ENVIRONMENTAL ASPECTS OF PROJECT MANAGEMENT

ENVIRONMENTAL ASPECTS OF PROJECT MANAGEMENT

ABSTRACT

The primary challenge in project management is to achieve all of the defined project goals and objectives while adhering to typical constraints which are usually scope, quality, time, and budget. Often, the basic flaw in project planning and design is the complete neglect or minimal consideration of environmental and social costs and dependence only on economic analysis for project preparation and investment. A failure to understand and internalize diverse or negative impacts on environment during project preparation could lead to several undesirable consequences, which may ultimately jeopardize the very objectives of growth and development for which the project was proposed.

The need for environmental management for successful project completion is stressed upon and the challenges of addressing the key environmental issues are discussed. Environmental management is not just about the ‘trees and bees’ but also about health, safety, profits, quality assurance, reduced risks to reputation, and increased global competitiveness, states the author. Overall, it is about efficiency and reducing environmental and legal liabilities. It is argued that sound environment management reduces the unforeseen obstacles and bottlenecks that may otherwise hamper the delivery of project objectives while helping to improve the environmental performance of project operations.

Environmental Impact Assessment

An environmental impact assessment is an assessment of the possible positive or negative impact that a proposed project may have on the environment, together consisting of the natural, social and economic aspects.
The purpose of the assessment is to ensure that decision makers consider the ensuing environmental impacts when deciding whether to proceed with a...

Similar Documents

Free Essay

Environmental Management

...Measures and controls which are directed at environmental conservation, the rational and sustainable allocation and utilization of natural resources, the optimization of interrelations between society and the environment and the improvement of human welfare for present and future generations.  Environmental Impact Assessment  Environmental Management Planning  Environmental Auditing  Socio-Economic Assessment  Solid Waste Management  Air Quality Monitoring  Water Quality Assessment  Soil Quality Assessment  Water and Wastewater Management Environmental Impact Assessment It's the study undertaken in order to assess the effect on a specified environment of the introduction of any new factor, which may upset the current ecological balance. An Environmental Impact Assessment (EIA) study is a statutory requirement in all projects that might produce considerable adverse effects. EIA does not involve any decisions about the project, nor does it restrict the citizens' subsequent opportunities to influence the project. The purpose of EIA is to increase the citizens' opportunities of participation and obtaining information at an early stage of the project, and to reveal the environmental impact so that it can be considered in the planning stage. The EIA process has to be completed before the commencement of any project. Environmental Management Planning Environment Management Planning includes the identification of mitigation and compensation measures for all the...

Words: 1527 - Pages: 7

Premium Essay

Sustainability

...for profit or non-profit are held accountable to the current Federal, State, and Local laws. If corporate sustainability reporting is not a current law then a company does not have the responsibility to incorporate disclosures relating to environmental, social and economic trends of the company resulting from sustainable actions into its financial statements. Milton Freedom put this best “"there is one and only one social responsibility of business – to use it resources and engage in activities designed to increase its profits so long as it stays within the rules of the game, which is to say, engages in open and free competition without deception or fraud" (Freidman 1970). Thus we believe that whether private or public, a business does not have the responsibility to report on sustainability as well as take sustainable initiatives if it is not required by the law. However, according to the trend more and more businesses are reporting on sustainability, and taking initiatives to become sustainable. Cascade Engineering is one of them. Based on our analysis of the sustainability report by Cascade Engineering, and knowledge gathered about the organization, we have concluded that there are several reasons for it to produce a sustainability report. Most importantly, sustainability is fundamental to its mission statement, “To have a positive impact on our society, the environment and to be financially successful” (Cascadeng.com) .The mission statement incorporates the three......

Words: 1444 - Pages: 6

Free Essay

Project Management Assign 1

...Research and read an article on recent recipients of the project management institute’s project of the year award (2013 PMI winners – Adelaide Desalination Project). Summarize how the project manager or team exhibited exceptional and ethical project management practices. Discuss the role of the project manager or team, the organizational setting, the recipient’s approach to project integration management, and obstacles that had the potential of adversely impacting the triple constraints Ugbe Maurice Ugbe Stratford University (Falls Church, Virginia) Abstract The Adelaide Desalination Project involves the construction of a 100 GL per annum desalination plant, including the seawater intake and outfall tunnels and structures, and associated infrastructure including the transfer pipeline, power supply works and interconnection and upgrade works at Happy Valley Water Treatment Plant. Research and read an article on recent recipients of the project management institute’s project of the year award (2013 PMI winners – Adelaide Desalination Project). Summarize how the project manager or team exhibited exceptional and ethical project management practices. Discuss the role of the project manager or team, the organizational setting, the recipient’s approach to project integration management, and obstacles that had the potential of adversely impacting the triple constraints. Introduction Traditionally, South Australia has always relied on the River Murray...

