The ABC’s of Failure – Getting Rid of the Noise in Your System
For the past 40 years, I have observed many companies, including DuPont (where I spent 27 years) pursuing planned maintenance with the standard tools of planned maintenance: inspections, planning, scheduling, materials procurement, CMMS systems, etc. with the same results. They succeed for a while and get their percent planned and scheduled maintenance up to the 80+ only to see that drop back later to 60 I am amazed how many of the companies we work with have had this experience. This pattern of behavior has led us to conclude that the reason for this experience is that only 60% of the normal work of maintenance is inherently plannable. The rest of the work is created by random acts of what we are now calling care-lessness. The sites where we see people break this pattern and achieve 92% to 96% planned maintenance for the long term without regressing, are the ones who eliminate the inherently unplannable work. Of course, this cannot be done by maintenance alone. Everyone who does work at a site contributes to the defects that create the unplannable work, and therefore everyone must participate in eliminating the defects that create the 40% of the work that is unplannable. In the diagram below we attempt to more clearly articulate the true significance of Defect Elimination by outlining the ABC’s of failure. Fundamentally, failures happen because things that exist are not perfect. To reduce failures we must eliminate as many imperfections as possible. One of the classes of imperfections is “defects”. Our studies have concluded that all failures of equipment and processes can be traced back to defects (we use bugs to symbolize defects). Therefore, defects are the basic cause of all of our failures and can be classified into three sources: A, B, and C. A. Stands for Aging, which typically generates about 4% of the defects that eventually become failures over long periods of time (25-50 years). This is easiest to see in site infrastructure such as steel and concrete. These defects are generated even if the equipment is not operated at all. B. Stands for Basic Wear And Tear of the equipment when we operate it, which typically generates about 12% of the defects that become failures over shorter periods of time (1 month to 7 years depending on the quality and appropriateness of the design). This may be easiest to observe in the most critical equipment in a site. This equipment usually has a long Mean Time Between Repair and has everyone’s attention to any small deviations. C. Stands for Care-less Work Habits, which contributes the remaining 84% of the defects that become failures over random periods of time. Care-less is not the same as irresponsible. While irresponsible habits would be included in the care-less category, it is a small part of the total. By care-less we mean, “not providing the care” that the equipment needs to run perfectly.

7/31/2008 .

1/1

© Ledet Enterprises, Inc. SMRP Conference 2008

Most people do not realize that the vast majority of defects are created by Care-less Work Habits and underestimate the significant impact that defects can have. People waste much of their time and energy on trying to prioritize a long list of failure repairs that should never have happened in the first place. People refuse to accept that they have Careless Work Habits because they equate carelessness with irresponsibility. Most people fail to understand this way of looking at defect generation because it is hard to accept that we could operate that badly and still survive. The validation for this insight is well documented in Total Productive Maintenance (TPM) award winners in Japan who tell the story of eliminating 90% to 98% of their failures as far back as 1991. The data to support this has been around a long time. It is simply hard to believe. This is the blindness created by our assumptions. The BP Lima refinery eliminated 87% of their pump failures when they implemented defect elimination. One assumption that blinds us is that the failures are avoided by doing a repair early as a preventive task. This is clearly not what we saw at the TPM award sites. The defects that cause the failures are removed without need for a repair or the defects are never generated in the first place. In our experience, we have observed three modes of behavior that create performance in three different Stable Domains. The domains are Reactive, Planned, and Precision. We concluded that there are three potential modes of action that an organization can take when dealing with defects. • • It can React to the difficulties it faces without growing capability, It can Plan, seeking to impose its will on anticipated future circumstances, or It can choose to create a culturally based system of Purposeful action that embeds new ways of working into the everyday actions of workers.



7/31/2008 .

2/2

© Ledet Enterprises, Inc. SMRP Conference 2008

The Planned Domain is a step above the Reactive Domain, but it is unstable. It creates the need for a parallel organization to plan improvement activities like equipment maintenance and personnel training. We now look at the previous chart on Stable Domains in a different manner from just a few years ago. We do not believe that it is necessary to go through the Planned Domain to achieve the Precision Domain. Instead we see this as a bifurcation when moving from Reactive…do you intend to try to plan unplannable work or do you intend to eliminate unplannable work? By rotating the axis of the previous chart it is easy to understand that trying to attain the Planned Domain will cause you to work harder. Instead, we recommend achieving the third domain through a program of eliminating unplannable work by defect elimination, with a core logic at every level of the company such as “Don’t just fix it, improve it.” How, then, can such a change be led without becoming yet another initiative? This is a topic for creative thinking on all our parts, and such change is sufficiently rare that there are no pat answers. One thing we are sure of is that it is necessary to pursue a higher purpose to achieve the Precision Domain. So we ask, “Can each and every employee at a site answer the question, “How do I personally contribute to the company’s vision?” Each and every employee who cannot answer that question is unwittingly contributing to the carelessness category of defects. There is no way companies can achieve inspirational visions unless they become great in their core business. So how can we advance up the Stable Domains?

The Life of a Defect
In order to understand why Careless Work Habits are such a large part of the failures category, it is helpful to consider a typical life of a defect. A defect is born when something is done that is not perfect. For example, the nut on a bolt that holds down the base plate of a pump is not tightened to the right torque. Life begins as a loose nut, which tends to further loosen if there is any vibration in the pump. As long as the pump is not running, this defect is Aging, and the fact that it is loose allows moisture to get under the base plate and corrosion begins to form. Thus, our defect has spawned another defect that is also growing. Both of these defects can have long lives since it would take 25 to 30 years for the base plate to corrode through. However, an operator decides to use this pump so he starts running it, which throws some strain into the bolt because of the motor torque and creates some Working Smarter versus Working Harder vibration. The vibration causes the nut to become even looser, and now the base plate can PLANNED warp slightly under the strain, which allows DOMAIN Take Defects Trying to plan Out Faster Unplannable work more moisture, creating more corrosion throwing the pump slightly out of alignment REACTIVE which puts an off balance load on the bearings. DOMAIN So you can see where this is going. As the PRECISION pump operates, defects of the Basic Wear and DOMAIN Tear category are generated. On top of that we Eliminate Sources now have Careless Work Habit defects being Of Defects Eliminating Unplannable work generated from the loose nut because the OPERATIONAL operator closes down the suction valve to quiet PERFORMANCE the shaking from the loose nut, which creates some cavitation at the impeller leading to erosion. Therefore, we can see that saying “Defects Beget Defects” can sum up the typical life of a defect.
AMOUNT OF WORK
RCM/EAM Conference 2008

Organizational Discipline

Responsive Work

Planned Work

34

7/31/2008 .

