Premium Essay

Title: Major Engineering Project – Eastern Siberia-Pacific Ocean Oil Pipeline

In: Science

Submitted By nake
Words 427
Pages 2
Firstly, let me say, why I think we need these reflective journal entries? My impression that journal helps us to understand engineering job more deeply and makes us to engage industry issues; in addition, it helps us to reveal our preferences. However, I want to notice that these two paragraphs do not show my real interest. Just because of condition that project should be related with previous written engineering disciplines compelled me to do it.
Project for today is Eastern Siberia-Pacific Ocean oil pipeline transporting crude oil extracted from Russian oilfields to the Asia-Pacific ‘hungry’ oil refinery markets such as China, Japan and Korea. The idea of creating such pipeline was proposed since USSR period, but not implemented. However, in 2004 it was decided to run pipes from East Siberian Taishet to Pacific Pervoznaya. Construction works of first stage of this pipeline began in April 2006 and finished in April 2009. After establishing oil flow through first line, the construction works of second stage started including bifurcation of pipes of 1963 km long section from Skovorodino to the Pacific Ocean region terminal Kozmino. The investment attracted to the first stage estimated at approximately &14bn. If talking about second stage, the overall investment is even more and approximate completion could be in 2014 and it is estimated to have a capacity of 25-30 mn. tons of oil per year.
This pipeline is special for both political and economic reasons. My impression that if Russia carry out this grandiose plan, oil price would decrease slightly because of high competence among oil exporter countries such as Saudi Arabia, Iraq, Iran, UAE as well as Russia. Assuming that China replaced USA as the largest consumer of crude oil and high demand of oil in Asian refineries, cooperation of Russia and Asia-Pacific region could be significant and play leading role in the…...

Similar Documents

Premium Essay

Pacific Oil

...Pacific Oil Company MGT470-2: Conflict Management and Negotiation Vimarie J. Negron, MBA September 23, 2012 Professor Susan Weese As part of this assignment I will discuss the negotiation between Pacific Oil Company and Reliant Chemical Company in early 1985. Negotiation is a process by which two or more parties attempt to resolve the opposing interests (Lewicki, 2011). This scenario is about the problems Pacific Oil Company faced as it reopened negotiations with Reliant Chemical Company in early 1985. Pacific Oil Company was founded in 1902 as the Sweetwater Oil Company of Oklahoma City, Oklahoma. The founder of Sweetwater Oil, E.M. Hutchinson, pioneered a major oil strike in north central Oklahoma that touched off the Oklahoma “black gold” rush. of the early 1900s. Through growth and acquisition in the 1920s and 1930s, Hutchinson expanded the company rapidly and renamed it Pacific Oil in 1932. After a period of consolidation in the 1940s and 1950s, Pacific expanded again. It developed extensive oil holdings in North Africa and the Middle East, as well as significant coal beds in the western United States. Much of Pacific’s oil production is sold under its own name as gasoline through service stations in the United States and Europe, but it is also distributed through several chains of independent gasoline stations. In addition, Pacific is also one of the largest and best-known worldwide producers of industrial petrochemicals. In 1979, Pacific Oil......

Words: 1141 - Pages: 5

Premium Essay

All American Pipeline

...All American Crude Pipeline System All American Pipeline Company I n August 1984, American West Pipeline Constructors, a joint venture of Willbros and Gregory & Cook, Inc., began construction of a 1,931-km (1,200-mile), 24- and 30-inch crude oil pipeline for All American Pipeline Company. The All American Pipeline System runs from Gaviota, California, to McCamey, Texas. The line has a capacity of 300 Mbpd and is capable of transporting light and heavy crude oils. Willbros double-jointed 1,968 km (1,223 miles) of 30-inch pipe and constructed a single spread 895-km (556-mile), 30-inch heated crude oil pipeline extending from Oracle Junction, Arizona to McCamey, Texas with 23 pump stations. The project scope included open-cut river crossings—the San Pedro in Arizona and the Rio Grande and Pecos in Texas. An 8-m (26-foot) ditch was required at the San Pedro river crossing because of deep scouring. The river crossings were prebuilt in 1984 to take advantage of low flows. The construction spanned three rugged mountain ranges—the Delawares in Texas, the Peconcillos in New Mexico, and the Winchesters in Arizona. Pipeline crossings also included seven interstates, 12 railroads, and more than 50 other major roads. Other special terrain encounters included caliche and limestone rock, dug with rock trenchers Willbros purchased specifically for this project. CALIFORNIA Santa Maria Gaviota Santa Barbara ARIZONA Phoenix o San Pedr NEW MEXICO El Paso Oracle Junction......