Words: 1109 - Pages: 5

Premium Essay

Miss

...|PROJECT ASSESSMENT FORM | |[pic] |Faculty of Engineering |Department of | | |Course: ND Industrial Engineering |Industrial and Systems | | |Subject: Industrial Leadership 3 |Engineering | | |Subject Code: INL300S |2015 | | |Individual (or Pair) Project | | |Student 1 | |Student Number | | |Student 2 | |Student Number: | | |Project Title: ...

Words: 635 - Pages: 3

Free Essay

The Adelaide Desalination Project

...THE SUCCESS OF THE ADELAIDE DESALINATION PROJECT Abstract The PMI Project of the Year for 2013 was won by the South Australia Water Corporation for the Adelaide Desalination Project. This project was performed to raise Adelaide out of its worst droughts. It was also completed ahead of schedule and within budget. Though the project ran into some uncertainties even before its start, due to some exceptional management practices followed by the Project Director and his team, the project was a resounding success. This report studies some of the key aspects that led to the success of this project and it eventually winning the coveted PMI Project of the Year Award. THE SUCCESS OF THE ADELAIDE DESALINATION PROJECT The Project that won the Project Management Institute’s Award for the year 2013 was the Adelaide Desalination Project Adelaide, Australia by the SA Water Corporation. South Australia, as the "driest state in the driest inhabited continent", experienced severe water shortages during periods of drought. As drought conditions worsened during 2006-2007, reduced inflow into the River Murray lead to the introduction of harsher water restrictions. The need for climate-independent sources of drinking water was clear to government leaders and residents. The South Australian Water Corporation (SA Water) responded with a plan to build an AU$1.8 billion desalination plant in Adelaide.  Launched in February of 2008, the project originally aimed to construct a......

Words: 1065 - Pages: 5

Premium Essay

Wriiten Report

...Project Management Project Management I. Introduction This takes place as part of the executing process group. This is the process of tracking, reviewing, and regulating the progressed in order to meet the performance objectives defined in the project management plan. In addition to reviewing the work that is being performed, this process also makes sure that the deliverables themselves, plus the way in which they are being delivered according to the project management plan. This is a macro integration process and looks at the progress of the overall project taking corrective action as and when needed via change requests. The focus here is on identifying any variances from the project management plan, to carry out problem-solving in order to determine appropriate corrective and preventative action, perform root cause analysis of such variances, and to manage the time and cost reserve allocations. The corrective action that the project manager should be making here is based on how the project has been progressing and from this how things are forecast to continue. The results of the work being undertaken are compared to the baseline is within the plan and appropriate adjustments made to ensure that the two are harmonized. Such adjustments and changes to the work are both identified and implemented within this process. Another key aspect here is to ensure that risks are being managed properly, new risks identified, and that the overall project......

Words: 1404 - Pages: 6

Premium Essay

Financial Analysis

...accountant, property accountant, or may have some other similar title. This accountant's primary responsibility is to maintain the official fixed assets records for the business or organisation. This may be a full-time position in a company that has a large investment in fixed assets and that has either a high volume of activity in fixed assets, or has major capital expenditure projects in process. In operations where keeping track of fixed assets does not involve sufficient work to occupy an accountant full-time, this responsibility may be combined with other accounting duties. The level of responsibility of the person in charge of fixed assets, and the functions performed will also depend on the size and nature of the operation, and the way in which the organisation is set up to handle accounting and reporting for property, plant, and equipment. Accounting for fixed assets may be more of a clerical function, involving entering data and maintaining records. Or the position could involve more of a financial analyst role, where the person would participate in economic evaluations of proposed projects. An audit role may also form part of the overall planning, controlling and reporting function for capital expenditures. What Does A Fixed Asset or Property Accountant Do? In an accounting and administrative capacity, the person in charge of fixed assets will maintain the fixed assets register. This may be a spreadsheet application, a separate module within the accounting......

