Free Essay

Nt1310 Unit 6 Exercise 1

In: Computers and Technology

Submitted By amw3118
Words 421
Pages 2
NT1310 Physical Networking
Unit 6 Exercise 1
Thomas Westbrook
Due Date:

Unit 6 Exercise 1: Connector Installation
Twisted -Pair Cable * Measure the cable you want to put ends on, using a cable cutter trim off the excess * Use a cable stripper to strip about 1 ½ inches of the jacket from the end, then rotate the stripper around the cable twice to cut through the jacket * Remove the stripper and pull the trimmed jacket from the cable, so that you can see the inner conductors. Separate any visible jacket slitting cords that are present, trim it backto the edge of the jacket. * Untwist all the inner conductor pairs and spread them apart so that you can see each individual conductor * Line up the individual conductors so that the color matches the color-coding standard you are using * Trim the conductors so that the ends are even with each other, make sure that the jacketof the cable will be inside the connector. The total length of the exposed connectors after trimming should be no longer then ½ inch to 0.625 inches * Insert the conductors into the connector, make sure that all conductors line up properly with the pins as they were in the previous step. If they don’t line up, try again. Make sure to do this step carefully, it’s the last one before crimping * Carefully insert the connector and cable into the crimping tool. It has two dies that will press into the connector. Push the pins in the connector into the conductorsinside the connector. After installation is done you should check to make sure all conductors are making contact and that all pins have been crimped properly
Coaxial Cable * Adjust the coaxial cable wire strippers so that the first cut is down the center of the copper wire. Adjust so that the second cut goes through the rubber jacket, but not the wire * After the stripper is properly adjusted insert the cable into the strippers so the end of the cable is flush with the edge. Spin the stripper around the cable until it turns freely. Pull the stripper off while lightly squeezing the jaws on it * Slide the proper caxial cable connector onto the cable. This sometimes requires a pair of pliers to grip the connector if the fitting is stubborn and does not want to slide on * After the cable connector is properly fitted, insert it into the crimp tool. When the connector is properly in place squeeze the handle to crimp the connector onto the cable

Similar Documents

Premium Essay

Nt1310 Unit 6 Exercise 1

...E. SPIN (Sensor Protocols for Information via Negotiation) A. Martorosyan and , Jamal N. Al-Karak et.al SPIN [9, 10] belongs to a family of protocols called adaptive routing. These protocols uses resource-adaptive and data negotiation algorithms. SPIN belongs to the family of data centric routing protocol. It assumes 1) All nodes with in the network are base stations. 2) Close proximity nodes have similar data. The idea behind the SPIN protocol is that to name the data using high- level descriptors. As all nodes with in the network can be assumed as the base stations and all information can be broadcasted to each and every node in the network. So the users can forward the query to any node and can get the required information immediately. A high level name is used to the nodes in this network to describe their collected data called meta-data....

Words: 518 - Pages: 3

Premium Essay

Nt1230 Syllabus

...routine adminstrative tasks of popular desktop operating system(s) for standalone and network client computers, and related aspects of typical network server functions. Client-Server Networking I Syllabus Where Does This Course Belong? 1st QTR GS1140 NT1110 GS1145 Problem Solving Theory Computer Structure and Logic Strategies for the Technical Professional 2nd QTR NT1210 Introduction to Networking NT1230 Client-Server Networking I MA1210 College Mathematics I 3rd QTR NT1310 NT1330 MA1310 4th QTR PT1420 NT1430 EN1320 5th QTR PT2520 NT2580 EN1420 6th QTR NT2640 NT2670 CO2520 7th QTR NT2799 SP2750 Physical Networking Client-Server Networking II College Mathematics II Introduction to Programming Linux Networking Composition I Database Concepts Introduction to Information Security Composition II IP Networking Email and Web Services Communications Network Systems Administration Capstone Project Group Theory The follow diagram indicates how this course relates to other courses in the NSA program: 1 Date: 8/31/2012 Client-Server Networking I Syllabus NT2799 NSA Capstone Project NT2580 Introduction to Information Security NT2670 Email and Web Services NT2640 IP Networking PT2520 Database Concepts NT1330 Client-Server Networking II NT1230 Client-Server Networking I NT1430 Linux Networking PT1420...

