Project Management Hue Plant

In: Business and Management

Submitted By thuynttqb
Words 1099
Pages 5
Executive Summary


Conclusion

1.0 Introduction/Problem Statement:

2.0 Project Initiation and Planning

2.1 Project Objective

Section 1:

1.1 Project Scope
1.2 Project Charter:
1.3 Project Validation Analysis
1.4 Work Breakdown Structure
The WBS at the summary task level is listed below.

Section 2:
2.1 Schedule
















| |Task Name |
|CP1 |Select Architect |





















3. Budget cost:


|Task Name |Resource Names |Fixed Cost (VND) |Cost (VND) |Hour per day |EAC (VND) |
| | | | |(h) | |
|"HUE - Project" | | | | | |
| | |- |- | |- |
|PLANNING PHASE | | | | | |
| | |- |- | |590,827,874 |
|Select Architect |PM[10%], FS[60%] | | 2,616,960 |5.6 |…...

Similar Documents

Milk Processing Plant - Project Appraisal

.../unions. 9. PROJECT DETAILS |   | 9.1 Land and Location: i) Ample space is required for buildings, future expansion, parking of transport vehicles and for empty cans. About two acres of land is required for a milk processing plant handling about 10000 liters of milk per day (8 hours). However the built up area to total area should be around 1:3 ratio; ii) The location of a plant should be close to the milk producing area in case of products manufacturing unit and if liquid milk is the main product it should be close to the consumer; iii) The location of site should have proximity to road/rail facilities, services, such as water, electricity and effluent mains, social infrastructure, etc. iv) The subsoil of the site should be firm with proper drainage. 9.2 Site Development:- i) Preferably the entire site should be fenced with barbed wire or compound wall is constructed with gates at suitable places; ii) Internal roads should be of tar/bricks/WBM depending upon the soil conditions, rainfall and the number of vehicles moving every day. 9.3 Layout and Buildings:- The civil works comprises of factory building, quarters, office, garages, security post etc. The factory building for the milk reception, quality control, processing, packing and storage of milk products should be as per the BIS. The total covered area depends on the processes involved, products manufactured, the quantity of milk handled and the equipment chosen for services and product manufacturing. About 4000......

Words: 6187 - Pages: 25

Huntsville Plant Project

...To determine whether the Huntsville Plant Project can be done by its required completion time, calculation of the projects earliest and latest dates was required to figure out the project’s completion date. As a result, the project will be ready by the end of 2009 and will even meet the June 30, 2010 deadline set by the board of directors. According to my finding, the project will actually be completed earlier than scheduled. In most case, this is not usually normal for a project to result like the Huntsville project but instead be delayed and not meeting the projects deadline. When placed in a situation as this there are several things that should be kept in mind to ensure a project will be ready to meet its deadlines on time. One suggestion to consider is to make sure that all project team members are aware of the projects objectives and their own role in the project. In doing this it will alleviate any misunderstanding, and uncertainties that are likely to occur through the project. Another suggestion to be considered is the utilization of key tools such as risk management, scope management, proactive communication, and issue management to ensure that a project deadline is met. If properly utilized these key tools there is no 100% guarantee that the project will be prevented from being delayed. However, it will guide the project manager and team member on how to properly handle a situation that might occur. After much research, I will discuss in this paper how...

Words: 632 - Pages: 3

Communication Plan for Huntsville Project Plant

...Huntsville Plant Communication Plan The communication plan is an important document for any undertaking. In any relationship, communication is key to its success. When one or more members are not involved in the process, problems begin to form. It may be as simple as a paint scheme, extending a floor several feet more, or can be a major change, such as a site change or requesting more material and labor. The biggest thing that the communication plan brings to a project team is providing a plan in which to mitigate problems and execute the project in the same manner as it is drawn up, thereby ensuring that everyone involved is on the same page. The project communication also outlines the level of involvement in which each person must communicate. As we discussed, communication involves a sender, a medium, and a receiver. For each specific event that we have outlined in our communication plan, there is a plan that clearly defines who the sender is, what medium to transmit that information, and the recipients. The different levels of communication change as the significant impact to the project as a whole will be different. For example, the daily meetings can be done through a teleconference, with all members actively being there and participating. This could be equated to the morning breakfast that you would have with your family. Pleasantries aside, this keeps all members of the team involved and aware of what is going on from a day to day basis. The meeting with......

