Premium Essay

Project Info

In: Business and Management

Submitted By anandshewalkar
Words 1572
Pages 7
SESSION: MARCH 2011-SEPTEMBER 2011

NIPS COLLEGE OF IT AND MANAGEMENT
ALL AHABAD

[Synopsis and Project Guidelines]
MCA-6th Semester BCA-6th Semester PGDCA-2nd Semester And MBA-4th Semester

IMPORTANT DATE
S ynopsis Approval Last Date Project S ubmission Date MBA S ynopsis Approval Last Date MBA Project S ubmission Date : : : : 20/05/2011 27/07/2011 30/05/2011 10/08/2011

IMPORTANT INFORMATION
MCA-6th S em Project Coordinator PGDCA-2nd S em Project Coordinator BCA-6th Sem Project Coordinator MBA- 4th S em Project Coordinator : Mrs Seema S rivastava : Mr.Gangesh Kumar :Mr.Deepak Mishra Ph:9451686685 :Mr. Jitendra Kumar Keswani Ph: 8081313153

SYNOPSIS GUIDELINE SYNOPSIS AND PROJECT GUIDELINES

MCA- BCA- PGDCAMCA -6 BCA-6 & PGDCA -2 Synopsis Format
1. Introduction Of Project 2. Objective Of The Project 3. Scope Of The Project 4. Project Plan 5. The Existing System 6. Background Of The Organization 7. Current Problems 8. Areas For Improvement 9. Proposed System 10. Input/Output Requirement 11. Hardware And Software Requirement 12. Database Requirement 13. System Design 14. Tables And Fields For Database 15. Database Dictionary 16. E-R Diagram 17. ‘0’ Level DFD 18. ‘1’ Level DFD 19. Security Control 20. Future Scope Of The Project 21. Conclusion
NIPS COLLEGE OF IT & MANAGEMENT ALLAHABAD Ph: 0532-3291133

th

th

nd

1

SYNOPSIS AND PROJECT GUIDELINES

22. Reference Or Bibliography

Some Suggested Project Title
1. Bank Transactions Management 2. Hotel Management 3. Gas Agency Management 4. Office Automation 5. Railway Reservation 6. Computerization Course Registration 7. Hostel Management 8. Hospital Management 9. Inventory Management 10. Competitive Examination Database 11. Air Line Reservation 12. Transport Management 13. College Admission 14. Library Management 15. On Line Examination 16. Social Networking Sites 17. E-Shopping System...

Similar Documents

Free Essay

What Is Infor Abot?

...The domain name info is a generic top-level domain (gTLD) in the Domain Name System (DNS) of the Internet. The name is derived from information indicating that the domain is intended for informative Internet resources, although registration requirements do not prescribe any theme orientation. The info TLD was a response to ICANN's highly publicized announcement[citation needed], in late 2000, of a phased release of seven new generic top-level domains. The event was the first addition of major gTLDs since the Domain Name System was developed in the 1980s. The seven new gTLDs, selected from over 180 proposals, were meant in part to take the pressure off the com domain.[1] The info domain has been the most successful of the seven new domain names, with over 5.2 million domain names in the registry as of April 2008. After the September 11, 2001 attacks in the United States, the Metropolitan Transportation Authority of New York switched to the easier to remember mta.info website to lead users to latest information on schedules and route changes on the area's transportation services. Even in 2013, a website, Current Score info, was formed to provide current score of Football and Cricket across India. ICANN and Afilias have also sealed an agreement for country names to be reserved by ICANN under resolution 01.92.[2] info is an unrestricted domain, meaning that anyone can obtain a second-level domain under info for any purpose, similar to the com, net or org domains. This is in......

Words: 333 - Pages: 2

Premium Essay

Management Info Systems - Project

...Running head: Course Project Course Project MIS Abstract The company that I chose to identity business issues is Motorola mobility, which is now a subsidiary of Lenovo which was just recently purchased from Google. Motorola Inc. split into two separate companies back in 2011. They manufacture smartphones and mobile devices that run on the Android operating system. Since it conception in 2011, it has gone through a lot of change, obviously the two biggest changes are being sold to Google and more recently Lenovo. Some major issues the company has is it’s slow to market performance. The areas discussed will focus in on how Motorola could learn from other companies and the different processes of Managing an organization in order to produce products in a timely manner Changes in Technology The first major change was Google’s purchase of the company. This obviously had a major effect on the upper management and how Google is going to integrate its management with the existing management. In addition, Google was faced with how to overcome the software issues with the Android operating system; however, since they recently sold that business off to Lenovo and kept the patent, they will pass that issue on. Lenovo will have to rely on the existing management and technical staff along its management and staff, which can cause some difficulties due to the difference in culture between the two companies. It is important to have a strong CIO to manage all of these......