3/3

© Ledet Enterprises, Inc. SMRP Conference 2008

The rest of the life of this defect is determined by how much people care about the pump. If the operator notices that the nut is loose and uses a wrench to tighten it to the proper torque, the defect has a very short life and never becomes a failure. If no one takes care of the loose nut, it continues to beget more defects until a failure or multiple failures occur to the pump. This brings us to another principle, “Failure Events create extra Defects”. If this pump is allowed to run until the bearings seize, the power from the motor could slightly bend the shaft in the act of failing which becomes the defect that causes the next failure. So the total number of failures that result from a defect is determined by how carefully the pump is operated and maintained. Careful Work Habits can be defined as noticing defects when they are very small and removing them before they generate other defects or cause failure events. This is the essence of Total Productive Maintenance as practiced in Japan.

How Do Defects Affect Safety
If our equipment was perfect and we operated and maintained the equipment perfectly, there would be very few safety problems. Failures inevitably direct energy into places that cannot bear the amount or intensity of the energy and therefore cause collateral damage. This misdirected energy then is the source of hazards to the people and equipment. So the principle is Defects create Failures that cause Hazards that can hurt people and/or damage equipment. Personal Safety programs create capacity in the organization to cope with the hazards when they happen. Process Safety Management programs create capacity in the organization to eliminate the defects that are the root causes of the failures and hazards. The Personal Safety programs are typically designed for the immediate reactions and short term dealings with defects. The Process Safety Management programs have to deal with all three classes of defects. To properly deal with Aging defects the Process Safety Management programs must look ahead 25 to 50 years. This long term perspective is the reason that Process Safety Management requires very senior management attention to be effective. They are typically the only ones who can support programs that have such a long life.

The Remedies
First, we expanded the operating domains chart to include two more domains that were not in the original benchmarks we conducted at DuPont. The diagram below shows 5 domains to account for a state below Reactive, which we call Regressive, and a state above Precision, which we call World Class. The Regressive Domain is below Reactive because the organization, for whatever reason, is not capable of reacting to all of the needs of the facilities. The World Class Domain is added to recognize the opposite end of the spectrum where the inevitable progress happens through human innovation.

7/31/2008 .

4/4

© Ledet Enterprises, Inc. SMRP Conference 2008

Determine which Stable Domain your organization is in
In order to decide what should be done, first it is advisable to determine which domain your organization is currently in. In this evaluation it is wise to consider the history of the organization to make a good judgment. For example, the defects generated by the Aging sources of defects have long lives before they become failures. Therefore, even though Aging is only 4% of the total defects being generated, if they are left unattended for 40 years, they can produce failures equal to more than 100% of normal failure rates. At this point, your organization has fallen out of the Reactive Domain into the lower one, which we call the Regressive Domain. In this domain, at least twice the number of failures as normal must be dealt with. This is the case at many older facilities where the infrastructure has been neglected. In this domain, the organization usually does not have the resources to deal with the situation.

For sites in the Regressive Domain
If you end up in this Regressive Domain, your people are not able to react to all of the failures adequately. At this point, there are several choices that can be made. 1. You can decommission the facilities that are in the Regressive Domain. 2. You can double your resources for dealing with failures. 3. You can reduce the rate of operating the facility so that the failures from the Basic Wear And Tear are reduced to a level that can be handled by existing resources. (This is a good choice since Basic Wear And Tear is 12% of the failures and the reduction in rates usually also reduces the defects from the Careless Work Habits because there is less activity going on.) 4. You can improve the efficiency of the process for dealing with failures which might be a better planning and scheduling process, parts procurement, predictive techniques, management of work, etc. 5. You can lower your standards of performance and let the resources you have do the best that they can and hope nothing catastrophic happens. 6. You can sell the property to an organization that has the resources to restore it to sustainable performance. All of these options for getting out of the Regressive Domain are survival techniques and do not add to the organization’s capacity to sustain the performance over long periods of time. They
7/31/2008 . 5/5 © Ledet Enterprises, Inc. SMRP Conference 2008

are just ways of mitigating the risk of having a catastrophic event. These choices basically return you to the starting line in the Reactive Domain.

For sites in the Reactive Domain
Option 1. Pursue the Planned Domain
Once you have succeeded in restoring performance to the Reactive Domain and are meeting your standards, the question of what domain you want to pursue can be addressed. If you decide to pursue the Planned Domain, some means of dealing with the fact that this domain is unstable must be established. The only facilities that we have observed, who have stayed in the Planned Domain for long periods of time, have implemented some version of the “900 pound Gorilla” strategy. The essential element of this domain is that your organization will impose their will on the facilities by force of some personalities. Therefore, either those particular people have to remain in the power positions at the site for long periods of time to make sure the infrastructure is maintained, or you have to have a very strong discipline of succession in those jobs to avoid the inevitable back-sliding into the Reactive Domain.

