RISK REGISTER | Risk Identification | Qualitative Risk Assessment | Risk Response Plan | Ref. | Description of Risk | Consequences | Primary Objective | Likelihood(H-M-L) | Seriousness(H-M-L) | Managing or Mitigating Actions | Responsible Officer | 1. | Inspection happens at the construction site for checking permits or quality check | Any problem might cause delay in project. | Time | L | M | Take proper permits related with set up of building | Project Manager | 2. | Insufficient Material available | Insufficiency means additional time and raw material cost | Time | M | H | Quantity of the raw material required should be duly checked before and also at regular intervals so that at least delay can be avoided. | Project Manager | 3. | Shortage of labourers | This might increase the cost in two ways:-Introduce machinery-training cost of remaining working laborers | Cost | H | H | Try retaining labourers back by a nominal increase in wages or through productivity based incentives | Consultant | 4. | Difficulty in managing the overall cost | The financial differences would eventually increase the time as arrangement of remaining funds would stop the project for a while | Cost | H | H | Should Ensure that proper financial planning is done, and excess fund should be reserved for unforeseen contingencies | Project Manager | 5. | Maintaining the Quality of the Project | The quality of the material if not checked properly at initial stages can highly increase the cost of the project, which eventually also affects the time dimension | Cost | M | H | It should be ensured that the raw material being used is duly checked, also the site should be checked if appropriate or not for the project. | Project Manager...

Similar Documents

Premium Essay

Risk Register

...Name Professor’s / Tutor’s Name The Course Number 29 October 2015 Risk Register According to (Hulett, 123), is a master document prepared after drafting a risk management plan. A risk register is essential as it enables one to highlight certain risks, their severity, and the action to take to prevent the occurrence of the risk or even minimize its impact. In a risk management plan, various countermeasures are outlined in case the risk happens. These countermeasures are put in reducing the severity of the threat when it happens. A risk register is part of the risk management plan. In this paper, my interest is to prepare a risk register given then activities of my project. Date | 29th October 2015 | | Description of the risk | The problem may not be completed due to the scarcity of time and resources. Also different activities within the project might take long | | Risk Type | The risk we are facing is a project risk | This type is because we are undertaking to implement a project | Chances of occurrence | The likelihood of the risk to occur is medium | The percentage chance of happening is between thirty to seventy percent. | Severity of the risk | The risk will not be severe. Its effect will be moderate | This action will depend on measures adopted to minimize the impact of this risk. | Counter Measures | Contingency planning and adequate allocation of resources and time | Contingency planning will involve short-term plans as opposed to long-term......

Words: 303 - Pages: 2

Premium Essay

Risk Register

...Developing a Risk Register What is a risk register? The risk register lists all the risks identified at the beginning and during the life of a project or undertaking, their grading in likelihood of occurring and seriousness of impact on the project, initial plans for mitigating each high level risk, and subsequence results. It usually includes: • A unique identifier for each risk • A description of each risk and how it will affect the project • An assessment of the likelihood it will occur and the possible seriousness/impact if it does occur (low, medium, high) • A grading of each risk according to a risk assessment table (refer to table 1) • Who is responsible for managing the risk • An outline of proposed mitigation actions (preventative and contingency). The Register should be maintained throughout the project and will change regularly as existing risks are re-graded in the light of the effectiveness of the mitigation strategy, and new risks are identified. In smaller projects the risk register is often used as the risk management plan. Why would you develop a risk register? A risk register is developed to: • Provide a useful tool for managing and reducing the risks identified before and during the project • Document risk reduction and management strategies • Provide those involved with or supporting the activity with a documented framework from which risk status can be reported • Ensure the communication......

Words: 897 - Pages: 4

Premium Essay

Risk Register

...Contents of a Risk Register A risk register is a table that lists information about each of the risks you identify during the Identify Risks process. It includes a description of each risk, its potential impact, and its root causes. Information gathering sessions provide you with important information about project risks. However, if this information is not properly documented, it won't benefit the current project or serve as a useful resource for subsequent projects. To avoid this, it's important to record the output of the sessions in the risk register. New and more detailed information continues to be added to the risk register as other risk management and general project management processes are conducted. Tracking number, RBS, WBS, and date The first four columns in the register enable you to track each risk and its context throughout the project life cycle: • a tracking number uniquely identifies each recorded risk so it can be easily referenced and monitored. • the RBS column links each risk to its category within the risk breakdown structure. • the WBS column associates each risk with the work components it may affect within the work breakdown structure. • the Date column lists the date at which each risk was identified. Another identifying characteristic that could be included in the risk register is risk status, which could be recorded as pending, current, or ended. Description The Description column contains a clear and concise description of each......