Words: 333 - Pages: 2

Huntsville Plant Project

...Running head: PM586_ESSAY QUESTIONS PM586_ESSAY QUESTIONS Maggie Larocque Keller Graduate School of Management Abstract This project schedule for the Huntsville Plant has been completed. The task sequencing as well as the duration of each activity has been assigned with its predecessors. As each phase has been completed, the resource list has been loaded and aligned to each task. This report will analyze the results of the project schedule and resource allocation. An analysis of the Gantt chart reveals that the estimated duration of each activity and when it will be completed. At this time, the estimated completion date is scheduled for July 15, 2012. This will be after the projected deadline of June 30, 2012. An analysis of the Gantt Chart also shows a number of the activities are deemed as critical tasks. We also note that during the Planning Phase, a there are quite a few tasks that are scheduled during non-working hours; we recommend rescheduling the tasks so that they occur during working time. There are also a number of potential scheduling problems with other tasks that may be responsible for delayed start date. Our text, states some critical success factors when scheduling (Gido, p.179): • The estimated duration for an activity must be based on the types and quantities of resources required to perform the activity. • Activities should not be longer in estimated duration than the time intervals at which the actual progress will be reviewed...

Words: 628 - Pages: 3

Hue City

...Battle of Hue City The Battle of Hue City was one of the most fierce and brutal battles in the Vietnam War. Three Marine Battalions totally fewer than twenty-five thousand men attacked and successfully defeated over ten thousand enemy troops liberating Hue for South Vietnam. The City of Hue was located in central Vietnam and was the country’s cultural capital for that reason is was spared from the horrible effects of the war until 1968. During Tet a lunar New Year’s holiday celebrated all over Vietnam the North Vietnamese and Viet Cong launch a massive attack on South Vietnam. Second Battalion Fifth Marines fought alongside the Army of the Republic of Vietnam, supported my Army Calvary units to take over Hue City block by block. Hue City was an insanely brutal battle to say the least. Enemy soldiers were pulled out there homes and other buildings they found cover in and eliminated. This battle lasted twenty-six days the longest battle since the battle for Seoul during the Korean War. Major Ron Christmas was quoted saying “fighting house-to-house is the dirtiest of all fighting. . . Just as a rat must be drawn from his burrow to be eradicated, an enemy soldier, burrowed in a building, must also be pulled from his hiding place to be eliminated. Normally, he will not come out without a fight. The attacker must go in and dig him out.” The battle began early January 31, 1968 and by 0800 the North Vietnamese had raised there red and blue Viet Cong flag with its gold star in...

Words: 709 - Pages: 3

Battle of Hue

...Battle of Huế From Wikipedia, the free encyclopedia Jump to: navigation, search | This article needs additional citations for verification. Please help improve this article by adding reliable references. Unsourced material may be challenged and removed. (March 2010) | Battle of Huế | Part of the Tet Offensive, Vietnam War | US Marines fighting in Hue | Date | January 30 – March 3, 1968 | Location | 16°28′30.9″N 107°34′33.6″E / 16.47525°N 107.576°E / 16.47525; 107.576Coordinates: 16°28′30.9″N 107°34′33.6″E / 16.47525°N 107.576°E / 16.47525; 107.576 Huế, South Vietnam | Result | Tactical South Vietnamese and US victory[1] | | Belligerents |  South Vietnam  United States | North Vietnam Viet Cong | Commanders and leaders | Ngô Quang Trưởng Foster LaHue | Trần Văn Quang | Strength | 11 ARVN battalions 2 U.S Army battalions 3 U.S Marines battalions | 10 PAVN and NLF battalions | Casualties and losses | ARVN: 452 killed 2,123 wounded U.S.: 216 killed 1,584 wounded[2] Total: 663 killed 3,707 wounded | PAVN figures: About 2,400 killed and 3,000 wounded (from 30-1 until 28-3)[3] MACV estimate: 8,113 killed[4] 98 captured[5] | 844 civilian deaths and 1,900 injuries due to accident of battle, 4,856 civilians and captured personnel executed by communists or missing according to the South Vietnamese government[6] | [show]v · d · e Military engagements of the Vietnam War | | | Laos - Sunrise – 1st Ap Bac – Go...

