I have been given a grant to make an existing building state of the art by running fiber throughout the space. For this project I will choose an office building as an example of what type of hardware that will be needed inside and outside of the building to accommodate the fiber. I will discuss some safety procedures, and some regulations and standards that will apply to this install that may have not been regarded to when installing copper wire. In this setup, there will be an FTTB (Fiber-to-the-building) passive optical network. On the outside of the building the distribution cables will supply the network access point (NAP) which in turn supplies fiber through drop cables to the buildings NID or Network Interface Device. On the inside of the building in the equipment room will house patch panels and other equipment necessary to support the network.
On the outside of the building fiber can reach the building either via an aerial method which run along existing poles that may already carry electrical power lines or by means of direct burial. These methods may also be used in the event I ever needed to expand our current network to another building in future upgrades. “Cables in aerial installations must be able to withstand loading from high winds, ice, birds and climbing animals, and even windblown debris such as branches.” (Oliviero, 2010) If I choose a direct burial route, one advantage over an aerial installation would be that the fiber is less prone to the weather elements. A disadvantage would be that once the fiber is buried, the cable may be hard to locate if the location is not properly documented due to the fact that fiber cables don’t emit electromagnetic energy the way copper cables do.
On the inside of the building in the equipment room will stand a 19” rack that will house the necessary equipment and help keep the cables organized. For the inside of the building the LAN network will use multimode optical fiber throughout. The horizontal runs will be on horizontal ductwork or conduits depending on what the space calls for. Being that we are running fiber throughout the building instead of copper there are some standards that now apply that may have not applied before. Such as, “Section 4.3 of ANSI/TIA-568-C.3 defines the bend radius requirements for inside plant, indoor-outdoor, outside plant, and drop cables.” (Oliviero, 2010) and “ANSI/TIA-568-C.3 Section 4.3 defines the minimum pull strength requirements for inside plant, indoor-outdoor, outside plant, and drop cables.” (Oliviero, 2010) Understanding these standards with regard to the bend radius and pull load will help ensure we don’t damage the fiber cables during installation. It is also important to use tools that will help with installation such as a pulling eye. A pulling eye will help run cable through walls and conduits. Also it will be helpful if we make sure the conduits that are installed have pull boxes to help ease friction when pulling cables.
Some safety precautions should be followed such as being aware of a cable’s fire resistance and grounding and to follow the standards set forth in Article 770 of the NEC. In this article it will also discuss the installation of fiber optic cables that contain metallic members. When running cable through plenum spaces, it is important to use the specified cable for those specified spaces because plenum cables have a fire resistance and have low smoke producing characteristics. The same goes for installing riser cables. When choosing the proper riser cable it is important that the cable have fire resistant characteristics to avoid spreading fires in such an emergency.
In a situation like this, adding fiber to an already existing infrastructure takes proper planning and insight on what the building currently has and what the ultimate goal is. If a network is currently in use it is important to figure out whether you can going to just upgrade the existing equipment or if you are going to start fresh. Knowing the environment the cables will have to be in is also important. This will help in assisting on where you plan to run the cables, whether it is through plenum spaces, through the walls or along the walls in conduits. If you had to install in a new building, planning may be a little easier because you get to start from scratch and may be able to avoid problems that someone didn’t take into consideration for future upgrades, such as not leaving enough room in conduits to run extra cables. References
Oliviero, A. (2010). WCLS Oliviero/Cabling, 4e. Hoboken, NJ : John Wiley & Sons.

Similar Documents

Premium Essay

Building a New Structure

...This lab I went to the Madison building codes web site. I will put in the codes from off the web page. I’m writing this as notes and a check out list. Here is a list of the steps to do first. * Processing of permit applications for all types of construction * Review of commercial and residential construction plans * Issuing building and various related trade permits * Conducting various inspections of new commercial and residential construction including alterations, additions, new detached structures, and swimming pools * Evaluating existing buildings to verify code compliance based on occupancy * Investigation of complaints relating to violations of the property maintenance code and other sections of the City Code of Ordinances * Providing assistance to developers, contractors and citizens regarding building code requirements * Educating the public concerning safety, health and welfare in the built environment * Investigating unlicensed businesses * Enforcing city sign regulations, as well as grass and weed control regulations * Monitoring and enforcing regulations pertaining to junk, abandoned, unlicensed or inoperable vehicles * Repairing and maintaining the interior and exterior of City Hall and the Madison City Library Here is a list of the codes Codes The City currently enforces the 2006 International Residential Code and the 2009 International Building Code and related International Codes for Plumbing, Mechanical, and...