Words: 567 - Pages: 3

Premium Essay

Risk Register

...Management VoIP Implementation-Risk Management Introduction: Risk is for all intents and purposes anything that debilitates or limits the capacity of a group or philanthropic association to accomplish its main goal. It can be startling and erratic occasions, for example, devastation of a building, the wiping of all our PC records, loss of stores through robbery or harm to a part then again guest who stumbles on a tricky floor and chooses to sue. Any of these or a million different things can happen, and on the off chance that they do they can possibly harm our association, money loss, or in a most dire outcome imaginable, cause your association to close. [1] Risk Management: Risk management is the procedure of distinguishing risk, surveying risk, and making moves to diminish risk to a worthy level. The risk management methodology decides the procedures, strategies, instruments, and group parts and obligations regarding a particular task. The risk management plan portrays how chance administration will be organized and performed on the venture. As an administration procedure, risk management is utilized to recognize and maintain a strategic distance from the potential cost, timetable, and execution/specialized dangers to a framework, take a proactive and organized way to deal with oversee negative results, react to them on the off chance that they happen, and distinguish potential open doors that may be covered up in the circumstance. The risk management approach and......

Words: 1755 - Pages: 8

Premium Essay

Risk Register Ohs

...General OHS Inspection Checklist This checklist is included as a guide only and may be modified to suit specific contract requirements |Contract Name: | |Contract Description: | |Works Manager: Date: | |Contractor: | |Indicate in the following manner: (Acceptable (Not Acceptable N/A Not Applicable | |Health and Safety Systems | |OH&S policy displayed | | |Accident report book | | |Induction records | | |Rehabilitation policy available ...

Words: 912 - Pages: 4

Premium Essay

Dry Cleaner Risk Analysis and Risk Register

...A REPORT ON THE ENTERPRISE RISK MANAGEMENT PLAN OF MH GROUP HOLDINGS A risk is an event or condition that, if it occurs, may produce positive or negative effects on a company’s objectives. The risk management process therefore identifies, assesses, controls, monitors and reports the exposures that an entity faces. This report defines the exposures associated with MH group; how they will be identified, assessed and managed and also outlines how the risk management activities will be performed, recorded and monitored on a regular basis. This report is presented by the Risk Manager to the Board of directors on the risk management analysis of the following entities of the group; MHA, USA-based professional baseball team and the Canadian textile manufacturing and distributing entity. The steps for accomplishing this are outlined in the following sections. The focus has been to identify pure risks rather than speculative risks. Government regulations and natural catastrophes?? 1) Risk Identification and assessment for MHA The risk identification process entails the evaluation of environmental and operational factors as well as the organisational structure. Information is gotten from the financial reports, audit report, industry reports, site visits, employee questionnaires and contracts/agreements with contractors and suppliers. The holding’s revenue has tripled since 2001; a detail examination of loss histories would add valuable information to risk management analysis. The......

Words: 2575 - Pages: 11

Premium Essay

Bus 519 Assignment 3: Risk Workshop and Risk Register ( Eqi in Siwa )

...BUS 519 Assignment 3: Risk Workshop and Risk Register ( EQI in SIWA ) https://homeworklance.com/downloads/bus-519-assignment-3-risk-workshop-risk-register-eqi-siwa/ Due Week 6 and worth 240 points Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another. Write an eight to ten (8-10) Risk Workshop and Risk Register Component paper in which you: 1. Identify the required pre-workshop activities. 2. Prepare a risk workshop agenda based on Figure B-8, Sample Agenda for a First Risk Assessment / Two – Day Risk Workshop (Appendix B of the Hillson and Simon text). Include suggested time intervals for each activity and justify why each agenda item is relevant for this case. 3. Determine the top five (5) threats in a risk register following Figure B-11, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon text). Include information from the case for each threat. 4. Justify the assignment of probability and impacts for each threat identified in criterion number 3 of this assignment. 5. Document the top three (3) opportunities in a risk register following Figure B-11, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon text). Include information from the case for each opportunity. 6. Justify the assignment of probability and impacts for each opportunity identified in criterion number 5 of this......

