management Class 1 | |Course Title |BTEC Higher National Diploma in Business (Management/Finance) | |Unit Title |Unit 43 – Small Business Enterprise...

Words: 444 - Pages: 2

Premium Essay

Design for Riordan Manufacturing

...analysis of the present process pertaining to the production of the Riordan electric fans is presented. The new process design attempts to eliminate bottlenecks within the process in order to make the supply-chain as optimal as possible. A production forecast for the Riordan electric fans is included and a Gantt chart is included as well. Lastly, a cover letter is included which details the coordination of the aggregate operations planning and TQM for the Riordan electric fans. Process Design for Riordan Manufacturing MRP for Manufacturing The present process at Riordan Manufacturing is centered on the China plant, which applies material requirement planning to adhere to the material requirements, which then go through a collection process at receiving units in order to make its way to the molding unit. The assembly unit then receives the products, which are forwarded to the appropriate packing unit for appropriate handling. Lastly, the shipping unit handles the electric fans’ distribution. Riordan Manufacturing is concerned about scrap materials from the respective units. As such, there should be a reduction in the level of wasteful products from every unit; this, in turn, would lower the price of producing each fan. One initiative already commenced is the Hangzhou plant’s utilization of extra parts within its products that are customized. There are, however, additional concerns pertaining to...

Words: 1488 - Pages: 6

Premium Essay

Research Paper

...Process Design for Riordan Manufacturing MRP for Manufacturing The present process at Riordan Manufacturing is centered on the China plant, which applies material requirement planning to adhere to the material requirements, which then go through a collection process at receiving units in order to make its way to the molding unit. The assembly unit then receives the products, which are forwarded to the appropriate packing unit for appropriate handling. Lastly, the shipping unit handles the electric fans’ distribution. Riordan Manufacturing is concerned about scrap materials from the respective units. As such, there should be a reduction in the level of wasteful products from every unit; this, in turn, would lower the price of producing each fan. One initiative already commenced is the Hangzhou plant’s utilization of extra parts within its products that are customized. There are, however, additional concerns pertaining to periodic orders in regard to the supply of fans. As such, it is difficult to properly assess material requirements. In order to make this process more effective and precise, the MRP process needs to factor in variability in regard to overall supply and demand within the electric fans’ production. A New Process Design Riordan Manufacturing's China plant’s operations focus is on quantity when it comes to the production of the fans. The necessary amount of inventory is maintained according to a production forecast. Nonetheless, the amount of inventory is...

Words: 366 - Pages: 2

Free Essay

Material Flow Improvement

...Material Flow Improvement By Léo Belime Diploma work No. 35/2010 At Department of Materials and Manufacturing Technology CHALMERS UNIVERSITY OF TECHNOLOGY Göteborg, Sweden Diploma work in the Master in Production Engineering Program Performed at: Société des Ateliers Louis Vuitton Supervisor(s): Florence Laprade Société des Ateliers Louis Vuitton 36100 Issoudun - France Peter Almström Department of Materials and Manufacturing Technology Chalmers University of Technology, SE-412 96 Gothenburg Marie-Agnès Girard Ecole Nationale Supérieure des Mines de Saint Etienne 42023 Saint Etienne - France Examiner: Bertil Gustafsson Department of Materials and Manufacturing Technology Chalmers University of Technology, SE-412 96 Gothenburg Material flow improvement Léo Belime © Léo Belime 2010 Diploma work no 35/2010 Department of Materials and Manufacturing Technology Chalmers University of Technology SE-412 96 Gothenburg Sweden Telephone + 46 (0)31-772 1000 Chalmers Repro Service Gothenburg, Sweden 2010 Material flow improvement Léo Belime Department of Materials and Manufacturing Technology Chalmers University of Technology Contents Abstract ............................................................................................................................. i Acknowledgements........................................................................................................... ii Foreword ..............................................................

Words: 9966 - Pages: 40

Premium Essay

Mrp-Toyota

...Mrp-Toyota Materials Requirements Planning (MRP) Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in scheduling and placing orders for dependent demand items. Dependent demand items are components of finished goods—such as raw materials, component parts, and subassemblies—for which the amount of inventory needed depends on the level of production of the final product. For example, in a plant that manufactured bicycles, dependent demand inventory items might include aluminum, tires, seats, and derailleurs. The first MRP systems of inventory management evolved in the 1940s and 1950s. They used mainframe computers to explode information from a bill of materials for a certain finished product into a production and purchasing plan for components. Before long, MRP was expanded to include information feedback loops so that production personnel could change and update the inputs into the system as needed. The next generation of MRP, known as manufacturing resources planning or MRP II, also incorporated marketing, finance, accounting, engineering, and human resources aspects into the planning process. A related concept that expands on MRP is enterprise resources planning (ERP), which uses computer technology to link the various functional areas across an entire business enterprise. MRP works backward from a production plan for finished goods to develop requirements for components and raw materials. "MRP begins...