Words: 328 - Pages: 2

Free Essay

Building a New Structure

...Lairquneder Robinson 06 April 2015 Building a New Structure A lot of thought, decision, and design goes into building a new structure on a school campus. A few of those decisions goes towards what wiring and cabling the building will have. There are quite a few codes, standards, and specifications that needs to be followed. Some of those guidelines are NFPA, NEMA, FCC, UL, and NEC. NFPA stands for National Fire Protection Association. NFPA was founded in 1896 as a nonprofit organization to help protect property, people, and the environment from fire damage. It’s now an international organization representing over 100 countries with 65,000 members. NFPA’s mission is to help reduce the risk of fire through safety requirements, research, codes, and fire-related education. NFPA is published every three years. It covers issues related to electrical safety requirements and it’s not used as a design specification or instruction manual. NFPA publishes 300 codes and standards. They are designed to minimize the risk and effects of fire. Its over 200 technical codes-and standard- development committees and is comprised of over 2,000 volunteer seats. The volunteers vote on revision and proposals in a process that is accredited by the ANSI (American National Standards Institute). NFPA also provides free online access to its codes and standards. NEMA stands for the National Electrical Manufacturers Association. NEMA is the association of medical imaging and electrical equipment...

Words: 716 - Pages: 3

Premium Essay

Building a Network Structure

...First in building a network we must figure out what cable will be used for our telecommunication rooms. Category 5e twisted-pair copper cable is the most common and inexpensive cabling used today. Next we will need to have the right set of tools for building or telecommunication room. Lastly we need to figure out what type of testing will be performed to see if everything runs properly. The advantages of using the CAT5e cable is that it is an upgraded version of CAT 5 that adds specifications for reducing electromagnetic interference from a twisted pair unshielded to another twisted pair. CAT5e also provides greater signal-carrying capacity. Another advantage of using a CAT5e cable is its support for Ethernet, Fast Ethernet and Gigabit Ethernet. Bandwidth is important because it provides information that contains a part of the system. Finally CAT5e upgrade the thickness of the PVC protective coating which has improved the longevity of the cable. For new installations, including cable and crossover, CAT5e provides the speed and CAT6 capacity, but on a much better price. Now that we know what cable we will be using next is the equipment required to build our physical network. Since we are running CAT5e cable we will need to use patch panels to act as a midway. All the wiring will need to be punched down and attached to the back of the patch panel. The front is made up of RJ-45 connectors into which patch cables connect. This prevents any damage to the room wires. Now that we...

Words: 689 - Pages: 3

Free Essay

Building a New Structure - Rfp

...My RFP for this building is I will be wiring this entire building with Cat5e cable because it’s cheaper and better to use in a building like this. I will try and get the job done as quickly as possible; it probably will take me about 3 or 4 day to wire this building. I will provide all the labor, material, tools and equipment need for this job. Me and my team will do a great job on wiring your building and have it up in running in no time. I plan to have your Telco room in the back of the building in the left corner with all the theory rooms and labs surrounding it. I will have racks and switches setup in the Telco room for the other rooms , but for labs 4 and lab 1 I will have a switches in those rooms because those tow labs have the most computers in them and that’s a lot of cable to run from every computer in those rooms back to the Telco room . So I will just put the switches in the labs mount them on the wall or a have racks setup so the stiches and cables can be place and cable be neatly organized, and have to main cables running from those rooms back to the Telco room. Then with the other two labs , LRC I will do the same thing as I did with the other labs so it want be so much cable and they have their own switch in them , with the 5 theory rooms and front desk I will have 3 cables in each room going back to the Telco room . All the cables in all rooms will be organized and in the Telco room will have the cables on racks so they are neat and if a cable...

