Premium Essay

Project Management Notes

In:

Submitted By Exzil
Words 584
Pages 3
Analogous Estimating: An estimating technique that uses the cost along with measures of scale such as size, weight or complexity from a previous project to estimate cost for a similar future project. (Aka Top Down, -40% to +100%)
Parametric Estimating: An estimating technique that uses a statistical relationship between historical data and other variables to calculate project costs. (More accurate, -30% to +50%)
Bottom-Up Estimating: Estimating project decomposed of detail, time consumption, most accurate form of estimation, ensures every item is included. (High Accuracy, -10% to 15%)

Value Engineering: Creative approach used to optimize project costs, save time, increase profits, improve quality, expand market share, solve problems and/ use resources more effectively. PERT+ CPM = used for project
Life Cycle Costing: Includes total costs of creating and using the project during its useful life. Consider disposition costs of the product after its useful life is complete.
Contingency reserve is calculated during risk analysis. Management reserve is determined by how much uncertainty management feels exists in project Project Risk Management: Systematic process of identifying, analyzing and responding to project risks. The purpose of this is to reduce overall project risk level. (Benefits: Proactive rather than reactive, reduces surprises/ negative consequences, provides better control over the future, improves chances of reaching project performance.)
EMV = Likelihood x Impact. (Likelihood is the probability of occurrence and impact is the amount at stake
Qualitative Risk Analysis: Process of prioritizing risks for subsequent further analysis or action by assessing and combining their probability and impact. (Doesn’t use numbers, uses high/low/medium risk, uses words)
Quantitative Risk Analysis: (Based on numbers, show risk, probability, impact, EMV aka

Similar Documents

Premium Essay

Communication

...Instructor's Manual to accompany PROJECT MANAGEMENT A SYSTEMS APPROACH to PLANNING, SCHEDULING, and CONTROLLING TENTH EDITION HAROLD KERZNER, PH.D. John Wiley & Sons, Inc. Table of Contents PART ONE: Solutions to Chapter Problems Chapter 1-Problems Chapter 2-Problems Chapter 3-Problems Chapter 4-Problems Chapter 5-Problems Chapter 6-Problems Chapter 7-Problems Chapter 8-Problems Chapter 9-Problems Chapter 10-Problems Chapter 11-Problems Chapter 12-Problems Chapter 13-Problems Chapter 14-Problems Chapter 15-Problems Chapter 17-Problems Chapter 18-Prob1ems PART TWO: Solutions to Case Studies Clark Faucet Company Kombs Engineering Williams Machine Tool Company Wynn Computer Equipment (WCE) Reluctant Workers Hyten Corporation Macon, Inc. Continental Computer Corporation Goshe Corporation Acorn Industries MIS Project Management at First National Bank Cordova Research Group Cortez Plastics Phil Condit and the Boeing 777 Teaching Note AMP of Canada (B) Case Study AMP of Canada (C) Case Study AMP of Canada (A) Teaching Note AMP of Canada (B) Teaching Note AMP of Canada (C) Teaching Note Riverview Children’s Hospital Teaching Note Como Tool and Die (A) Como Tool and Die (B) Apache Metals, Inc. Haller Speciality Manufacturing An International Project Manager’s Day (B) Case Study An International Project Manager’s Day (C) Case Study An International Project Manager’s Day (D) Case Study Hazelton International Limited...

Words: 1932 - Pages: 8

Premium Essay

Cis 517 Wk 2 Assignment 1 It Project

...ASSIGNMENT 1 IT PROJECT To purchase this visit here: http://www.activitymode.com/product/cis-517-wk-2-assignment-1-it-project/ Contact us at: SUPPORT@ACTIVITYMODE.COM CIS 517 WK 2 ASSIGNMENT 1 IT PROJECT CIS 517 WK 2 Assignment 1 - IT Project Management Assessment Research and read an article on recent recipients of the Project Management Institute’s Project of the Year Award. Write a two to three (2-3) page paper in which you: 1. Summarize how the project manager or team exhibited exceptional and ethical project management practices. 2. Discuss the role of the project manager or team, the organizational setting, the recipient’s approach to project integration management, and obstacles that had the potential of adversely impacting the triple constraints. More Details hidden... Activity mode aims to provide quality study notes and tutorials to the students of CIS 517 WK 2 Assignment 1 IT Project in order to ace their studies. CIS 517 WK 2 ASSIGNMENT 1 IT PROJECT To purchase this visit here: http://www.activitymode.com/product/cis-517-wk-2-assignment-1-it-project/ Contact us at: SUPPORT@ACTIVITYMODE.COM CIS 517 WK 2 ASSIGNMENT 1 IT PROJECT CIS 517 WK 2 Assignment 1 - IT Project Management Assessment Research and read an article on recent recipients of the Project Management Institute’s Project of the Year Award. Write a two to three (2-3) page paper in which you: 1. Summarize how the project manager or team exhibited exceptional and ethical project management...