Option 2. Pursue the Precision Domain
The Precision Domain is very stable and resilient to change. The BP Lima and Premcor Port Arthur sites have remained in the Precision Domain for 10 or more years despite multiple changes in ownership and management. One simple explanation for the difference in stability is that rather than relying on a “900 pound Gorilla” to maintain performance, a site has “900 one pound Gorillas” maintaining performance. If you choose to pursue the Precision Domain, there is a 3-stage program that must be achieved before the defect elimination culture is created. There are also three essential processes to make the transformation. • The first is a process to create urgency to change that is based on a strong business case for change. • The second is a process to empower the workforce to make decisions in their work based on a culture of defect elimination. • The third is a strong leadership process to guide the change process long enough for the defect elimination habit to be self-sustaining in the form of a work culture. This program can be accomplished in 12 to 18 months but must go through three stages. The first stage is to unfreeze the organization by establishing that the status quo is no longer acceptable. The second stage is the changes to processes, structures, and systems that support the defect elimination culture. The third stage is to refreeze the organization into the new culture and end the change process. In the third stage, the organization continues to improve and people learn that continuous improvement does not mean continuous change, but comes when improvement is accepted as a normal part of the every day work and involves constant vigilance to provide the care needed to improve the performance as the environment changes.

Recommendations
We recognize that most organizations are stretched and having difficulty meeting the many demands being placed on them. Therefore, we have recommendations for what should be discontinued to free up resources as well as what should be done.
7/31/2008 . 6/6 © Ledet Enterprises, Inc. SMRP Conference 2008

What to do
Based on our observations, we believe that many companies have assets that have fallen into the Regressive Domain and consequently we make the following recommendations. 1. Significantly reduce defect generation rate in equipment and processes in the Regressive Domain through the use of equipment proprietors. A well-designed proprietor system restores the infrastructure deterioration back to acceptable standards. The proprietor system should be designed as a widely distributed system to match the distributed nature of the defects. Basically, every cubic inch of property should be assigned to a proprietor who is in a position to visually inspect the real estate and hardware personally. The proprietor should be the voice of the needs of the property he is assigned. Each proprietor should be assigned no more property than he could inspect in one day using his normal mode of transportation. The role of proprietor is simply to run equipment within standards or shut it down. When a property is shut down, only the Aging defects accumulate, which is a reduction of 96% in defect generation rate so the property can remain relatively stable until the resources are available to deal with the higher defect generation rate. The proprietor should not be the budget holder for his property – that way he can concentrate on maintaining standards and not have that over ruled by monetary constraints. 2. Engage the entire workforce in defect elimination using cross functional Action Teams as a means of creating a culture that assumes equipment improvement as a normal part of the everyday job. Once a particular proprietor determines his facility to be out of the Regressive Domain and into at least the Reactive Domain, a systemic process of defect elimination must be created within the workforce. The basic need is to learn how to work cross functionally instead of in silos and to learn to treat contractors the same as employees in this process. Much of the randomness created in the Careless Work Habits category comes from the lack of appreciation for the needs of the other functions that impact common equipment and work processes. By using cross functional teams to eliminate defects, people learn how to be a team while doing their normal work. We have observed an incredible amount of organizational learning take place among people in these teams. Launching cross functional Action Teams must continue until this cross functional way of working becomes a habit and the generation rate from Careless Work Habits is reduced by about 30% of total work orders. 3. Create a leadership process for the culture change based on boundary setting that creates freedom for the workers and proprietors to make decisions aligned within standards established through reflection and dialogue. Management must learn how to create boundaries for cross functional teams so that the teams are free to make decisions on their own that are within the level of risk that is tolerable to the management. The focus of management work should be to avoid two other kinds of imperfections -excesses and recycles. This requires conscious and creative energy. The best questions a manager can ask are “Where did the excess energy come from that created these defects?” and “How can we keep this kind of a failure from happening again in the future since we can’t change the past or the present?”

7/31/2008 .

7/7

© Ledet Enterprises, Inc. SMRP Conference 2008

4. Standards should be set on the tolerance of imperfections in the outcome of work and not on controlling the process for attaining these results. Process controls only deal with the functional aspects of an operation and ignore the “will” and “being” of the situation. Therefore, process controls only deal with one third of what the people are experiencing. While many processes have universal application to many different situations functionally, they do not deal with the will of the situation or the being of the organization dealing with the situation. Attempts to apply universal processes to all situations tend to get so complicated that people are not able to use them. Many of these processes are based on the assumption that Aging and Basic Wear And Tear sources of defects are the only defects present and therefore ignore 84% of the situation

What to stop doing
1. Do not treat each initiative as if it were independent of all others. Use defect elimination potential as the key principle in rationalizing all initiatives into one to maximize the probability of success and minimize the risk of catastrophe along the way. 2. Do not use internal change agents. Using outside change agents is advised to preserve the talent of employees to concentrate on the main line work of pursuing the corporate vision. The change agents will only be required for a few years to make the culture change and will not be needed after that so it is better to rent them rather than own them. Also once the change reaches Stage 3, it is necessary to remove all change agents so that the organization can refreeze into an efficient operation of the new culture. 3. Do not focus on implementing computer systems. Implementation of computer systems to institutionalize the new culture should not take place until you reach Stage 3 of the change process. If you implement systems first, you do not have the culture to use them so the systems get perverted to accommodate the old culture, which takes an incredible amount of time and distracts the most talented people from the main work of changing the culture. Implementation in Stage 3 is better because the work practices match the system being implemented, and by this time as much as 84% of the defect generation rate has been eliminated so the job is one-sixth the size as it would be in Stage 1 of the change. 4. Do not focus on team building. Most people attack this change in work culture by training people how to be a team. In many of these approaches, there is no common work for the people to do together in the training so they learn how to be a team when doing training exercises but not how to do their normal work as a team. Recommendation #2 of what to do above will create the desired teamwork and is an example of how resources can be made available by integrating initiatives.

