Premium Essay

Pcm Guideline

In: Business and Management

Submitted By juanita981
Words 66299
Pages 266
Project Management in the OSCE
A Manual for Programme and Project Managers

Organization for Security and Co-operation in Europe

Development, Coordination and Design
This manual is designed and developed by the OSCE Secretariat’s Conflict Prevention Centre, Programming and Evaluation Support Unit (CPC/PESU). Main Author: Sebnem Lust, Programme and Project Evaluation Officer Co-Authors: Laura Vai, Head of Programming and Evaluation Support Unit Sean McGreevy, Project Co-ordination Officer Editor: Keith Jinks Designer: Nona Reuter

Published by the Organization for Security and Co-operation in Europe OSCE Secretariat CPC/PESU Wallnerstrasse 6 1010 Vienna Austria Telephone: +43 1 514 36 6122 Fax: +43 1 514 36 6996 www.osce.org Email: pcc-at@osce.org © 2010 OSCE ISBN: 978-92-9234-301-9 Rights and Permissions: All rights reserved. The contents of this publication may be freely used and copied for educational and other non-commercial purposes, provided that any such reproduction is accompanied by an acknowledgement of the OSCE as the source. ii Acknowledgements
This manual contains comprehensive guidance on how the Organization for Security and Co-operation in Europe applies the Project Cycle Management method and the Logical Framework Approach to its project work, as well as essential information on the political, programmatic, regulatory and information technology aspects of project management. The manual’s purpose is to ensure coherence, consistency and transparency of project work across the OSCE and to provide a complete set of tools, techniques and templates on how OSCE projects are identified, developed, managed, monitored and evaluated. It is aimed primarily at OSCE Programme Managers and Project Managers, who will be managing projects and other staff and mission members directly or indirectly involved in project work, as well as consultants and

Similar Documents

Free Essay

Web/434 Week 2 - Web Accessibility Standards Paper

...Running Head: WEB ACCESSIBILITY Web Accessibility Week Two Individual [Place Name Here] University of Phoenix March 21, 2011 Web accessibility is for individuals with disabilities. This allows these individuals to use the web. Web accessibility helps people with disabilities to perceive, understand navigate and interact with the web. This also allows these people to contribute to the web. Web accessibility can benefit many individuals but benefits the elderly more due to the changing abilities due to their aging (W3C 2011). Web accessibility helps individuals with all different disabilities that have trouble accessing the web. This can include individuals with visual, auditory, physical, speech, cognitive, and neurological disabilities. There are millions of people with disabilities and these disabilities can really affect the way that they use the web. These days there are so many web sites and different web software that have accessibility barriers that can really make it challenging for individuals with disabilities to use the web. There are more web sites and web software that becomes available and as they do individuals with disabilities are able to use and contribute to the web better (W3C 2011). As mentioned before web accessibility can benefit other individuals without disabilities. Web accessibility is designed to meet the needs of many different users and their situations. This flexibility can benefit individuals without...

Words: 668 - Pages: 3

Premium Essay

What Is Project Cycle Management (Pcm)

...What is Project Cycle Management (PCM)? “Project Cycle Management” is a term used to describe the management activities and decision-making procedures used during the life-cycle of a project1. The image of a ‘project cycle’ assists applicants to understand how to organize their work so that it is based on real needs, is well planned, monitored and evaluated, and allows involved parties to learn from every project to improve their future work. The cycle represents a continuous process in which each stage provides the foundation for the next. The generic project cycle has six phases. In practice, the duration and importance of each phase may vary for different projects. Identification Evaluation Identification Appraisal Evaluation Preparation Preparation Appraisal Implementation and monitoring Proposal preparation, approval , financing Implementation and monitoring Proposal preparation, approval , financing Identification – generation of the initial project idea and preliminary design Preparation – detailed design of the project addressing technical and operational aspects Appraisal – analysis of the project from technical, financial, economic, gender, social, institutional and environmental perspectives Proposal preparation, approval and financing – writing the project proposal, securing approval for implementation and arranging sources of finance Implementation and monitoring – implementation of project activities, with on-going checks on progress and feedback...