Words: 1630 - Pages: 7

Premium Essay

Intro to Info Security Project Part 1

...User Domain Risk, Threat, or Vulnerability Lack of user awareness • Conduct security awareness training display security awareness posters, insert reminders in banner greetings, and send e-mail reminders to employees. User apathy toward policies • Conduct annual security awareness training, implement acceptable use policy, update staff manual and handbook, discuss dring performance reviews. Workstation Domain Risk, Threat, or Vulnerability Unauthorized access to workstation • Enable password protection on workstations for access. Enable auto screen lockout for inactive time. Unauthorized access to systems, applications, and data • Define strict access control policies, standards, procedures, and guidelines. Implement a second-level test to verify a user’s right to gain access. Account Policies | Password, lockout, and Kerberos settings. | Local Policies | Audit, user rights, and security options. ("Security Options" consist primarily of security-relevant registry values.) | Event Log | Settings for system, application, security and directory service logs. | Restricted Groups | Policy regarding group membership. | System Services | Startup modes and access control for system services. | Registry | Access control for registry keys. | File System | Access control for folders and files. | LAN Multilayer Security * Coverage considerations for wireless LAN (WLAN) users in a branch office * Distance considerations from the closet to......

Words: 726 - Pages: 3

Premium Essay

Business

...Lesson 04 Decision Making Solutions Solved Problem #1: see text book Solved Problem #2: see textbook Solved Problem #3: see textbook Solved Problem #6: (costs) see textbook #1: A small building contractor has recently experienced two successive years in which work opportunities exceeded the firm’s capacity. The contractor must now make a decision on capacity for the next year. Estimated profits under each of the two possible states of nature are shown in the table below. The units are in $ thousands. Next Year’s Demand Low High 50 60 20 80 40 70 -AlternativesDo nothing Expand Subcontract a. Calculate the regret table. -AlternativesDo nothing Expand Subcontract Low High 0 30 10 20 0 10 Determine the alternative and payoff /regret which should be selected for the decision criteria in each of the following questions. b. Maximax (best of all possible alternatives)? Expand – payoff $80 thousand c. Maximin (best of all the worst alternatives)? Do nothing – payoff $50 thousand d. Laplace (best of the expected payoffs for all alternatives)? Tie between Do nothing and Subcontract – Payoff $55 thousand e. Minimax regret (least of all the maximum regrets for each alternative)? Subcontract – Regret $10 thousand #2: Refer to problem 1. Suppose after a certain amount of discussion, the contractor is able to subjectively assess the probabilities of low and high demand: P(Low) = .3, P(High) = .7. a. Determine the expected profit fore each alternative? Do nothing - $57......

Words: 476 - Pages: 2

Premium Essay

Poo on Women: Is This Bad?

...Kempen | C402/C405 | Extend Diploma Mechanical Engineering EDENGM22A/B | Peter Kempen | C402/C405 | | GCSE English | Katherine Davey | G4 | GCSE English | Katherine Davey | G4 | | AS English Literature | Francesca Thomas | A58 | | | | | Archaeology: Unit 1 | Caroline Wilcox | B254 | Archaeology: Unit 2 | Caroline Wilcox | B254 | | Vocational Business assignment completion | Kemi Osoba | A49 | Vocational Business assignment completion | Bekoe Newman | A49 | | Vocational Sport and Travel Tourism assignment completion | Danny Chilvers | A50 | Vocational Sport and Travel Tourism assignment completion | Danny Chilvers | A50 | | AS /A2 GraphicsExtend Diploma Year 2 Final Major Project | Mark Pearson | Art Rooms | AS /A2 GraphicsExtend Diploma Year 2 Final Major Project | Mark Pearson | Art Rooms | Spring Term Revision Schedule 2013-14 Week 1 | Tuesday 8th April | | Morning session 10.00-12.00 | Afternoon Session 1.00-3.00 | | Subject/course | Teacher | Room | Subject/course | Teacher | Room | | A2 Business (China Research Theme) | Nessa | A25 | AS Business | Nessa | A25 | | A2 Economics | Charles | G5 | AS Economics | Charles | | | AS Business | Sarah (11.00-12.30) | A39 | A2 Business (Higher level exam technique) | Sarah | A39 | | AS Law | Amina | A26 | | | | | Vocational Business assignment completion | Kemi Osoba | A49 | Vocational Business assignment completion | Bekoe Newman | A49...