Words: 404 - Pages: 2

Premium Essay

Norhern Gateway Pipeline

...supporting the construction of the Northern Gateway Pipeline. Throughout our brief, we will provide several arguments reinforcing our position. In addition to the questions provided by the Hearing Panel, we found it extremely important and pertinent to address economic implications of the construction and functioning of the pipeline. For this reason, these elements will be discussed in Section IV of our brief. We chose to omit a couple of Questions of Analysis in favour of expanding on others that we felt were more relevant and necessary to our argument. We hold the belief that the potential benefits of the Northern Gateway Pipeline outweigh the potential costs; reasons for which will become evident in this written submission. Section II: Questions of Fact: Answered 1. Will the pipeline be running above or below ground? The vast majority of the pipeline will be buried up to a meter underground. The only exceptions will be select water crossings where it is safer to run the pipeline above the water crossing. (Enbridge Northern Gateway Project, 2013) 2. What is the lifespan of the project? The project will have a lifespan of 30 years (Enbridge Northern Gateway Project). 3. What is being transported in the pipeline? There are 2 pipelines. One is the oil pipeline and the other is the condensate pipeline. They will be transporting petroleum through the oil pipeline (525,000 barrels per day). The condensate pipeline will be transporting condensate, which is a......

Words: 3175 - Pages: 13

Premium Essay

Oil and Gas Outlines

...Petroleum refers to the hydrocarbon compounds of crude oil and natural gas that are found in the underground rock formations Reservoirs are generally thousands of feet below the surface and are made up of the remains of small marine plants and animals that lived millions of years ago. Petroleum may also seep to the earth’s surface along fault lines and cracks Petroleum refers to both crude oil and natural gas Modern uses of petroleum and its byproducts include: Transportation fuels (gasoline, diesel, jet fuel, and compresses natural gas) Heating Fuels (Propane, heating oil and natural gas) Electric Generation fuels such as natural gas and fuel oil Manufactured products such as plastics and building materials. Crude oil refers to unrefined hydrocarbon mixtures produced from underground reservoirs that are liquid at atmospheric pressure and temperature Classified as either light or heavy depending on the density of the mixture Density is measured in API gravity Heavy crude oil has more of the longer, larger hydrocarbon molecules (greater density) Difficult to produce and transport to market; more expensive to process; weighs more but sells for less Natural Gas refers to hydrocarbon mixtures that are NOT liquid but gaseous at normal atmospheric pressure and temperature. Natural Gas is largely methane, which is a clear, odorless gas. It has the smallest natural hydrocarbon molecule (CH4). Natural Gas mare also contain some of the larger hydrocarbon molecules......

Words: 6775 - Pages: 28

Premium Essay

Keystone Xl Pipeline

...Alberta Oil – Keystone XL pipeline The high demand for oil in the U.S. is continuously increasing. In 2010, the United-States, on average, consumed 19.15 million barrels of oil per day (bpd) (Index Mundi 1). Due to the high demand and the proximity to the U.S., Canada is a major supplier of their oil. The Alberta Tar Sands are the 2nd largest oil reservoir in the world and are a major source of Canada’s oil exports to the States and to the world. The high demand is being met with extreme dislike from environmentalists. It also creates thousands of jobs. Bureaucrats are pushing for its construction; they do it for the economical growth and the capital benefits. The construction of the Keystone XL pipeline (KXL) is a controversial issue which has lead President Obama to deny the permit for TransCanada to continue building in the United-States. Sending crude oil down to the United-States would be a sensitive issue and could hurt Canada’s economic development in the future if not handled correctly. The Keystone XL pipeline would primarily perform the job of bringing oil down from Alberta to the large refineries in Texas. The pipeline will provide millions of new jobs in North America. The quick job increase is due to the fact that government of Alberta assigns permits to extract oil from the Tar Sands and not one has been denied. Robert Rampton, a reporter for the Financial Post, wrote, “Canadian production is surging on expanding output from the oil sands. With exports to...