Words: 320 - Pages: 2

Free Essay

Cost Effectiveness and Indian Market

...Economic Environment of Business Report On “COST EFFECTIVENESS AND INDIAN INDUSTRY” Course Instructor: Dr. S.P. Das Economic Environment of Business Report On “COST EFFECTIVENESS AND INDIAN INDUSTRY” Course Instructor: Dr. S.P. Das Submitted By: | Astha MathurSection C | Roll No.: | UM15135 | Submitted By: | Astha MathurSection C | Roll No.: | UM15135 | CONTENT Sr. No | Title | Page No. | 1 | Abstract | 4 | 2 | Introduction | 4 | 3 | Overview of Indian Industry | 4 | 4 | Implementing Cost Effectiveness | 6 | 5 | Implications of Cost Effectiveness | 7 | 6 | Break-Down of Indian Industrial Sector | 8 | 7 | Government initiatives to support for Cost Effectiveness in Indian Industry | 11 | 8 | Conclusion | 16 | ACKNOWLEDGEMENT We would like to express a whole-hearted gratitude to all those who have helped with the report or have been associated with the report in any which way and made it a worthwhile experience. We are greatly indebted to our batch mates and our seniors for having shared their invaluable experience that went a long way in the successful completion of our report. We are also grateful to Dr. S.P Das who has given us the opportunity for working on such a project and incessant support & guidance leading it to successful completion. Thank you. We would like to express a whole-hearted gratitude to all those who have helped...

Words: 3809 - Pages: 16

Premium Essay

Malnutrition in Bangladesh

...Malnutrition in Bangladesh 1. Introduction: Malnutrition is globally the most important risk factor for illness and death, contributing to more than half of deaths in children worldwide. It is one of the most important underlying causes of child mortality in developing countries, particularly during the first 5 years of life; the major causes for this are poverty, world conflicts, lack of education, natural disasters and poor access to health care. Nearly one-third of children in the developing world are malnourished. The effects of changing environmental conditions in increasing malnutrition are multifactorial. Poor environmental conditions may increase insect and protozoal infections and also contribute to environmental deficiencies in micronutrients. Overpopulation, more commonly seen in developing countries, can reduce food production, leading to inadequate food intake or intake of foods of poor nutritional quality. Conversely, the effects of malnutrition on individuals can create and maintain poverty, which can further hamper economic and social development. Bangladesh being the eighth most populous country in the world, and one of the poorest a significant progress has been made in recent years in reducing the incidence of poverty and malnutrition, the fact remains that roughly half of its 15.5 million citizens live in deprivation, while roughly half of all children under 6 years show some evidence of chronic malnutrition. Poverty and malnutrition in Bangladesh...

Words: 22491 - Pages: 90

Free Essay

Avoiding Taxes - Essay

...Model SR7500/SR8500 User Guide AV Surround Receiver CAUTION RISK OF ELECTRIC SHOCK DO NOT OPEN CAUTION: TO REDUCE THE RISK OF ELECTRIC SHOCK, DO NOT REMOVE COVER (OR BACK) NO USER-SERVICEABLE PARTS INSIDE REFER SERVICING TO QUALIFIED SERVICE PERSONNEL The lightning flash with arrowhead symbol within an equilateral triangle is intended to alert the user to the presence of uninsulated “dangerous voltage” within the product’s enclosure that may be of sufficient magnitude to constitute a risk of electric shock to persons. The exclamation point within an equilateral triangle is intended to alert the user to the presence of important operating and maintenance (servicing) instructions in the literature accompanying the product. IMPORTANT SAFETY INSTRUCTIONS READ BEFORE OPERATING EQUIPMENT This product was designed and manufactured to meet strict quality and safety standards. There are, however, some installation and operation precautions which you should be particularly aware of. 1. Read Instructions – All the safety and operating instructions should be read before the product is operated. Retain Instructions – The safety and operating instructions should be retained for future reference. Heed Warnings – All warnings on the product and in the operating instructions should be adhered to. Follow Instructions – All operating and use instructions should be followed. Cleaning – Unplug this product from the wall outlet before cleaning. Do not use liquid cleaners or aerosol cleaners...

Words: 44992 - Pages: 180

Premium Essay

Health Care Utilization

...Health Care Utilization Paper Meriecha Gaines HCS/235 Health Care Delivery in the U.S. Prof. Delores Usea Access to care tends to be a large issue across our nation especially in rural towns. It also affects who can get the care they need based on their social standings. The new health care reform has tried to expand the access for these particular groups of patients. The act has allowed for a number of things like access to care for those without insurance, increasing pay to rural providers and more pay for primary care providers. According to the HHS website, each year from 2010 through 2014 allow for new developments in the act to promote access to care. Effective July 1, 2010, “The Pre Existing Condition Insurance Plan provides new coverage options to individuals who have been uninsured for at least six months because of a pre-existing condition. States have the option of running this program in their state. If a state chooses not to do so, a plan will be established by the Department of Health and Human Services in that state (Key Features, 2010). By implementing these new ideas and plans we are allowing more Americans access to not only better quality care but care in general. Many people will say that this hinders us, but in reality it can make us stronger health wise. Allowing rural doctors to have a pay increase generates more enthusiasm to stay and or migrate to those areas. Also paying doctors based on quality not quantity will change the way patients are treated...