Words: 633 - Pages: 3

Premium Essay

Project Management

...MAN620/ADM720 Project Management Lecture Session 1 : 26th January 2010       An introduction into project management with some history of project management and some contextual information. How project management has permeated almost all aspects of working life. The evolution of the project management context. Why and under what circumstances project management is used. What characterizes projects and differentiates them from other forms of management. Examples of projects – large medium and small. Chapter 1 - An Introduction to Project Management The Project Management Book of Knowledge (PMBoK) defines Projecy Management as “the application of knowledge, skills, tools and techniques to project activities to meet project requirements”. In the course outline we make the following statements with regard to what this course promises you engineering students. In the engineering environment, Project Management can be practiced either a stand-alone professional discipline or as an integral part of the delivery mechanism for engineering services. Either way, all engineers need a thorough understanding of Project Management theory, principles, practices, tools and techniques. This course has been structured to stimulate the interest of student engineers in the discipline of Project Management and to equip them with sufficient knowledge of the discipline to meaningfully participate in project work at an early stage. Many organisations do not employ full time Project Managers and...

Words: 5880 - Pages: 24

Premium Essay

Assignment

...JANUARY SEMESTER 2016 (USTY) EMPM5103/EMPM5203 PROJECT MANAGEMENT / PRINCIPLES OF PROJECT MANAGEMENT ASSIGNMENT OBJECTIVE: To apply the concept of Project Management process from planning, scheduling and controlling. INSTRUCTIONS: You are required to provide a report on the following tasks. It is acceptable to use the opinions and judgments of project professionals to support your work. QUESTION 1 Review one of the pages from your local newspaper, and try to identify all the projects contained in the articles. How many were you able to find? You must highlight all of them. From the articles that you had chosen, explain why did you classify them as ‘project’? Justify your arguments by providing supporting theories in project management. Note: You should scan and attach the relevant articles or pictures in the assignment. [20 marks] QUESTION 2 How many of you have heard or experienced yourself of the abandoned or sick projects in Malaysia? For the Malaysian construction industry, reports indicate 17.3% of 417 government projects were considered “sick” (Malaysia Ministry of Works, 2005). In a context of project management, discuss critically why these problems are occurring and what can be done to minimize the sick projects from occurring. Note: You are required to provide a report based on criteria which are set out in the marking rubric. [50 marks] 1 QUESTION 3 a) From Table 1 below, draw the Critical Path Method (CPM) network diagram and...

Words: 406 - Pages: 2

Premium Essay

My Aploads

...freely printed, copied and distributed for private and commercial use, as long as the layout, contents and the copyright notes remain unchanged. Items (questions with answering options) from this document may be copied and discussed in public forums and Internet discussion groups as long as the source is correctly stated. In such case please inform the author to allow his contribution to the discussion, if necessary. Visit www.oliverlehmann.com and find many more free sample questions to prepare for the PMP exam. Feedback is welcome at oliver@oliverlehmann.com. Document version: 2.5 This prep test was written by: Oliver F. Lehmann, PMP Email: oliver@oliverlehmann.com Proof reading and editing was done by: Antje Lehmann-Benz, M.A. Email: antje@oliverlehmann.com Questions are based on:   PMBOK® Guide 5th Edition PMP® Examination Content Outline Language aids:   PMI offers language aids to the real exam in ten languages. A German language aid for this prep test is available for free download here. If you wish to develop a language aid in your own language, don’t hesitate to contact us and ask for support. Language aid development is a great exercise if you want to get prepared for the PMP exam.   This document may be freely printed, copied and distributed for private and commercial use, as long as the layout, contents and the copyright notes remain unchanged. Please verify that you have the most up-to-date version at: www.oliverlehmann.com. 2 © 2007-2013...