Words: 883 - Pages: 4

Premium Essay

Half Term Revision Dates

...Kempen | C402/C405 | Extend Diploma Mechanical Engineering EDENGM22A/B | Peter Kempen | C402/C405 | | GCSE English | Katherine Davey | G4 | GCSE English | Katherine Davey | G4 | | AS English Literature | Francesca Thomas | A58 | | | | | Archaeology: Unit 1 | Caroline Wilcox | B254 | Archaeology: Unit 2 | Caroline Wilcox | B254 | | Vocational Business assignment completion | Kemi Osoba | A49 | Vocational Business assignment completion | Bekoe Newman | A49 | | Vocational Sport and Travel Tourism assignment completion | Danny Chilvers | A50 | Vocational Sport and Travel Tourism assignment completion | Danny Chilvers | A50 | | AS /A2 GraphicsExtend Diploma Year 2 Final Major Project | Mark Pearson | Art Rooms | AS /A2 GraphicsExtend Diploma Year 2 Final Major Project | Mark Pearson | Art Rooms | Spring Term Revision Schedule 2013-14 Week 1 | Tuesday 8th April | | Morning session 10.00-12.00 | Afternoon Session 1.00-3.00 | | Subject/course | Teacher | Room | Subject/course | Teacher | Room | | A2 Business (China Research Theme) | Nessa | A25 | AS Business | Nessa | A25 | | A2 Economics | Charles | G5 | AS Economics | Charles | | | AS Business | Sarah (11.00-12.30) | A39 | A2 Business (Higher level exam technique) | Sarah | A39 | | AS Law | Amina | A26 | | | | | Vocational Business assignment completion | Kemi Osoba | A49 | Vocational Business assignment completion | Bekoe Newman | A49...

Words: 883 - Pages: 4

Free Essay

Media

...internship activity: 1) Title Page 2) Table of Contents • Include an entry each main section as identified below (Introduction, Responsibilities, Major Projects, etc. • Provide an entry for each appendix, i.e., Appendix 1: Internship Proposal, Appendix 2: Documentation of Work Hours, etc.) 3) Introduction • Provide background information on the Company (paragraph). 4) Responsibilities • This should be a generalized description of Internship responsibilities (a couple of paragraphs at most). • Include a statement of the number of hours worked, with supporting documents in the Appendix. 5) Major Projects • Write summary descriptions for each major project, report, employee communication, or training packages developed (about a paragraph summarizing each) • Heading Examples: o Cyanide air sampling project o MSDS Inventory o Lead abatement project o Respiratory Protection Training o Compressor House Noise Survey o Acid tank ventilation project o Ergo Hazard evaluations • Provide examples of your work in an appendix (see below) 6) Internship Summary • Include pros and cons of your experience 7) Appendices • Include documents supporting the report, such as: o Internship Proposal o Documentation of Work Hours  A copy of check stubs showing first check and last check is sufficient (black out personal info like SS#). o Supervisor’s Evaluation  If you don’t have a copy, make sure that your supervisor has sent it to the instructors. A letter......

Words: 311 - Pages: 2

Premium Essay

Car Services

...Problem: Car Services Ltd (CSL) rends motor vehicle breakdown recovery service to its members. It attracts new members through a television advertising campaign that encourages potential clients to telephone a free call number for further information and the opportunity to immediately enroll with a credit card. Members are offered the choice of three levels of annual service contract in descending order of coverage and price: Gold, Silver and Standard. The telephone inquiries come through to a call centre staffed by CSL employees at the company’s premises who are paid a basic salary and a bonus of each new member that they successfully enroll. Located in the same building on another floor is the Car Hospital (CH) team who take the calls from the stranded motorists and arrange for a franchised garage to deal with the breakdown. These garages are independently owned and CSL pay them a fee for every callout that they undertake. CSL has recently (after January 2004) commenced employing trained mechanics on enhanced salaries to dispense technical advice to members on the telephone in the hope that a proportion of the call-outs to franchised garages will be avoided. Detailed information on costs, revenues, business activity and staff is displayed in the following tables. Table 1 Cost, Revenue and business Activity data for 2004 | |Gold |Silver |Standard ......

