Free Essay

Power Factor Correction Using Boost Converter

In:

Submitted By yuva
Words 4088
Pages 17
Whitby Hydro Energy Services Corp.

Power Factor Correction at the Residential Level – Pilot Project Report to the LDC Tomorrow Fund

September 12, 2005

Executive Summary In December of 2004 Whitby Hydro applied for funding from the EDA Tomorrow Fund to carry out a pilot project to determine the impact of installing capacitors at residential homes on system capacitance and generation requirements. The study involved 31 homes within Whitby Hydro’s distribution territory. The houses selected were located in a new residential neighbourhood and were consistent in size, age and type of heating. For the pilot, a bench mark had to be established for the loading of each transformer. The three transformers where metered for a two month period prior to the installation of the capacitors. The information gathered included KW, KVAR, volts and amps. Once the benchmark was established homes fed from two of the transformers where equipped with capacitors providing 3.34 KVAR into there distribution panel. Readings at the transformer continued for an additional two month period after the units were installed in the homes. In addition two homes where equipped with metering devices that allowed the measurement of power factor. The information gathered allowed analysis to be carried out to determine if the additional capacitance improved power factor at the home as well as at the transformer. Power Factor at the transformer was the first value to be analysed. KW and KVAR was measured at 15 minute intervals for the pilot period (Appendix G). This information was used to determine monthly power factors and other related billing determinants at the transformer. The peak Power Factor each month was as follows: March (PF) TX5545 (BM) 96.6 TX5554 98.4 TX5547 97.9 April (PF) 96.1 98.8 98.5 May (PF) 95.1 99.9 98.3 June (PF) 92.7 99.1 97.1 July (PF) 93.0 99.9 95.7

(Note: BM is the bench mark transformer of which capacitance was not added) During the study it was quickly realized that although the study group was selected for its consistency, variances in ON and OFF-peak Power Factor clearly indicated that there was little or no consistency on how or when motor loads were used. Even though an attempt was made to pick homes with similar characteristics there was enough variance in how and when motor loads where used to cause inconsistency between the transformers. This made it difficult to determine the full effect that the added capacitance had on Power Factor at the transformer. However, based on the fact that KW and KVAR were being measured it was easy to see the impact the added capacitance had on KVAR at the transformer. Also because KVAR is a factor when determining generation requirements, this unit of measurement would allowed us to determine the impact on provincial generation. The improvements in KVAR was as follows:

March (KVAR) TX5545(BM) TX5554 TX5547 4.2041 2.3756 3.1778

April (KVAR) 3.3670 2.3999 2.6754

May (KVAR) 3.0253 -.9916 .9480

June (KVAR) 7.1944 -4.3036 3.0449

July (KVAR) 7.5343 -4.0268 2.9364

To further verify the impact of the capacitance on power factor two homes where measured. . These homes where fitted with capacitors that would turn on and off on twenty four hour cycles to show day to day comparison on power factor. Typically, the average power factor when the units where off was 87%. When the units were turned on the power factor was over 99%. To get a real understanding of positive impact power factor correction has on generation costs benefit analysis was carried out to see if such a project would make sense on mass. Four assumptions where used in this analysis: 1. a typical home has a 5kW demand 2. the cost of new generation is about $1,000,000 an MVA 3. a typical homes power factor is improved from 87% to 99% when 3.34 KVAR of capacitance is add 4. the cost of the Power Medix units is $450,000 installed With an example of 1000 homes each using the above information, the generation requirement would be 5.75MVA (5kW/.87PF x 1000). By installing capacitance at the residential level the requirement of the generator for the 1000 homes would now only be 5.05MVA (5kW/.99PF X 1000) or 700 KVA less. Therefore the cost to generate 700 KVA would be $700,000 (.700MVA X $1,000,000). The cost to supply and install capacitance at the residential level to free up the same amount of capacitance would be $450,000. The environment and health costs associated with the generation of electricity are also removed making the economics even stronger. The pilot project showed that the installation of capacitors at the residential level is a viable option in freeing up capacitance within the province is deployed on mass. The savings can also be achieved without having the customer drastically changing their lifestyle. The following report provides the details and back up information for the analysis.