Words: 407 - Pages: 2

Premium Essay

Bus 519 Assignment 3: Risk Workshop and Risk Register ( Eqi in Siwa )

...BUS 519 Assignment 3: Risk Workshop and Risk Register ( EQI in SIWA ) https://homeworklance.com/downloads/bus-519-assignment-3-risk-workshop-risk-register-eqi-siwa/ Due Week 6 and worth 240 points Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another. Write an eight to ten (8-10) Risk Workshop and Risk Register Component paper in which you: 1. Identify the required pre-workshop activities. 2. Prepare a risk workshop agenda based on Figure B-8, Sample Agenda for a First Risk Assessment / Two – Day Risk Workshop (Appendix B of the Hillson and Simon text). Include suggested time intervals for each activity and justify why each agenda item is relevant for this case. 3. Determine the top five (5) threats in a risk register following Figure B-11, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon text). Include information from the case for each threat. 4. Justify the assignment of probability and impacts for each threat identified in criterion number 3 of this assignment. 5. Document the top three (3) opportunities in a risk register following Figure B-11, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon text). Include information from the case for each opportunity. 6. Justify the assignment of probability and impacts for each opportunity identified in criterion number 5 of this......

Words: 407 - Pages: 2

Premium Essay

Bus 519 Assignment 3: Risk Workshop and Risk Register ( Eqi in Siwa )

...BUS 519 Assignment 3: Risk Workshop and Risk Register ( EQI in SIWA ) Follow Below Link to Download Tutorial https://homeworklance.com/downloads/bus-519-assignment-3-risk-workshop-risk-register-eqi-siwa/ For More Information Visit Our Website ( https://homeworklance.com/ ) Email us At: Support@homeworklance.com or lancehomework@gmail.com Due Week 6 and worth 240 points Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another. Write an eight to ten (8-10) Risk Workshop and Risk Register Component paper in which you: 1. Identify the required pre-workshop activities. 2. Prepare a risk workshop agenda based on Figure B-8, Sample Agenda for a First Risk Assessment / Two – Day Risk Workshop (Appendix B of the Hillson and Simon text). Include suggested time intervals for each activity and justify why each agenda item is relevant for this case. 3. Determine the top five (5) threats in a risk register following Figure B-11, Sample Simplified Risk Register Format (Appendix B of the Hillson and Simon text). Include information from the case for each threat. 4. Justify the assignment of probability and impacts for each threat identified in criterion number 3 of this assignment. 5. Document the top three (3) opportunities in a risk register following Figure B-11, Sample Simplified Risk Register Format (Appendix B of the Hillson and......

Words: 432 - Pages: 2

Premium Essay

Jit1 Risk Register

...------------------------------------------------- TASK 1A. RISK REGISTER OF TARRANT COUNTY HOSPITAL OF NORTH TEXAS Risk | Description | Owner | Source | Likelihood of Occurrence* | Severity of Impact* | Controllability* | Typhoon*global risk | Typhoon strikes Japanese supplier of latex gloves. The hospital gets ¾ of its latex gloves from this Japanese company because of cost efficiency. The typhoon floods Japanese supplier thus halting production of gloves which can cause hospital to run low on latex gloves | Japanese supplier’s CEO | Natural Disaster | Low to medium; will most likely occur during typhoon season; on average typhoons, historically, in Japan are not severe enough to cause this type of delay because supplier is located far enough inland | Low to medium; will depend on the size of the typhoon as well as direct or indirect impact | Low; hospital has low control over this situation because it is a natural disaster; hospital can suggest ideas to supplier to help prevent a total shut down due to typhoon | Patient Slip/Falls | Patients slip and fall while in the care of the hospital staff | Chief Medical Officer of hospital | Hospital nurses and patient technicians | Medium as patient needs to get up for bathroom or required exercise | High; if there is a slip/fall in the hospital, there is potential for injuries and legal ramifications | High; written policy in place to handle patients and their needs as well as staff training on patient safety | ......

Words: 2022 - Pages: 9

Premium Essay

Basics of Estimation and Building a Risk Register in Project Management Office

...Title: Basics of Estimation and Building a Risk Register in Project Management Office Authors Name: 1. Dr. Balbir Singh 2. Dr. Lakshmi B. Affiliation: Administrative Staff College of India Mailing Address: balbirahs@gmail.com Mobile: 9059350790 Key Words: Project Management Office, Cost Estimation, Risk, Benchmark, Strategy. Basics of Estimation and Building a Risk Register in Project Management Office Abstract: Analysis of measurement data from multiple projects allows the organization to formulate new estimating models and also to set certain benchmarks. Hence it is important to make measurement an integral part of the estimating process. Later, when we get ready to identify a risk, one thing that we must ask our self is what could greatly block the team or project from being able to achieve its objectives? When we take the time to figure out what may have an impact on our ability to reach our goals, this will give us the foundation which is necessary to properly construct the risk register. Key Words: Project Management Office, Cost Estimation, Risk, Benchmark, Strategy. Introduction: The success of software projects depends largely on the Effort and Cost Estimation. Consequentially, a lot of work is done proposing good estimation procedure but without any convincing results. In this article we will see some ways on improving the accuracy of estimation. What are estimates? The word “estimate” is to produce a statement of the approximate value of some quantity.......