Words: 23317 - Pages: 94

Premium Essay

Projectteamchart

...Communications Management Plan Template This Project Communications Management Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome your comments. Public distribution of this document is only permitted from the Project Management Docs official website at: www.ProjectManagementDocs.com Communications Management Plan Company Name Street Address City, State Zip Code Date Table of Contents Introduction 2 Communications Management Approach 2 Communications Management Constraints 3 Stakeholder Communication Requirements 3 Roles 4 Project Team Directory 6 Communication Methods and Technologies 6 Communications Matrix 8 Communication Flowchart 9 Guidelines for Meetings 9 Communication Standards 10 Communication Escalation Process 11 Glossary of Communication Terminology 12 Introduction The purpose of the Communications Management Plan is to define the communication requirements for the project and how information will be distributed. The Communications Management Plan defines the following: • What information will be communicated—to include the level of detail and format • How the information will be communicated—in meetings, email, telephone, web portal, etc. • When information will be distributed—the frequency of project communications both formal and informal • Who is responsible for communicating project information ...

Words: 3808 - Pages: 16

Premium Essay

Week3 Project

...PROJECT SCOPE STATEMENT Note: Any work not explicitly included in the Project Scope Statement is implicitly excluded from the project. * Create links to referenced documents (e.g., Link_To_… ) by using Insert Hyperlink on your toolbar. * Note that all documents that are linked to the Scope Statement become part of the Project Scope and require the same degree of management control. Such documents should be maintained in a separate Scope directory along with the Scope Statement. | Project Name: | | Prepared by: | | Date (MM/DD/YYYY): | | Version History (insert rows as needed): | Version | Date (MM/DD/YYYY) | Comments | 1.0 | | | | | | | | | | | | 1. Executive Summary | Provide below a brief overview of this project (e.g., project purpose and justification): | | Provide a brief project summary in the space below. This information may be available in the Project Charter. Also provide a link to the Project Charter for reference. | Link_To_Project_Charter | | Note: In any instance where there is a discrepancy between the Project Charter and the Project Scope Statement, the latter is considered authoritative. | 2. Business Objectives | 2.1 Product Description (Solution): | | 2.2 Business Objectives: | | 3. Project Description | For each area below, provide sufficient detail to define this project adequately: | 3.1 Project Scope | ...

Words: 1070 - Pages: 5

Premium Essay

Abcdefg

...Project Management Plan |Project Name: |Project Number: | | | | |Project Sponsor: |Project Manager: | |Signature: |Signature: | |E-mail: |E-mail: | |Start Date: |Estimated End Date: | 1. Project Overview 5 1.1 PURPOSE: 5 1.2 KEY STAKEHOLDERS/DEPARTMENTS: 5 1.3 KEY DELIVERABLES: 5 1.4 MAIN OBJECTIVES: 6 1.5 ASSUMPTIONS: 6 1.6 CONSTRAINTS: 6 1.7 PROJECT MANAGEMENT PLAN VERSION CONTROL 6 2. INTEGRATION MANAGEMENT 7 2.1 INTEGRATED CHANGE CONTROL 7 2.1.1 CHANGE REQUEST FORM 7 2.1.2 CHANGE CONTROL BOARD (CCB) 8 2.2 PROJECT CHECKLIST 8 3. SCOPE MANAGEMENT PLAN 11 3.1 SCOPE STATEMENT 11 3.2 OVERALL SCOPE MANAGEMENT PLAN STRATEGY 11 ...