Words: 1956 - Pages: 8

Premium Essay

The Architecture Company

...twenty (120) thousand Euros. If the proposal for the second building is accepted the earnings will be seventy (70) thousand Euros. The final profit is given by the total earnings (resulting from the accepted proposals) minus the total costs of preparation of the proposals. The architecture company has the option to submit no proposal, to submit a proposal for only one of the buildings, or to submit proposals for the two buildings. Any of the submitted proposals may be accepted or rejected. If two proposals are submitted, it is possible that none is accepted, only one is accepted, or both are accepted. In the particular case that both proposals are submitted and both are accepted then there will be severe problems implementing both projects simultaneously implying an extra cost of fifty (50) thousand Euros (to be deducted from profits). There is a 50% probability that a proposal for the first building is accepted. The probability that a proposal for the second building is accepted is 50%. The acceptance of one proposal is independent of the acceptance of the other proposal. Answer the following questions by presenting your calculations and justifying your answers. (a) If the maximum EMV decision criterion is adopted, should any proposals be submitted? If yes, for only one building (which one?) or for both? What is the EMV for the optimal decision? (b) If the architecture company was risk averse, could the optimal decision be different...

Words: 733 - Pages: 3

Premium Essay

Unit 7 Project Mm305

...may be required to also upload original files from Excel or QM for Windows. * The calculations are not your final answer. A summary/explanation in your own word for each question posed should be included. * Question 6 requires the use of the States Data File. The States Data file is located in Doc Sharing->Instructor Graded Projects. * Be sure to put your name on this document and save it to your computer. Upload this Word document as your Unit 7 submission in the course Drop Box. Submitting Your Project: * Save your project in a location that you will remember and with your full name. When you are ready to submit your project, click on the Dropbox and complete the steps below: * Click the link that says, “Submit an Assignment.” * In the “Submit to Basket” menu, select Unit 7 Project. * In the “Comments” field include your name. * Click the “Add Attachments” button. * Follow the steps listed to attach your Word Document. * You should revisit the Dropbox to view any helpful feedback your instructor has and to retrieve your graded project. * Make sure that you save a copy of your submitted project. 1. Even though independent gasoline stations have been having a difficult time, Susan Solomon has been thinking about starting her own independent gas station. Susan’s problem is to decide how large her station should be. The annual returns will depend on both the size of the station and a number of marketing factors related......

Words: 1210 - Pages: 5

Premium Essay

Red Brand Case

...6. Is it advisable to purchase any of the available 100,000 lbs of grade A tomatoes? (use the sensitivity report from question 2). If so, (a) how much should we buy? (b) How will the additional tomatoes be used? In order to figure out if we should buy and by how much we should purchase, we made some modifications associated with our model. First of all, we need to add one more decision variable, Additional A, which is the amount of extra grade A tomatoes we decide to purchase. Then we need to change the profit formula to subtract additional purchase cost, which is $0.15*Additional A, the deal Gordon had to purchase up to 100,000 lbs. grade A tomatoes. Also, we need to change the constraint for A grade tomatoes from 600,000 lbs. to (600,000+Additional A) lbs. The last step is to add another constraint to make the decision variable Additional A can be no more than 100,000 lbs. When we ran sensitivity analysis, the shadow price for grade A tomatoes is $0.27, which means when the company increases 1 lb. of grade A tomatoes available in production process, the total profit will increase by $0.27. So as long as the purchase price less than the shadow price, company should purchase extra grade A tomatoes. Moreover, the allowable increase for constraint of amount of grade A tomatoes available is 1,400,000. It means any amount of additional grade A tomatoes under 1,400,000 lbs. will be feasible to purchase to increase profit. Thus it is a good idea to purchase whole 100,000......