Words: 1550 - Pages: 7

Premium Essay

Course Registration System

...Registration System the online registrar version 0.1 Specifications Document by Emma Boroson Introduction This Course Registration System is a web-based program aimed to make easier and more convenient the class registration process, a hassle through which students go every semester. As it stands, here at Brown University, in order to officially register for classes, each student must fill out a course registration form manually, bring it to the Registrar’s Office at University Hall, stand in line (often for upwards of twenty to thirty minutes), and finally have the form officially approved and stamped. In order to change anything about one’s current schedule, such as dropping or adding a class, changing grade option, or showing official permission from a professor, the student must go through the same tedious process. Course Registration System (CRS) attempts to alleviate these hassles by providing several services to students through the internet. CRS provides a way to search for classes without having to open a course catalog, a way to “shop” around and view various possible schedules, and finally, officially register for the chosen classes. All this can be done in the privacy of the students’ own rooms and without the stress and time it takes to stand in line in University Hall. The System Basical sketch of the system model Network Login GUI search keys GUI DB Course Pages GUI The various parts of the system are: ● Login/Security – Login using NetID and......

Words: 1138 - Pages: 5

Free Essay

Appointment of Company Secretary

...public company; or is a barrister, advocate or solicitor; or is a member of any of the following bodies: the Institute of Chartered Accountants; the Association of Certified Accountants; the Institute of Chartered Secretaries and Administrators; the Chartered Institute of Cost and Management Accountants; the Chartered Institute of Public Finance and Accountancy; or is a person who, by virtue of having held any other position or being a member of any other body, appear to the directors to be capable of discharging the functions of secretary. The duties of company secretary include the following: ensuring that the company’s documentation is in order, that the requisite returns are made to the companies Registry, and that the company’s registers are maintained; taking minutes of meetings; sending notices to members; and countersigning documents. Powers of company secretary, the secretary is the chief administrative officer of the company and no matters of administration he has ostensible authority to make contracts on...

Words: 581 - Pages: 3

Free Essay

Business

...Registration Process Students registering in an online course, must register using the “Online Course Registration Form” and submit it to the Academic Coordinator. The form is attached to this e-mail. You may submit it by e-mail or fax to 705-673-6518. Students may not register through WebAdvisor. Rules and Regulations Students, who register for and complete an online course, must be aware of the following expectations: - A student who registers for an online course, will be actively engaged in the course beginning on the course start date Monday, June 10th, 2013. The course start date information posted in WebAdvisor may be incorrect. - Online students are required to work in groups in the D2L online environment and must participate actively ONLINE in order to successfully complete the course; - For the most part, students will be paired with other on-campus students completing online courses; - Each online course requires the student to complete an in-person examination on a pre-determined date. All students will be notified of the examination date within the first 4 weeks of the course start date; - A student cannot complete a summer (SU) course to apply towards a final degree requirement with the expectation of graduating in the fall. The final grades for courses offered in the summer session are not available until mid-October and will not be made available to the Registrar on time for graduation; -......

Words: 684 - Pages: 3

Free Essay

The Courage of Jennifer Wright

...Jennifer went out of her way putting herself in the line of danger to help. Jennifer and my Sandy (My wife) were coworkers at a convenience store. In December right before Christmas a gentleman came into the store and proceeded to rob it. The gentlemen was acting weird when asking if he could use the restroom, so Sandy decided to call 911 because the robber was acting suspicious and was wearing a big hoddie. It was December and cold so that was not so much out of place. When the gentleman came out of the restroom he wanted a pack of cigarettes and Jennifer was up at the register at the time because sandy was on phone with 911. But the guy pulled out the knife and demanded money. When Jennifer told him that Sandy was the cashier he came running at her with the knife. He chased her into the back room and demanded money; she told him that if he wanted the money then they would have to go back out to the cash register. Jennifer had made it out of the store almost out of the parking lot when she looked back and saw that Sandy was faced with a knife at her throat. Jennifer noticed that Sandy could not get away from the robber so she came back inside and attacked the robber. The police arrived in time to take over the struggle and arrest the guy. This event demonstrated a lot of courage because Jennifer did not even think about her own safety and what could happen if things did not work out. She came back into the store when she was already safely out and fought off the robber......

Words: 370 - Pages: 2