Introduction
Purpose The following report outlines the process, procedures and results of a pilot project carried out by Whitby Hydro to determine if providing power factor correction at residential homes frees up capacity at pad mount transformers and therefore reduces load on utility systems. The report also determines whether such applications are feasible at this level. Scope The report looks at the application and justification of the process for the pilot. Total costs where also analysed to determine the feasibility of such an application. The report only addresses the resulting impact the pilot had on the customer and the pad-mount transformers. It does not explore system impacts up stream of the transformer other than assumptions of the system impact if implemented on mass throughout the Town. Background Whitby Hydro carried out a project to identify the ability to free up system and generation capacity by correcting power factor at the residential level. Theoretically, correcting power factor makes the system, which is generator, distribution and consumer, more efficient. Because kW’s are what the load consumes and kVA is what it takes to push the kW’s through the system, by improving the power factor the more efficient the system becomes. Take the case of a generator capable of producing 1000 kW into a load of 1000 kW. At unity power factor, 1000 kW = 1000 kVA. At 70% power factor, 1000 kW = 1429 kVA. The generator output would need to be increased by 429 kW to satisfy a 1000 kW load operating at 70% PF. In short improving the power factor at the distribution system and at the load equates to less losses and more efficient use of the energy produced. From the generator’s prospective, he is capable of serving more clients from his fixed output. The project involved the installation of a capacitor unit developed and manufactured by Cos Phi Inc. out of London Ontario. The unit is tied into the residential service panel and provides capacitance and surge suppression. By adding capacitance into the system the power factor for any motor loads (air conditioners, washers, dryers, fans, fridges, and dishwashers) is improved. Thirty homes were selected for the pilot project. These homes where fed by three 50kVA transformers. Homes from two of the transformers were supplied with Power Medix Units while homes from the third transformer were not be fitted and used as a bench mark. The dimensions of the units are 12” X8”X4”. The small profile makes them easy to install without taking up much physical space in the customers home. Because the pilot period extended over a number of months, average degree days where collected (Appendix ). It was difficult however to determine how weather impacted the results of the pilot and we have put greater emphisis on the comparison between the transformers feeding equipped homes and the transformer feeding the remaining homes.

Initially the pilot was to run for 4 months. Each transformer was fitted with KVA meters and consumption on these transformers was collected for two months prior to the installation of the Power Medix Units. Once the Power Medix Units were installed the measurements at the transformers would be taken for another two months. Access to customer homes to install the units caused delays in the pilot which required the pilot to be carried on for an additional two months. Discussion To properly determine the success and benefits of the project a comprehensive detailed pilot project was carried out. Three 50 KVA transformers supplying 31 homes in total were selected in a new residential subdivision. Two of the transformers, TX5545 and TX5547 fed 10 customers each with transformer TX5554 feeding the remaining 11 customers. Appendix A lists the transformers and the associated customers on each transformer. Although a $10.00 a month incentive was offered to all customers enrolling in the pilot, not all customers participated. Only two customers fed from TX 5545 were interested in participating in the pilot. This transformer was therefore selected as the benchmark site and the homes fed from it were not equipped with PM units. Transformer TX5554 had 9 customers interested in participating in the pilot and 9 homes where fitted with the units. Transformer TX5547 had 8 customers interested in participating in the pilot and 8 homes where fitted with the units. A breakdown of those who did and did not participate is available in Appendix B. A new subdivision was selected for the pilot so that minimal impact to the home owner would occur. It was assumed that the majority of homes in a new subdivision would not have finished basements allowing easy access to the electrical panel for the installation of the Power Medix unit.

Typical Basement Panel

Installed Unit

The houses selected where in a new residential neighbourhood and where consistent in size, age and type of heating to ensure relative consistency among the usage patterns of each home. Inventory List per Customer Part of the pilot was to carry out surveys prior to and after the installation of the units. The first survey provided us with a number of occupants within the house and an inventory of equipment that required motor loads. A copy of the survey can be found in Appendix C.

The surveys allowed us to determine an average number of family members and equipment with motor load. . The assumed family size and motor loads per house are as follows: Number of Adults Number of Children Number of Homes with Central AC Number of Homes with Gas Heating Number of Homes with Refrigerators Number of Homes with Freezers Number of Homes with Washing Machines Number of Homes with Electric Cloths Dryer Number of Homes with Dishwashers Number of Homes with Central Vac Number of Homes with Portable Vac 2.1 1.1 29 31 31 15 31 25 25 15 21 (Note: some of these customers also had central vac)

Customers where also surveyed to assess what other motor loads, such as pumps, power tools, extra refrigerators, pools or hot tubs may be within their homes. A complete inventory list can be found in Appendix D. These averages where applied to the customers fed from the baseline transformer. This gave us a comparator as to the number of appliances and family members were in each home. Upon completion of the pilot a follow up phone survey was carried out to identify any significant changes to the number of appliances and or motorized equipment that may have been added to the home. At the same time we enquired if the customer had noticed any changes or anomalies to the electrical supply when the Power Medix was added. No anomalies where reported however some did report that since the unit was added they did not experience dimming lights due to motors and compressors cycling on and off. Appliances added included: One freezer One hot tub

One Air conditioner One above ground pool Meter Readings at the Transformer For the pilot, a bench mark had to be established for the loading of each transformer. The three transformers where metered for a two month period (March and April) prior to the installation of the capacitors. The information gathered included KW, KVAR, volts and amps. Seventeen (17) of the target homes were equipped with Power Medix units beginning in May. Delays in getting access to the customer premises required a longer period of time to install the units. All units of participating customers were installed by June 7 and a two month data collection period began. The meters at the transformers continually monitored for the period of the pilot. Two months of data from June 7 to August 7 was collected and used as a comparator to the transformer readings over March and April. Power Factor at the transformer was the first value to be analysed. KW and KVAR was measured at 15 minute intervals for the pilot period (Appendix G). This information was used to determine monthly power factors and other related billing determinants at the transformer. The peak Power Factor each month was as follows: March (PF) TX5545 TX5554 TX5547 96.6 98.4 97.9 April (PF) 96.1 98.8 98.5 May (PF) 95.1 99.9 98.3 June (PF) 92.7 99.1 97.1 July (PF) 93.0 99.9 95.7