Words: 7096 - Pages: 29

Premium Essay

Engineering Management Syllabus

...ENGINEERING MANAGEMENT Spring 2016 Instructor E-mail: Phone Fax Office Office Hours Berna EREN TOKGOZ berna.tokgoz@lamar.edu E-mail communication is the best. Please do NOT e-mail the instructor through Blackboard!!! Always use berna.tokgoz@lamar.edu. (409) 880-8815 (409) 880-8121 2202 Cherry Engineering Monday: 1:00 pm – 2:00 pm, Thursday: 1:00 pm – 2:00 pm or by appointment. Class Web Site https://luonline.blackboard.com/webapps/login/ Communication Login to Blackboard and check your e-mails frequently for notes, downloads and announcements. Course Textbook (Required) 1. Management by John R. Schermerhorn. 13th Edition. John Wiley & Sons Inc. ISBN: 978-1-118-11392-9 2. Managing Engineering and Technology by Lucy C. Morse and Daniel L. Babcock. 6th Edition. Pearson Higher Education, Inc. ISBN-13: 978-0-13-348510-3, ISBN-10: 0-13-348510-2 3. Project Management: A managerial Approach by Jack R. Meredith and Samuel J. Mantel, Jr. 8th Edition. John Wiley & Sons Inc. ISBN-13: 9780470533024, ISBN-10: 0470533021 4. Seven habits of highly effective people by S&S, ISBN 0-6-7170863-5 Course Overview This course will cover the fundamentals of engineering management. It is designed to teach management principles to engineering students to prepare them as engineering manager. Topics of the course will be divided seven major areas of management. These are management, environment, planning and controlling, organizing, leading, managing projects, and managing...

Words: 2646 - Pages: 11

Premium Essay

Bus 519 Week 3 Bus519 Week 3

...addresses uncertainty as part of “doing the job.” Argue the value of having a risk strategy despite the cost associated with it. Include an example to support your response. Provide a rationale for your selection and determine how this approach helps a project to be successful. BUS 519 Week 2 Discussion "Need for Risk Management" Please respond to the following: * There are four (4) critical success factors that are important for effective risk management: supportive organization; competent people; appropriate methods, tools and techniques; and simple, scalable process. Determine three (3) obstacles for an organization to manage risk effectively. Suggest strategies from the perspective of a project manager to avoid the obstacles. BUS 519 Week 3 Discussion "Project Initiation" Please respond to the following: * Using the “Stakeholder Analysis Template” (Appendix B2 in the Hillson and Simon text) for a company that you currently work for or you are familiar with, determine the key stakeholders and categorize them by their attitude, power, and interest dimensions. Explain how stakeholder analysis affects the overall project risk management within an organization. * One of the most important aspects of managing risk for a project is to accurately define the...

Words: 2422 - Pages: 10

Premium Essay

Bus 519 Week 6 Bus519 Week 6

...addresses uncertainty as part of “doing the job.” Argue the value of having a risk strategy despite the cost associated with it. Include an example to support your response. Provide a rationale for your selection and determine how this approach helps a project to be successful. BUS 519 Week 2 Discussion "Need for Risk Management" Please respond to the following: * There are four (4) critical success factors that are important for effective risk management: supportive organization; competent people; appropriate methods, tools and techniques; and simple, scalable process. Determine three (3) obstacles for an organization to manage risk effectively. Suggest strategies from the perspective of a project manager to avoid the obstacles. BUS 519 Week 3 Discussion "Project Initiation" Please respond to the following: * Using the “Stakeholder Analysis Template” (Appendix B2 in the Hillson and Simon text) for a company that you currently work for or you are familiar with, determine the key stakeholders and categorize them by their attitude, power, and interest dimensions. Explain how stakeholder analysis affects the overall project risk management within an organization. * One of the most important aspects of managing risk for a project is to accurately define the...

Words: 2422 - Pages: 10

Premium Essay

Bus 519 Complete Course Bus519 Complete Course

...addresses uncertainty as part of “doing the job.” Argue the value of having a risk strategy despite the cost associated with it. Include an example to support your response. Provide a rationale for your selection and determine how this approach helps a project to be successful. BUS 519 Week 2 Discussion "Need for Risk Management" Please respond to the following: * There are four (4) critical success factors that are important for effective risk management: supportive organization; competent people; appropriate methods, tools and techniques; and simple, scalable process. Determine three (3) obstacles for an organization to manage risk effectively. Suggest strategies from the perspective of a project manager to avoid the obstacles. BUS 519 Week 3 Discussion "Project Initiation" Please respond to the following: * Using the “Stakeholder Analysis Template” (Appendix B2 in the Hillson and Simon text) for a company that you currently work for or you are familiar with, determine the key stakeholders and categorize them by their attitude, power, and interest dimensions. Explain how stakeholder analysis affects the overall project risk management within an organization. * One of the most important aspects of managing risk for a project is to...