Summary
In July of 1998, The BP Lima refinery experienced the successful completion of a Hero’s Journey change effort.
7/31/2008 . 8/8 © Ledet Enterprises, Inc. SMRP Conference 2008

This Hero’s Journey change began earlier in the 1980’s. Lima employees did not realize at the time, that through their hard work to keep the plant profitable, they would ultimately save their own jobs and save their plant from closure. Guided by Continuous Improvement Forums, everyone at the site participated in defect elimination practices that improved operational profits by over $40 million a year which tripled their earnings in three years. At the same time safety improved as well. OSHA recordables dropped from five per 200,000 man-hours to two and they experienced 5 years without a lost workday case. Environmental impact was reduced which also contributed to profit by reducing crude losses from 1.3% to 0.3%, a pacesetter performance for a refinery. Mean time between pump failures changed from 12 months to 50 months, which accounted for $1.5 million in cost savings but more importantly, it reduced the number of work orders on pumps by 78%. The total workload for the maintenance people dropped by 37.5% in those 3 years. But that is only half of the story, in the next 5 years; they cut the workload by another 50% in maintenance for an overall reduction of 70% in maintenance work orders. Their budget for maintenance dropped 60% in the 8 year period and they were running the refinery with 20% less manpower. Contrary to other cost cutting experiences in the past, these improvements are continuing after 13 years without outside help. This was sustained through four changes of ownership and many managers. The first sale of the refinery in 1998 was for $215 Million. In 2007, the Lima refinery was sold for the third time to Husky Energy for $1.9 billion, which the Wall Street Journal pointed out, was a 51% premium over the any refinery that was sold in the USA that year. The results Lima experienced are staggering. What was the formula for success at Lima? And what can people do to make this formula successful for them? As stated earlier, three things are required to make a culture change of this type. • An urgent business need. If your site needs to improve safety by at least 40%, reduce maintenance costs by 30% to 40%, and improve earnings while improving the quality of life for everyone on site, then perhaps you have the urgent business need. • An empowered work force to make decisions in their work. See the NPRA paper “A case study in effectively implementing corporate change initiatives” in the 2007 NPRA Maintenance and Reliability Conference proceedings to learn more about how this is done. • A strong leadership process to guide the change. Since initiative overload is common today, the first step leaders should consider is rationalizing all initiatives into one with defect elimination as the key principle.
7/31/2008 . 9/9 © Ledet Enterprises, Inc. SMRP Conference 2008

Winston P. Ledet Ledet Enterprises, Inc. The Manufacturing Game 7702 FM 1960 East, Ste 226 Humble, TX 77346 www.mfg-game.com 281-812-4148 wpledet@mfg-game.com Winston Ledet, is a leading consultant and internationally known workshop instructor on proactive manufacturing and maintenance. His work is focused on manufacturing organizations interested in becoming learning organizations. He has 27 years of experience with E. I. DuPont de Nemours serving in a variety of assignments in research, technical, works engineering, operations, human resources/safety and maintenance. He is one of the creators of The Manufacturing Game® as part of his work at DuPont. Winston formed his own consulting firm, Ledet Enterprises, Inc, fourteen years ago using The Manufacturing Game® to help drive improvement efforts in process industries as well as discreet part manufacturing sites around the world. He has extensive capability in System Dynamics modeling, proactive manufacturing and large-scale organizational change strategies. Ledet Enterprises, Inc. has developed and been a participant in the development of several other simulations over the last 12 years with a focus on improvement of safety and reliability through organizational culture change. Winston did his undergraduate work at the University of Southwestern Louisiana and received his Ph.D. in chemical engineering at the University of Texas - Austin.

7/31/2008 .

10/10

© Ledet Enterprises, Inc. SMRP Conference 2008

The ABC’s of Failure – Getting Rid of the Noise in Your System
Winston P. Ledet TRACK: Equipment Reliability
1

Key Points Of This Presentation
1. Benchmark data indicate there are three Stable Operating Domains that determine performance 2. Defect Elimination is the means for Continuous Improvement to higher domains 3. Getting rid of 38% of the work is the best way to succeed at achieving the Precision Domain and 96% of Planned Maintenance.
6,000 planned work orders/10,000 total work orders = 60% planned work 6,000 planned work orders/6,250 total work orders = 96% planned work

SMRP Conference 2008

© 2008 Ledet Enterprises, Inc.

2

All rights reserved worldwide

How does your asset add value?
Potential value of inputs from the world

Performance = Value of outputs
Divided by Potential Value of Inputs

Plant Processes

People

Value of outputs to the world
SMRP Conference 2008
© 2008 Ledet Enterprises, Inc.

3

All rights reserved worldwide

Why Things Fail Why Things Fail
• Things fail because they are NOT perfect. • Therefore imperfections are the root cause of all failures • Three classes of Imperfections Defects – something is missing Excesses – too much of a good thing is a bad thing Recycles – fixes that fail
SMRP Conference 2008
© 2008 Ledet Enterprises, Inc.

4

All rights reserved worldwide

DEFECTS: any THING that deviates from perfection
(anything that erodes value, reduces production, compromises HSE, or creates waste)

SMRP Conference 2008

© 2008 Ledet Enterprises, Inc.

5

All rights reserved worldwide

Five Direct Sources of Defects
RAW MATERIALS

21%
OPERATE

29%

WORKMANSHIP

21%

MAINTENANCE MATERIAL

8%
DESIGN

21%
SMRP Conference 2008
© 2008 Ledet Enterprises, Inc.

6

All rights reserved worldwide

Failure Patterns
(from “RCM: Gateway to World Class Maintenance” by Anthony M. Smith & Glenn R. Hinchenhcliffe p59)

Percent of Failures
Preventive Maintenance (time based)

4%

Failure Rate

10 %

Failure Rate

Bathtub Curve (Infant mortality and wear out)

Time

2%

Wear Out

Time Failure Rate

Predictive Maintenance (Condition/ Inspection Based)

Gradual Increasing

50 %

5%

Time Failure Rate

7%

Infant Reliability

Time Failure Rate

14%
Breakdown Maintenance 40 %

Constant

Time Failure Rate

68%
SMRP Conference 2008

Infant Mortality
© 2008 Ledet Enterprises, Inc. All Time reserved worldwide rights

7

The ABC’s of Failure
Aging
4%

Basic
Wear & Tear 12%

Careless
Work Habits 84%

SMRP Conference Inc. © Ledet Enterprises,2008 All rights reserved worldwide

© 2008 Ledet Enterprises, Inc.