Beginning May 11 with completion by June 7 the capacitance added to the system was as follows: TX5545 TX5554 TX5547 3.34 KVAR 30.06 KVAR 20.04 KVAR

During the study it was quickly realized that although the study group was selected for its consistency, variances in ON and OFF-peak Power Factor clearly indicated that there was little or no consistency on how or when motor loads were used. This made it difficult to determine the full effect that the added capacitance had on Power Factor at the transformer. However, based on the fact that the added capacitance was known, and because we were measuring interval units of power at the transformer, the effect on KVAR would be more noticeable and better represented as a comparator to KW. The transformers where monitored for three months prior to the installation of the capacitors. Two channels of each transformer where measured and the average KVAR per month was recorded as follows: March April May June July

(KVAR) TX5545 TX5554 TX5547 4.2041 2.3756 3.1778

(KVAR) 3.3670 2.3999 2.6754

(KVAR) 3.0253 -.9916 .9480

(KVAR) 7.1944 -4.3036 3.0449

(KVAR) 7.5343 -4.0268 2.9364

An assessment of the changes that occurred between the three months prior to the installation of the units and the three months after the installation showed that significant change occurred in the KVAR readings of each transformer. This indicates that there may have been an over correction that occurred on Transformer TX5554. This may be due to smaller homes fed from that transformer therefore less air conditioning load or less appliance use. Visually the impact of the capacitance is clear. TX 5545 (3.34 KVAR added May 20) kW,kVAR 20.2

16.2

12.2

8.2

4.2

0.2

5/1

5/3

5/5

5/7

5/9

5/11

5/13

5/15

5/17

5/19

5/21

5/23

5/25

5/27

5/29

5/31

Time (days)
Customer ID Date TX5545 TX5545 Channel Line # Units 05 06 kVAR kW

05/01/2005 Leg1 05/01/2005 Leg2

TX5547 (20.04 KVAR added between May16 and June 7) kW,kVAR 25.0 20.0 15.0 10.0 5.0 0.0 -5.0

Capacitance Comes on Line
5/1 5/3 5/5 5/7 5/9 5/11 5/13 5/15 5/17 5/19 5/21 5/23 5/25 5/27 5/29 5/31

Time (days)
Customer ID Date TX5547 TX5547 Channel Line # Units 03 04 kVAR kW

05/01/2005 Leg1 05/01/2005 Leg2

TX5554 (30.06 KVAR added between May11 and May 31) kW,kVAR 20.0 15.0 10.0 5.0 0.0 -5.0 -10.0

Capacitance Comes on Line
5/1 5/3 5/5 5/7 5/9 5/11 5/13 5/15 5/17 5/19 5/21 5/23 5/25 5/27 5/29 5/31

Time (days)
Customer ID Date TX5554 TX5554 Channel Line # Units 01 02 kVAR kW

05/01/2005 Leg1 05/01/2005 Leg2

Graphs of all months can be found in appendix ?. Clearly the addition of capacitance into the system reduced the KVAR readings at the transformer. It was noted, however, that the amount of KVAR added was not equivalent to the the KVAR reduction at the transformer. It was determined that this was the result of loads switching on and off at different times. The results indicate that the installation of the Power Medix units has had a positive impact on the transformer requirements. Our results showed that TX5554 experienced a significant reduction on the loading of the transformer. Further investigation which involved field verification and analysis of the meters showed no indication of faulty data collection. Regardless of this anomaly, TX5547, which was fitted with the Power Medix equipment, showed significant decreases in VAR readings as opposed to TX5545 which was not fitted with the units and showed substantial increases in VAR’s during the summer months. Meter Reads at House (Alternate Analysis) To further support the pilot project two homes where retrofitted with Power Medix units along with KVA meters and timers. The units would run for a twenty-four hour period and then turn off for 24 hours. Test site 1 represented a typical home. The Power Medix turns on at approximately 2pm and runs for 24 hours at which time it stays off for 24 hours. The graph below shows the impact on Power Factor when the unit is on and when it is off.
%

95.7

90.7

Unit Turns On
85.7

80.7

75.7

0:00

4:00

8:00

12:00

16:00

20:00

70.7 24:00

Time (hours)
Customer ID Recorder ID Date Res-PF RES Channel Units %

08/02/2005 R4

%
99.7

94.7

89.7

Unit Turns Off
84.7

79.7

0:00

4:00

8:00

12:00

16:00

20:00

74.7 24:00

Time (hours)
Customer ID Recorder ID Date Res-PF RES Channel Units %

08/01/2005 R4

As shown the power factor achieves almost 100% when the unit is on. When off, power factor fluctuates between 70 and 90%. Measurements where also taken at a home that had a ground source heat pump. The unit turned on at 7 am and ran for 24 hours at which time it would shut off and stay off for a 24 hour period.
%
97.2 92.2 87.2 82.2 77.2 72.2 67.2 24:00