Words: 2421 - Pages: 10

Premium Essay

Project Plan

...URCovered Mobile Application Project Plan Project Scope – The project scope is to allow customers an alternative means of communication with case managers which in turn will provide a more efficient claims process. Project Objectives – The objectives of this provide will include extending the current process into a more efficient and user friendly process. The work load for case managers will be decreased as the application will allow for case managers the ability to manage more cases without affecting the quality of their work. Customers will be given real time status updates and be provided with instant and personal communication with their case managers. Objectives for this project will specifically target the IOS market, as the application will be designed for the Iphone/Ipad platform. Finally, the current claim management system will be updated and improved so that it can be integrated with the new system. Project Monitoring and Control – Monitoring and control methods used will include peer and expert reviews in the initiation, requirements, and verification phase. During the initiation phase, Project notes will be reviewed in order to determine if all information reported will be sufficient enough to move to the following phase. In the requirements phase, the existing system will be reviewed and compare to the system in development. Developers will determine what needs to be implemented, removed, and improved in order to meet system requirements. The last review...

Words: 545 - Pages: 3

Premium Essay

Week 1

...MGMT- 404 PROJECT MANAGEMENT STATEMENT OF PARTICIPation This document will contain the information needed for your team operations, guidelines and commitment. It should be kept in doc sharing and each update should have a version control identifier (e.g., Team A SOP v1, v2, v3, etc.). IMPORTANT NOTE: The statement of participation must be posted in the team’s doc sharing area and the final submission must be available for the team to review and approve each week. Approval can be achieved by downloading the document. If you have disagreements, it is critical to contact your project leader and get a correction posted immediately. The professor should be notified of any disagreements. If the statement of participation is not submitted, the entire team will receive the same grade (including any point loss from other team members). I. Team Information PROJECT NAME: | MEMBER NAME | # | PHONE # | | EMAIL | | MEETING AVAILABILITY | Jade Xiong | 1 | | | | | Monday at 5 / email/ phone | Raquel Godoy | 2 | | | | | Monday at 5/ email/ phone | Genaro Zavala | 3 | | | | | Monday at 5/ email /phone | | 4 | | | | | | | 5 | | | | | | | 6 | | | | | | II. Weekly meeting schedule The most successful teams schedule at least (2) meetings a week throughout the course. Scheduling standing meetings allows everyone to schedule this time in advance and coordinate other activities around the scheduled meeting times. Meetings can change...

Words: 1698 - Pages: 7

Premium Essay

Socc Project Plan

...[pic] Project Management Plan Project: Southern Ontario Construction Conference Client: The Southern Ontario Builder’s Association Prepared by: Event Executives: Amanda Jones, Leigh West and Krystal Connors April 4, 2012 Release 2.2 Abstract This document contains the full Project Plan surrounding the event “Southern Ontario Construction Conference”. The purpose of the Project Management Plan is to define the high level processes and methods that will be used for project execution. Table of Contents 2.0 Statement of Purpose V 3.0 Executive Summary V 3.1 Overview of the Organization V 3.2 Current Situation and Problem/Opportunity Statement V 3.3 Project Objectives VI 4.0 Project Organization 1 4.1 Project Team 1 4.2 Key Stakeholders 1 5.0 Project Requirements 1 5.1 In Scope 1 5.2 Out of Scope 1 5.3 Critical Success Factors 2 6.0 Work to be performed – Work Breakdown Structure (WBS) 2 6.1 WBS Structure Purpose and Limitations 2 6.2 WBS Dictionary 2 6.3 WBS Outline View 5 6.4 WBS Organizational Chart 7 7.0 Network Diagram 8 8.0 Scope Management Plan 8 8.1 Introduction 8 8.2 Scope Management Approach 8 8.3 Scope Definition 9 8.4 Project Scope Statement 9 8.6 Scope Control 10 9.0 Project Schedule 10 9.1 Project Schedule Constraints 10 9.2 High Level Project Milestones 10 9.3 Detailed Project Plan 11 10.0 Schedule Management Plan 13 10.1 Introduction...

Words: 14533 - Pages: 59