Words: 1747 - Pages: 7

Premium Essay

Trans Mountain Pipeline Expansion Project: Regulatory Requirements and Technical Analysis

...Trans Mountain Pipeline Expansion: Regulatory Requirements and Technical Analysis Student Name University Name Table of Contents 1.0 Introduction 5 2.0 Shipping 5 2.1 Spills risk 6 2.2 Spills response 7 2.3 Spills recovery 8 3.0 Pipeline safety and integrity 9 3.1 Risk analysis 10 3.2 Spill preparedness and response 10 4.0 Greenhouse gas emissions 11 4.1 Implications of pipeline expansion 12 4.2 Alternatives and its effects 13 5.0 Conclusion 13 Abstract There is high rate of increase in the world’s demand for energy to run its various development projects. However, the most popular source of the needed energy is oil and petroleum products. To respond to this dire need for energy, Trans Mountain company under the Kinder Morgan Canada has presented a request for approval of its multi-billion dollar expansion. However, their proposal report for approval has drawn mixed reactions from first nations, municipal governments, British Columbia residents and various environmental organizations. A lot of environmental issues have topped the list of the project’s safety complications. Some of these groups have vowed never to support the expansion project citing various loopholes. Kinder Morgan Canada’s oil spills risk assessment both on pipelines and shipping vessels is elaborate. It has considered every concern of various partied and has tried to adjust to the NEB requirements. The NEB has scheduled public hearing on this project for 2015. As the......

Words: 2994 - Pages: 12

Premium Essay

Pacific Oil Case Study

...Critical Thinking – PACIFIC OIL CASE STUDY Brian Crummy MGT 470-1: Conflict Management and Negotiation August 31, 2014 The Pacific Oil Company, known for touching off the “black gold” rush began working with the Reliant Corporation in 1979. The first contract between the two was for the purchase of vinyl chloride monomer. As the end of the contract drew close in 1982, the companies worked together to broaden the contract from 1983 to 1987. In 1984 Jean Fontaine, the marketing vice president in Europe for Pacific Oil, and Paul Gaudin began to re-examine the company’s chemical contracts. Upon examination of the Reliant contract, they realized the demand for VCM was rising, and that a new contract could be re-negotiated for a better price. Gaudin contacted Frederich Hauptmann, the senior purchasing manager for Reliant in Europe. From this point, negotiations began. When they first found out about the increased demand for VCM, Fontaine and Gaudin decided to use the two company’s long history together as a leverage point. This point ended up hurting them because Hauptmann asked for a little more concession wise each time the parties met based off the history the two companies had together. Each time, Fontaine and Gaudin agreed to provide these while thinking the negotiation would end with a contract extension like the previous deal with the company. Because of inadequate planning, Fontaine and Gaudin did little to use the power they had over Reliant to secure a......

Words: 486 - Pages: 2

Free Essay

Trans-Siberian Pipeline Faces Huge Obstacles

... the first trans-Siberian oil pipeline is to run 4,150 kilometers - more than three times as long as the trans-Alaska pipeline. At a cost of $15.5 billion, it looms as modern Russia's biggest infrastructure investment, President Vladimir Putin's answer to the Trans-Siberian Railway of the czars. Because China and Japan both rely on the Middle East for about 85 percent of their oil imports, both economic giants competed fiercely over what could be the world's longest and most expensive oil pipeline. Trumping China with a more generous financing offer, Japan, the world's second-largest oil importer, hopes that the pipe, 1.2 meters, or four feet, in diameter, will bind it to Russia, the world's second-largest oil exporter. It may be a decade before the 2,580-mile pipeline is completed. But the line would represent an increase of about one-third in Russia's oil pipeline export capacity and would signify a major Russian shift toward the Pacific, where oil could be sold to any country, including the United States. The project faces major hurdles. There are no guarantees that there will be enough oil to fill the pipeline, although Russia has as much as 67 billion barrels of untapped oil reserves along the pipeline route. When the oil reaches the Sea of Japan, there are no public commitments binding Russia to sell it to Japan, whose ports are only a day's sail away. And Russia's last-minute switch of the Pacific terminal site from an existing oil port to this pristine bay...