Words: 1361 - Pages: 6

Premium Essay

Upstream Oil and Gas

...we analyze the upstream sector from the aspect of legal and regulatory aspect, the production of oil and gas in a country, brings conflicting issues that affects the interest of four major stakeholders. These are the government of the host state, the oil company, the communities hosting and works in the oil production process and the environment. To balance the conflicting interest of the above players, countries hosting oil production activities need to devise a requisite legal framework, for the efficient promotion and sound management of the petroleum production activities. The establishment of such rules and regulations gives major impact to the oil and gas industry. It can be stated that the rules and established basically causes burden especially to the oil company involved. We can analyze the burden and pressure caused through many aspects. One of them is rules regarding licensing authority and procedure. There is solid evidence that shows that the current regulatory framework in this matter imposes a significant burden on the upstream petroleum sector. Most of the process to obtain license is complex and consume a lot of time. For example, in Ghana, the licensing procedure is co-ordinated by Ghana National Petroleum Corporation (GNPC) which has packaged Ghana’s upstream oil potential into blocks. Interested investors have to apply the Minister, who then refers the application to the GNPC, for evaluation and due diligence. A report is then issued which leads to......

Words: 1093 - Pages: 5

Free Essay

The Big Dig

...Introduction This aim of this report to give an overview of Boston's Central Artery/Tunnel or 'Big-Dig' Infrastructure Project, identify the rationale behind the project, the owner, the stakeholders, project life cycle and timeline. It will also identify the critical management issues and problems that arose through the project, the solutions the project managers and those involved in the project found. It will also give an assessment of the project performance and its benefits and assess and reflect the critical failure and success factors involved in the implementation of the project. Information for this investigation into the 'Big Dig' project has been from sought various Journals, publications specific to the project, the World Wide Web, independent reports into the project and other reports delivered by the Project Managers Bechtel/Parsons Brinckerhoff (B/PB) and the project owners Massachusetts Turnpike Authority (MTA) . Before the merger of the previously mentioned companies the MTA was known as the Massachusetts Highway Department The big dig or CA/T as it became more infamously known as was a magnanimous infrastructural project that took place in the greater Boston area from inception in 1982 to completion in 2007. This was to be the solution to the escalating traffic problem that plagued motorists in the greater Boston area for the past 50 years. The Central Artchry was originally built in 1959 and was a significant infrastructural project in its day.......

Words: 1250 - Pages: 5

Premium Essay

Leadership Essay

...efficiently with they workers, they knew how to schedule and report the duties. Ethical behaving was very important but only for the superior leaders as others didn’t have any ethical codes. The first king that made an ethical and governmental code was Hammurabi. Team leadership is a very important science in the present and it isn’t abstract at all, as many people say. Everything started in 1950 when scientists developed the interconnections between persons to a higher level, to working groups and connections between them. The first time when scientists put accent on leadership and mostly team leadership effectiveness, was in the 60’s and 70’s. The modality to improve the effectiveness was made by several organizational interventions. In the 80’s and 90’s the world’s biggest economies developed some standards with quality teams, leadership skills with continuous improvements. That’s the reason why organizations have faster response capability, great quality management and developed global view. Teamwork The base of leadership is team work and leadership type dependent. But what is teamwork? At a Customer-Centric Project Management Conference in 2001, person from Sydney said that “Teamwork is the fuel that enables ordinary people to do extraordinary things.” The writer of the report considers that this opinion reflects in an appropriate way the idea of teamwork. Actually he put the sentence as an introduction in the report atmosphere and content. I don’t......

Words: 1619 - Pages: 7

Free Essay

Random

...Key Sustainability Issues The keys sustainability issue of delivering a Green research laboratory are: 1. Water consumption 2. Carbon Management 3. Purchase sustainable goods and services 4. Indoor environmental quality 5. Waste management The sustainability issues shall be identified with clear project objectives and execution plan at the design stage. In addition, it is vital to monitor the construction process against indicators for the delivery of a Green laboratory. Finally, the staff of the laboratory as well as the Loughborough University shall pay continuous effort to maintain a resource-efficient operation during the lifecycle of the new lab. Design stage The design of the new laboratory shall take significant environmental aspects into account throughout the feasibility report, project definition and drawing development stages. First of all, the Environmental Management System of Loughborough University shall act as the main guideline of the client need. On the other hand, the design work shall satisfy specific sustainability specification such as BREEAM New Construction Technical Manual SD5073-2.0:2011. Goal #1 Water consumption The water strategy is designed to increase efficiency of water use, with consideration to the huge water consumption of the new laboratory. Key objectives: 1. Reduce the consumption of portable water for sanitary use from all sources. 2. Reduce unregulated water consumption by introducing water......