Unit On

0:00

4:00

8:00

12:00

16:00

20:00

Time (hours)
Customer ID Recorder ID Date Res-PF RES Channel Units %

08/22/2005 R3

%
96.8 91.8 86.8 81.8

Unit Off

76.8 71.8 66.8 24:00

0:00

4:00

8:00

12:00

16:00

20:00

Time (hours)
Customer ID Recorder ID Date Res-PF RES Channel Units %

08/23/2005 R3

Significant loads are apparent in the above example but the power factor is improved during periods that the unit is on compared to periods when the unit is off. Full data on the actual home measurements can be found in Appendix Cost Benefit Analysis The reductions in KVAR translate into a reduction in generation requirements and reduction in the amount of capacity required in the system. Improving system capacity results in less wear and tear on the system. It is difficult, however, to determine exactly what the savings are. The cost of the units was $491.00/each. These units included surge suppression for cable, phone and satellite. The cost without this feature is approximately $300.00 and is the value we used to calculate savings. Installation costs including material and inspection was $150.00 per unit. There are a number of ways to estimate what the savings are when correcting power factor at the residential level. For industrial customers, adding capacitance reduces utility penalties and frees up capacity within their system, often reducing the need for new or larger transformers. Although there are no billing incentives to the end use residential customer by correcting power factor the benefits of free capacitance to the utility is similar to that of the industrial customer. By preventing overloading of a transformer we extend the life expectancy of it, however, residential pad mount transformers are not typically overloaded, however the improved capacitance on a transformer allows for the connection of additional residential units. The problem is that the number of units connected to a transformer is typically determined by space on the buss or a function of the subdivision planning process.

The real benefit of adding capacitance is that it improves the efficiency of the current provincial generation and transmission system. In the case of a typical home power factor went from 87% to 99% on average. Assuming each home uses 5 KW the KVA at a home is reduced from 5.75 KVA to 5.05 KVA. This means that the reactive power of KVAR of a generator is reduced from 2.83 KVAR to 0.708 KVAR or by 2.12 KVAR. With an example of 1000 homes each using 5KW and not fitted with capacitance, the generation requirement would be 5 MW. The KVA requirement would there fore be 5.75MVA. By installing capacitance at the residential level the requirement of the generator for the 1000 homes would now only be 5.05MVA or 700 KVA less. A ball park figure for building new generation is $1,000,000 per MVA. Therefore the cost to generate 700 KVA would be $700,000. The cost to supply and install capacitance at the residential level would be $450,000 to free up the same amount of capacitance. The installation of the units therefore makes economical sense as a method of reducing the requirement of generation in the province. Another advantage to this conservation application is the environmental and health benefits. Improving efficiency of existing generation and displacing the requirement for the addition of new generation have significant advantage in offsetting the environment and health costs associated with generation in the province. Although a firm number can not be put on the cost of generation from a heath and environmental prospective, the following from Ministry of Healt gives an idea of the associated costs.

Health and Environmental Costs
Ontario’s coal-fired plants are the largest industrial source of greenhouse gas emissions, sulphur dioxide (SO2) and oxides of nitrogen (NOx) in the province. Greenhouse gas emissions are subject to the Kyoto treaty on climate change, while SO2 and NOx are contributors to smog. Scenario 1 Status Quo Financial Costs Health Damages Environmental Damages Total Cost of Generation $ 985 a $3,020 $371 $4,377 2 All Gas $ 2,076 $388 $141 $2,605 3 Refurbished Nuclear/ Gas $ 1,529 $365 $48 $1,942 4 Emission Reducing Technology $ 1,367 $1,079 $356 $2,802

a: All values are expressed as annualised costs/damages in 2004$ Millions. The study found a relationship between increased air pollution due to coal-fired electricity generation and up to 668 premature deaths, 928 hospital admissions, 1,100 emergency room visits and 333,600 minor illnesses annually. These health costs amount to $3 billion annually.

In addition to the health costs are economic damages due to environmental effects. The cost of greenhouse gas control and carbon sequestration from coal-fired emissions is $371 million annually.

Conclusions
The results of the pilot indicated that the addition of capacitance at the residential home reduces the demand requirements at the transformer. Further assumptions indicate that installation of the units on mass will reduce the generation requirements throughout the province. There are a number of other social costs associated with building generation that are difficult to put a price to such as: • • • environmental impacts of construction emissions fuel costs

Recommendations
We recommend that the findings of this pilot be shared with government officials as a viable means to help address the supply and transmission issues within the province.