Words: 1834 - Pages: 8

Premium Essay

Unit 1 Exercise 1

...NT1310 Unit 1 Exercise 1 6/17/14 The world is connected more than ever through the use of the internet. From paying bills to shopping or enjoying leisure time on the web; taking advantage of the internet has become second nature to society. Focusing in on one specific type of networking entertainment, online gaming has become a major league sport in its own right. Online gaming allows people from all around the world to connect together to team up or fight against one another. Behind the scenes is where the real magic happens. Between the gamers sits countless devices and hardware not to mention miles and miles of land. Using Call of Duty as an example, each gamer has a copy of the map being played on installed onto their local computer. Every time the gamer moves the direction of their character, their data is sent from their machine to their router, and then out past the demarc point. On the other side of the demarc is where the service provider picks up the data and moves the data from local network to the central office (better known as the local exchange). The central office then sends the data over the MAN (metro area network) or WAN (wide area network) to continue the data to game server. If the data hasn’t reached the server yet (for example the gamer lives in Michigan and the server is in California) the data will be passed over the core (also known as long-haul) network which connects MANs and WANs of different geographies together. On the off chance...

Words: 398 - Pages: 2

Premium Essay

Nothing

...ITT Technical Institute NT1310 Physical Networking Student Course Package Bring this document with you each week Students are required to complete each assignment and lab in this course package on time whether or not they are in class. Late penalties will be assessed for any assignments or labs handed in past the due date. The student is responsible for replacement of the package if lost. Table of Contents Syllabus 2 Student Professional Experience 19 Graded Assignments and Exercises 23 Labs 47 Documenting your Student Professional Experience 57 ITT Technical Institute NT1310 Physical Networking Onsite Course SYLLABUS Credit hours: 4.5 Contact/Instructional hours: 56 (34 Theory Hours, 22 Lab Hours) Prerequisite(s) and/or Corequisite(s): Prerequisites: NT1210 Introduction to Networking or equivalent Course Description: This course examines industry standards and practices involving the physical components of networking technologies (such as wiring standards and practices, various media and interconnection components), networking devices and their specifications and functions. Students will practice designing physical network solutions based on appropriate capacity planning and implementing various installation, testing and troubleshooting techniques for a computer network. Where Does This Course Belong? | | | NT2799 | | | | | | | | NSA Capstone | | | | | | | Project | | | | | NT2580...

Words: 10839 - Pages: 44

Premium Essay

Unit 3 Exercise 1 Nt1310

...| Unit 3. Exercise 1. | | Specifications - Definitions | | Unit 3. Exercise 1. | | Specifications - Definitions | NT1310: physical networking April 15, 2014 Authored by: Nicholas Rapisardi NT1310: physical networking April 15, 2014 Authored by: Nicholas Rapisardi 1. Application (in terms of cabling infrastructure): The application layer is the OSI layer closest to the end user, which means both the OSI application layer and the user interact directly with the software application. When determining resource availability, the application layer must decide whether sufficient network or the requested communication exists.. (OSI_model#Layer_7:_application_layer) 2. Unshielded twisted-pair: UTP cable is a popular cable used in computer networking that consists of two shielded wires twisted around each other. In the image to the right, is an example of the different network cables you're likely to encounter. (/jargon/u/utpcable.htm) 3. Shielded Twisted-pair: Twisted Pair (STP) has a fine wire mesh surrounding the wires to protect the transmission; Unshielded Twisted Pair (UTP) does not. Shielded cable is used in older telephone networks, network, and data communications to reduce outside interference. In the picture to the right, is an example of what these cables look like inside. (jargon/t/twispair.htm) 4. Fiber-Optic cable: A fiber optic cable is a network cable that contains strands of glass fibers inside an insulated casing. These...

Words: 1317 - Pages: 6

Free Essay

Connector Installations

...NT1310 Unit 6 Exercise 1 Luz Garcia 7/22/14 Connector Installations Twisted-pair cable: Step 1: Measure the cable you want to put ends on and trim it to the proper length using the cable cutter. Step 2: Use the cable stripper to strip about 1.5" of the jacket from the end of the cable. Then, rotate the stripper around the cable twice. This will cut through the jacket. Step 3: Remove the stripper from the cable and pull the trimmed jacket from the cable, exposing the inner conductors. If a jacket slitting cord (usually a white thread) is present, separate it from the conductors and trim it back to the edge of the jacket. Step 4: Untwist all the inner conductor pairs and spread them apart so that you can see each individual conductor. Step 5: Line up the individual conductors so that the color code matches the color-coding standard you are using. Step 6: This step includes two points. First, trim the conductors so that the ends are even with each other, making sure that the jacket of the cable will be inside the connector. Second, the total length of exposed connectors after trimming should be no longer than 0.5" to 0.625". Step 7: Insert the conductors in the connector, ensuring that all conductors line up properly with the pins as they were in the previous step. If they don't line up, pull them out and line up. Do this carefully, as it's the last...