Words: 1601 - Pages: 7

Premium Essay

Investment and Portfolio Mangement

...Different stakeholders can minimise th degradation of environment by "green practice." In Bangladesh, as one of the key stakeholders, banks can play a vital role in development and response to the environment through "Green Banking" practice.Green banking considers social factors with environmental aspects. It has already started working well in the developed countries. Fundamentally, green banking keeps away from as much paper work as possible and relies on electronic transactions for processing. Green banks adopt and implement environmental standards for lending. The interest of loan of green banks is comparatively less with those from normal banks.Natural resources conservation is an underlying principle in here in assessing capital and operating loans to extracting and industrial business sector. In other words, green banking refers to the attempt of the banking sector to consider social, ecological and environmental factors with an aim to protect the environment.In Bangladesh Bank's Recent Reform Initiatives, it has been written that green banking products are those that help create a favourable impact on environment. From green banking operations four key stakeholders namely customers, management, employees and shareholders can be benefited.The banking sector can play a significant role in protecting the environment by financing support to high impact environmentally sensitive sectors. As part of the Rio+20 Summit, Bangladesh and Vietnam jointly organised a side event......

Words: 873 - Pages: 4

Premium Essay

Management

...Business Ethics and Sustainability (BUS300) Trimester Two, 2013 Lecturer/Tutor : Dr Ross Spence – contact Ross.Spence@koi.edu.au Section 1: General Information 1.1 Administrative details: Associated HE Award(s) | Duration | Level | Subject Coordinator | BBus (Accg); BBus (MgtFin) | One trimester | Level 3 | Dr Ross Spence | 1.2 Core or elective subject/unit Indicate if the subject/unit is acore subject/unit or elective subject/unit BOTH Core subject for BBus (MgtFin); elective subject for BBus (Accg) | 1.3 Subject/unit weighting Indicate below, the weighting of this subject/unit and the total course points (eg 10 credit points for the subject/unit and 320 credit points for the course). Subject/Unit Credit Points | Total Course Credit Points | 1 unit | 24 units | 1.4 Student workload Indicate below, the expected student workload per week for this subject/unit: No. timetabled hours/week* | No. personal study hours/week** | Total workload hours/week*** | 4 hours/week | 5 hours/week | 9 hours/week | * Total time spent per week at lectures, tutorials, clinical and other placements etc ** Total time students are expected to spend per week in studying, completing assignments,etc *** That is, * + ** = workload hours. 1.5 Mode of Delivery Indicate if this subject/unit is delivered face to face: YES 1.6 Pre-requisites Are students required have undertaken a prerequisite/co-requisite subject/unit(s) for this subject/unit? YES If yes, provide details of the......

Words: 1247 - Pages: 5

Premium Essay

Manager

...Download Free Project Reports Free Reports, Assignments, Presentations, MBA Reports, BBA Reports, Business Reports, Analysis of Annual Reports Project Report on Nokia Preface In this era, where the technology is growing in a very faster speed and every positive change is bringing new and enhanced features with them, the cellular phones are at the very hot issue in this growing technology. The technologies in these cellular/mobile phones are enhancing and developing day by day, including new features of entertainment, and multiple options like imaging facilities, movie/animation features, sound technologies etc. When the technology is the matter, every consumer/user prefers the latest, best and interacting featured technologies and also prefers these facilities in less cost. So, in this view, there is a very big and fast competition between many companies/manufacturers of cellular phones at the world level. Introduction to the Organization Company Information:- NOKIA is the world leader in mobile communications backed by its experience, innovation, user-friendliness and secure solutions. It is a very well knowned company having its vast offices world wide. Their specialized product is cellular phones. They have many house hold items as well. Board of Directors:- The current members of Nokia's Board of Directors were elected at the Annual General Meeting on March 27, 2003. Click here for a short résumé and information on the members'......

Words: 1161 - Pages: 5

Premium Essay

New Technologies in Civil Engineering and Forensic Consepts of Engineering

...Graduate Program in Engineering and Technology Mangement Bogazi¸ i University c 2012 Name Surname: ID: Approved by: Prof. Name Surname: Date of Approvel: Alper Kırdal 2011712393 Sabri Altıntaş ABSTRACT This is report is written corresponding to the seminar given by Hüseyin Cimşit in March, 03 2012. The seminar was about the new techologies in civil engineering and the forensic issues in engineering that should be known. The speaker also has given examples about some interesting forensic cases related with civil engineering area which provided a clear point of view about the issue. TABLE OF CONTENTS ABSTRACT .......................................................................................................... 2 1. INTRODUCTION .......................................................................................... 4 2. CIVIL ENGINEERING DEVELOPMENTS ................................................. 4 a. Coastal engineering...................................................................................... 4 b. Construction Engineering ............................................................................ 4 c. Earthquake Engineering ............................................................................... 5 d. Environmental Engineering ......................................................................... 5 e. Geotechnical Engineering ............................................................................ 5 f. Water resources......

Words: 1497 - Pages: 6