Similar Documents

Free Essay

Power Factor Improvement Using Boost Converter

...Project Report On “POWER FACTOR IMPROVEMENT USING BOOST CONVERTER” Submitted by BABLOO KUMAR (U06EE508) RAJ RAKESH (U06EE542) SUBHASH REDDY (U06EE569) VIKAS KUMAR (U06EE579) B. Tech (IV) ELECTRICAL ENGINEERING Year 2009 -2010 Under the Guidance of Mr. M. A. MULLA Department of Electrical Engineering Sardar Vallabhbhai National Institute of Technology, Surat. 1 CERTIFICATE This is to certify that the project report titled “Power Factor Improvement USING ”submitted by Babloo Kumar (U06EE508), Raj Rakesh (U06EE542), Subhash Reddy (U06EE569) and Vikas Kumar (U06EE579) is a record of bonafide work carried out by them, in fulfillment of the requirement for the award of the Degree of Bachelor of Technology. Date: 14-05-2010 Examiner 1: ____________ Examiner 2: ____________ Examiner 3: ____________ Examiner 4: ____________ GUIDE (Mr. M. A. Mulla) HOD (Prof. Mrs. V. A. Shah) ACKNOWLEDGMENT 1 We would like to express our deep sense of gratitude to our guide Mr. M. A. Mulla (Lecturer, EED, SVNIT, SURAT) for his valuable guidance and motivation and for his extreme cooperation to complete the project work successfully. We would like to express our sincere respect and profound gratitude to Prof. V. A. Shah, Head of Electrical Engineering Department for supporting us and providing the facilities for the project work. We appreciate all our colleagues whose direct and indirect contribution helped a lot to accomplish this project work. We would also...

Words: 6972 - Pages: 28

Premium Essay

Essay On Electric Vehicle

...Reshma S Nair P G Scholar, Department of EEE Ilahia College of Engineering and Technology Muvattupuzha, India reshmasnairch@gmail.com Ansar Jamal Assisstant Professor, Department of EEE Ilahia College of Engineering and Technology Muvattupuzha, India Abstract— DC/DC converters are having important applications in many offline power supplies. They are widely used in different types of electronic devices such as battery charger, electric vehicles, and in portable devices like cellular phones, laptops, computers etc. In battery charging applications of hybrid plug in electric vehicles full bridge dc-dc converters are commonly used. The fundamental problem regarding the conventional full bridge DC/DC converter topology is the voltage spikes across output diodes due to...

Words: 1734 - Pages: 7

Free Essay

Hybrid Boost Converter

...The Design and Simulation of Controlled Converter Circuit for Smart Phone Battery Charger at Rated 1.5A and 3.8V load Ban Siong Lee1, Kang Yung Yee1, Yoong Xiang Wong1 1 Faculty of Electrical and Electronics Engineering, Universiti Teknologi Petronas, 31750, Perak, Malaysia leebansiong92@gmail.com, ky.christopher@gmail.com, tikuz92@gmail.com Abstract— There have been increasing demand on low power application over the years, particularly in charging devices for device such as smartphones. A buck converter with controlled PWM is proposed in this paper to achieve 1.5A and 3.8V load. This method can ensure that the output current and voltage stay within the satisfactory range. A buck converter with rectified DC voltage of 240V DC as input voltage, and output voltage of 3.8 with 1.5A output current and duty cycle of 0.016 is designed. P pice is used in designing simulation and the results of the circuit have been obtained to verify the operation and performance of the concept. The theoretical calculations are compared with the simulation results. The ripple output voltage and current obtained is relatively low as calculated of around 1%. Losses can be further controlled by adjusting the dead time and duty ratio of the circuit. Keywords— Full Wave Bridge Rectifier; Buck Converter; DCDC Converter; Smartphone Battery Charger I. INTRODUCTION Portable electronic industry has grown over the years, many different demands has increased for instance, small...

Words: 3144 - Pages: 13

Premium Essay

Electrical Installation Standards

...MINISTRY OF POWER AND MINERAL RESOURCES OF THE REPUBLIC OF KAZAKHSTAN APPROVED by Prikaz No 189 of the Minister of Power and Mineral Resources of the Republic of Kazakhstan, as of August 26, 2004.) REGULATIONS ON ELECTRICAL INSTALLATIONS OF THE REPUBLIC OF KAZAKHSTAN (PUE) Astana, 2003 TABLE OF CONTENTS SECTION 1: GENERAL REGULATIONS 10 CHAPTER 1.1: GENERAL 10 SCOPE, TERMS AND DEFINITIONS 10 GENERAL REGULATIONS FOR INSTALLATION OF ELECTRICAL EQUIPMENT 11 CONNECTION OF ELECTRICAL INSTALLATIONS TO THE POWER STATIONS 13 COMMISSIONING OF ELECTRICAL INSTALLATIONS 14 CHAPTER 1.2 POWER SUPPLY AND POWER SYSTEMS 14 SCOPE, DEFINITIONS 14 GENERAL REQUIREMENTS 14 CATEGORIES OF POWER CONSUMING DEVICES AND RELIABILITY OF POWER SUPPLY 15 VOLTAGE LEVELS AND CONTROLS, REACTIVE POWER COMPENSATION 16 CHAPTER 1.3 SELECTION OF CONDUCTORS: HEATING, CURRENT DENSITY AND CORONA DISCHARGE CONDITIONS 16 SCOPE 16 SELECTION OF CROSS-SECTION OF CONDUCTORS: HEATING 17 MAXUIMUM CONTINUOUS CURRENTS FOR WIRES, CORDS AND CABLES IN RUBBER OR PLASTIC INSULATION 18 MAXIMUM CONTINUOUS CURRENTS FOR CABLES IN IMPREGNATED PAPER INSULATION 22 MAXIMUM CONTINUOUS CURRENTS FOR BARE WIRES...