8

All rights reserved worldwide

Fundamental Attribution Error Fundamental Attribution Error
• The attribution of a problem to the characteristics, and character flaws, of individuals in a system rather than to the system in which they find themselves is so pervasive that psychologists call it the “fundamental attribution error”
– MIT System Dynamics Professor John Sterman and Nelson Repenning, published in the California Management Review in 2001 (“Nobody Ever Gets Credit for Fixing Problems that Never Happened”)

• The People are not the problem, the System is. • We need to fix the system so the people can do better work. • We need everyone’s help to fix the system. • Only by working cross-functionally is it possible to succeed.
SMRP Conference 2008
© 2008 Ledet Enterprises, Inc.

9

All rights reserved worldwide

Failure Prevention Failure Prevention Requires Proper Care in Requires Proper Care in Designing, Operating, Designing, Operating, Maintaining & Maintaining & Improving the Plant Improving the Plant
SMRP Conference 2008
© 2008 Ledet Enterprises, Inc.

10

All rights reserved worldwide

Working Smarter versus Working Harder STABLE OPERATING DOMAINS
Planned Work PLANNED DOMAIN

Responsive Organizational PERFORMANCE Work Discipline

PRECISION DOMAIN REACTIVE DOMAIN REACTIVE DOMAIN PLANNED DOMAIN

OPERATIONAL

PRECISION DOMAIN

Responsive Work

Planned Work

Organizational Discipline

SMRP Conference 2008

NATURE OF BEHAVIOR OPERATIONAL PERFORMANCE © 2008 Ledet Enterprises, Inc.
11
All rights reserved worldwide

Reactive Maintenance Practices
Aging
4%
Preventive Maintenance (Time Based) 1000 Work Orders/Yr

Basic

Predictive Maintenance (Condition/Inspection Based) 5000 Work Orders/Yr

Careless

Breakdown Maintenance 4000 Work Orders/Yr

Wear & Tear 12%

Work Habits 84%

60% Planned & Scheduled
© Ledet Enterprises, Inc. All rights reserved worldwide

40% Schedule Breakers & 12 Emergencies

Planned Maintenance Practices
Aging
4%
Preventive Maintenance (Time Based) 1000 Work Orders/Yr

Basic

Predictive Maintenance (Condition/Inspection Based) 7000 Work Orders/Yr

Careless

Breakdown Maintenance 2000 Work Orders/Yr

Wear & Tear 12%

Work Habits 84%

80% Planned & Scheduled
© Ledet Enterprises, Inc. All rights reserved worldwide

20% Schedule Breakers & 13 Emergencies

Working Smarter versus Working Harder STABLE OPERATING DOMAINS
Planned Work PLANNED DOMAIN

Responsive Organizational PERFORMANCE Work Discipline

PRECISION DOMAIN REACTIVE DOMAIN REACTIVE DOMAIN PLANNED DOMAIN

OPERATIONAL

PRECISION DOMAIN

Responsive Work

Planned Work

Organizational Discipline

SMRP Conference 2008

NATURE OF BEHAVIOR OPERATIONAL PERFORMANCE © 2008 Ledet Enterprises, Inc.
14
All rights reserved worldwide

Planned Work is Part of All Domains
Planned Work PLANNED DOMAIN
80% planned

10,000 Work orders

84,000 inspections
8,000 planned

AMOUNT OF WORK

Responsive Work

REACTIVE DOMAIN
60% planned

Organizational Discipline

10,000 Work orders 20,000 inspections 6,000 planned

y nc e nd te g BLE in lid STA s ck UN Ba

PRECISION DOMAIN
>96% planned

6,250 Work orders 20,000 inspections 6,000 planned

SMRP Conference 2008

OPERATIONAL PERFORMANCE
15

© 2008 Ledet Enterprises, Inc. All rights reserved worldwide

Precision Maintenance Practices
Aging
4%
Preventive Maintenance (Time Based) 1000 Work Orders/Yr

Basic

Predictive Maintenance (Condition/Inspection Based) 5000 Work Orders/Yr

Careless
Breakdown Maintenance 250 Work Orders/Yr

Breakdown Defect Maintenance Elimination 4000 Action Teams Work Orders/Yr

Wear & Tear 12%

Work Habits 84%

Start of Defect Elimination

96% Planned & Scheduled
© Ledet Enterprises, Inc. All rights reserved worldwide

Eliminates 3750 Work Orders/Yr
16

Working Smarter versus Working Harder
PLANNED DOMAIN

Planned Work

Take Defects Out Faster

Trying to Plan Unplannable Work

AMOUNT OF WORK

Responsive Work

REACTIVE DOMAIN

PRECISION DOMAIN

Organizational Discipline

Eliminate Sources Of Defects

Eliminating Unplannable Work

SMRP Conference 2008

OPERATIONAL PERFORMANCE
17

© 2008 Ledet Enterprises, Inc. All rights reserved worldwide

2

3

The Lima Experience: Reliability Went up While Costs,
Production and HSE Continuously Improved for 12 years so far
Overall
$2,500,000

Reliability and Cost
MM$
95 Basis
Dollars Per Year
$2,000,000 $1,500,000 $1,000,000 $500,000 $0 1991 1992 1995 1993 1994 1996 1997 1998

$/BBL Crude
95 Basis

$1.5 million / yr cost reduction

Higher Reliability Hydrocarbon Loss Process Optimization Crude Costs Energy Efficiency

0.08 0.27 0.22 0.05 0.06

4.7 16.0 13.0

approx 4,000 man -hours /yr created to pursue proactive activity Year 1991 1992 1993 1994 1995 1996 1997 1998 # Repairs Repair Cost 643 599 599 545 355 221 168 131 $2,250,500 $2,096,500 $2,096,500 $1,907,500 $1,242,500 $773,500 $588,000 $458,000

Sale to Clark

60

3.1
Pump MTBF (months)

Closure decision

50 40 30 20 10 1993 1991 1995 1996 1992 1994 1997 1998 0
Sell or close announcement Proactive Mfg. effort starts

3.4 5.3 45.5

Cost Savings Initiatives 0.09 TOTAL Improvement 0.77

Hydrocarbon Loss
2.00 1.50 50 40

Employee Safety recordable injuries
40.8 42.2 36.4
OSHA Rec. Lost Time

% WT LOSS

per 1,000,000 manhrs

Rate

30
23.3

1.00 0.50 0.00 SMRP Conference 2008 1994 1990 1992

20 10
8.3 4 2.9 1.9

15.9 10.8 1.1 10.9 9.5 0

0

0

1996

1998

0

© 2008 Ledet Enterprises, Inc.