Words: 884 - Pages: 4

Premium Essay

Pacific Oil

...The Pacific Oil Company “Look, you asked for my advice, and I gave it to you,” Frank Kelsey said. “If I were you, I wouldn’t make any more concessions! I really don’t think you ought to agree to their last demand! But you’re the one who has to live with the contract, not me!” Static on the transatlantic telephone connection obscured Jean Fontaine’s reply. Kelsey asked him to repeat what he had said. “OK, OK, calm down, Jean. I can see your point of view. I appreciate the pressures you’re under. But I sure don’t like the looks of it from this end. Keep in touch—I’ll talk to you early next week. In the meantime, I will see what others at the office think about this turn of events.” Frank Kelsey hung up the phone. He sat pensively, staring out at the rain pounding on the window. “Poor Fontaine,” he muttered to himself. “He’s so anxious to please the customer, he’d feel compelled to give them the whole pie without getting his fair share of the dessert!” Kelsey cleaned and lit his pipe as he mentally reviewed the history of the negotiations. “My word,” he thought to himself, “we are getting completely taken in with this Reliant deal! And I can’t make Fontaine see it!” Background Pacific Oil Company was founded in 1902 as the Sweetwater Oil Company of Oklahoma City, Oklahoma. The founder of Sweetwater Oil, E.M. Hutchinson, pioneered a major oil strike in north central Oklahoma that touched off the Oklahoma “black gold” rush Source: Case prepared by Roy J.......

Words: 13412 - Pages: 54

Free Essay

Proc 5840 Pacific Oil Case Study

...Case Study #2: Pacific Oil Company PROC 5840: Pacific Oil Case Study 30 Sep 2013 Abstract This paper assesses a negotiation between Pacific Oil Company, a seller of vinyl chloride monomer (VCM), and Reliant Chemical Company, a buyer of VCM. Each negotiation team’s strengths and weaknesses will be assessed. The Pacific Oil strengths included their negotiation team and the strength of the VCM market. Their weaknesses included poor organizational control, managerial decision making, and their failure to recognize the changing interests of Reliant Chemical and selection of a negotiation strategy. Reliant Chemical strengths were assessed as a strong organizational relationship and management decision making. It recognized, resolved and or reconciled the changing interests of Pacific Oil, derived the best approach for the negotiation, determined the relationship with the other negotiator(s), and selected the appropriate strategy and tactics. Reliant Chemical had one assessed weakness, which was its possible vulnerability to effective counter tactics. The paper concluded by providing a recommendation to close the negotiation with Reliant Chemical on more favorable terms to Pacific Oil. Introduction The Pacific Oil Company negotiation filled with examples of how people (Corporations, Management and Negotiator(s)) should prepare, interact and react during a......

Words: 5908 - Pages: 24

Premium Essay

Titles for Preparation of Project Titles

...MBA PROJECT TITLES Check out this comprehensive collection of MBA project titles at a2zmba.com. Learn how to do your project better and easily...MBA Projects made easy.. Get help for your MBA project from a2zmba users here. Post your project related queries here.. 1. Product strategies of private life insurance companies 2. A study on "why companies should go for outsourcing" 3. Effectiveness of advertising on real estate sector 4. Study on consumer expectations and perceptions towards consumer loans 5. Workers attrition rate at hotel industry is increasing. Study regarding this issue 6. Attrition rates at different sectors 7. Effectiveness and scope of employee referrals in the process of talent sourcing 8. Study of training needs across different industries 9. Study on creation of luxury brand 10. Strategies used to build successful Internet based customer services 11. Measuring the effectiveness of retail banking of a nationalised bank compared to a MNC 12. Conspicuous consumption 13. Study of awareness and acceptibility of UPVC windows and door systems 14. Opportunities of Financing the NANO's in Bangalore 15. Changing trends in FMCG industry in India 16. A study of best HR practices in service industry 17. Fundamental analysis of Indian telecom companies 18. Study of consumer behaviour in automobile industry 19. customer buying behaviour towards insurance products 20. Promotion strategies followed in Insurance sector 21. Study on changing consumer......

Words: 3790 - Pages: 16

Premium Essay

Pacific Oil Co.

...Pacific Oil Company Gene Arnold Negotiation Strategy Oklahoma Wesleyan University Pacific Oil Company The Pacific Oil Company went into negotiations with Reliant Manufacturing, and its goal was to sign a new long-term agreement. Pacific assumed that the new contract would be signed with no major obstacles, and that the principal point of negotiation would be price. Jean Fontaine, who is the marketing vice president for Pacific, went into a negotiation process with Reliant. Fontaine started the process three years before Reliant Manufacturing’s current contract was up, hoping to best his competition by offering Reliant a lower price and getting them to agree to a five year contract extension. Fontaine did not adequately research his client’s needs or sufficiently project the outcome of these negotiations. Due to this error Pacific was not prepared to address the concerns and requests that Reliant brought up during the negotiation. Both parties wished to renew the contract in a timely manner, but Fontaine slowed down the negotiations because he did not have a complete negotiation strategy that included a contingency plan or best alternatives. The negotiators for Pacific were not prepared for all the changes that Reliant would ask for at each meeting, and they had no power to make any key decisions to settle the negotiations. Reliant’s negotiators used Pacific’s lack of preparation to negotiate a far better contract. (Lewicki, Saunders, Minton, & Barry, 2015).......