Words: 695 - Pages: 3

Premium Essay

Building a New Structure Rfp

...Rey Lozada NT1330 homework June 19, 2015 IP Addressing Scenario According to the scenario, the company will have a single, physical location with approximately 145 hosts on the network. In this case, I would us a class C address such as 192.168.0.0. Reason why is because you can put all the devices on a single subnet with the subnet mask 255.255.255.0/24. This would allow for 253 usable host addresses, which is more than needed in this case. Whether you should dynamically or statically assign those IP’s goes, I suggest assigning it dynamically. Unless you don’t mind MANUALLY managing 218 hosts, you should definitely go with DHCP. The router will be well capable of handing out addresses for 145 hosts. Since there is only one location used in this case, only one network should be used as it will only complicate things to have more than one network. Since DHCP is being used as the suggestion, whether we should use a router and/or firewall, or utilizing Windows Server…the answer is yes. The router for dishing out the IP addresses and the firewall should be used for security purposes. Using Windows Server just for DHCP is rather overkill. Using these suggested methods should also accommodate for at least 50% growth within the next few years. Rey Lozada NT1330 homework Unit 1: Assignment June 19, 2015 Window 2008 Networking Services Domain Name System (DNS) - are the Internet's equivalent of a phone book. They maintain a directory of domain names and translate them to...

Words: 385 - Pages: 2

Free Essay

Constructing a New Structure- Building Codes

...Constructing a new Structure- Building Codes The information in this document should be useful in making design-related decisions that will not only satisfy the move to our new building Information Technology (IT) requirements but also meet the needs of the building and its future occupants with respect to voice, video and data communications. The intention of this document is to provide a comprehensive understanding and reference guide that can be referred to when moving to our new building. Moving into our new building we need to follow certain cable codes and specification. A properly designed network is based around components or wiring units. The components should also follow certain performance specifications so that when installing we will know exactly what types of applications will be supported. The cable specifications and building codes requirements that we use will be based on * ANSI/EIA/TIA standards 568-C-- Commercial Building Telecommunications Cabling Standard * ANSI/EIA/TIA 569-- Commercial Building Standards for Telecommunications Pathways and Spaces; ANSI/EIA/TIA 606- Administration Standard for the Telecommunications Infrastructure of Commercial Buildings * ANSI/EIA/TIA 607-Commercial Building Grounding and Bonding Requirements for Telecommunications; BICSI Telecommunications Distribution Methods Manual (TDMM) and NFPA 70--National Electric Code (NEC). Cabling has changed over time. Cabling installations have evolved from proprietary systems...

Words: 2982 - Pages: 12

Premium Essay

Building a New Structure - Problem Analysis

...Activity 1: Building a New Structure – Problem Analysis Here are the most common causes of fiber network malfunctions: • Broken fibers because of physical stress or excessive bending • Insufficient transmitting power • Excessive signal loss due to a cable span that’s too long • Excessive signal loss due to a contaminated connector • Excessive signal loss due to faulty splices or connectors • Excessive signal loss due to having too many splices or connectors • Faulty connection of fiber to the patch panel or in the splice tray Typically, if a connection is completely dead, it’s because of a break in the cable. However, if the connection is intermittent, there are several possible causes: • The cable’s attenuation may be too high because of poor quality splices or too many splices. • Things like dust, fingerprints, scratches, and humidity can contaminate connectors. • There is low transmitter strength. • There are bad connections in the wiring closet. Some tools to assist in determining the issue with the network would be: Cable fault finder - fault locator, cable and wire manager and tone generator Electrical Contractor Telecom Kits - these kits contain essential industry standard telecommunications tools and test equipment. Voltage Detector - provides protection against hazardous voltages. Punchdown Tool - termination tool allows you to terminate jacks. Modular Crimper Cable Strippers Once you find the problem, you have to repair it. Besides the...

Words: 313 - Pages: 2

Free Essay

Case for Biovail

...1. 17*4.5*2.5m= 1700*450*250=191250000cm3 0.5+1=1.5 cm3 Pills fitting trailer=191250000/1.5=127500000 pills 2.83/(100+400+35)=0.5 127500000*0.5=63750000 One truck will be more than enough to carry the products. 2. As we saw in the case according to GAAP there are 4 conditions which are persuasive evidence of arrangements exists in which Surely there was a transaction and there was an arrangement further after. Second is seller's price is fixed for the buyer and in the case we can see is the truth. Third in which collection is reasonably assured has been also followed as we can see in the case. And the last one concerning the delivery. As mentioned inside of the case the company though that the product was free on the board and it was not their responsibility to take care of the shipment process and the product. However the case was the opposite as Distributor's employee made sure to change the title and finish the transaction as the product would reach the destination. In this case Biovail should recognize the revenue the moment that the product have left the first destination and the company in order to go to Distributor's destination. That way the responsibility would be not only concern Biovail but also Distributor. 3.it does not influence them in third quarter at least, in any of the case whether they take revenue at the moment the product reaches the destination or they count revenue the moment it leaves the warehouse. In first case it cannot affect the third quarter...

