Study Material

Page 49 of 50 - About 500 Essays
  • Free Essay

    Economic

    system 4) Material requirements planning (MRP) is a computerized information system developed specifically to aid in managing dependent demand inventory and scheduling replenishment orders. Answer: TRUE Reference: Material Requirements Planning Difficulty: Easy Keywords: material requirements planning, MRP 5) A materials requirements planning (MRP) explosion occurs when the system is bombarded with too many orders to schedule at one time. Answer: FALSE Reference: Material Requirements

    Words: 9434 - Pages: 38

  • Free Essay

    Cogon Grass as Heat Insulator

    Cogon Grass as Thermal Insulator COGON GRASS AS THERMAL INSULATING MATERIAL KRISELLE ANNE A. GERPACIO A Thesis Outline Submitted to the Department of Civil Engineering, College of Engineering and Computing, University of Southern Mindanao, Kabacan, Cotabato in Partial Fulfillment of the Requirements for the Degree of BACHELOR OF SCIENCE IN CIVIL ENGINEERING DECEMBER 2014 INTRODUCTION Significance of the Study Cogon grass known as Imperata cylindrical is considered as the

    Words: 2651 - Pages: 11

  • Premium Essay

    Anonymous Company

    Case Study: Anonymous Company Eo Martin is a production manager for Anonymous Company, and he is very concerned about the way the company currently control its production. The method used is a manual in which job order tickets are written and production progress is followed through the shop by production expenditers. A number of scheduling and load charts are used to enable the production control people to record and visually observe order progress. This method worked fine during the early years

    Words: 1307 - Pages: 6

  • Free Essay

    Material Flow Improvement

    Material Flow Improvement By Léo Belime Diploma work No. 35/2010 At Department of Materials and Manufacturing Technology CHALMERS UNIVERSITY OF TECHNOLOGY Göteborg, Sweden Diploma work in the Master in Production Engineering Program Performed at: Société des Ateliers Louis Vuitton Supervisor(s): Florence Laprade Société des Ateliers Louis Vuitton 36100 Issoudun - France Peter Almström Department of Materials and Manufacturing Technology Chalmers University of Technology, SE-412 96 Gothenburg

    Words: 9966 - Pages: 40

  • Free Essay

    Effectiveness of Material Requirenents Planning

    PROPOSAL Research Title Effectiveness of Material Requirements Planning (MRP) framework within manufacturing cooperatives based in Polokwane Municipality Area Presented by Phetola Cyprian Mogale Student Number: 113904 Postal Address P.O. Box 507 Polokwane Ladanna 0704 Contact Numbers Work 015 297 6632 Cell 082 906 2746 Email address: mogalep@libsa.co.za Date submitted: 12 April 2012 Proposal for dissertation submitted in partial fulfilment of the degree Masters in Business Administration

    Words: 6238 - Pages: 25

  • Free Essay

    Cogon Grass as Thermal Insulator

    COGON GRASS AS THERMAL INSULATING MATERIAL KRISELLE ANNE A. GERPACIO A Thesis Outline Submitted to the Department of Civil Engineering, College of Engineering and Computing, University of Southern Mindanao, Kabacan, Cotabato in Partial Fulfillment of the Requirements for the Degree of BACHELOR OF SCIENCE IN CIVIL ENGINEERING DECEMBER 2014 INTRODUCTION Significance of the Study Cogon grass known as Imperata cylindrical is considered as the one of the worst weed because it

    Words: 3964 - Pages: 16

  • Premium Essay

    Operations Management

    1. Explain the different concepts of Job Design. Job Design specifies the tasks that constitute a job for an individual or a group. There are five components of job design, namely: • Job specialization-it suggested division of labor which can be done in several ways such as development of dexterity and faster learning by the employee because of repetition, less loss of time because employees would not be changing jobs or tools and development of specialized tools and the reduction of investment

    Words: 1406 - Pages: 6

  • Premium Essay

    Make

    distinction in production systems (technological classification) is between process production and part production. * Process production means that the product undergoes physical -chemical transformations and lacks assembly operations, therefore raw materials cant easily be obtained from the final product, examples include: paper, cement and nylon. * Part production (ex: cars and ovens) comprises both manufacturing systems and assembly systems. In the first category we find job shops, manufacturing

    Words: 1955 - Pages: 8

  • Free Essay

    Invntrymgmt

    ROWEL ANTONIO SUBMITTED ON: MARCH 6, 2015 I. Time Context March 6, 2015 II. View Point Manager of XYZ Company III. Statement of the problem The problem in the case is to contemplate installing a Materials Requirement Planning (MRP) System to the XYZ Company. The most pertinent questions in the problem are, How will it be done?, How much will be its cost? And what action will be needed to lead this project into success? IV. Objectives

    Words: 810 - Pages: 4

  • Free Essay

    Cacete

    UTS Faculty of Engineering 46316 Materials Handling Assignment 1 – 2016 Thiago Luiz Lara Oliveira - 12224390 1. A rotary screw conveyor is to be designed to discharge Willow wood chips from the below ground bin illustrated, at a suitable rate of X tones per hour (to be estimated by students), into the furnace. The conveyor is to be a Y m long inclined screw conveyor which elevates the material 5 m. It requires a suitable pitch screw and may be selected from one of the standard diameters

    Words: 2362 - Pages: 10

Page   1 42 43 44 45 46 47 48 49 50