Words: 177034 - Pages: 709

Premium Essay

Drive Application Engineering

...Table of Contents Section 1 – Motor and Load Basics.................................................................................................... 9 AC Motors........................................................................................................................................... 11 NEMA Design Types........................................................................................................................ 12 Motor Synchronous Speed............................................................................................................... 12 3-Phase Motor Connections - NEMA ............................................................................................... 13 Rotor Inertia – NEMA....................................................................................................................... 16 3-Phase Motor Connections – IEC Nomenclature............................................................................ 17 Rotor Inertia – IEC ........................................................................................................................... 18 AC Motor Operation above Base Speed .......................................................................................... 19 Synchronous Motors ........................................................................................................................ 20 Wound Rotor........................................................................................

Words: 7023 - Pages: 29

Premium Essay

Mobile Computing

...and telecommunication technologies has heralded the age of information superhighway over wire-line and wireless networks. Mobile cellular communication systems and wireless networking technologies are growing at an ever-faster rate, and this is likely to continue in the foreseeable future. Wireless technology is presently being used to link portable computer equipment to corporate distributed computing and other sources of necessary information. Wide-area cellular systems and wireless LANs promise to make integrated networks a reality and provide fully distributed and ubiquitous mobile communications, thus bringing an end to the tyranny of geography. Higher reliability, better coverage and services, higher capacity, mobility management, power and complexity for channel acquisition, handover decisions, security management, and wireless multimedia are all parts of the potpourri. Further increases in network security are necessary before the promise of mobile telecommunication can be fulfilled. Safety and security management against fraud,...

Words: 8346 - Pages: 34

Free Essay

Eu Comission Regulation

...28.7.2008 EN Official Journal of the European Union L 199/1 I (Acts adopted under the EC Treaty/Euratom Treaty whose publication is obligatory) REGULATIONS COMMISSION REGULATION (EC) No 692/2008 of 18 July 2008 implementing and amending Regulation (EC) No 715/2007 of the European Parliament and of the Council on type-approval of motor vehicles with respect to emissions from light passenger and commercial vehicles (Euro 5 and Euro 6) and on access to vehicle repair and maintenance information (Text with EEA relevance) THE COMMISSION OF THE EUROPEAN COMMUNITIES, (3) Having regard to the Treaty establishing the European Community, and in particular Article 95 thereof, Having regard to Regulation (EC) No 715/2007 of the European Parliament and of the Council of 20 June 2007 on type-approval of motor vehicles with respect to emissions from light passenger and commercial vehicles (Euro 5 and Euro 6) and on access to vehicle repair and maintenance information (1), and in particular Articles 4(4), 5(3) and 8 thereof Whereas: (5) (1) Article 5 of Regulation (EC) No 715/2007 provides for specific technical requirements relating to the control of emissions from vehicles to be set in its implementing legislation. Therefore, it is appropriate to adopt such requirements. (4) Following the adoption of the main requirements for type approval in Regulation (EC) No 715/2007, it is necessary to establish administrative provisions for EC type-approval of light duty...

Words: 54214 - Pages: 217

Premium Essay

Mi Notebook

...Introduction To The Computer The type of computer that we are choice for this assignment is notebook computer. A notebook computer is a battery or AC-powered personal computer generally smaller than a briefcase that can easily be transported and conveniently used in temporary spaces such as on airplanes, in libraries, temporary offices, and at meetings. A notebook is an extremely lightweight personal computer. Notebook computers typically weigh less than six pounds and are small enough to fit easily in a briefcase.  Notebook computers generally cost more than desktop computers with the same capabilities because they are more difficult to design and manufacture. A notebook can effectively be turned into a desktop computer with a docking station, a hardware frame that supplies connections for peripheral input/output devices such as a printer or larger monitor. The less capable port replicator allows you to connect a notebook to a number of peripherals through a single plug. Notebooks usually come with displays that use thin-screen technology. The thin film transistor or active matrix screen is brighter and views better at different angles than the STN or dual-scan screen. Notebooks use several different approaches for integrating a mouse into the keyboard, including the touch pad, the trackball, and the pointing stick. A serial port also allows a regular mouse to be attached. The PC Card is insert able hardware for adding a modem or network interface card to a notebook...