Words: 591 - Pages: 3

Premium Essay

Unit

...ITT TECHNICAL INSTITUTE NT1310 Physical Networking GRADED ASSIGNMENTS ------------------------------------------------- Student Professional Experience Project NSA SPE Project 1 (to be completed by the end of NT1310): Install, Configure, Test, Maintain and/or Document the Worksite Local Area Network and Its Components Purpose The purpose of the Student Professional Experience (SPE) project is to provide you an opportunity for work experience in your field or in a related field to add to your résumé. You may have an opportunity to serve your community or work for a local employer for a project that will take between 20 and 30 hours. Project Logistics Career Services will identify an employer with needs in the following areas: Network related tasks (mostly confined to the LAN and Microsoft Windows Server 2008 environments) Students are expected to practice various skills discussed in all the technical courses in Quarters 1 through 3 of the NSA program at an employer’s site on network related tasks (more confined to the LAN and Microsoft Windows Networking with Server 2008 environments) that would involve installation, configuration, testing, maintenance and documentation of the worksite network and its components, and to properly document the technical information in all involved activities. Such documentation will be used as the source material for Items 2 and 3 defined in the Deliverables section of this document. Possible example projects could...

Words: 6762 - Pages: 28

Free Essay

Nt1310 Unit 9 Exercise 1

...Montie Ramsarran August 11th, 2014 NT1310 Mr. Amos Unit 9 Exercise 1 Light Source and Components-Definitions 1. Forward Biased LED: A bias voltage that is applied to a pn-junction in the direction that causes a large current flow; used in some semiconductor diode circuits. 2. Incoherent Light: Light in which the electric and magnetic fields of photons are completely random in orientation. Incoherent light is typically emitted from light bulbs and LEDs. 3. Laser: Acronym for light amplification by stimulated emission of radiation. The laser produces a coherent source of light with a narrow beam and a narrow spectral bandwidth (about 2cm). Lasers in fiber optics are usually solid-state semiconductor types. Lasers are used to provide the high-powered, tightly controlled light wave lengths necessary for high-speed, long-distance optical fiber transmissions. 4. Output Pattern: A setting that selects the output pattern for comparison outputs. This enables outputs for changes in levels rather than just upper/lower limit comparisons to set value. It can be set according to the control applications. Note: The settings must be as follows for correct zone outputs. 5. Output Power: The useful signal or power delivered by a circuit or device. 6. Modulation Speed: (1) Coding of information onto the carrier frequency. Types of modulation include amplitude modulation (AM), frequency modulation (FM), and phase modulation...

Words: 1207 - Pages: 5

Premium Essay

Nt2640

...associate degree in Mobile Communications Technology. The following diagrams indicate how this course relates to other courses in respective programs: Network Systems Administration NT2799 NSA Capstone Project NT2580 Introduction to Information Security NT2670 Email and Web Services NT2640 IP Networking PT2520 Database Concepts NT1330 Client-Server Networking II NT1230 Client-Server Networking I NT1430 Linux Networking PT1420 Introduction to Programming NT1110 Computer Structure and Logic NT1201 Introduction to Networking NT1310 Physical Networking CO2520 Communications SP2750 Group Theories EN1420 Composition II EN1320 Composition I GS1140 Problem Solving Theory GS1145 Strategies for the Technical Professional MA1210 College Mathematics I MA1310 College Mathematics II Networking Technology Courses Programming Technology Courses General Education/ General Studies 1 Date: 7/18/2011 IP Networking Syllabus Mobile Communications Technology MC2799 MCT Capstone Project NT2640 IP Networking MC2560 Mobile Wireless Communication I MC2660 Mobile Wireless Communication II MC2665 Mobile...

Words: 2573 - Pages: 11

Premium Essay

Fsmo Role Ayer Nate Method

...have one domain controller (not recommended), there is nothing to do since all roles must be on this server, but if you have multiple servers you should move some of theese roles on to more servers. It is also important to be aware of what servers are Global Catalog servers, especially if you have more than one domain and even if only one domain, they will be prefered by applications like Exchange server. It is recommended to place the forest roles on one Domain Controller (DC) and the domain roles on another server. If not all Domain Controllers are Global Catalog servers, it is also important to place the infrastructure master on a server that is NOT a Global Catalog server. Recommended Best Practice setup of FSMO roles. Domain Controller #1 Place the two forest roles on this server. * Schema Master * Domain Master Domain Controller #2 Place the domain roles on this server. * RID Master * Infrastructure Master * PDC Emulator If more domains exist in the forest, place the domain roles on a server in theese domains like Domain Controller #2 Global Catalog configuration. In Windows 2008 Active Directory all Domain Controllers are by default Global Catalog servers, personally...

Words: 10360 - Pages: 42