Words: 680 - Pages: 3

Free Essay

Oil Politics -Trans-Siberian Pipeline

...Trans –Siberian Pipeline: The Urengoy–Pomary–Uzhgorod pipeline (also known as the West-Siberian Pipeline, or Trans-Siberian Pipeline) is one of Russia's main natural gas export pipelines, partially owned and operated by Ukraine. The pipeline was constructed in 1982-1984. It created the transcontinental gas transportation system Western Siberia-Western Europe. Controversies surrounding the pipeline The erstwhile Soviet’s plans to build the pipeline were considered a threat to the balance of energy trade in Europe, and were strongly opposed by the Reagan administration. The United States prevented U.S. companies from selling supplies to the Soviets for the pipeline, as part of what was also retribution against the Soviets for their policies towards Poland. America's Western European allies, however, refused to bow to U.S. pressure to boycott the pipeline, insisting that contracts already signed between the Soviets and European companies needed to be honoured. This led to several European companies being sanctioned by the U.S. Government. Reagan reportedly said "Well, they can have their damned pipeline, but not with American equipment and not with American technology." The efforts by the U.S. pressure to prevent the construction of the pipeline, and its export embargo of supplies for the pipeline (1980–1984) constituted one of the most severe transatlantic crises of the Cold War. Russia-Ukraine gas dispute The Russia–Ukraine gas disputes refer to a number of disputes......

Words: 839 - Pages: 4

Free Essay

Pacific Oil Case Study

...Pacific Oil Company is a Sweetwater Oil company of Oklahoma City, Oklahoma. It was founded in 1902. One of the major chemical lines of Pacific's is the production of vinyl chloride monomer (VCM). “VCM is subjected to the process of polymerization, in which smaller molecules of vinyl chloride are chemically bonded together to form larger molecular chains and networks.” Pacific Oil's first major contract with the Reliant Corporation was in 1979. The contract between Pacific Oil and Reliant was a standard one for the industry and due to expire in December of 1982. The contract was negotiated by the purchasing managers in Europe then it was reported to the vice presidents in the states. In February 1982, Jean Fontaine marketing vice president of Pacific Oil Europe, discussed the Reliant account with his VCM marketing manager, Paul Gaudin. Fontaine and Gaudin agreed that the Reliant account had been extremely profitable and beneficial for Pacific and Relaint also, overall the quality and the service of the agreement was satisfied. The latest projections proved that there was a worldwide shortage of VCM and that demand was continuing to rise. If the situation would remain the same for years then Pacific believed that it could justify a high favorable formula price for VCM. Fontaine and Gaudin decided to renegotiate the current agreement, so the strategy would be to ask Reliant for their five-year demand projections on VCM and polyvinyl chloride products. In their negotiations...

Words: 1256 - Pages: 6

Free Essay

Pipeline

...per cent for pipelines and 5 per cent for roads. Railways and roads are inefficient modes of carrying petroleum products because they consume significantly more energy (320 BTU for railways and 1700 BTU for roads to move one tonne of petroleum products over one km) than pipelines for which the comparable figure is only 50-135 BTU. Clearly, pipeline transportation is the most efficient way of moving petroleum products and gases and, hence, is the preferred mode all over the world. In developed countries like the USA and the UK, almost all long distance transportation of petroleum products and gas takes place through pipelines. India is far behind these countries in realizing the full potential of pipelines because it does not have a well-developed pipeline network. A rapid development of pipelines, therefore, is essential to ensure that the share of this mode in the transportation of petroleum products and natural gas reaches the desired level. It is estimated that around Rs 30,000 crore are likely to be invested over the next 10-12 years in setting up pipeline networks for liquid petroleum products The efficient and effective movement of natural gas from producing regions to consumption regions requires an extensive and elaborate transportation system. In many instances, natural gas produced from a particular well will have to travel a great distance to reach its point of use. The transportation system for natural gas consists of a complex network of pipelines, designed to......

Words: 20191 - Pages: 81