18

1992

1994 1996 1998 All rights reserved worldwide

PROCESS SAFETY MANAGEMENT PROCESS SAFETY MANAGEMENT
DEMANDS DEFECT ELIMINATION DEMANDS DEFECT ELIMINATION
GOOD BARRIERS STOP HAZARDS! (HOLES IN BARRIERS ARE DEFECTS THAT ALLOW INJURIES TO HAPPEN)
Barrier 1

30% DEFECT ELIMINATION YIELDS 67% REDUCTION IN INCIDENTS AND INJURIES
Barrier 1 Barrier 2 Barrier 3

RD S

Barrier 3

ZA

IN JU RI ES

HA

HA

ZA

RD S

Barrier 2

&

IN CI DE NT S

Lima Employee Safety
Recordable
36.4
OSHA Rec. Lost Time

per 1,000,000 manhrs

50 StartInjuries of Defect Elimination 42.2
40.8

SA FE TY

40

Rate

30 20 10 0 1992
8.3 4 2.9

23.3 15.9 10.8 10.9 1.9 1.1 0 0 9.5 0

SMRP Conference 2008

© 2008 Ledet Enterprises, Inc. © Ledet Enterprises, Inc.

1994

19 1996

1998

Allrights reserved worldwide All rights reserved worldwide

SA FE T

YI

NC ID

EN TS

&

IN JU RI ES

What to Do
1. Create Equipment Proprietors 2. Engage the Entire Workforce Using Cross-Functional Teams 3. Create a Leadership Process for Culture Change 4. Standards Should Be Set for Tolerance of Imperfections

SMRP Conference 2008

© 2008 Ledet Enterprises, Inc.

20

All rights reserved worldwide

What to Stop Doing
1. Do Not Treat Each Initiative As If It Were Independent of All Others 2. Do Not Use Internal Change Agents 3. Do Not Focus on Implementing Computer Systems 4. Do Not Focus on Team Building

SMRP Conference 2008

© 2008 Ledet Enterprises, Inc.

21

All rights reserved worldwide

Questions?

Winston P. Ledet WPLedet@mfg-game.com 281-812-4148

SMRP Conference 2008

© 2008 Ledet Enterprises, Inc.

22

All rights reserved worldwide

Similar Documents

Premium Essay

Failure

...Failure As Confucius once said “Success depends upon previous preparation, and without such preparation there is sure to be failure.” Some of history’s most influential people knew exactly what it was like to fail numerous times before they became successful. Walt Disney, one of the most creative and imaginative people was fired by a newspaper company because he was said to have “lacked imagination and had no good ideas.” Abraham Lincoln one of the most influential leaders of the United States, had multiple failed business attempts, and while in the armed forces went to war as a captain and was degraded to a private when he returned.(Michalko, 6,8) Success takes hard work, dedication, long hours, pain, and a lot of disappointment. If some of the most influential people in American history have failed then why are others so afraid of it? When I asked a group of people about what they feared most when they tried something new most of them replied “failing.” When asked why, they didn’t really know. They just didn’t like the idea of not being successful. Successful people like to achieve high standards; they become so afraid of failure that it turns into a handicap. We let the fear hold us back from our true potential. This fear causes some people to not try something altogether because they are so afraid of the feeling associated with not accomplishing something. Today, we live in a society where failing or messing up is viewed as unacceptable, people want to do something...

Words: 1349 - Pages: 6

Premium Essay

Failures

...During the design and implementation of a reliable distributed system is a very important. The failure of this system can result in easily repairable errors, such as hardware, software, or catastrophic meltdowns where hardware overloads, hardware crashes that were not protected. Faults can occur in any of the components of a distributed system. There are four types of failures more commonly known as compute cluster which allows applications to run on more than one computer (node). Data centric systems that involve high volumes of access are more difficult to make fault tolerant. They require failure monitoring software and a special configuration. These types of systems are high availability clusters that allow two or more computers and a set of shared disks. Any application can be installed on the shared disk which allows all other computers access, with certain restrictions designated for each user or pc. The running application's node has exclusive access to the application's data on disk. Specific applications may run very well from this type of system. The application may fail on the shared disk and the nodes exclusive access is terminated and is granted to another node in the cluster. The application is restarted on a new node, which the user will notice a slight interrupt and lose of some data. Design issues are very important in utilizing the multiplicity of processors and storage devices transparent to users. In a conventional, centralized system the user interface...

Words: 279 - Pages: 2

Premium Essay

Failure

...Some people think that their lives are hard and full of disappointment; well I am one of those people. No matter how hard you try, Thers , I still face problems. It is as if my life is an ocean of endless problems and disappointments; however one of the disappointments I have faced happens to be the most interesting part of my life. I had been learning how to drive for five month. I was spending part of my life in the car, but I kept up with that to get my license and enjoy the freedom of being able to go wherever I wanted, whenever I wanted. The day I had my driving test was the day I would find out if all the effort and time I had put into driving was worth it or not. The day before my driving test was one of the worst and darkest days of my life because I was extremely nervous and worried about the judgment day, which was the next day. My brothers and sisters teased me about failing the road test. We went through all the instructions and all other details that there was to know. I usually sleep late, but on the day before my driving test I slept unusually early. During my sleep, I kept imagining failing the test the next day, and I couldn't stop thinking about it. However, I tried to stop thinking about tomorrow and tried to get a good night's sleep, which would be an advantage for me when taking the test. Finally, I slept like a baby without any nightmares this time. On the big day, I woke up to my alarm and got ready to be picked up by my uncle to go to the DMV, where I...