Words: 1162 - Pages: 5

Free Essay

Data Structures

...Chapter 1 Basic Networking Chapter 1 Basic Networking:                      Data communication is the transfer of data from one device to another via some form of transmission medium. A data communications system must transmit data to the correct destination in an accurate and timely manner. The five components that make up a data communications system are the message, sender, receiver, medium, and protocol. Text, numbers, images, audio, and video are different forms of information. Data flow between two devices can occur in one of three ways: simplex, halfduplex, or full-duplex. A network is a set of communication devices connected by media links. In a point-to-point connection, two and only two devices are connected by a dedicated link. In a multipoint connection, three or more devices share a link. Topology refers to the physical or logical arrangement of a network. Devices may be arranged in a mesh, star, bus, or ring topology. A network can be categorized as a local area network (LAN), a metropolitan-area network (MAN), or a wide area network (WAN). A LAN is a data communication system within a building, plant, or campus, or between nearby buildings. A MAN is a data communication system covering an area the size of a town or city. A WAN is a data communication system spanning states, countries, or the whole world. An internet is a network of networks. The Internet is a collection of many separate networks. TCP/IP is the protocol suite for the Internet...

Words: 2538 - Pages: 11

Premium Essay

Vermont Teddy Bear

...Approaches to Process Performance Modeling: A Summary from the SEI Series of Workshops on CMMI High Maturity Measurement and Analysis Robert W. Stoddard II Dennis R. Goldenson January 2010 TECHNICAL REPORT CMU/SEI-2009-TR-021 ESC-TR-2009-021 Software Engineering Measurement and Analysis Unlimited distribution subject to the copyright. http://www.sei.cmu.edu This report was prepared for the SEI Administrative Agent ESC/XPK 5 Eglin Street Hanscom AFB, MA 01731-2100 The ideas and findings in this report should not be construed as an official DoD position. It is published in the interest of scientific and technical information exchange. This work is sponsored by the U.S. Department of Defense. The Software Engineering Institute is a federally funded research and development center sponsored by the U.S. Department of Defense. Copyright 2010 Carnegie Mellon University. NO WARRANTY THIS CARNEGIE MELLON UNIVERSITY AND SOFTWARE ENGINEERING INSTITUTE MATERIAL IS FURNISHED ON AN "AS-IS" BASIS. CARNEGIE MELLON UNIVERSITY MAKES NO WARRANTIES OF ANY KIND, EITHER EXPRESSED OR IMPLIED, AS TO ANY MATTER INCLUDING, BUT NOT LIMITED TO, WARRANTY OF FITNESS FOR PURPOSE OR MERCHANTABILITY, EXCLUSIVITY, OR RESULTS OBTAINED FROM USE OF THE MATERIAL. CARNEGIE MELLON UNIVERSITY DOES NOT MAKE ANY WARRANTY OF ANY KIND WITH RESPECT TO FREEDOM FROM PATENT, TRADEMARK, OR COPYRIGHT INFRINGEMENT. Use of any trademarks in this report is not intended in any way to infringe on...

Words: 27376 - Pages: 110

Premium Essay

United

...Description One of my favorite things to eat is breakfast cereal. I have been a cereal eater since I was a kid and have chosen to do my paper on the breakfast cereal industry. The NAICS code is 311320. The SIC code is 2043 Cereal Breakfast Foods. The SIC gives a description of establishments as primarily engaged in manufacturing cereal breakfast foods and related preparations, except breakfast bars. Cereal breakfast foods include: coffee substitutes made grain, hulled corn, farina, granola (except bars and clusters), hominy grits, infant cereal foods, oatmeal, rolled oats, rice breakfast foods and wheat flakes. History Breakfast cereal is one of the most popular forms of breakfast in the United States. Just about all of us have had and enjoyed a bowl of cereal in the morning. The breakfast cereal industry is very profitable and has been around a long time. In 2007, the market value for the industry was $11.2 billion (Datamonitor, 2007). The breakfast cereal was first invented in 1863 by Dr. James Caleb Jackson who made the granula. The granula was a hard wheat that had to soak overnight before it could be eaten. Later the popular Corn Flakes was invented and today there are many varieties of cereal to choose from. There were a number of individuals who made various forms of cereal as a diet for its patients of the Sanitarium in Battle Creek, Michigan. The cereals that were made however were not for mass market. Not until 1906 was there a patent for cereal, and...