Words: 4508 - Pages: 19

Toyota Plant in Valenciennes: Cross-Cultural Management

... corporate ladders in Japan with their masculine norm of hard and long working hours. • Uncertainty Avoidance France: 86 / Japan: 92 Japan and France both has one the highest scores on the Uncertainty Avoidance index. The two countries don’t like uncertainty at work. They need details, and work with structure, rules and security. In corporate, all the risk factors must be worked out before any project can start. They often have a second plan in case of the first one fails. Changes are very difficult to realize in both countries. • Long Term Orientation France: 39 / Japan 80 France is a short-term oriented society whereas Japan is one of the longest terms oriented society. In France people are respecting traditions but they don’t live much with the past. In terms of business, the short-term orientation focuses on quick results (quarterly results). Management is based on personal achievement, hard work and managers are judged on short-term results. In Japan, people see their life as a very short moment in a long history of mankind. Japanese aspire for the best you can do in your lift time, they are not driven by God but by people. In corporate, it results by a long-term orientation in the investments (even in difficult times) and the priority to steady growth of market share rather than quarterly profits. They prefer companies that grow slowly but for a long time than companies with large profit but during a short period of time. Toyota Management style in......

Words: 1479 - Pages: 6

Huntsville Plant Project

...|Project Name |Huntsville Plant |Project Number |XXX | |Project Manager |Ahmad Malal |Prioritization |High | |Owner(s) |Johann Seitz |Start Date: |April 18, 2011 | | | | | | |Scheduled Completion |June 30, 2012 | |Date: | | |Mission | | |The purpose of this project is to construct anew plant so the strategic goals set in place will be met in the next fiscal year. | |Scope | | |In Huntsville, Alabama a new plant will be constructed accommodate for the increased number of sales the company is reaching for, room for new products | |that will be available, increased productivity and to house supplies so dependency on others will no longer be a factor...

Words: 538 - Pages: 3

Project Management

... understanding of all the processes that goes into producing the product. For example: one cannot project manage the delivery of a housing project without understanding how a house is built. So the Project Manager will need to understand the whole process of building a house as well as the process of obtaining the authorisations from local authorities, as well as the process of obtaining environmental clearance, as well as the process of getting bulk services to the site etc. This Project Manager may, on completion of this housing project, be required to project manage the upgrade of the N1 between Beaufort West and Laingsburg. Thereafter, he will be the Project Manager on the Materials Handling System Upgrade at Saldanha Steel and thereafter the Project Manager for the Balance of Plant Project as part of the Pebble Bed Modular Reactor Programme. This places the experienced Project Manager in the very unique position of knowing (in combination) a lot of stuff about a lot of stuff that in all likelihood very few other people know as well. Project Management in the EPCM Environment. At this point I will introduce my own experience. I started in Project Management by accident 18 years ago. I was a young(ish) electrical engineer with little ambition other than to become a damn good Senior Electrical Engineer one day. My experience has taught me that Project Management need not only be about being the Project Manager. In large organisations where project management is the......

Words: 5880 - Pages: 24

Project Management Hue Plant

...Executive Summary Conclusion 1.0 Introduction/Problem Statement: 2.0 Project Initiation and Planning 2.1 Project Objective Section 1: 1.1 Project Scope 1.2 Project Charter: 1.3 Project Validation Analysis 1.4 Work Breakdown Structure The WBS at the summary task level is listed below. Section 2: 2.1 Schedule | |Task Name | |CP1 |Select Architect | 3. Budget cost: |Task Name |Resource Names |Fixed Cost (VND) |Cost (VND) |Hour per day |EAC (VND) | | | | | |(h) | | |"HUE - Project" |  | | | | | | | |- |- | |- | |PLANNING PHASE...

Words: 1099 - Pages: 5

The Huntsville Plant Project

...Answer the following essay questions Essay Question #1: Will the Huntsville Plant Project be ready by the June 30, 2012 deadline set by the board of directors? What options might be open to ensure this deadline is met, if the current schedule indicates the Huntsville plant project will not be ready in time? The Huntsville Plant Project starts on April 18, 2011. This is the early start date for the project. If the scheduled activities for the development of the project, the projected June 30, 2012 start date set by the board of directors would be successfully accomplished The critical path of the project is the Plant Readiness Phase. This phase has a total of 40 weeks of completion. The procurement of equipment which has duration of 24 weeks can be completed upon completing the predecessors of creating a project plan. In order for the equipment to be installed, the building construction, recruitment of plant personnel, and procurement of equipment need to be completed on time. The construction of the building is scheduled to be completed within the period of 40 weeks. The development of the building design, obtaining necessary permits and approvals, and preparation of the site are critical steps that need to be on schedule for the smooth flow of the Huntsville Plant Project development. Following the AIB simulation, the critical path (CP) is established above. The early start (ES) is April 18, 2011. The late start (LS) is not identified in the narrative...