Words: 692 - Pages: 3

Free Essay

Failure for Me

...In the blog post “Embracing Suckage”, Willam Van Winkle states that people should not care about how people think, but they should work hard to fix the failure that they have been made in order to learn and improve. I totally agree failure is the important part of human life because no one are born to be perfect and failure must be happened to all the people of the world. Few weeks ago, I got a new job in a Malaysian restaurant as a server. The first week is the hardest week for me because they have a lot of food names, ingredients and rules that needed to be memorized. Of course, I made a lot of mistakes in the first week, but I didn’t hesitated to fix the problem that I made. First, I was slow like a snail to type in the order on the computer, and my workmates had to wait me until I found the name and sent it in to the kitchen. Second, I often order some food that customer did not order because of some food names are similar. After I learned from all those fail, I learned all the food names, ingredients and rules in this coupe weeks. Now, I can type in order faster without mistake and take care of all the customer’s question professionally. Everyone must experience some fails to make things better and better. The best way to ameliorate ourselves is to fail repeatedly and learn from it to make the failure become...

Words: 255 - Pages: 2

Free Essay

A Failure to Comply

...A Failure to Comply Justine Marie R. Masangcap It is disappointing to see and to hear that President Noynoy Aquino’s Daaang Matuwid program against corruption has failed. From PNoy’s latest SONA, the programs that succeeded are enumerated and expounded. Education and poverty are upheld, but many say that it is still not worthy. The administration is still lacking in terms of programs and actions. Pay once said that during his reign, there will be a “Wang-Wang” ban and road reconstructions for better and easier travel, but the MMDA office is still experiencing traffics, transportation problems and road failures. Employees get late for work, students wake up earlier to prevent the traffic, business produce low profit and a lot experience headache and frustration. The Aquino Administration is fighting corruption, they uphold programs and services for funds and other financial matters, but why is it that DepEd is having problems in finances for the teachers’ salary and for school renovations? There are low number of teachers, low number of school facilities, but high number of students. It is not balanced and proportional. These situations may lead to students’ lacking knowledge just like in the latest news saying that a lot of pupils are asking why Apolinario Mabini is sitting in the whole movie of “Heneral Luna” considering he is one of the country’s heroes. In terms of poverty matters, it is said that the rate from the start of his reign up until now lessen, but it is not transparent...

Words: 319 - Pages: 2

Premium Essay

Failure In Wrestling

...Falling off your bike, missing a popfly coming straight to you, or not passing a quiz: failure surrounds us whether we like it or not. Failure always seems to discourage people from trying and that’s a shame. I’m comfortable with admitting my failures unlike most people. I take my failures and absorb the lessons from each one. . For example, I learn from all my losses in wrestling. I’m not the best wrestler, I’ll be the first to tell you that, but I always try my hardest in my matches. No matter the outcome of the match, I ask my coach what I did wrong and what I can do better just to help me learn. That’s the key to improvement. A good example of this is when I first learned to wrestle. The first time anyone does something, they’re probably...

Words: 355 - Pages: 2

Premium Essay

Baseball Failure

...Failure is a strong thing, it has a great effect on people. What's important is how you react to failure and what you take from it. One of my most memorable failures would be not making the high school baseball team. This had a lasting effect on me but it provided motivation for me which took me to greater things. So let’s start with my reaction. At first I did not take the news well, I was devastated. Baseball is my life and always has been. I thought about all the things that were gonna change with the absence of baseball in my life. As time went on the reality started to hit me that I probably would never play again. I panicked, I told my parents to transfer my school so I could play again. But what would that do? Chances are I might not...

Words: 292 - Pages: 2

Premium Essay

Success Is Not Failure

...Success Is Not Final, Failure Is Not Fatal What is failure? William Zinsser doesn’t believe that just because you drop out, doesn’t mean you just failed the toughest class you would ever take called life. Confucius once said, “Success depends upon previous preparation, and without such preparation there is sure to be failure.” Just like Zinsser Confucius also thought that one’s success doesn’t have to depend on working hard it could also depend on failing at something that doesn’t work. There’s rarely such a thing as failure usually it’s success at finding what doesn’t work. William Zinsser was a writing professor at Yale University in the 1970. William Zinsser was also a writer, columnist, editor, and critic. William Zinsser thought that, one shouldn’t be afraid to fail, because sometimes one will find what one is really looking for in failing. College isn’t for everybody one should standup for oneself and do what one really love to do. It’s okay to dropout but it shouldn’t be a goal of yours. Sometimes one has to fail to succeed. One should also stay true to who one’s self to succeed. “For the young, dropping out is often a way of dropping in.” William Zinsser stated in ‘The Right To Fail’ as an over all conclusion to what a dropout is defined as. Consequently, success is simply a matter of luck confined in anybody that has once failed then succeeded. “I only mean that failure isn’t bad in itself, or success automatically good.” Zinsser stated in passage about...

Words: 811 - Pages: 4

Premium Essay

Hardware Failures

...Hardware Failure Transient faults, intermittent faults and Permanent faults are the three types of component errors. A transient deficiency happens once and then vanishes. In the event that the operation has repeated then the system will function typically. An irregular fault emerges, then goes away, surfaces again and the cycle repeats. A typical reason for an irregular interruption is a faulty or loose contact on a connector. These issues are frustrating and hard to maintain due to their intermittent behavior. Finally there are permanent faults created by faulty parts. The system will not function until the part is swapped. Worn out chips, programming bugs and processor errors are all patterns of undying flaws. Byzantine Failure The processor is special component, and it can fail in three ways, fail quietly, Byzantine and break. All lead to an alternate type of malfunction. A fail-stop, shortcoming happens when a processor quits working. It generally will not acknowledge inputs and will not output anything, with the exception of maybe to say it is no longer working. Byzantine liabilities happen when a flawed processor keeps on running, giving wrong answers and perhaps working with other defective processors to give the notion that they are working as they should. Compared with fail-silent errors, Byzantine issues are complex to diagnose and more complicated to manage. A slow-down fault happens when a certain processor executes slowly but surely. That processor may be named...