Words: 321 - Pages: 2

Premium Essay

Building an Empire: How a Single Structure Influenced a City

...before the Empire State Building do not stare beyond its facade and question the history that has made it one of New York City's most prized landmarks. It is often viewed two-dimensionally, as a vertical line amongst other vertical lines in an impressive skyline. However, the Empire State Building is not so much a building as a capsule encompassing a three-dimensional space loaded with histories. It is necessary to address these histories dynamically, and from multiple historical angles in order to gain a more complete and multi-faceted understanding of the building. To discuss the Empire State Building, this paper will look beyond its presence as a building and question its history on a micro level, as well as the history it produced on a macro level, from the impact it had on the lives of poor laborers, to its impact throughout the entire nation and the rest of the world. This discussion of the Empire State will start at the beginning, and address two characters that were foundational to its creation. The first of these men is John Jacob Raskob, the financial support that was necessary for the building's realization. Raskob chose real estate as a venue in which to invest because it was popularly regarded as safe and secure (Tauranac 98). He was not interested in investing in something that was perceived as glamorous and rather chose the path he imagined to have the least risk. The second man is Alfred E. Smith; he became a spokesperson of sorts to the building. As a politician, Smith...

Words: 5154 - Pages: 21

Premium Essay

Unit 3: Lab 1: Building a New Structure - Nfpa Codes

...Unit 3: Lab 1: Building a New Structure – NFPA Codes The transmission of words, sounds, images, or data in the form of electronic or electromagnetic signals or impulses: Telecommunications what a concept. In order for us as a person and an IT Administrator is to stay safe. History has shown the safety departments about having to write policies which are used to provide recommended practices for the design and installation of safety standards with the Telecommunications infrastructure that will support a wide variety of existing and future services, using industry accepted design and installation methods. To define standards that will enable the design and implementation of structured cabling systems for commercial buildings and between buildings. The telecommunications industry standards, codes and practices are defined in various state and agencies on web sites defined in a catalog that can purchase and downloaded and read for immediate enforcement of these guidelines used for each industry. These policies are intended to answer faxes of infrastructure practices and not to be a substitute for knowledge of industry accepted practices, standards and codes. Policies are not intended to be used in lieu of a construction specification document, are used to abide to the specifications. Communications technologies can be complex and designed and installed by experienced professionals. Telecommunications are considered a fourth utility, to be designed, funded and installed with...

Words: 1394 - Pages: 6

Free Essay

Han Guo

...SRTP Essay 1: A Statistical Analysis Report on the Seismic Appraisal of Classroom Buildings in Primary and High Schools Located in Shapingba . Zhou Shuyi, Meng Fei, Guo Han (College of Civil Engineering, Chongqing University, Chongqing, 401331) Abstract: This paper statistically analyses the earthquake resistance capacities of 107 Classroom Buildings in 107 primary and high schools located in Chongqing's Shapingba District; it further makes an analysis of various indicators, summarizes the most serious hidden risks of the buildings, and finally provides a statistical basis for seismic design. Key Words: Classroom Buildings, Seismic Appraisal, Reinforcement . Introduction In the 2008 Sichuan Earthquake, numerous buildings in the stricken area fell down, and many people died. As primary and high schools were generally located in heavily traveled high populated areas, Classroom Buildings in them were public ones with very high population density. So if a building collapsed, a considerable number of students and teachers would die and a large amount of property would be damaged. After the Earthquake, the State Council and the Ministry of Education immediately orders local governments to undertake an earthquake resistance appraisal of each building in each primary and each high school, and to take corrective measures with regard to the buildings that failed to meet the earthquake resistance standards correspondingly. In response thereto, in September 2009, the...