Words: 464 - Pages: 2

Premium Essay

Biam 500 Week 2 Lab Analysis

...Lab 2 Analysis Sheila Mejia BIAM 500 Prof. Bruning Keller March 13, 2016 Explain the Solver results you obtained for both the initial problem and your sensitivity analysis. The solver results in the initial analysis in my workbook showed that 333 units of the cc7 and 200 units of the cc8 should be produced in order to obtain the maximum of a little over $5 million in profit while still remaining within the given constraints. The constraints included that that MBI Corporation cannot produce more than 200,000 units in its plant and must remain under an $8million dollar budget. MBI Corp. must also meet marketing constraints of at least producing 100 units of cc7 and 200 units of cc8. In the sensitivity analysis we increases the constraints by ten percent and Solver determined that the optimal units MBI should produce is 110 of cc7 and 46 of cc8. Increasing the constraints decreased the number of units produced and decreased the profit by 31%. Thus, the sensitivity analysis helped determine that the current constraints made for a bigger profit while making staying within budget and satisfying other needs within the corporation. Based on the solver results MDI should not increase the parameters of their constraints, at least not by ten percent. What did you learn from the exercise and how is it important to businesses? The lab showed me how analyze a word problem and interpret the numbers using a spreadsheet. It also taught......

Words: 363 - Pages: 2

Premium Essay

Business

...Assignment No.2 Production Operations Management Decision Making Under Certainty, Uncertainty, Environment is effect on the decisions which are making undercertainty.Certainty and undercertainty are reciprocal to each other,the degree will be vary certainty to uncertainty Decisions making associate with different kinds of risks. Certainty situation refer to who people think they are making reasonable decisions and what will be next in future and they predict analysis and make decisions . The reliable information will help to considered the cause and effect the matter is come to know about relationship for both uncertainty and certainty. Uncertainty situation reffer to people have data base which is not sufficient and reliable data which base brings sure accurate result so this becomes a not sure able result which tells neither good nor bad results. Evaluation of different variables for interaction is so difficult,For example if i start to expand the business in Chinese market but I have nominal and not sufficient information About china culture,climate,political situation ,Govt laws,policies,norms,values etc. It will be more difficult in situation to start business. Founder of Pakistan Quid-E_Azam says”I don’t like to take Right Decisions….!!!!! “I take decisions and make them Right. Correct Pay off table Alternative Low(125dozen) Medium(800dozen) High (1750 dozen) Small facility 15625 15625 15625 Medium......

Words: 366 - Pages: 2

Premium Essay

Business

...spreadsheet applications is important. Text(s): Most current editions of the following: Spreadsheet Modeling & Decision Analysis By Cliff T. Ragsdale, Ed. (Thomson Southwestern) Recommended Course Objectives To understand a variety of quantitative methods. To emphasize presentations, peer review and application of quantitative methods. Measurable Learning Outcomes: Use linear programming for optimization and modeling business applications. Apply the concept of sensitivity analysis. Apply regression analysis for problem solving in business applications. Explain queuing theory. Evaluate risk assessment and project management. Topical Outline: • Optimization linear programming • Modeling LP problems • Sensitivity analysis • Network modeling • Regression analysis • Integer linear programming • Project management Culminating Experience Statement: Material from this course may be tested on the Major Field Test (MFT) administered during the Culminating Experience course for the degree. During this course the ETS Proficiency Profile may be administered. This 40-minute standardized test measures learning in general education courses. The results of the tests are used by faculty to improve the general education...

Words: 401 - Pages: 2

Premium Essay

Optimal Selection

...DECISION THEORY & DECISION TREES(Decision making under risk) Janet Kim, president Kim Manufacturing, Inc., is considering whether or not to build more manufacturing plants in Wisconsin. She has developed the following pay-off table for her decision: Payoff in dollars Alternative Build large plant Build small plant Don’t build Market probabilities Favorable Market 400,000 80,000 0 0.4 Unfavorable Market -300,000 -10,000 0 0.6 (a) Use the expected monetary value approach to determine the decision that Kim should make. (b) Use the expected opportunity loss (regret) approach to determine the decision that Kim should make. (c) What is the expected value of perfect information? Class Example 2 (Decision making under uncertainty) Even though independent gas stations have been having a difficult time, Susan Solomon has been thinking about starting her own independent gasoline station. Susan’s problem is to decide how large her station should be. The annual returns depend on both the size of her station and a number of market factors related to the oil industry and demand for gasoline. After a careful analysis Susan has developed the following table: Size of gas station Small Medium Large Very large Payoff in dollars Good Market 50,000 80,000 100,000 300,000 Fair Market 20,000 30,000 30,000 25,000 Poor Market -10,000 -20,000 -40,000 -160,000 (a) What is the Maximax (optimistic) decision? (b) What is the Maximin (pessimistic) decision? (c) What is the criterion of realism......

Words: 1391 - Pages: 6