Words: 291 - Pages: 2

Free Essay

Operations Management

...Context March 6, 2015 II. View Point Manager of XYZ Company III. Statement of the problem The problem in the case is to contemplate installing a Materials Requirement Planning (MRP) System to the XYZ Company. The most pertinent questions in the problem are, How will it be done?, How much will be its cost? And what action will be needed to lead this project into success? IV. Objectives Short-range Objective - To set up the new system in order to have a smooth flow of production and avoid interruption. Long-range Objective – To be able to upgrade equipment which will help fit to the new system. V. SWOT Analysis STRENGTHS | WEAKNESSES | * Has workers with expertise in using company’s equipment & following the system * High availability of raw materials * Near to target market | * Poor manufacturing system * Inefficient use of resources * Higher percentage of employee turnover & scrap/waste | OPPORTUNITIES | THREATS | * Possible development of the production system * Affordability in the cost of production | * Breakdown of existing system * Competitors build stronger relationship with other customers | VI. Alternative Courses of Action * ACA# 1: Execute Materials Requirement Planning System. Advantages: Reduce the levels of inventory. Minimize the holding cost Disadvantages: Execution of the system will be at high cost. . ...

Words: 810 - Pages: 4

Free Essay

Mrp 2

...MANUFACTURING RESOURCES PLANNING What is MRP II and why it is being used Definition and History According to American Production and Inventory Control Society, MRP II can be defined as a method of the effective planning of all the resources of a manufacturing company (Higgins, Leroy and Tierney 1996). It is actually advancement or can be said as a upgrading of Material Requirement Planning System (MRP) system, which is a set of technique that uses bills of material, data and a master production schedule to calculate the requirements for materials in a manufacturing company. The MRP system was initiated in the 1960s and was spearheaded by a team of IBM innovators comprising Joe Orlicky, George Plossl and Ollie Wright who sought to create a structured methodology for planning and scheduling materials for complex manufactured products. Over the past 30 years MRP has spawned an entire industry in manufacturing and professional services. It has evolved hand in hand with technological advancements in the computer hardware industry. At the beginning, MRP systems were run on large mainframe computer costing a lot of money and required large technical staff to support them. However in the 1970s they underwent refinements that saw disparate modules get included and critical business concerns such as cost accounting and Capacity Requirements Planning get added. This gave rise to a new generation system called MRP II. Continued changes spurred by increased technological advances coupled...

Words: 610 - Pages: 3

Premium Essay

Managerial Application of Information Technology

...Levels 4 c. Benefits of MRP System 5 i. How will ABC, Inc. benefit 5 d. High Level Approach 6 i. Assessment of resources and costs ii. Presentation to Management 6 e. Audience 6 i. Who will benefit 6 ii. How the beneficiaries will benefit 6 iii. The role of senior management in the implementation 6 Milestone 1 a. Business problem relooked 7 i. Problems facing ABC 7 b. Company background 7 ii. ABC’s business 7 iii. ABC’s current state 7 c. Discussion of business issue 8 i. Why MRP Implementations Fail 8 ii. Risks associated with implementation 8 d. Benefits of Solving the problem 8 i. Benefits From Good Design 8 ii. Benefits From Correct Implementation 8 e. Initial business/Technical Approach 9 i. Implementation Approach 9 ii. Management Commitment Required 9 f. High Level Solution 9 i. Requirements and Design 9 ii. Specific Functions 9 Milestone 2 a. Implementation 10 i. Configuration 10 ii. Integration 10 iii. User Education 10 b. Design 10 i. Modules 1. Demand Management Customer Related Files (DM) 11 2. Rough Cut Capacity Planning File (RCCP) 11 3. Master Production Schedule File (MPS) 11 4. Capacity Requirements Planning Routing File (CRP) 11 5. Shop Floor Control (SFC) 11 Milestone 3 a. Technology or Business Practice Used 12 ...

Words: 3853 - Pages: 16

Free Essay

Mrp-Toyota

...Materials Requirements Planning (MRP) Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in scheduling and placing orders for dependent demand items. Dependent demand items are components of finished goods—such as raw materials, component parts, and subassemblies—for which the amount of inventory needed depends on the level of production of the final product. For example, in a plant that manufactured bicycles, dependent demand inventory items might include aluminum, tires, seats, and derailleurs. The first MRP systems of inventory management evolved in the 1940s and 1950s. They used mainframe computers to explode information from a bill of materials for a certain finished product into a production and purchasing plan for components. Before long, MRP was expanded to include information feedback loops so that production personnel could change and update the inputs into the system as needed. The next generation of MRP, known as manufacturing resources planning or MRP II, also incorporated marketing, finance, accounting, engineering, and human resources aspects into the planning process. A related concept that expands on MRP is enterprise resources planning (ERP), which uses computer technology to link the various functional areas across an entire business enterprise. MRP works backward from a production plan for finished goods to develop requirements for components and raw materials. "MRP begins with...