Words: 6319 - Pages: 26

Free Essay

Nit-Silchar B.Tech Syllabus

...NATIONAL INSTITUTE OF TECHNOLOGY SILCHAR Bachelor of Technology Programmes amï´>r¶ JH$s g§ñWmZ, m¡Úmo{ à VO o pñ Vw dZ m dY r V ‘ ñ Syllabi and Regulations for Undergraduate PROGRAMME OF STUDY (wef 2012 entry batch) Ma {gb Course Structure for B.Tech (4years, 8 Semester Course) Civil Engineering ( to be applicable from 2012 entry batch onwards) Course No CH-1101 /PH-1101 EE-1101 MA-1101 CE-1101 HS-1101 CH-1111 /PH-1111 ME-1111 Course Name Semester-1 Chemistry/Physics Basic Electrical Engineering Mathematics-I Engineering Graphics Communication Skills Chemistry/Physics Laboratory Workshop Physical Training-I NCC/NSO/NSS L 3 3 3 1 3 0 0 0 0 13 T 1 0 1 0 0 0 0 0 0 2 1 1 1 1 0 0 0 0 4 1 1 0 0 0 0 0 0 2 0 0 0 0 P 0 0 0 3 0 2 3 2 2 8 0 0 0 0 0 2 2 2 2 0 0 0 0 0 2 2 2 6 0 0 8 2 C 8 6 8 5 6 2 3 0 0 38 8 8 8 8 6 2 0 0 40 8 8 6 6 6 2 2 2 40 6 6 8 2 Course No EC-1101 CS-1101 MA-1102 ME-1101 PH-1101/ CH-1101 CS-1111 EE-1111 PH-1111/ CH-1111 Course Name Semester-2 Basic Electronics Introduction to Computing Mathematics-II Engineering Mechanics Physics/Chemistry Computing Laboratory Electrical Science Laboratory Physics/Chemistry Laboratory Physical Training –II NCC/NSO/NSS Semester-4 Structural Analysis-I Hydraulics Environmental Engg-I Structural Design-I Managerial Economics Engg. Geology Laboratory Hydraulics Laboratory Physical Training-IV NCC/NSO/NSS Semester-6 Structural Design-II Structural Analysis-III Foundation Engineering Transportation Engineering-II Hydrology &Flood...

Words: 126345 - Pages: 506

Free Essay

Case

...2010 BiCMOS LOW-POWER CURRENT-MODE PWM CONTROLLER FEATURES DESCRIPTION D Enhanced Replacement for UC3842A Family D D D D D D D D D D UCC38C4x family is a high-performance currentmode PWM controller. It is an enhanced BiCMOS version with pin-for-pin compatibility to the industry standard UC384xA family and UC384x family of PWM controllers. In addition, lower startup voltage versions of 7 V are offered as UCC38C40 and UCC38C41. With Pin-to-Pin Compatibility 1-MHz Operation 50-μA Standby Current, 100-μA Maximum Low Operating Current of 2.3 mA at 52 kHz Fast 35-ns Cycle-by-Cycle Overcurrent Limiting ±1-A Peak Output Current Rail-to-Rail Output Swings with 25-ns Rise and 20-ns Fall Times ±1% Initial Trimmed 2.5-V Error Amplifier Reference Trimmed Oscillator Discharge Current New Under Voltage Lockout Versions MSOP-8 Package Minimizes Board Space Providing necessary features to control fixed frequency, peak current-mode power supplies, this family offers the following performance advantages. The device offers high-frequency operation up to 1 MHz with low start-up and operating currents, thus minimizing start-up loss and low operating power consumption for improved efficiency. The device also features a very fast current-sense-to-output delay time of 35 ns and a ±1 A peak output current capability with improved rise and fall times for driving large external MOSFETs directly. APPLICATIONS D Switch-Mode Power Supplies D dc-to-dc...

Words: 9368 - Pages: 38

Premium Essay

Siwess Report

...basic modern system consists of a dependable primary power supply, a secondary or backup power supply, any number of "initiating devices" and "notification appliances." Automatic fire alarm systems can be used to notify people of the need to evacuate in the event of a fire or other emergency, to summon emergency forces aid, and to prepare the structure and associated systems to control the spread of fire and smoke. However, the use of fire alarm system in buildings and campuses in Nigeria is not encouraging at all. FUNDAMENTAL COMPONENTS THAT MAKE UP THE FIRE ALARM SYSTEM • Fire alarm control unit (panel): A fire alarm control panel is the central control device that receives information from input devices such as smoke detectors, heat detectors, manual call points, etc. The panel then processes the information to trigger output devices which are usually bells, horns, or strobes. Panels usually have a number of loops within the range of two to 20 loops. At the present time, four or six loop panels are the most common. Each loop can have a number of devices connected to it. Each device has its own address, and so the panel knows the state of each individual device connected to it. There are three types of panels: coded panels, conventional panels, and addressable panels. A fire alarm control panel • Primary Power supply: Commonly the non-switched 220/240 Volt Alternating Current source supplied from a commercial power utility. In non-residential applications, a branch circuit...