Words: 438 - Pages: 2

Huntsville New Plant Project Agenda

...HUNTSVILLE NEW PLANT PROJECT AGENDA ESSAY As the Project manager I will be holding a status review meeting with the following topics in the agenda. Status reports, project schedule updates, identify possible solutions and risks, impact of risk to project objective, determine if any problems have been solved, and meeting minutes. Written communication would be through email and paper hard copies. Verbal communication would be utilized through face-to-face contact and via phone. Project managers need to take time to prepare for the meeting well in advance. The first thing on my list would be to send out a reminder email three days prior to meeting time and location along with a prepared agenda and outline of meeting topics to send via email to all team members. Ask all team members to bring their updates and concerns to meeting. Gather all paper work with special interest to this project and the latest updates and possible risks that have been identified. Prepare colored power point slides as visual aids for team members if possible. Visual aids help see the topics more clearly and keep the audience alert and provide more effective communication. It is also very important to start the project meeting on time. Team members need to become familiar with the start of meeting times and know that when they show late the project manager will not hold the meeting for them. As the meeting starts the project manager should make sure that everyone has an...

Words: 444 - Pages: 2

Rampal Power Plant Project

... financial supporter of the project and it would take the lead in management and operation of the power plant and it would be operated like an independent private power plant selling electricity to PDB. Though, the plant will become a major source of generation and electricity, India has failed realize that Sunderbans which partly lacated in the West Bengal will be massively affected. Rampal power plant will not only threaten the biodiversity of Sundarbans but as a result of the deforestation the entire environment will be vulnerable to storm, cyclone, and other natural disasters. The motive of both the countries earning profits is in question. There is a high level of political deception inducing the rural community to surrender the lands forcefully. According to the chronology of events it would be clear that the EIA process was merely a sham, used as an instrument to rationalize a predetermined project. (1) Land acquisition order for this power plant was issued on 27 December 2010 more than two years before the EIA was done. (2) Before the EIA was approved, the joint venture agreement to set up the power plant was signed between Indian company NTPC and Bangladeshi company PDB on 29 January 2012 . (3) The EIA was published on January 2013 in the PDB website for public opinion. Experts and some concerned organizations submitted their opinion in due time, they rejected the EIA. (4) A public consultation was arranged by PDB on 12 April 2013 . The experts, who were present......

Words: 2181 - Pages: 9

Blacktown Water Treatment Plant Project Brief

...Blacktown Water Treatment Plant Project Brief Version: 1.1 Date: 8/22/2014 Copy: Uncontrolled Document Acceptance and Release Notice This is Version 1.1 of the Blacktown Water Treatment Plant Project Brief. Title: Blacktown Water Treatment Plant. Background: This treatment plant is designed to remove potentially harmful substances from waste water. It also includes safe effluent discharge and production of agro-ash. This is the process diagram of the treatment plant: [pic] Process flow - step 1 Preliminary treatment bar screen Removal of large objects As wastewater enters LMWQCC, it is screened through bar screens for the removal of objects that could damage or interfere with the process and equipment. Chemical addition Ferrous chloride (FeCl2, an industrial by-product), and lime are added to the sewage before it enters the grit tanks, to improve the subsequent chemical treatment process. Grit removal The effectiveness of the chemicals added in the pre-treatment stage is improved by extra mixing in the grit tanks, and by introducing compressed air into the tanks (aeration). The grit (approx 1.5 tonnes/day) is then pumped to a grit classifier where the wastewater is separated, then further treated. Process flow - step 2...

Words: 1246 - Pages: 5

Plant

...[pic] Operation Management Assignment Task 1 4 Vs of IKEA FURNITURE Name Saqib Ali Enrolment ID 30113460 Submitted to Dr Maria Zenaida Mullin Submission date 14 Aug, 2015 IKEA FURNITURE OUTLETS Executive summary Brief summary findings It’s difficult to manage furniture store like IKEA because lot of employees are required to run the operations smoothly and it’s a big problem to manage bigger workforce, so that’s why it’s one of the biggest issue for the IKEA furniture to handle the big workforce. IKEA furniture retail stores having very big and complicated store structure, which is also one of main problem to organize, in any worst case like fire into the store it’s difficult to move everyone out of the retail store. And big furniture Retail stores like IKEA also having a lot of products like chairs, beds, sofas etc. So in case, sales of the products gone slow all of the product gone dusty and its difficult to maintain all furniture clean and in good condition. (Furniture World 2012). Conclusion After analysing all the operation of the IKEA furniture, I am able to find out IKEA furniture emphasis a lot on efficiency and effectiveness of its operation management. The company has implemented its operations management strategy in all of its business process and operations to maintain low cost model. IKEA furniture’s is one of the best examples of the corporations who concentrate high effective operation management...

Words: 1861 - Pages: 8