Words: 3986 - Pages: 16

Free Essay

Building the Burj Khalifa

...Building the Burj Khalifa: Main: Chronological order 200 Mechanical, electrical and plumbing: air conditioning (temperature), 300 Safety – (getting everyone out) refuge rooms 300 Elevators– mention of transition from steam to motor and latched systems and electrical brakes and coping with load 100 Spire 100 Maintenance - Broadcast and communications floors, Mechanical Floors Conc: How it has progressed engineering and enabled more (buttress structure). Future plans – The kingdom Tower in Saudi (1km into the sky) Building potential: Space elevator, new arising problems, strength of materials, what that would mean and enable if possible. Throughout history, progression and advancement in technology has fundamentally separated us from our evolutionary antecedents, enabling a life of greater comfort, extravagance and an increased ability to procreate and sustain ourselves. This improvement is especially apparent in the world of architecture and civil engineering, where there has been an unremitting ambition to surpass the existing boundaries, particularly with regards to height. The most renowned early example of a structure where height was key are the Pyramids of Giza where elevation was crucial in order to radiate power and divine authority. The tallest pyramid, standing at 146.5m, was built more than 4500 years ago, and remained the tallest manmade structure for the next 3800 years, until the 1300s when Lincoln Cathedral was built topping it by only 13.5m [1][2]...

Words: 3583 - Pages: 15

Free Essay

Fernando Calatrava's Ciudad de Las Artes Y Sciencias

...Santiago Calatrava’s Ciudad de las Artes y Las Ciencias Santiago Calatrava’s Ciudad de las Artes y Las Ciencias Mrs. Crowley 12/06/12 Mrs. Crowley 12/06/12 Fernando Praza A study of Santiago Calatrava’s Ciudade de las Artes y Las Ciencias including in depth looks at El Palau de les Artes Reina Sofia, L’Hemsiferic, El Museu de les Ciencies Principe Felipe, L’Agora, and L’Umbracle. Fernando Praza A study of Santiago Calatrava’s Ciudade de las Artes y Las Ciencias including in depth looks at El Palau de les Artes Reina Sofia, L’Hemsiferic, El Museu de les Ciencies Principe Felipe, L’Agora, and L’Umbracle. Table of Contents Introduction……………………………………………………………..……………..3 El Palau de les Artes Reina Sofia…………………………………….……….………4 L’Hemsiferic………………………………………………………..…………………8 El Museu de les Ciencies Principe Felipe…………………………………….….…..10 L’Agora……………………………………………………………………….….…..13 L’Umbracle……………………………………………………………………..……16 Conclusion………………………………………………………………..…………..17 Figures………………………………………………..………………………………19 Sources………………………………………………………………………………..28 Throughout history, there have been many examples of architecture, and each culture has added different elements to the progression of architecture. From Stonehenge to Falling Water, architecture has grown and evolved with the changing cultures, climates, and eras. Architecture has progressed from a basic need for shelter, to an art form all unto itself. One of the most prominent architects...

Words: 5258 - Pages: 22

Premium Essay

Architecture as Art

...According to Webster’s dictionary, architecture is defined as “an art or science of building.” While I believe buildings are mostly engineering processes, structures can be artistic. Architecture comes with design and design usually has some kind of creative element to it. This creativity to reflect the architect’s artistic ability in a building, the thought processes, functional aspects, is art. There is a lot of effort put into making a building. Apart from the engineering process and scientific principles of manipulating mass, volume, materials, and pragmatic elements such as keeping in mind cost, technology, an architect has to be creative to make the building or structures very pleasurable to view. This is because architecture, in essence, fulfills all the roles of an artist. I believe architecture primarily reflects the history, time, culture of the people, technology, and is very symbolic of that time in several different ways. Several examples can be attributed to the artistic roles of architecture. I personally love the fig 494 on page 370 of our text. It is structure called Turning Torso Residential Tower in Sweden. This particular building reflects the third and fourth role of artists of making the structure pleasurable and give hidden meaning of stronger powers. Another impressive building is the Burj Khalifa (fig 501, pg 373, name changed in 2010) in Dubai that is the tallest building in the world as of now demonstrating again third and fourth role of artists demonstrating...

Words: 933 - Pages: 4

Premium Essay

National Register Of Historic Places

...National Register of Historic Places The National Register of Historic Places is a distinct & honorable recognition for a building. This list of historically significant buildings & structures provide some-what of a census for these properties. There are numerous ways to get onto the National Register, however a structure must pass the criteria for evaluation. The criteria is written broadly because there are a number of reasons or important significance for a property to considered as significant. (write about oldest house on register & newest listing). The National Register of Historic Places encompasses over 90,000 buildings, structures, structures, sites, and objects. To get a structure listed on the National Register, you must pass...

Words: 787 - Pages: 4