Words: 3522 - Pages: 15

Premium Essay

Signal Analyzing Kit

...Resume Of S.M. Hasanur Rahman C/O,M.A.Samad, Holding No# 778, Post:Noapara,Village: Guakhola, Thana: Avayanagar, District: jessore, Country:Bangladesh ,Post code-7460. e-mail: hasanur98@yahoo.com Ph:+88-01711-504709 CAREER OBJECTIVE : ( To build up my career in the field of Telecommunication engineering. ( To be a professional technical leader and efficient manager. ( Willing to work in an environment where I can utilize my experiences and always get the feelings that I am developing through my works. JOB EXPERIENCE : 5 Years in the field of telecommunication sector and one year in data communication field KEY EXPERIENCES : ❖ Experience on Quality Audit and Acceptance: ➢ 3 Years work experience in Grameenphone Ltd. (A sister conern of Telenor) as a highly performing quality controller and acceptance engineer. I’ve the strong sense and good knowledge on international standard procedure of installation and acceptance of GSM network, Transmission backbone & Optical fibers. ❖ Technical Experience on GSM Network & Power System: ➢ In depth knowledge and installation, commissioning & Maintenance of Ericsson 2202, 2206,2206V2 GSM RBS and HUAWEI 3900 BTS. ➢ Installation, commissioning, acceptance and critical fault handling of PDH transmission network specially PASSOLINK, PASSOLIN+, NEC NEOC, SRAL, SRAL XD, OPTIX RTN equipments. ➢ Practical experience on acceptance and trouble shooting of both...

Words: 1484 - Pages: 6

Free Essay

Student

...Theater Sound MAE 5083 Charles O’Neill November 20, 2001 Contents 1 Introduction 2 Sound Recording 2.1 Mechanical Schemes 2.2 Optical Schemes . . 2.3 Magnetic Schemes . 2.3.1 Tape Noise . 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1 1 2 2 3 Theater Construction 3.1 Room Sizing and Materials . . 3.2 Seating . . . . . . . . . . . . . 3.3 Large Theater . . . . . . . . . . 3.4 Small Screening Room Theater . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 4 5 5 6 . . . . . 7 7 7 7 9 9 . . . . . . . . . . . . . . . . . . . . 4 Sound Equipment 4.1 Terminology . . . . . . . . . . . 4.2 Dolby . . . . . . . . . . . . . . 4.2.1 Noise Reduction Theory 4.2.2 Analog . . . . . . . . . . 4.2.3 Digital . . . . . . . . . . . . . . . ii . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . “You ain’t heard nothing yet” Al Jolson 1 Introduction The movie theater is a creation of the 20th century. While both pictures and reproduced sound existed earlier, their joining didn’t occur until the 1920’s. The movie theater requires syncronization...

Words: 2525 - Pages: 11

Premium Essay

Indian Telecom Industry Analysis

...Telecommunications Industry in India Industry Background The telecom sector in India is a booming market now. India is the world’s second largest mobile phone user with a total subscriber base of 894 million as of December 2011, and the third largest internet user with a subscriber base of 121 million as of December 2011. The total market values according to experts are $75.88 billion with a y-o-y growth rate of 26% and generate employment for about 10 million people. The services sector generates revenue of about $62.31 billion (FY 2010-2011) and the equipment sector generates about $25.75 billion. Factsheet as of Dec, 2011: Particulars | Wireless | Wired | Total | Total Subscribers (million) | 893.84 | 32.69 | 926.53 | Total net addition (million) | 9.47 | -0.28 | 9.19 | % of monthly growth (%) | 1.07 | -0.84 | 1 | Urban Subscribers (million) | 586.26 | 24.94 | 611.19 | Net addition (million) | 4.93 | -0.2 | 4.73 | % of monthly growth (%) | 0.85 | -0.8 | 0.78 | Rural Subscribers (million) | 307.59 | 7.75 | 315.33 | Net addition (million) | 4.54 | -0.07 | 4.47 | % of monthly growth (%) | 1.5 | -0.94 | 1.44 | Overall Tele-density | 74.15 | 2.71 | 76.86 | Urban Tele-density | 161.01 | 6.85 | 167.85 | Rural Tele-density | 36.56 | 0.92 | 37.84 | Share of Urban subscribers | 65.59% | 76.30% | 65.97% | Share of Rural subscribers | 34.41% | 23.70% | 34.03% | Industry in the pre-independence era: The industry was born in 1850 under the British East...