Words: 2834 - Pages: 12

Premium Essay

Material Requirement Plannin

...IEOR 4000: Production Management 1 page 1 Professor Guillermo Gallego Material Requirements Planning (MRP) Material Requirements Planning (MRP) is a computer-based production planning and inventory control system. MRP is concerned with both production scheduling and inventory control. It is a material control system that attempts to keep adequate inventory levels to assure that required materials are available when needed. MRP is applicable in situations of multiple items with complex bills of materials. MRP is not useful for job shops or for continuous processes that are tightly linked. The major objectives of an MRP system are to simultaneously: 1. Ensure the availability of materials, components, and products for planned production and for customer delivery, 2. Maintain the lowest possible level of inventory, 3. Plan manufacturing activities, delivery schedules, and purchasing activities. MRP is especially suited to manufacturing settings where the demand of many of the components and subassemblies depend on the demands of items that face external demands. Demand for end items are independent. In contrast, demand for components used to manufacture end items depend on the demands for the end items. The distinctions between independent and dependent demands are important in classifying inventory items and in developing systems to manage items within each demand classification. MRP systems were developed to cope better with dependent demand items. ...

Words: 2977 - Pages: 12

Free Essay

Invntrymgmt

...Context March 6, 2015 II. View Point Manager of XYZ Company III. Statement of the problem The problem in the case is to contemplate installing a Materials Requirement Planning (MRP) System to the XYZ Company. The most pertinent questions in the problem are, How will it be done?, How much will be its cost? And what action will be needed to lead this project into success? IV. Objectives Short-range Objective - To set up the new system in order to have a smooth flow of production and avoid interruption. Long-range Objective – To be able to upgrade equipment which will help fit to the new system. V. SWOT Analysis STRENGTHS | WEAKNESSES | * Has workers with expertise in using company’s equipment & following the system * High availability of raw materials * Near to target market | * Poor manufacturing system * Inefficient use of resources * Higher percentage of employee turnover & scrap/waste | OPPORTUNITIES | THREATS | * Possible development of the production system * Affordability in the cost of production | * Breakdown of existing system * Competitors build stronger relationship with other customers | VI. Alternative Courses of Action * ACA# 1: Execute Materials Requirement Planning System. Advantages: Reduce the levels of inventory. Minimize the holding cost Disadvantages: Execution of the system will be at high cost. . ...

Words: 810 - Pages: 4

Premium Essay

Master Requirement Planning

...Material Requirements Planning (MRP) Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in scheduling and placing orders for items of dependent demand. Dependent demand items are components of finished goods—such as raw materials, component parts, and subassemblies—for which the amount of inventory needed depends on the level of production of the final product. For example, in a plant that manufactured bicycles, dependent demand inventory items might include aluminum, tires, seats, and bike chains. The first MRP systems of inventory management evolved in the 1940s and 1950s. They used mainframe computers to explode information from a bill of materials for a certain finished product into a production and purchasing plan for components. Before long, MRP was expanded to include information feedback loops so that production personnel could change and update the inputs into the system as needed. The next generation of MRP, known as manufacturing resources planning or MRP II, also incorporated marketing, finance, accounting, engineering, and human resources aspects into the planning process. A related concept that expands on MRP is enterprise resources planning (ERP), which uses computer technology to link the various functional areas across an entire business enterprise. MRP works backward from a production plan for finished goods to develop requirements for components and raw materials. MRP begins with a schedule...

Words: 1616 - Pages: 7

Premium Essay

Inventory Management

...Material handling 1.1 Introduction The section below will represent the techniques that are being used for handling inventories, putting orders and outsourcing the finished goods within the Giant factory positioned in Lelystad. The managerial processes within the company are aimed at the very best way in which inventory levels can be handled in order to minimize cost, ensure an on time production and provide the highest possible quality to the customers. The successful handling of those processes is assured by the use of the so – called software Microsoft Axapta. With the help of the use of this software program the management can assure a smooth work flow within the assembly factory and provide the best services possible. The paragraphs below contain vital information containing the basic approaches of the management to the processes of material handling. Those processes are summarized by points such as material purchase planning, inventory decisions and finished goods outsourcing. 1.2 Basic managerial approach to inventories The main goal of the processes of inventory management is to keep inventories at such levels that there is no an overstock of raw material within the warehouses of the assembly factories and at the same time to make sure that there is no lack of such at any point of time. The assembly factory of Giant which is under discussion is aimed at keeping as low as possible levels of the different parts that are needed for the creation a of the bike. This means...

Words: 2585 - Pages: 11