Words: 615 - Pages: 3

Free Essay

Memory Failure

...Memory Failure Memory Failure Memory failure is a main focus of extensive psychological research, after memory construction was delineated into three stages; encoding, storage, and retrieval, the origin of thought behind memory failure was solely on the breakdown of the first two stages, encoding and storage, until shifting its focus at the hands of Endel Tulving, who discovered the actual primary cause was due to a disruption in the third stage, thus termed retrieval failure. Retrieval failure is simply defined as the inability to access information, and the reason behind the ‘tip of the tongue’ phenomenon. My Failed Memory As I walked with my patient into my first school meeting to test my ability as a community liaison, I felt confident. Not only did I wake up early enough to study her chart, background, and write down her effective coping mechanisms; I brewed a fresh cup of coffee, reminiscent of the one I drink each day and night, and arrived on-site just in time to see her arrive. As I sipped my coffee, watched her mothers van park, mouthed the words to a song on my playlist while checking my timing, I felt on top of all my tasks – surely going to impress. Shortly there after, unbeknownst to me, getting my patient out of the van and into the school was much more challenging then I planned for. Employing my verbal de-escalation skills, and helping communication tactics for Mom and daughter, I successfully aided her out of the van and onto school grounds. Leaving my...

Words: 1236 - Pages: 5

Free Essay

Managing Failures

...shot way to get a highly paid and high ranked job in a large MNC. He was lured by big advertisements of business schools which promised the students an ultra-modern campus and dream jobs. But even after attending over 25-30 job interviews, the best job he was offered was of sales executive with a “CTC” of rupees 2.5 lakh per annum but having fixed salary component of less than 10,000 rupees a month. Most of us reading this true story will perceive the reason for Rajesh’s problem to be “Lack of skills or knowledge”. However the careful analysis leads us to a completely different perspective of the situation. The actual problem with Rajesh was that while his ambitions were high, he was not well prepared to handle failures. In fact his high ambitions made each failure appear bigger in his self appraisal....

Words: 1047 - Pages: 5

Premium Essay

Gymnastic Failure

...Failure is not an idea unknown or independent to anyone. It encompasses all of us, and it becomes an experience for everyone. My experience wasn’t seen as a major downfall to most, in fact, it was trivial to people unfamiliar with my situation. It was my last season of gymnastics, and I was crushed to learn that I was not being moved up to compete at the next level with the rest of my teammates. While it was in no way a monumental failure that would drastically change my life, it was quite devastating to me. I was adversely affected, I lost all my motivation to compete and all my drive and faith in myself. However, I took valuable lessons away from it. I learned that attitude and effort are always essential, no matter the circumstance, and that nothing is a given....

Words: 651 - Pages: 3

Premium Essay

Failure Is Not Daunting

...Hulya Er Summary/Response Essay Failure is not Daunting Undoubtedly, nearly all of us want to become successful, advance up our career ladders and attain better social ranking, so our vocabulary repertoire does not comprise the concept of failure. At schools, teachers lay great stress on the significance of academic achievement. In the field of popular psychology, many books like 99 Steps or Tips for Accomplishment are written about how people achieve success. Even though numerous people pay attention to the value of success especially in this Era of Knowledge, saying “failure is a good thing” astonishes me. In Jon Carroll’s article, “Failure is a Good Thing”, he asserts that failure is a beginning, not the end of the world. Failure is how we learn, that is, failure is a natural part of our learning process and a proof that we are trying. Carroll also contends that success is boring since it becomes tedious after a while because of not feeding the soul and keeping us from risking and trying new things. Most of us fear failure, but failure and believing in the possibility of it offer some oppurtunities: It encourages creativity, provides us with new beginnings, and reminds us of being human. First of all, fault is an important teacher that promotes innovation as Jon Carroll connotated. Some of our most memorable lessons come from the stories of our biggest mistakes. The history books are full of those who failed repeatedly before reaching the zenith of success in their fields:...

Words: 1133 - Pages: 5

Premium Essay

Fear of Failure

...Fear of Failure Fear of failing, or atychiphobia, has been present in one form or another in everyones lives. What a failure means to one person is completely variable to another and what matters most is how you handle it and go forward afterwards. William Faulkner stated, “Our tragedy today is a general and universal physical fear so long sustained by now that we can even bear it.” Some people become so stricken with the image of failure that they become immobilized and cannot even bring themselves to start the task at hand. There are others however who embrace the challenge and view failure as a learning curve and opportunity not to the make the same mistake twice. Failure exists in every person’s life and can define our existence and character. Understanding that fear jeopardizes success and from failure we gain new insights, the question arises as to why people are so afraid to fail in the first place. People like to understand where things originate and how they became as they are so let’s discuss fear of failure and it’s roots. As a child in school for example, commonly if a child fails they are not given rewards. In some school culture the football player that doesn’t kick the football highest is a wimp, the one who failed that last math test is dumb, or if you didn’t make in on the basketball team you’re a loser. The harsh reality is, many of us have felt like other people judge our failures. Our focus is emphasized too much on visible success and not the ways...

Words: 903 - Pages: 4

Premium Essay

Failure Is Not an Option!

...Failure is Never an Option No matter how you may approach a situation, there will always be a gain or a win. In this case, it’s referred to as an obstacle or opportunity. An obstacle is somebody or something that hinders or prevents progress. In life, everyone faces an obstacle, be it big or small. An opportunity is a chance, one that offers some kind of advantage. Just like an obstacle, you will always face ways of opportunities. Just because you failed at a task doesn’t mean you will fail at life. One thing I was always brought up on was never underestimate you. I feel as when you do underestimate yourself, you will not succeed at it. To me, negativity never gets you anywhere. Someone who complains all the time will be known as a complainer. Someone who purposely fails themselves in life will always be viewed as a failure at life. No one wants to be seen as that because no one would ever give them the encouragement or the support that makes them want to succeed. One thing that will make sure you guarantee not to fail is by eliminating failure as an option. By eliminating failure as an option, it automatically gives you a better attitude on things. You will start to feel confident in yourself and confident in whatever you do. The saying “it’s often easier said than done” is true on so many different levels. A person may say they will do something or say something to someone, and not necessarily mean it. When a person say they will work hard on a project, a task, etc. it’s...

Words: 541 - Pages: 3