Words: 4007 - Pages: 17

Premium Essay

Mr Mhlongo, Will Use This Site for Research Purpose and Other Reasons

...CURRICULUM VITAE CURRENT EMPLOYMENT Name of company : EOH (Pty) Ltd Position : Senior Performance Consultant & Test Lead Period : 01/09/09 to Date Location : Bedfordview Work Description Performance testing activities. Develop Automation / performance testing / scripting standards and procedures. Develop automated Mercury tools (Loadrunner, QTP) scripts. Define performance test objectives. Develop and enhance test data staging/back-up/restore strategy. Analyze and report performance test results. Advise on QA environment configurations to achieve reliable results. Setup performance monitoring scripts, reports and alerts. Develop Automation Test scripts Using: Winrunner, QTP, TestPartner, TestComplete, Selenium, Cubic Test, WebUI Test Studio & IBM Rational Functional Tester Work closely with Operations staff, to ensure the correct O/S and Application Servers settings are applied. Work closely with System Architect to determine the non-functional requirements of the system. Using Mercury QC, PM, Test Director, QTP and Load Runner tools Doing (Regression, SIT, Functional, Manual, Automation and Performance Testing) Analyze the project documents Provide test strategy and plan documents Derive Load testing requirements Derive Load testing scripts Execute Load tests Monitoring with BAC tool Analyze Load testing results Provide regular testing feedback to the relevant stakeholders Maintain Load test scripts Provide a sign off recommendation ...

Words: 3927 - Pages: 16

Free Essay

Networking

...COMPUTER NETWORK INTERVIEW QUESTIONS WITH ANSWERS 1.What do you mean by data communication? Ans: It is the exchange of data between two devices via some form of transmission medium such as wire cable. The communicating system must be part of a communication system made up of a combination of hardware and software.The effectiveness of a data communication system depends on three fundamental characteristics: delivery, accuracy and timeliness. 2.What is simplex? Ans: It is the mode of communication between two devices in which flow of data is unidirectional. i.e. one can transmit and other can receive. E.g. keyboard and monitor. 3.What is half-duplex? Ans: It is the mode of communication between two devices in which flow of data is bidirectional but not at the same time. ie each station can transmit and receive but not at the same time. E.g walkie-talkies are half-duplex system. 4.What is full duplex? Ans: It is the mode of communication between two devices in which flow of data is bidirectional and it occurs simultaneously. Here signals going in either direction share the capacity of the link. E.g. telephone 5.What is a network? Ans: It is a set of devices connected by communication links. A node can be a computer or any other device capable of sending and/or receiving data generated by other nodes on the network. 6.What is distributed processing? Ans: It is a strategy in which services provided by the network reside at multiple sites. 7.What is point to point connection? Ans:It...

Words: 3493 - Pages: 14

Premium Essay

United Parcel Service

...Harvard Business School 9-488-016 Rev. March, 23 1992 Associate Professor Jeffrey Sonnenfeld and Research Assistant Meredith Lazo wrote this case as the basis for class discussion rather than to illustrate either effective or ineffective handling of an administrative situation. Copyright © 1987 by the President and Fellows of Harvard College. To order copies or request permission to reproduce materials, call 1-800-545-7685 or write Harvard Business School Publishing, Boston, MA 02163. No part of this publication may be reproduced, stored in a retrieval system, used in a spreadsheet, or transmitted in any form or by any means—electronic, mechanical, photocopying, recording, or otherwise—without the permission of Harvard Business School. 1 United Parcel Service (A) The management committee at United Parcel Service (UPS) wrestled with the last item on the agenda. Frank Erbrick, head of the Information Services department, had been invited to make a presentation. Responding to Erbrick’s presentation, Jack Rogers, chief executive, inquired: “So you’re convinced that we can’t locate this talent internally or develop it in the smart computer-trained kids working in our districts?” “Oh, I think we can groom some from the inside, but we also have to get a large number of the senior programmers and middle managers from the outside. The field has gotten very specialized,” replied Frank. Erbrick was interrupted by Operations Vice President Frank Middendorf: “Look Frank...

Words: 11726 - Pages: 47