Words: 14033 - Pages: 57

Premium Essay

Cointegration Between Housing Prices and Mortgage Rates

...AMERICAN UNIVERSITY OF BEIRUT COINTEGRATION BETWEEN MORTGAGE RATES AND HOUSING PRICES: CASE OF THE UNITED STATES by MOHAMAD SAMIR HAMMOUD A project submitted in partial fulfillment of the requirements for the degree of Master of Arts in Financial Economics to the Department of Economics of the Faculty of Arts and Sciences at the American University of Beirut Beirut, Lebanon March 2009 AMERICAN UNIVERSITY OF BEIRUT COINTEGRATION BETWEEN MORTGAGE RATES AND HOUSING PRICES: CASE OF THE UNITED STATES by MOHAMAD SAMIR HAMMOUD Approved by: ______________________________________________________________________ Dr. Simon Neaime, Professor Economics First Reader ______________________________________________________________________ Dr. Marcus Marktanner, Assistant Professor Economics Second Reader Date of project presentation: March 4, 2009 AMERICAN UNIVERSITY OF BEIRUT PROJECT RELEASE FORM I, Mohamad Samir Hammoud authorize the American University of Beirut to supply copies of my project to libraries or individuals upon request. do not authorize the American University of Beirut to supply copies of my project to libraries or individuals for a period of two years starting with the date of the project defense. ____________________ Signature ____________________ Date ACKNOWLEDGMENTS I would like to thank Professor Simon Neaime who directly and indirectly promoted my productivity by making me experience interesting challenges...

Words: 16474 - Pages: 66

Free Essay

Broadband Technologies

...PROJECT REPORT ON TRAINING IN BHARAT SANCHAR NIGAM LIMITED Submitted by: Varsha Khanna IT-06 110808 Acknowledgement Success of every project depends largely on the SELF & encouragement and guidance of many others. We take this opportunity to express my gratitude to the people who have been instrumental in the successful completion of this study project. First of all we would like to thank the Management at BHARAT SANCHAR NIGAM LIMITED (BSNL) for giving us the opportunity to do our one-month project in their esteemed institution. We also thank our Internal Guide Ms.Kiran for providing me with valuable advice and endless supply of new ideas and support for this project. INTRODUCTION Broadband is often called high-speed internet, because it usually has a high rate of data in general, any connection to the customer of 256 kbit/s (0.256 Mbit/s) or more is considered broadband internet. The international Telecommunication Union Standardization Sector (ITU-t) recommendation 1.113 has defined broadband as a transmission capacity that is faster than primary rate ISDN, at 1.5 to 2 Mbit/s. The FCC definition of broadband is 200 kbit/s (0.2 Mbit/s) in one direction, and advanced broadband is at least 200 kbit/s in both directions. The OECD has defined broadband as 256 kbit/s in at least one direction and this bit rate is the most...

Words: 9604 - Pages: 39

Free Essay

Indoor Positioning

...September 2011 School of Health and Society Department Computer Science Embedded Systems Indoor Positioning using Sensor-fusion in Android Devices Authors Ubejd Shala Angel Rodriguez Instructor Fredrik Frisk Examiner Kamilla Klonowska School of Health and Society Department Computer Science Kristianstad University SE-291 88 Kristianstad Sweden Authors, Program and Year: Ubejd Shala, Master’s Program - Embedded Systems, 2011 Angel Rodriguez, Master’s Program - Embedded Systems, 2011 Instructor: Fredrik Frisk, Dr, HKr Examination: This graduation work on 15 higher education’s credits is a part of the requirements for a Degree of Master in Embedded Systems Title: Indoor Positioning using Sensor-fusion in Android Devices Abstract: This project examines the level of accuracy that can be achieved in precision positioning by using built-in sensors in an Android smartphone. The project is focused in estimating the position of the phone inside a building where the GPS signal is bad or unavailable. The approach is sensor-fusion: by using data from the device’s different sensors, such as accelerometer, gyroscope and wireless adapter, the position is determined. The results show that the technique is promising for future handheld indoor navigation systems that can be used in malls, museums, large office buildings, hospitals, etc. Keywords: Sensor fusion, accelerometer, gyroscope, compass, INS, GPS, Wi-Fi, indoor navigation, smartphone, Android...

Words: 15879 - Pages: 64

Free Essay

Molecular Communication

...Giné *, Ian F. Akyildiz The Broadband Wireless Networking (BWN) Laboratory, School of Electrical and Computer Engineering, Georgia Institute of Technology, Atlanta, GA, USA a r t i c l e i n f o a b s t r a c t Nanotechnology is an emerging field of science devoted to provide new opportunities in a vast range of areas. In this paper, different techniques are proposed to enable the long range interconnection of nano-machines, deployed over distances from a few centimeters up to several meters. Long range nano-communications will enable the development of applications that could not be implemented using other techniques. The usage of both short-range nano techniques and long range micro techniques are not practical or are unfeasible for a huge application scope. Biologically inspired research provides promising features to long range communication, such as very low power consumption and biocompatibility. In this paper, several bio-inspired techniques are discussed following a twofold taxonomy divided according to whether a fixed physical link is required for signal propagation or not, i.e., either wired or wireless communication. In the first group, pheromones, spores, pollen and light transduction are discussed. In the second group, neuron-based communication techniques and capillaries flow circuit are explored. All proposed techniques offer a good framework for long-range molecular communication, and their components and test-beds can benefit from different research expertise...

Words: 11420 - Pages: 46